PUESTO DE ASISTENCIA - PAR SEDE LA MOLINA

REVISIN :
CLIENTE :
PROYECTO :
FECHA :

UPC RESUMEN
UPC1 Obras Provisionales S/. -
UPC2 Estructura de Concreto S/. 6,599.39
UPC3 Arquitectura S/. -

TOTAL COSTO DIRECTO S/. 6,599.39


GASTOS GENERALES 6940.65% S/. 458,040.47
UTILIDADES 2.64% S/. 174.09
DESCUENTO COMERCIAL
SUB TOTAL S/. 464,813.95
IGV 18.00% S/. 83,666.51
TOTAL INC IGV S/. 548,480.46
REVISIN
CLIENTE
PROYECTO
FECHA

Cdigo
ITEMIZADO
PUESTO DE ASISTENCIA - PAR SEDE LA MOLINA
:
:
:
:

Descripcin
OBRAS PROVISIONALES
INSTALACIONES DE OBRA
Oficinas con equipamiento, tiles de escritorio, instalaciones elctricas, sanitarias.
Obras Provisionales, contenedores, bodegas, oficinas contratista, caseta de guardiana, almacenes
Instalacin de baos qumicos, duchas, lavaderos.
Instalacin de cerco perimtrico de paneles de triplay

Subtotal Instalaciones de Obra


INSTALACIONES PROVISORIAS (Incluye consumo)
Agua Potable (Consumo para obreros de toda contrata)
Alcantarillado
Electricidad (Energa para obra para toda contrata)
Telfono
Internet
Subtotal Varios Instalaciones Provisorias
VARIOS
Topografa, trazado y replanteo
Implementos de seguridad y sealizacin de obra
Limpieza diario de Obra
Acarreo y eliminacin de excedentes de materiales; incluidos otros proveedores.
Movilizacin y desmovilizacin de maquinarias y equipos
Vigilancia permanente en obra
Exmenes mdicos
Subtotal Varios
COMPLEMENTARIAS
Transporte vertical y horizontal de materiales
Limpieza final de Obra
Instalacion electrica provisional
Andamios
Montaje y desmontaje de puertas y ventanas
Demolicion de muros
Demolicion de pavimento flexible
Remocion de techo pastelero
Demolicion de veredas
Remocion de Toldos
Desmontaje de mamparas
Picado de Pared
Reposicion de Pared

Subtotal Complementarias

COSTO DIRECTO OBRAS PROVISIONALES


Unid. Cant. Parcial S/. Comentarios

mes 3.00 S/. -


mes 3.00 S/. -
mes 3.00 S/. -
mes 3.00 S/. - Posterior 62.5+frontal 6.30
Todo el perimetro rachel 194.00
S/. -

mes 3.00 S/. - Medidor de Agua


mes 3.00 S/. -
mes 3.00 S/. - Medidor de luz
mes S/. - Considerado en GG
mes S/. - Considerado en GG
S/. -

mes 3.00 S/. -


mes 3.00 S/. -
da ### S/. -
mes 3.00 S/. -
glb 1.00 S/. -
mes 3.00 S/. -
glb S/. - Considerado en GG
S/. -

gbl 1.00 S/. -


gbl 1.00 S/. -
glb 1.00 S/. -
glb 1.00 S/. -
und
m2
m3
m2
m2
S/. -

S/. -
REVISIN
CLIENTE
PROYECTO
FECHA

1.00.00
1.01.00
1.02.00
1.03.00
1.04.00
1.05.00

2.00.00
2.01.00
2.02.00
2.03.00
2.04.00
2.05.00

3.00.00
3.01.00
3.01.01
3.01.02
3.01.03
3.02.00
3.02.01
3.02.02
3.02.03
3.03.00
3.03.01
3.03.02
3.03.03
3.04.00
3.04.01
3.04.02
3.04.03
3.05.00
REVISIN
CLIENTE
PROYECTO
FECHA

3.05.01
3.05.02
3.05.03
3.06.00
3.06.01
3.06.02
3.06.03
3.07.00
3.07.01
3.07.02
3.07.03
3.07.04
3.08.00
3.08.01
3.08.02
3.08.03
3.08.04
3.9.00
3.9.01
3.9.02
3.09.03
3.10.00
3.10.01
3.10.02
3.10.03
3.11.00
3.11.01
3.11.02
3.11.03
3.12.00
3.12.01
3.12.02
REVISIN
CLIENTE
PROYECTO
FECHA

3.12.03
3.13.00
3.13.01

4.00.00
REVISIN
CLIENTE
PROYECTO
FECHA
ITEMIZADO
PUESTO DE ASISTENCIA - PAR SEDE LA MOLINA

:
:
:
:

DESCRIPCION Unidad
OBRAS CIVILES / ESTRUCTURALES
MOVIMIENTO DE TIERRAS
Excavacion de zanjas para cimentacin corrida m3
Eliminacin de material excedente con equipo m3
Excavacion para zapata
Relleno con material propio m3
Nivelacin interior y apisonado m2
SUB TOTAL MOVIMIENTO DE TIERRAS
Concreto Simple
Solados concreto Fc= 100 Kg/cm2 h=2" m2
Cimiento Corrido 1:10 +30% de PG de 6"cm m3
Encofrado y desencofrado normal para sobrecimiento hasta h=0.60 m2
Concreto 1:8 + 25 % PM para sobrecimiento m3
Concreto en falso piso e=4" m2
SUB TOTAL OBRAS DE CONCRETO SIMPLE
Concreto Armado
Vigas de cimentacin
Concreto fc=210 Kg/cm2 m3
Encofrado y desencofrado normal m2
Acero fy=4200 kg/cm2 Grado 60 Kg
Zapatas
Concreto fc=210 Kg/cm2 m3
Encofrado y desencofrado normal m2
Acero fy=4200 kg/cm2 Grado 60 Kg
Columnas primer piso
Concreto fc=210 Kg/cm2 m3
Encofrado y desencofrado normal m2
Acero fy=4200 kg/cm2 Grado 60 Kg
Columnas segundo piso
Concreto fc=210 Kg/cm2 m3
Encofrado y desencofrado normal m2
Acero fy=4200 kg/cm2 Grado 60 Kg
Vigas primer piso
ITEMIZADO
PUESTO DE ASISTENCIA - PAR SEDE LA MOLINA

:
:
:
:

DESCRIPCION Unidad
OBRAS CIVILES / ESTRUCTURALES
Concreto fc=210 Kg/cm2 m3
Encofrado y desencofrado normal m2
Acero fy=4200 kg/cm2 Grado 60 Kg
Vigas segundo piso
Concreto fc=210 Kg/cm2 m3
Encofrado y desencofrado normal m2
Acero fy=4200 kg/cm2 Grado 60 Kg
Losas aligeradas primer piso
Concreto fc=210 Kg/cm2 m3
Encofrado y desencofrado normal m2
Acero fy=4200 kg/cm2 Grado 60 Kg
Ladrillo hueco de arcilla 15x30x30 cm und
Losas aligeradas segundo piso
Concreto fc=210 Kg/cm2 m3
Encofrado y desencofrado normal m2
Acero fy=4200 kg/cm2 Grado 60 Kg
Ladrillo hueco de arcilla 15x30x30 cm und
Losa masiza
Concreto fc=210 Kg/cm2 m3
Encofrado y desencofrado normal m2
Acero fy=4200 kg/cm2 Grado 60 Kg
Cisterna
Concreto fc=210 Kg/cm2 m3
Encofrado y desencofrado normal m2
Acero fy=4200 kg/cm2 Grado 60 Kg
Tanque elevado
Concreto fc=210 Kg/cm2 m3
Encofrado y desencofrado normal m2
Acero fy=4200 kg/cm2 Grado 60 Kg
Escalera
Concreto fc=210 Kg/cm2 m3
Encofrado y desencofrado normal m2
ITEMIZADO
PUESTO DE ASISTENCIA - PAR SEDE LA MOLINA

:
:
:
:

DESCRIPCION Unidad
OBRAS CIVILES / ESTRUCTURALES
Acero fy=4200 kg/cm2 Grado 60 Kg
Escalera metalica
Escalera metlica (segn detalle) und

SUB TOTAL ESTRUCTURAS DE MADERA


DOCUMENTOS Y OTROS
Planos As built Gbl.
SUB TOTAL DOCUMENTOS Y OTROS
COMPLEMENTARIAS
Mov de Tierra
Exc. masiva m3
Relleno compactado con afirmado m3
Excavacion de cisterna m3
Excavacion de GGEE m3
Excavacion de pozo septico m3
Colocacion de Water Stop ml
Curado
Curado de Estructuras m2
Cimentacion Muros de Contencin
Concreto f'c = 210 kg/cm2 m3
Encofrado y desencofrado m2
Acero de refuerzo fy = 4200 kg/cm2 kg
Impermeabilizacin exterior con Igol Primer + Igol Denso m2
Grupo electrgeno
Concreto f'c=280 kg/cm2 m3
Encofrado y desencofrado m2
Acero de refuerzo fy = 4200 kg/cm2 kg
Pozo septico
Concreto f'c = 210 kg/cm2 m3
Encofrado y desencofrado m2
Acero de refuerzo fy = 4200 kg/cm2 kg
Conectores Mecanicos
ITEMIZADO
PUESTO DE ASISTENCIA - PAR SEDE LA MOLINA

:
:
:
:

DESCRIPCION Unidad
OBRAS CIVILES / ESTRUCTURALES
1/2" und
3/4" und
5/8" und
1" und
Ascensor

SUB TOTAL COMPLEMENTARIAS

COSTO DIRECTO ESTRUCTURAS DE OBRAS DE CONCRETO


LINA

CANT. P.U. S/. Comentarios

32.95 16.07 S/. 529.49


30.09 S/. 16.07 S/. 483.61
S/. 18.42
2.85 S/. 16.07 S/. 45.87
39.10 S/. 16.07 S/. 628.34
S/. 1,687.31

1.80 S/. 14.18 S/. 25.52


18.02 ### S/. 1,915.22
36.54 S/. 23.56 S/. 860.98
2.74 ### S/. 484.93
39.10 S/. 17.90 S/. 699.89
S/. 3,986.54

1.23 ### S/. 276.24 f'c impermeabilizado


13.66 S/. 16.56 S/. 226.14
119.20 S/. 3.55 S/. 423.16
S/. -
1.13
0.97 S/. - f'c impermeabilizado
16.34 S/. -
S/. -
5.76 S/. -
31.31
416.90 S/. -
S/. -
1.71 S/. -
27.40
188.19 S/. -
S/. -
LINA

CANT. P.U. S/. Comentarios

3.42 S/. -
49.72 S/. -
590.56
S/. -
4.46 S/. -
58.55 S/. -
554.90 S/. -

2.79 S/. -
31.91 S/. -
142.55 S/. -
265.81 S/. -

3.36 S/. -
38.43 S/. -
159.60 S/. -
320.11 S/. -

0.27 S/. -
1.83 S/. -
15.46 S/. -

4.47 S/. -
39.72 S/. -
463.72 S/. -

2.32 S/. -
21.09 S/. -
243.17 S/. -

0.63 S/. -
2.39 S/. -
LINA

CANT. P.U. S/. Comentarios

22.29 S/. -

1.00 S/. -

S/. 925.54

1.00 S/. -
S/. -

- Area terreno x hexc


- Area terreno x hrell
-
-
-
-
-
-
-
- f'c impermeabilizado
-
-
-
-
-
-
-
-
-
-
-
-
LINA

CANT. P.U. S/. Comentarios

-
-
-
-
-

S/. -

S/. 6,599.39
PUESTO DE ASISTENCIA - PAR SEDE LA MOLINA

REVISIN :
CLIENTE :
PROYECTO :
FECHA :

Cdigo Descripcin Unid. Cant.


ARQUITECTURA
1.00.00 Muros y tabiqueria de albaileria
1.01.00 Muros fr ladrillo King kong de arcilla (a maquin m2 61.32
1.02.00 Muros fr ladrillo King kong de arcilla (a maqui m2 59.31
1.03.00 Muros fr ladrillo King kong de arcilla (a maquin m2 37.32
1.04.00 Muros fr ladrillo King kong de arcilla (a maqui m2 6.93

SUBTOTAL MUROS Y TABIQUERIA


2.00.00 Revestimiento y revoques
2.01.00 Tarrajeo en exteriores primer piso m2 61.32
2.02.00 Tarrajeo en exteriores segundo piso m2 59.31
2.03.00 Tarrajeo en interiores primer piso m2 135.96
2.04.00 Tarrajeo en columas m2 37.44
2.05.00 Tarrajeo vigas m2 50.96
2.06.00 Tarrajeo en cieloraso m2 70.34
2.07.00 Vestidura de derrames ml 132.80
2.08.00 Tarrajeo fondo de escalera m2 1.65
2.09.00 Preparacion de contrapasos ml 4.20

SUBTOTAL REVESTIMIENTOS Y REVOQUES


3.00.00 Pisos y pavimentos
3.01.00 Veredas m2 15.89
3.02.00 Piso celima .30x.30 serie piedra color blanco m2 37.17
3.03.00 Piso celima .30x.30 serie piedra color verde m2 15.89
3.04.00 Piso celima .30x.30 serie piedra color cuero m2 30.75
3.05.00 Piso cemento pulido bruado m2 3.95

SUB TOTAL PISOS


4.00.00 Zocalos y contrazocalos
Zocalo Piso celima .30x.30 serie piedra color
4.01.00 blanco m2 142.24
Contrazocalo Piso celima .30x.30 serie piedra
4.02.00 color cuero h=15cm ml 40.88
Contrazocalo de cemento pulido bruado
4.03.00 h=15cm ml 8.70

SUB TOTAL ZOCALOS Y CONTRAZOCALOS


5.00.00 Cobertura
5.01.00 Ladrillo pastelero asentado con mezcla m2 31.77

SUBTOTAL PINTURAS
6.00.00 Carpinteria de madera
6.01.00 Puertas
6.01.01 P-1 (0.90x2.10) und 4.00
6.01.02 P-2 (0.80x2.10) und 2.00
6.01.03 P-3 (0.80x2.10) und 9.00
6.01.04 P-4 (0.70x1.70) und 1.00
6.02.00 Ventanas
6.02.01 V-1 (0.40x0.40) und 9.00
6.02.02 V-2 (0.80x0.80) und 2.00
6.02.03 V-3 (0.40x0.80) und 1.00
6.02.04 V-4 (1.20x1.20) und 2.00
6.02.05 V-5 (1.20x0.40) und 2.00
6.02.06 V-6 (0.40x1.20) und 1.00
6.02.07 V-7 (0.80x0.40) und 3.00
6.02.08 V-8 (0.80x0.80) und 1.00
6.02.09 V-9 (0.40x0.80) und 1.00

SUBTOTAL CARPINTERIA DE MADERA


7.00.00 Vidrios y cristales
Vidrio de cristal templado con lamina de
7.01.00 proteccin m2 0.76

SUBTOTAL VIDRIOS Y CRISTALES


8.00.00 Carpinteria metalica
8.01.00 Barandas de acero inox. de e=2" segn detalle ml 4.50
8.01.01 Balcon ml 7.40
8.01.02 Escalera ml 9.00

SUBTOTAL MAMPARAS
9.00.00 Pintura
9.01.00 Pintura en exteriores primer piso m2 61.32
9.02.00 Pintura en exteriores segundo piso m2 59.31
9.03.00 Pintura en interiores primer piso m2 135.96
9.04.00 Pintura en columas m2 37.44
9.05.00 Pintura vigas m2 50.96
9.06.00 Pintura en cieloraso m2 70.34
9.07.00 Pintura fondo de escalera m2 1.65

SUBTOTAL PINTURA

10.00.00 PLANOS AL BUILT


PLANOS AS BUILT glb 1.00

11.00.00 PARTIDAS ADICIONALES

SUBTOTAL PARTIDAS ADICIONALES

COSTO DIRECTO ARQUITECTURA


P. Unit S/. Parcial S/. Comentarios

S/. -
S/. -
S/. -
S/. -

S/. -

S/. 22.19 S/. 1,360.60


S/. 22.19 S/. 1,316.13
S/. 18.55 S/. 2,521.98
S/. 28.13 S/. 1,053.19
S/. 37.45 S/. 1,908.48
S/. 32.99 S/. 2,320.45
S/. 13.24 S/. 1,758.27
S/. 35.81 S/. 59.03
S/. 20.64 S/. 86.69

S/. 12,384.82

S/. 37.39 S/. 594.13


S/. 49.86 S/. 1,853.30
S/. 49.86 S/. 792.28
S/. 49.86 S/. 1,533.20
S/. 37.39 S/. 147.69

S/. 4,920.60

S/. 91.65 S/. 13,035.93

S/. 33.42 S/. 1,366.21


S/. 11.37 S/. 98.92

S/. 14,501.06

S/. 39.73 S/. 1,262.22

S/. 1,262.22

S/. 71.36 S/. 285.44


S/. 71.36 S/. 142.72
S/. 71.36 S/. 642.24
S/. 71.36 S/. 71.36

S/. 53.53 S/. 481.77 Se considera solo instalacion


S/. 53.53 S/. 107.06 Se considera solo instalacion
S/. 53.53 S/. 53.53 Se considera solo instalacion
S/. 53.53 S/. 107.06 Se considera solo instalacion
S/. 53.53 S/. 107.06 Se considera solo instalacion
S/. 53.53 S/. 53.53 Se considera solo instalacion
S/. 53.53 S/. 160.59 Se considera solo instalacion
S/. 53.53 S/. 53.53 Se considera solo instalacion
S/. 53.53 S/. 53.53 Se considera solo instalacion

S/. 1,623.53

S/. 60.10 S/. 45.68

S/. 45.68

S/. 101.14 S/. 455.13


S/. 101.14 S/. 748.44
S/. 101.14 S/. 910.26

S/. 2,113.83

S/. 8.79 S/. 538.97


S/. 8.79 S/. 521.35
S/. 8.79 S/. 1,195.05
S/. 8.79 S/. 329.10
S/. 11.41 S/. 581.46
S/. 11.41 S/. 802.56
S/. 8.79 S/. 14.49

S/. 3,982.98

S/. 2,500.00 S/. 2,500.00

S/. -
S/. -
S/. -
S/. -
S/. -
S/. -

S/. -

S/. 43,334.72
PRECIO DE LOS RECURSOS
Obra PUESTO ASISTENCIA RAPIDA - PAR
Ubicacin LA MOLINA
Fecha JUNIO 2013
Columna1 Columna2 Columna3 Columna4 Columna5
Codigo Insumo Unidad Cdigo IU Dic.2012
010004 ACEITE PARA MOTOR SAE-30 GLN 01 784.42
020007 ALAMBRE NEGRO RECOCIDO # 16 KG 02 427.68
020008 ALAMBRE NEGRO RECOCIDO # 8 KG 02 427.68
020104 CLAVOS 2" KG 02 427.68
020105 CLAVOS PARA MADERA C/C 3" KG 02 427.68
030018 FIERRO CORR. 5/8" SIDERPERU G-60 KG 03 422.58
050003 PIEDRA CHANCADA DE 1/2" m3 05 217.47
050008 PIEDRA GRANDE DE 6" PARA ZANJA m3 05 217.47
050009 PIEDRA GRANDE DE 8" m3 05 217.47
050010 PIEDRA MEDIANA DE 4" m3 05 217.47
050104 ARENA GRUESA m3 05 217.47
050105 ARENA FINA m3 05 217.47
050106 TIERRA DE CHACRA m3 05 217.47
170023 LADRILLO K.K. DE ARCILLA 9X14X24 UND 17 667.57
170040 LADRILLO PASTELERO 25X25 CON HUECO mll 17 667.57
170100 LADRILLO P/TECHO DE 12x30x30 4 HCOS. UND 17 667.57
210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 21 339.42
210001 CEMENTO PORTLAND TIPO I (42.5KG) ATLAS BLS 21 339.42
240001 CERAMICA 30X30 COLOR m2 24 272.16
240002 MAYOLICA NACIONAL 30X30 m2 24 272.16
260001 FRAGUA BLANCA 1Kg BLS 26 360.29
260002 PEGAMENTO CERAMICO 25Kg BLS 26 360.29
300101 CAL HIDRATADA DE 30 Kg BLS 30 344.42
340000 GASOLINA 84 OCTANOS GLN 34 510.85
370239 WINCHA DE 50m UND 37 290.48
370241 CORDEL ML 37 290.48
380000 HORMIGON m3 38 828.38
390500 AGUA m3 39 381.32
400001 LOSETA CERAMICA 30X30 COLOR m2 40 321.88
431652 REGLA DE MADERA P2 43 567.05
440004 MADERA CEDRO DE PUCALLPA CEPILLADA P2 44 346.11
440016 MADERA TORNILLO CEPILLADA P2 44 346.11
440020 MADERA PARA ANDAMIOS P2 44 346.11
450101 MADERA TORNILLO INC.CORTE P/ENCOFRADOP2 45 313.18
470022 OPERADOR DE EQUIPO LIVIANO HH 47 470.79
470032 TOPOGRAFO HH 47 470.79
470101 CAPATAZ HH 47 470.79
470102 OPERARIO HH 47 470.79
470103 OFICIAL HH 47 470.79
470104 PEON HH 47 470.79
490704 VIBRADOR DE CONCRETO 4 HP 2.40" HM 49 225.80
491007 MEZCLADORA CONCRETO TAMBOR 18HP 11P HM 49 225.80
491011 MEZCLADORA CONCRETO TROMPO 8 HP 9 P3HM 49 225.80
491824 WINCHE DE DOS BALDES (350KG)M.E. 3.6HP HM 49 225.80
540000 PINTURA LATEX GAL 54 363.77
540001 IMPRIMANTE GAL 54 363.77
540002 LIJA PARA MADERA HJA 54 363.77
540003 SELLADOR GAL 54 363.77
650000 CODO DE ACERO 2" UND 65 235.92
650001 TUBO ACERO NEGRO 2" UND 65 235.92
Precio Columna6 Precio Columna7 Precio8
Base IU Junio 2013 Deflactado IU Feb 2017 Deflactado
47.91 828.77 50.62 806.04 49.23
4.150 471.93 4.58 468.50 4.55
4.150 471.93 4.58 468.50 4.55
4.150 471.93 4.58 468.50 4.55
4.15 471.93 4.58 468.50 4.55
2.98 463.77 3.27 456.59 3.22
51.21 216.78 51.05 217.64 51.25
38.5 216.78 38.38 217.64 38.53
38.5 216.78 38.38 217.64 38.53
34.5 216.78 34.39 217.64 34.53
38.5 216.78 38.38 217.64 38.53
38.5 216.78 38.38 217.64 38.53
26.27 216.78 26.19 217.64 26.29
0.415 688.27 0.43 676.56 0.42
839.5 688.27 865.53 676.56 850.81
1.175 688.27 1.21 676.56 1.19
14.75 339.42 14.75 401.92 17.47
14.75 339.42 14.75 401.92 17.47
19.33 272.99 19.39 246.67 17.52
33.76 272.99 33.86 246.67 30.60
4.62 358.39 4.60 366.43 4.70
11.76 358.39 11.70 366.43 11.96
18.95 372.66 20.50 461.49 25.39
12.58 509.56 12.55 448.34 11.04
25 294.44 25.34 295.83 25.46
0.2 294.44 0.20 295.83 0.20
25 849.70 25.64 948.56 28.63
9 387.61 9.15 438.80 10.36
18.64 344.39 19.94 407.13 23.58
5.47 565.10 5.45 643.83 6.21
12.5 344.90 12.46 370.23 13.37
4.5 344.90 4.48 370.23 4.81
2.62 344.90 2.61 370.23 2.80
4.6 311.57 4.58 318.23 4.67
16.67 471.44 16.69 563.25 19.94
15.22 471.44 15.24 563.25 18.21
17.8 471.44 17.82 563.25 21.30
16.18 471.44 16.20 563.25 19.36
13.88 471.44 13.90 563.25 16.61
12.52 471.44 12.54 563.25 14.98
5.45 243.07 5.87 563.25 13.59
26.49 243.07 28.52 563.25 66.08
3.23 243.07 3.48 563.25 8.06
19.39 243.07 20.87 563.25 48.37
24.26 373.90 24.94 402.49 26.84
25 373.90 25.70 402.49 27.66
1.5 373.90 1.54 402.49 1.66
16.41 373.90 16.87 402.49 18.16
8.05 252.95 8.63 215.22 7.34
30.15 252.95 32.33 215.22 27.50
ANALISIS DE COSTOS
Obra PUESTO DE ASISTENCIA RAPIDA
Ubicacin LA MOLINA
Fecha FEBRERO 2017

Partida Codigo Insumo Unidad Cuadrilla Cantidad


01.00 REVESTIMIENTO Y REVOQUES
02.01 Tarrajeo frotachado exteriores. E=1.5 cm Mezcla 1:5
02.01 Rendimiento 12.0000
02.01 MATERIALES
02.01 020105 CLAVOS PARA MADERA C/C 3" KG 0.0220
02.01 050105 ARENA FINA m3 0.0180
02.01 390500 AGUA m3 0.0040
02.01 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1190
02.01 440016 MADERA TORNILLO CEPILLADA P2 0.2010
02.01 431652 REGLA DE MADERA P2 0.0240
02.01 MANO DE OBRA
02.01 470101 CAPATAZ HH 0.100 0.0667
02.01 470102 OPERARIO HH 1.000 0.6667
02.01 470104 PEON HH 0.330 0.2200
02.01 EQUIPO
02.01 370101 HERRAMIENTAS MANUALES %MO 3.0000

02.00 REVESTIMIENTO Y REVOQUES


02.01 Tarrajeo frotachado exteriores. E=1.5 cm Mezcla 1:5
02.01 Rendimiento 12.0000
02.01 MATERIALES
02.01 020105 CLAVOS PARA MADERA C/C 3" KG 0.0220
02.01 050105 ARENA FINA m3 0.0180
02.01 390500 AGUA m3 0.0040
02.01 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1190
02.01 440016 MADERA TORNILLO CEPILLADA P2 0.2010
02.01 431652 REGLA DE MADERA P2 0.0240
02.01 MANO DE OBRA
02.01 470101 CAPATAZ HH 0.100 0.0667
02.01 470102 OPERARIO HH 1.000 0.6667
02.01 470104 PEON HH 0.330 0.2200
02.01 EQUIPO
02.01 370101 HERRAMIENTAS MANUALES %MO 3.0000
02.01
02.03 Tarrajeo frotachado interiores. E=1.5 cm Mezcla 1:5
02.03 Rendimiento 15.0000
02.03 MATERIALES
02.03 020105 CLAVOS PARA MADERA C/C 3" KG 0.0220
02.03 050105 ARENA FINA m3 0.0180
02.03 390500 AGUA m3 0.0040
02.03 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1190
02.03 440016 MADERA TORNILLO CEPILLADA P2 0.2010
02.03 431652 REGLA DE MADERA P2 0.0240
02.03 MANO DE OBRA
02.03 470101 CAPATAZ HH 0.100 0.0533
02.03 470102 OPERARIO HH 1.000 0.5333
02.03 470104 PEON HH 0.330 0.1760
02.03 EQUIPO
02.03 370101 HERRAMIENTAS MANUALES %MO 3.0000
02.03
02.04 Tarrajeo en columnas. E=1.5 cm Mezcla 1:5
02.04 Rendimiento 9.0000
02.04 MATERIALES
02.04 050105 ARENA FINA m3 0.0180
02.04 390500 AGUA m3 0.0040
02.04 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1190
02.04 440016 MADERA TORNILLO CEPILLADA P2 0.2010
02.04 431652 REGLA DE MADERA P2 0.0250
02.04 MANO DE OBRA
02.04 470101 CAPATAZ HH 0.100 0.0889
02.04 470102 OPERARIO HH 1.000 0.8889
02.04 470104 PEON HH 0.330 0.2933
02.04 EQUIPO
02.04 370101 HERRAMIENTAS MANUALES %MO 3.0000

02.05 Tarrajeo en vigas. E=1.5 cm Mezcla 1:5


02.05 Rendimiento 6.5000
02.05 MATERIALES
02.05 050105 ARENA FINA m3 0.0180
02.05 390500 AGUA m3 0.0040
02.05 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1190
02.05 440016 MADERA TORNILLO CEPILLADA P2 0.2010
02.05 431652 REGLA DE MADERA P2 0.0250
02.05 MANO DE OBRA
02.05 470101 CAPATAZ HH 0.100 0.1231
02.05 470102 OPERARIO HH 1.000 1.2308
02.05 470104 PEON HH 0.330 0.4062
02.05 EQUIPO
02.05 370101 HERRAMIENTAS MANUALES %MO 3.0000

02.06 Tarrajeo en cielorraso. E=1.5 cm Mezcla 1:5


02.06 Rendimiento 8.0000
02.06 MATERIALES
02.06 020104 CLAVOS 2" KG 0.0040
02.06 050105 ARENA FINA m3 0.0170
02.06 390500 AGUA m3 0.0040
02.08 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1170
02.08 440016 MADERA TORNILLO CEPILLADA P2 0.5890
02.10 431652 REGLA DE MADERA P2 0.0270
02.10 MANO DE OBRA
02.11 470101 CAPATAZ HH 0.100 0.1000
02.11 470102 OPERARIO HH 1.000 1.0000
02.12 470104 PEON HH 0.330 0.3300
02.12 EQUIPO
02.13 370101 HERRAMIENTAS MANUALES %MO 3.0000

02.07 Vestidura de derrames. Mezcla 1:5


02.07 Rendimiento 18.0000
02.07 MATERIALES
020104 CLAVOS 2" KG 0.0060
#REF! 050105 ARENA FINA m3 0.0020
#REF! 390500 AGUA m3 0.0050
#REF! 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.0120
#REF! 440016 MADERA TORNILLO CEPILLADA P2 0.1270
#REF! 431652 REGLA DE MADERA P2 0.0250
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 0.0444
#REF! 470102 OPERARIO HH 1.000 0.4444
#REF! 470104 PEON HH 0.330 0.1467
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000

02.08 Tarrajeo en fondo de escalera. E=1.5 cm Mezcla 1:5


02.08 Rendimiento 8.0000
02.08 MATERIALES
020105 CLAVOS PARA MADERA C/C 3" KG 0.0300
#REF! 050105 ARENA FINA m3 0.0170
#REF! 390500 AGUA m3 0.0040
#REF! 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1188
#REF! 440020 MADERA PARA ANDAMIOS P2 1.0800
#REF! 431652 REGLA DE MADERA P2 0.0030
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 0.1000
#REF! 470102 OPERARIO HH 1.000 1.0000
#REF! 470104 PEON HH 0.500 0.5000
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000

02.09 Preparacin de pasos y contrapasos. E=1.5 cm Mezcla 1:5


02.09 Rendimiento 16.0000
02.09 MATERIALES
#REF! 050104 ARENA GRUESA m3 0.0110
#REF! 390500 AGUA m3 0.0026
#REF! 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.0681
#REF! 431652 REGLA DE MADERA P2 0.0360
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 0.0500
#REF! 470102 OPERARIO HH 1.000 0.5000
#REF! 470104 PEON HH 1.000 0.5000
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000

03.00 PISOS Y PAVIMENTOS


03.02 Piso celima .30x.30 serie piedra color
03.02 Rendimiento 11.0000
03.02 MATERIALES
03.02 240001 CERAMICA 30X30 COLOR m2 1.0700
03.02 260001 FRAGUA BLANCA 1Kg BLS 0.2857
03.02 390500 AGUA m3 0.0060
03.02 260002 PEGAMENTO CERAMICO 25Kg BLS 0.2000
03.02 MANO DE OBRA
03.02 470101 CAPATAZ HH 0.100 0.0727
03.02 470102 OPERARIO HH 1.000 0.7273
03.02 470104 PEON HH 1.000 0.7273
03.02 EQUIPO
03.02 370101 HERRAMIENTAS MANUALES %MO 3.0000

03.05 Piso cemento pulido bruado


03.05 Rendimiento 14.0000
03.05 MATERIALES
03.05 050104 ARENA GRUESA m3 0.0560
03.05 050105 ARENA FINA m3 0.0090
03.05 390500 AGUA m3 0.0110
03.05 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.4820
03.05 MANO DE OBRA
03.05 470101 CAPATAZ HH 0.100 0.0571
03.05 470102 OPERARIO HH 1.000 0.5714
470103 OFICIAL HH 0.500 0.2857
03.05 470104 PEON HH 1.000 0.5714
03.05 EQUIPO
03.05 370101 HERRAMIENTAS MANUALES %MO 3.0000

04.00 ZOCALOS Y CONTRAZOCALOS


04.01 Zocalo Piso celima .30x.30 serie piedra color blanco
04.01 Rendimiento 4.0000
04.01 MATERIALES
04.01 050105 ARENA FINA m3 0.0210
04.01 390500 AGUA m3 0.0060
04.01 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1870
260001 FRAGUA BLANCA 1Kg BLS 0.1950
04.01 240002 MAYOLICA NACIONAL 30X30 m2 1.0500
04.01 MANO DE OBRA
04.01 470101 CAPATAZ HH 0.100 0.2000
04.01 470102 OPERARIO HH 1.000 2.0000
04.01 470104 PEON HH 0.330 0.6600
04.01 EQUIPO
04.01 370101 HERRAMIENTAS MANUALES %MO 3.0000

04.02 Contrazocalo Piso celima .30x.30 serie piedra color cuero h=15cm
04.02 Rendimiento 150.0000
04.02 MATERIALES
260002 PEGAMENTO CERAMICO 25Kg BLS 0.0100
#REF! 240002 MAYOLICA NACIONAL 30X30 m2 1.0500
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 0.0053
#REF! 470102 OPERARIO HH 1.000 0.0533
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000

04.03 Contrazocalo de cemento pulido bruado h=15cm


04.03 Rendimiento 22.0000
04.03 MATERIALES
04.03 050105 ARENA FINA m3 0.0030
04.03 390500 AGUA m3 0.0010
04.03 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.0220
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 0.0364
#REF! 470102 OPERARIO HH 1.000 0.3636
#REF! 470104 PEON HH 0.500 0.1818
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000

05.00 COBERTURA
05.01 Ladrillo pastelero asentado con mezcla
05.01 Rendimiento 20.0000
05.01 MATERIALES
05.01 050105 ARENA FINA m3 0.0110
05.01 390500 AGUA m3 0.0080
05.01 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.2300
05.01 170040 LADRILLO PASTELERO 25X25 CON HUECO mll 0.0160
05.01 MANO DE OBRA
05.01 470101 CAPATAZ HH 0.100 0.0400
05.01 470102 OPERARIO HH 1.000 0.4000
05.01 470104 PEON HH 2.000 0.8000
05.01 EQUIPO
05.01 370101 HERRAMIENTAS MANUALES %MO 5.0000

06.00 PUERTAS Y VENTANAS


06.01 Puertas
06.01 Rendimiento 3.0000
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 0.2667
#REF! 470102 OPERARIO HH 1.000 2.6667
#REF! 470104 PEON HH 0.300 0.8000
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000

06.02 Ventanas
06.02 Rendimiento 4.0000
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 0.2000
#REF! 470102 OPERARIO HH 1.000 2.0000
#REF! 470104 PEON HH 0.300 0.6000
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000

07.00 VIDRIOS Y CRISTALES


07.01 Vidrio de cristal templado con lamina de proteccin
07.01 Rendimiento 5.0000
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 0.1600
#REF! 470102 OPERARIO HH 1.000 1.6000
#REF! 470104 PEON HH 1.000 1.6000
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000

08.00 CARPINTERIA METALICA


08.01 Balcon y escalera
08.01 Rendimiento 6.0000
08.01 MATERIALES
08.01 650000 CODO DE ACERO 2" UND 1.2000
08.01 650001 TUBO ACERO NEGRO 2" UND 1.5010
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 0.1333
#REF! 470102 OPERARIO HH 1.000 1.3333
#REF! 470104 PEON HH 1.000 1.3333
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 5.0000

09.00 PINTURA
08.01 Pintura en exteriores e interiores
08.01 Rendimiento 50.0000
08.01 MATERIALES
08.01 540000 PINTURA LATEX GAL 0.0500
540001 IMPRIMANTE GAL 0.0330
540002 LIJA PARA MADERA HJA 0.0400
540003 SELLADOR GAL 0.0250
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 0.0160
#REF! 470102 OPERARIO HH 1.000 0.1600
#REF! 470104 PEON HH 1.000 0.1600
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000

08.02 Pintura en cielo raso


08.02 Rendimiento 40.0000
08.02 MATERIALES
08.02 540000 PINTURA LATEX GAL 0.0500
540001 IMPRIMANTE GAL 0.0330
540002 LIJA PARA MADERA HJA 0.0400
440020 MADERA PARA ANDAMIOS P2 0.4000
540003 SELLADOR GAL 0.0250
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 0.0200
#REF! 470102 OPERARIO HH 1.000 0.2000
#REF! 470104 PEON HH 1.000 0.2000
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000
Precio Parcial Subtotal CODIGOS
RE
M2 22.19 Ta
M2/da

4.55 0.10 02
38.53 0.69 05
10.36 0.04 39
17.47 2.08 21
4.81 0.97 44
6.21 0.15 4.03 43

21.30 1.42 47
19.36 12.91 47
14.98 3.30 17.63 47

17.63 0.53 0.53 37

RE
M2 22.19 Ta
M2/da

4.55 0.10 02
38.53 0.69 05
10.36 0.04 39
17.47 2.08 21
4.81 0.97 44
6.21 0.15 4.03 43

21.30 1.42 47
19.36 12.91 47
14.98 3.30 17.63 47

17.63 0.53 0.53 37


M2 18.55 Ta
M2/da

4.55 0.10 02
38.53 0.69 05
10.36 0.04 39
17.47 2.08 21
4.81 0.97 44
6.21 0.15 4.03 43

21.30 1.14 47
19.36 10.32 47
14.98 2.64 14.10 47

14.10 0.42 0.42 37

M2 28.13
M2/da

38.53 0.69
10.36 0.04
17.47 2.08
4.81 0.97
6.21 0.16 3.94

21.30 1.89
19.36 17.21
14.98 4.39 23.49

23.49 0.70 0.70

M2 37.45
M2/da

38.53 0.69
10.36 0.04
17.47 2.08
4.81 0.97
6.21 0.16 3.94

21.30 2.62
19.36 23.83
14.98 6.08 32.53
32.53 0.98 0.98

M2 32.99
M2/da

4.55 0.02
38.53 0.66
10.36 0.04
17.47 2.04
4.81 2.84
6.21 0.17 5.77

21.30 2.13
19.36 19.36
14.98 4.94 26.43

26.43 0.79 0.79

M2 13.24
M2/da

4.55 0.03
38.53 0.08
10.36 0.05
17.47 0.21
4.81 0.61
6.21 0.16 1.14

21.30 0.95
19.36 8.60
14.98 2.20 11.75

11.75 0.35 0.35

M2 35.81
M2/da

4.55 0.14
38.53 0.66
10.36 0.04
17.47 2.07
2.80 3.03
6.21 0.02 5.96

21.30 2.13
19.36 19.36
14.98 7.49 28.98

28.98 0.87 0.87

M 20.64
M/da

38.53 0.42
10.36 0.03
17.47 1.19
6.21 0.22 1.86

21.30 1.06
19.36 9.68
14.98 7.49 18.23

18.23 0.55 0.55

M2 49.86
M2/da

17.52 18.75
4.70 1.34
10.36 0.06
11.96 2.39 22.54

21.30 1.55
19.36 14.08
14.98 10.89 26.52

26.52 0.80 0.80

M2 37.39
M2/da

38.53 2.16
38.53 0.35
10.36 0.11
17.47 8.42 11.04

21.30 1.22
19.36 11.06
16.61 4.74
14.98 8.56 25.58

25.58 0.77 0.77

M2 91.65
M2/da

38.53 0.81
10.36 0.06
17.47 3.27
4.70 0.92
30.60 32.13 37.19

21.30 4.26
19.36 38.72
14.98 9.89 52.87

52.87 1.59 1.59

M 33.42
M/da

11.96 0.12
30.60 32.13 32.25

21.30 0.11
19.36 1.03 1.14

1.14 0.03 0.03

M 11.37
M/da

38.53 0.12
10.36 0.01
17.47 0.38 0.51

21.30 0.78
19.36 7.04
14.98 2.72 10.54

10.54 0.32 0.32


M2 39.73
M2/da

38.53 0.42
10.36 0.08
17.47 4.02
850.81 13.61 18.13

21.30 0.85
19.36 7.74
14.98 11.98 20.57

20.57 1.03 1.03

UND 71.36
UND/da

21.30 5.68
19.36 51.62
14.98 11.98 69.28

69.28 2.08 2.08

UND 53.53
UND/da

21.30 4.26
19.36 38.72
14.98 8.99 51.97

51.97 1.56 1.56

UND 60.10
UND/da

21.30 3.41
19.36 30.97
14.98 23.97 58.35

58.35 1.75 1.75


M 101.14
M/da

7.34 8.81
27.50 41.28 50.09

21.30 2.84
19.36 25.81
14.98 19.97 48.62

48.62 2.43 2.43

M2 8.79
M2/da

26.84 1.34
27.66 0.91
1.66 0.07
18.16 0.45 2.77

21.30 0.34
19.36 3.10
14.98 2.40 5.84

5.84 0.18 0.18

M2 11.41
M2/da

26.84 1.34
27.66 0.91
1.66 0.07
2.80 1.12
18.16 0.45 3.89

21.30 0.43
19.36 3.87
14.98 3.00 7.30

7.30 0.22 0.22


ANALISIS DE COSTOS
Obra PUESTO DE ASISTENCIA RAPIDA
Ubicacin LA MOLINA
Fecha 2/1/2017

Partida Codigo Insumo Unidad Cuadrilla Cantidad Precio Parcial Subtotal


01.01 TRAZO Y REPLANTEO PRELIMINAR CON VALLAS AISLADAS M2 1.38
01.01 Rendimiento 500.0000 M2/da
01.01 MATERIALES
01.01 300101 CAL HIDRATADA DE 30 Kg BLS 0.0500 11.03 S/. 0.55
01.01 370239 WINCHA DE 50m UND 0.0030 40.00 S/. 0.12
01.01 370241 CORDEL ML 0.0020 0.20 S/. -
01.01 440016 MADERA TORNILLO CEPILLADA P2 0.0200 2.20 S/. 0.04 0.71
01.01 MANO DE OBRA
01.01 470032 TOPOGRAFO HH 1.000 0.0160 10.22 S/. 0.16
01.01 470101 CAPATAZ HH 1.000 0.0160 10.22 S/. 0.16
01.01 470104 PEON HH 3.000 0.0480 6.78 S/. 0.33 0.65
01.01 EQUIPO
01.01 370101 HERRAMIENTAS MANUALES %MO 3.0000 0.65 0.02 0.02

01.02 LIMPIEZA DE TERRENO MANUAL M2 1.61


01.02 Rendimiento 40.0000 M2/da
01.02 Mano de obra
01.02 470102 OPERARIO HH 0.100 0.0200 8.40 0.17
01.02 470104 PEON HH 1.000 0.2000 6.78 1.36 1.53
01.02 EQUIPO
01.02 370101 HERRAMIENTAS MANUALES %MO 5.0000 1.53 0.08 0.08

02.00 REVESTIMIENTO Y REVOQUES


02.01 Tarrajeo frotachado exteriores. E=1.5 cm Mezcla 1:5 M2 22.19
02.01 Rendimiento 12.0000 M2/da
02.01 MATERIALES
02.01 020105 CLAVOS PARA MADERA C/C 3" KG 0.0220 4.55 0.10
02.01 050105 ARENA FINA m3 0.0180 38.53 0.69
02.01 390500 AGUA m3 0.0040 10.36 0.04
02.01 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1190 17.47 2.08
02.01 440016 MADERA TORNILLO CEPILLADA P2 0.2010 4.81 0.97
02.01 431652 REGLA DE MADERA P2 0.0240 6.21 0.15 4.03
02.01 MANO DE OBRA
02.01 470101 CAPATAZ HH 0.100 0.0667 21.30 1.42
02.01 470102 OPERARIO HH 1.000 0.6667 19.36 12.91
02.01 470104 PEON HH 0.330 0.2200 14.98 3.30 17.63
02.01 EQUIPO
02.01 370101 HERRAMIENTAS MANUALES %MO 3.0000 17.63 0.53 0.53
02.01

02.03 Tarrajeo frotachado interiores. E=1.5 cm Mezcla 1:5 M2 18.55


02.03 Rendimiento 15.0000 M2/da
02.03 MATERIALES
02.03 020105 CLAVOS PARA MADERA C/C 3" KG 0.0220 4.55 0.10
02.03 050105 ARENA FINA m3 0.0180 38.53 0.69
02.03 390500 AGUA m3 0.0040 10.36 0.04
02.03 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1190 17.47 2.08
02.03 440016 MADERA TORNILLO CEPILLADA P2 0.2010 4.81 0.97
02.03 431652 REGLA DE MADERA P2 0.0240 6.21 0.15 4.03
02.03 MANO DE OBRA
02.03 470101 CAPATAZ HH 0.100 0.0533 21.30 1.14
02.03 470102 OPERARIO HH 1.000 0.5333 19.36 10.32
02.03 470104 PEON HH 0.330 0.1760 14.98 2.64 14.10
02.03 EQUIPO
02.03 370101 HERRAMIENTAS MANUALES %MO 3.0000 14.10 0.42 0.42
02.03
02.04 Tarrajeo en columnas. E=1.5 cm Mezcla 1:5 M2 28.13
02.04 Rendimiento 9.0000 M2/da
02.04 MATERIALES
#REF! 050105 ARENA FINA m3 0.0180 38.53 0.69
#REF! 390500 AGUA m3 0.0040 10.36 0.04
#REF! 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1190 17.47 2.08
ANALISIS DE COSTOS
Obra PUESTO DE ASISTENCIA RAPIDA
Ubicacin LA MOLINA
Fecha 2/1/2017

Partida Codigo Insumo Unidad Cuadrilla Cantidad Precio Parcial Subtotal


#REF! 440016 MADERA TORNILLO CEPILLADA P2 0.2010 4.81 0.97
#REF! 431652 REGLA DE MADERA P2 0.0250 6.21 0.16 3.94
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 0.0889 21.30 1.89
#REF! 470102 OPERARIO HH 1.000 0.8889 19.36 17.21
#REF! 470104 PEON HH 0.330 0.2933 14.98 4.39 23.49
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000 23.49 0.70 0.70

02.05 Tarrajeo en vigas. E=1.5 cm Mezcla 1:5 M2 #DIV/0!


02.05 Rendimiento 6.5000 M2/da
02.05 MATERIALES
#REF! 050105 ARENA FINA m3 0.0180 38.53 0.69
#REF! 390500 AGUA m3 0.0040 10.36 0.04
#REF! 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1190 17.47 2.08
#REF! 440016 MADERA TORNILLO CEPILLADA P2 0.2010 4.81 0.97
#REF! 431652 REGLA DE MADERA P2 0.0250 6.21 0.16 3.94
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
#REF! 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
#REF! 470104 PEON HH 0.330 #DIV/0! 14.98 #DIV/0! #DIV/0!
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!

02.06 Tarrajeo en cielorraso. E=1.5 cm Mezcla 1:5 M2 #DIV/0!


02.06 Rendimiento 8.0000 M2/da
02.06 MATERIALES
020104 CLAVOS 2" KG 0.0040 4.55 0.02
#REF! 050105 ARENA FINA m3 0.0170 38.53 0.66
#REF! 390500 AGUA m3 0.0040 10.36 0.04
#REF! 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1170 17.47 2.04
#REF! 440016 MADERA TORNILLO CEPILLADA P2 0.5890 4.81 2.84
#REF! 431652 REGLA DE MADERA P2 0.0270 6.21 0.17 5.77
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
#REF! 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
#REF! 470104 PEON HH 0.330 #DIV/0! 14.98 #DIV/0! #DIV/0!
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!

02.07 Vestidura de derrames. Mezcla 1:5 M2 #DIV/0!


02.07 Rendimiento 18.0000 M2/da
02.07 MATERIALES
020104 CLAVOS 2" KG 0.0060 4.55 0.03
#REF! 050105 ARENA FINA m3 0.0020 38.53 0.08
#REF! 390500 AGUA m3 0.0050 10.36 0.05
#REF! 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.0120 17.47 0.21
#REF! 440016 MADERA TORNILLO CEPILLADA P2 0.1270 4.81 0.61
#REF! 431652 REGLA DE MADERA P2 0.0250 6.21 0.16 1.14
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
#REF! 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
#REF! 470104 PEON HH 0.330 #DIV/0! 14.98 #DIV/0! #DIV/0!
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!

02.08 Tarrajeo en fondo de escalera. E=1.5 cm Mezcla 1:5 M2 #DIV/0!


02.08 Rendimiento 8.0000 M2/da
02.08 MATERIALES
020105 CLAVOS PARA MADERA C/C 3" KG 0.0300 4.55 0.14
#REF! 050105 ARENA FINA m3 0.0170 38.53 0.66
#REF! 390500 AGUA m3 0.0040 10.36 0.04
ANALISIS DE COSTOS
Obra PUESTO DE ASISTENCIA RAPIDA
Ubicacin LA MOLINA
Fecha 2/1/2017

Partida Codigo Insumo Unidad Cuadrilla Cantidad Precio Parcial Subtotal


#REF! 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1188 17.47 2.07
#REF! 440020 MADERA PARA ANDAMIOS P2 1.0800 2.80 3.03
#REF! 431652 REGLA DE MADERA P2 0.0030 6.21 0.02 5.96
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
#REF! 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
#REF! 470104 PEON HH 0.500 #DIV/0! 14.98 #DIV/0! #DIV/0!
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!

02.09 Preparacin de pasos y contrapasos. E=1.5 cm Mezcla 1:5 M #DIV/0!


02.09 Rendimiento 16.0000 M/da
02.09 MATERIALES
#REF! 050104 ARENA GRUESA m3 0.0110 38.53 0.42
#REF! 390500 AGUA m3 0.0026 10.36 0.03
#REF! 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.0681 17.47 1.19
#REF! 431652 REGLA DE MADERA P2 0.0360 6.21 0.22 1.86
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
#REF! 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
#REF! 470104 PEON HH 1.000 #DIV/0! 14.98 #DIV/0! #DIV/0!
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!

03.00 PISOS Y PAVIMENTOS


03.02 Piso celima .30x.30 serie piedra color M2 #DIV/0!
03.02 Rendimiento 11.0000 M2/da
03.02 MATERIALES
03.02 240001 CERAMICA 30X30 COLOR m2 1.0700 17.52 18.75
03.02 260001 FRAGUA BLANCA 1Kg BLS 0.2857 4.70 1.34
03.02 390500 AGUA m3 0.0060 10.36 0.06
03.02 260002 PEGAMENTO CERAMICO 25Kg BLS 0.2000 11.96 2.39 22.54
03.02 MANO DE OBRA
03.02 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
03.02 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
03.02 470104 PEON HH 1.000 #DIV/0! 14.98 #DIV/0! #DIV/0!
03.02 EQUIPO
03.02 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!

03.05 Piso cemento pulido bruado M2 #DIV/0!


03.05 Rendimiento 14.0000 M2/da
03.05 MATERIALES
03.05 050104 ARENA GRUESA m3 0.0560 38.53 2.16
03.05 050105 ARENA FINA m3 0.0090 38.53 0.35
03.05 390500 AGUA m3 0.0110 10.36 0.11
03.05 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.4820 17.47 8.42 11.04
03.05 MANO DE OBRA
03.05 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
03.05 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
470103 OFICIAL HH 0.500 #DIV/0! 16.61 #DIV/0!
03.05 470104 PEON HH 1.000 #DIV/0! 14.98 #DIV/0! #DIV/0!
03.05 EQUIPO
03.05 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!

04.00 ZOCALOS Y CONTRAZOCALOS


04.01 Zocalo Piso celima .30x.30 serie piedra color blanco M2 #DIV/0!
04.01 Rendimiento 4.0000 M2/da
04.01 MATERIALES
04.01 050105 ARENA FINA m3 0.0210 38.53 0.81
04.01 390500 AGUA m3 0.0060 10.36 0.06
04.01 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1870 17.47 3.27
260001 FRAGUA BLANCA 1Kg BLS 0.1950 4.70 0.92
ANALISIS DE COSTOS
Obra PUESTO DE ASISTENCIA RAPIDA
Ubicacin LA MOLINA
Fecha 2/1/2017

Partida Codigo Insumo Unidad Cuadrilla Cantidad Precio Parcial Subtotal


04.01 240002 MAYOLICA NACIONAL 30X30 m2 1.0500 30.60 32.13 37.19
04.01 MANO DE OBRA
04.01 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
04.01 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
04.01 470104 PEON HH 0.330 #DIV/0! 14.98 #DIV/0! #DIV/0!
04.01 EQUIPO
04.01 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!

04.02 Contrazocalo Piso celima .30x.30 serie piedra color cuero h=15cm M #DIV/0!
04.02 Rendimiento 150.0000 M/da
04.02 MATERIALES
260002 PEGAMENTO CERAMICO 25Kg BLS 0.0100 11.96 0.12
#REF! 240002 MAYOLICA NACIONAL 30X30 m2 1.0500 30.60 32.13 32.25
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
#REF! 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0! #DIV/0!
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!

04.03 Contrazocalo de cemento pulido bruado h=15cm M #DIV/0!


04.03 Rendimiento 22.0000 M/da
04.03 MATERIALES
04.03 050105 ARENA FINA m3 0.0030 38.53 0.12
04.03 390500 AGUA m3 0.0010 10.36 0.01
04.03 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.0220 17.47 0.38 0.51
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
#REF! 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
#REF! 470104 PEON HH 0.500 #DIV/0! 14.98 #DIV/0! #DIV/0!
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!

05.00 COBERTURA
05.01 Ladrillo pastelero sobre torto de barro M2 #DIV/0!
05.01 Rendimiento 20.0000 M2/da
05.01 MATERIALES
05.01 050105 ARENA FINA m3 0.0050 38.53 0.19
05.01 050106 TIERRA DE CHACRA m3 0.0420 26.29 1.10
05.01 390500 AGUA m3 0.0020 10.36 0.02
210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1000 17.47 1.75
05.01 170040 LADRILLO PASTELERO 25X25 CON HUECO mll 0.0160 850.81 13.61 16.67
05.01 MANO DE OBRA
05.01 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
05.01 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
05.01 470104 PEON HH 2.000 #DIV/0! 14.98 #DIV/0! #DIV/0!
05.01 EQUIPO
05.01 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!

06.00 PUERTAS Y VENTANAS


06.01 Puertas UND #DIV/0!
06.01 Rendimiento 3.0000 UND/da
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
#REF! 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
#REF! 470104 PEON HH 0.300 #DIV/0! 14.98 #DIV/0! #DIV/0!
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!

06.02 Ventanas UND #DIV/0!


06.02 Rendimiento 4.0000 UND/da
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
ANALISIS DE COSTOS
Obra PUESTO DE ASISTENCIA RAPIDA
Ubicacin LA MOLINA
Fecha 2/1/2017

Partida Codigo Insumo Unidad Cuadrilla Cantidad Precio Parcial Subtotal


#REF! 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
#REF! 470104 PEON HH 0.300 #DIV/0! 14.98 #DIV/0! #DIV/0!
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!

07.00 VIDRIOS Y CRISTALES


07.01 Vidrio de cristal templado con lamina de proteccin UND #DIV/0!
07.01 Rendimiento 50.0000 UND/da
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
#REF! 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
#REF! 470104 PEON HH 1.000 #DIV/0! 14.98 #DIV/0! #DIV/0!
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!

08.00 CARPINTERIA METALICA


08.01 Balcon y escalera M #DIV/0!
08.01 Rendimiento 6.0000 M/da
08.01 MATERIALES
08.01 650000 CODO DE ACERO 2" UND 1.2000 7.34 8.81
08.01 650001 TUBO ACERO NEGRO 2" UND 1.5010 27.50 41.28 50.09
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
#REF! 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
#REF! 470104 PEON HH 1.000 #DIV/0! 14.98 #DIV/0! #DIV/0!
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 5.0000 #DIV/0! #DIV/0! #DIV/0!

09.00 PINTURA
08.01 Pintura en exteriores e interiores M2 #DIV/0!
08.01 Rendimiento 50.0000 M2/da
08.01 MATERIALES
08.01 540000 PINTURA LATEX GAL 0.0500 26.84 1.34
540001 IMPRIMANTE GAL 0.0330 27.66 0.91
540002 LIJA PARA MADERA HJA 0.0400 1.66 0.07
540003 SELLADOR GAL 0.0250 18.16 0.45 2.77
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
#REF! 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
#REF! 470104 PEON HH 1.000 #DIV/0! 14.98 #DIV/0! #DIV/0!
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!

08.02 Pintura en cielo raso M2 #DIV/0!


08.02 Rendimiento 40.0000 M2/da
08.02 MATERIALES
08.02 540000 PINTURA LATEX GAL 0.0500 26.84 1.34
540001 IMPRIMANTE GAL 0.0330 27.66 0.91
540002 LIJA PARA MADERA HJA 0.0400 1.66 0.07
440020 MADERA PARA ANDAMIOS P2 0.4000 2.80 1.12
540003 SELLADOR GAL 0.0250 18.16 0.45 3.89
#REF! MANO DE OBRA
#REF! 470101 CAPATAZ HH 0.100 #DIV/0! 21.30 #DIV/0!
#REF! 470102 OPERARIO HH 1.000 #DIV/0! 19.36 #DIV/0!
#REF! 470104 PEON HH 1.000 #DIV/0! 14.98 #DIV/0! #DIV/0!
#REF! EQUIPO
#REF! 370101 HERRAMIENTAS MANUALES %MO 3.0000 #DIV/0! #DIV/0! #DIV/0!
ANALISIS DE COSTOS
Obra PUESTO DE ASISTENCIA RAPIDA
Ubicacin LA MOLINA
Fecha 2/1/2017

Partida Codigo Insumo Unidad Cuadrilla Cantidad Precio Parcial Subtotal

1.01.00 Excavacion de zanjas para cimentacin corrida M3 16.07


1.01.00 Rendimiento 4.0000 M3 /da
1.01.00 Mano de obra
1.01.00 470101 CAPATAZ HH 0.100 0.2000 10.22 2.04
1.01.00 470104 PEON HH 1.000 2.0000 6.78 13.56 15.60
1.01.00 EQUIPO
1.01.00 370101 HERRAMIENTAS MANUALES %MO 3.0000 15.60 0.47 0.47
1.02.00 Eliminacin de material excedente con equipo M3 16.07
1.02.00 Rendimiento 4.0000 M3 /da
1.02.00 Mano de obra
1.02.00 470101 CAPATAZ HH 0.100 0.2000 10.22 2.04
1.02.00 470104 PEON HH 1.000 2.0000 6.78 13.56 15.60
1.02.00 EQUIPO
1.02.00 370101 HERRAMIENTAS MANUALES %MO 3.0000 15.60 0.47 0.47
1.03.00 Excavacion para zapata M3 18.42
1.03.00 Rendimiento 3.4900 M3 /da
1.03.00 Mano de obra
1.03.00 470101 CAPATAZ HH 0.100 0.2292 10.22 2.34
1.03.00 470104 PEON HH 1.000 2.2923 6.78 15.54 17.88
1.03.00 EQUIPO
1.03.00 370101 HERRAMIENTAS MANUALES %MO 3.0000 17.88 0.54 0.54
1.04.00 Relleno con material propio M3 16.07
1.04.00 Rendimiento 4.0000 M3 /da
1.04.00 Mano de obra
1.04.00 470101 CAPATAZ HH 0.100 0.2000 10.22 2.04
1.04.00 470104 PEON HH 1.000 2.0000 6.78 13.56 15.60
1.04.00 EQUIPO
1.04.00 370101 HERRAMIENTAS MANUALES %MO 3.0000 15.60 0.47 0.47
1.05.00 Nivelacin interior y apisonado M3 16.07
1.05.00 Rendimiento 4.0000 M3 /da
1.05.00 Mano de obra
1.05.00 470101 CAPATAZ HH 0.100 0.2000 10.22 2.04
1.05.00 470104 PEON HH 1.000 2.0000 6.78 13.56 15.60
1.05.00 EQUIPO
1.05.00 370101 HERRAMIENTAS MANUALES %MO 3.0000 15.60 0.47 0.47
ANALISIS DE COSTOS
Obra PUESTO DE ASISTENCIA RAPIDA
Ubicacin LA MOLINA
Fecha 2/1/2017

Partida Codigo Insumo Unidad Cuadrilla Cantidad Precio Parcial Subtotal


2.01.00 Solados concreto Fc= 100 Kg/cm2 h=2" M2 14.18
2.01.00 Rendimiento 80.0000 M2 /da
2.01.00 Materiales
2.01.00 210001 CEMENTO PORTLAND TIPO I (42.5KG) ATLAS BLS 0.2840 14.83 4.21
2.01.00 380000 HORMIGON m3 0.0940 15.25 1.43
2.01.00 440004 MADERA CEDRO DE PUCALLPA CEPILLADA P2 0.1120 2.20 0.25 5.89
2.01.00 Mano de obra
2.01.00 470022 OPERADOR DE EQUIPO LIVIANO HH 1.000 0.1000 8.40 0.84
2.01.00 470101 CAPATAZ HH 0.200 0.0200 10.22 0.20
2.01.00 470102 OPERARIO HH 2.000 0.2000 8.40 1.68
2.01.00 470103 OFICIAL HH 1.000 0.1000 7.57 0.76
2.01.00 470104 PEON HH 6.000 0.6000 6.78 4.07 7.55
2.01.00 EQUIPO
2.01.00 370101 HERRAMIENTAS MANUALES %MO 3.0000 7.55 0.23
2.01.00 491011 MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 HM 1.000 0.1000 5.14 0.51 0.74
2.02.00 Cimiento Corrido 1:10 +30% de PG de 6"cm M3 106.29
2.02.00 Rendimiento 25.0000 M3 /da
2.02.00 Materiales
2.02.00 050009 PIEDRA GRANDE DE 8" m3 0.5000 22.03 11.02
2.02.00 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 3.0500 14.83 45.23
2.02.00 380000 HORMIGON m3 0.8700 15.25 13.27
2.02.00 390500 AGUA m3 0.1800 6.00 1.08 70.60
2.02.00 Mano de obra
2.02.00 470022 OPERADOR DE EQUIPO LIVIANO HH 1.000 0.3200 8.40 2.69
2.02.00 470101 CAPATAZ HH 0.100 0.0320 10.22 0.33
2.02.00 470102 OPERARIO HH 2.000 0.6400 8.40 5.38
2.02.00 470103 OFICIAL HH 1.000 0.3200 7.57 2.42
2.02.00 470104 PEON HH 8.000 2.5600 6.78 17.36 28.18
2.02.00 EQUIPO
2.02.00 370101 HERRAMIENTAS MANUALES %MO 3.0000 28.18 0.85
2.02.00 491007 MEZCLADORA CONCRETO TAMBOR 18HP 11P3 HM 1.000 0.3200 20.80 6.66 7.51
2.03.00 Encofrado y desencofrado normal para sobrecimiento hasta h=0.60 M2 23.56
2.03.00 Rendimiento 16.0000 M2 /da
2.03.00 Materiales
2.03.00 020008 ALAMBRE NEGRO RECOCIDO # 8 KG 0.2600 4.00 1.04
2.03.00 020105 CLAVOS PARA MADERA C/C 3" KG 0.1300 4.00 0.52
2.03.00 450101 MADERA TORNILLO INC.CORTE P/ENCOFRADO P2 4.8300 2.20 10.63 12.19
2.03.00 Mano de obra
2.03.00 470101 CAPATAZ HH 0.100 0.0500 10.22 0.51
2.03.00 470102 OPERARIO HH 1.000 0.5000 8.40 4.20
2.03.00 470103 OFICIAL HH 1.000 0.5000 7.57 3.79
2.03.00 470104 PEON HH 0.750 0.3750 6.78 2.54 11.04
2.03.00 EQUIPO
2.03.00 370101 HERRAMIENTAS MANUALES %MO 3.0000 11.04 0.33 0.33
2.04.00 Concreto 1:8 + 25 % PM para sobrecimiento M3 176.93
2.04.00 Rendimiento 10.0000 M3 /da
2.04.00 Materiales
2.04.00 010004 #REF! #REF! 0.0040 #REF! #REF!
2.04.00 050010 #REF! #REF! 0.4100 #REF! #REF!
2.04.00 210000 #REF! #REF! 3.6500 #REF! #REF!
2.04.00 340000 #REF! #REF! 0.2400 #REF! #REF!
2.04.00 380000 #REF! #REF! 0.9700 #REF! #REF!
2.04.00 390500 #REF! #REF! 0.1600 #REF! #REF! 80.67
2.04.00 Mano de obra
2.04.00 470022 OPERADOR DE EQUIPO LIVIANO HH 1.000 0.8000 8.40 6.72
2.04.00 470101 CAPATAZ HH 0.200 0.1600 10.22 1.64
2.04.00 470102 OPERARIO HH 2.000 1.6000 8.40 13.44
2.04.00 470103 OFICIAL HH 2.000 1.6000 7.57 12.11
2.04.00 470104 PEON HH 8.000 6.4000 6.78 43.39 77.30
2.04.00 EQUIPO
2.04.00 370101 HERRAMIENTAS MANUALES %MO 3.0000 77.30 2.32
2.04.00 491007 MEZCLADORA CONCRETO TAMBOR 18HP 11P3 HM 1.000 0.8000 20.80 16.64 18.96
ANALISIS DE COSTOS
Obra PUESTO DE ASISTENCIA RAPIDA
Ubicacin LA MOLINA
Fecha 2/1/2017

Partida Codigo Insumo Unidad Cuadrilla Cantidad Precio Parcial Subtotal


2.05.00 Concreto en falso piso e=4" M2 17.90
2.05.00 Rendimiento 110.0000 M2 /da
2.05.00 Materiales
2.05.00 210000 CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.5000 14.83 7.42
2.05.00 380000 HORMIGON m3 0.1450 15.25 2.21
2.05.00 390500 AGUA m3 0.0180 6.00 0.11
2.05.00 431652 REGLA DE MADERA P2 0.0600 2.20 0.13 9.87
2.05.00 Mano de obra
2.05.00 470022 OPERADOR DE EQUIPO LIVIANO HH 1.000 0.0727 8.40 0.61
2.05.00 470101 CAPATAZ HH 0.100 0.0073 10.22 0.07
2.05.00 470102 OPERARIO HH 2.000 0.1455 8.40 1.22
2.05.00 470104 PEON HH 8.000 0.5818 6.78 3.94 5.84
2.05.00 EQUIPO
2.05.00 370101 HERRAMIENTAS MANUALES %MO 3.0000 5.84 0.18
2.05.00 491013 MEZCLADORA DE CONCRETO 20-35HP 16P3 HM 1.000 0.0727 27.68 2.01 2.19

Vigas de cimentacin M3 224.76


3.01.01 Concreto fc=210 Kg/cm2
3.01.01 Rendimiento 25.0000 M3 /da
3.01.01 Materiales
3.01.01 010004 #REF! #REF! 0.0030 #REF! #REF!
3.01.01 050003 #REF! #REF! 0.8500 #REF! #REF!
3.01.01 050104 #REF! #REF! 0.4200 #REF! #REF!
3.01.01 210000 #REF! #REF! 9.7400 #REF! #REF!
3.01.01 340000 #REF! #REF! 0.2200 #REF! #REF!
3.01.01 390500 #REF! #REF! 0.1840 #REF! #REF! 184.13
3.01.01 Mano de obra
3.01.01 470022 OPERADOR DE EQUIPO LIVIANO HH 2.000 0.6400 8.40 5.38
3.01.01 470101 CAPATAZ HH 0.200 0.0640 10.22 0.65
3.01.01 470102 OPERARIO HH 2.000 0.6400 8.40 5.38
3.01.01 470103 OFICIAL HH 1.000 0.3200 7.57 2.42
3.01.01 470104 PEON HH 8.000 2.5600 6.78 17.36 31.19
3.01.01 EQUIPO
3.01.01 370101 HERRAMIENTAS MANUALES %MO 3.0000 31.19 0.94
3.01.01 490704 VIBRADOR DE CONCRETO 4 HP 2.40" HM 1.000 0.3200 5.75 1.84
3.01.01 491007 MEZCLADORA CONCRETO TAMBOR 18HP 11P3 HM 1.000 0.3200 20.80 6.66 9.44
Vigas de cimentacin KG 3.55
3.01.03 Acero fy=4200 kg/cm2 Grado 60
3.01.03 Rendimiento 250.0000 KG /da
3.01.03 Materiales
3.01.03 020007 ALAMBRE NEGRO RECOCIDO # 16 KG 0.0600 4.00 0.24
3.01.03 030018 FIERRO CORR. 5/8" SIDERPERU G-60 KG 1.0700 2.50 2.68 2.92
3.01.03 Mano de obra
3.01.03 470101 CAPATAZ HH 0.300 0.0096 10.22 0.10
3.01.03 470102 OPERARIO HH 1.000 0.0320 8.40 0.27
3.01.03 470103 OFICIAL HH 1.000 0.0320 7.57 0.24 0.61
3.01.03 EQUIPO
3.01.03 370101 HERRAMIENTAS MANUALES %MO 3.0000 0.61 0.02 0.02
ANALISIS DE COSTOS
Obra PUESTO DE ASISTENCIA RAPIDA
Ubicacin LA MOLINA
Fecha 2/1/2017

Partida Codigo Insumo Unidad Cuadrilla Cantidad Precio Parcial Subtotal


Zapatas M3 224.76
3.02.01 Concreto fc=210 Kg/cm2
3.02.01 Rendimiento 25.0000 M3 /da
3.02.01 Materiales
3.02.01 010004 #REF! #REF! 0.0030 #REF! #REF!
3.02.01 050003 #REF! #REF! 0.8500 #REF! #REF!
3.02.01 050104 #REF! #REF! 0.4200 #REF! #REF!
3.02.01 210000 #REF! #REF! 9.7400 #REF! #REF!
3.02.01 340000 #REF! #REF! 0.2200 #REF! #REF!
3.02.01 390500 #REF! #REF! 0.1840 #REF! #REF! 184.13
3.02.01 Mano de obra
3.02.01 470022 OPERADOR DE EQUIPO LIVIANO HH 2.000 0.6400 8.40 5.38
3.02.01 470101 CAPATAZ HH 0.200 0.0640 10.22 0.65
3.02.01 470102 OPERARIO HH 2.000 0.6400 8.40 5.38
3.02.01 470103 OFICIAL HH 1.000 0.3200 7.57 2.42
3.02.01 470104 PEON HH 8.000 2.5600 6.78 17.36 31.19
3.02.01 EQUIPO
3.02.01 370101 HERRAMIENTAS MANUALES %MO 3.0000 31.19 0.94
3.02.01 490704 VIBRADOR DE CONCRETO 4 HP 2.40" HM 1.000 0.3200 5.75 1.84
3.02.01 491007 MEZCLADORA CONCRETO TAMBOR 18HP 11P3 HM 1.000 0.3200 20.80 6.66 9.44
* M2 16.56
3.01.02 Encofrado y desencofrado normal
3.01.02 Rendimiento 8.5000 M2 /da
3.01.02 Materiales
3.01.02 020008 ALAMBRE NEGRO RECOCIDO # 8 KG 0.2100 4.00 0.84
3.01.02 020105 CLAVOS PARA MADERA C/C 3" KG 0.2400 4.00 0.96
3.01.02 450101 MADERA TORNILLO INC.CORTE P/ENCOFRADO P2 6.7100 2.20 14.76 16.56
3.01.02 Mano de obra
3.01.02 470101 CAPATAZ HH 0.100 0.0000 10.22 0.00
3.01.02 470102 OPERARIO HH 1.000 0.0000 8.40 0.00
3.01.02 470103 OFICIAL HH 1.000 0.0000 7.57 0.00
3.01.02 470104 PEON HH 1.000 0.0000 6.78 0.00 0.00
3.01.02 EQUIPO
3.01.02 370101 HERRAMIENTAS MANUALES %MO 3.0000 0.00 0.00 0.00
04.01.02 ACERO PARA ZAPATAS GRADO 60 KG 3.55
04.01.02 Rendimiento 250.0000 KG /da
04.01.02 Materiales
04.01.02 020007 ALAMBRE NEGRO RECOCIDO # 16 KG 0.0600 4.00 0.24
04.01.02 030018 FIERRO CORR. 5/8" SIDERPERU G-60 KG 1.0700 2.50 2.68 2.92
04.01.02 Mano de obra
04.01.02 470101 CAPATAZ HH 0.300 0.0096 10.22 0.10
04.01.02 470102 OPERARIO HH 1.000 0.0320 8.40 0.27
04.01.02 470103 OFICIAL HH 1.000 0.0320 7.57 0.24 0.61
04.01.02 EQUIPO
04.01.02 370101 HERRAMIENTAS MANUALES %MO 3.0000 0.61 0.02 0.02