Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Ao de N
Item atencin Lnea o SSEE (kV)
Torre Sector
300.00
300.00
280.00
280.00
310.00
310.00
300.00
360.00
300.00
300.00
313.48
280.00
280.00
310.00
280.00
280.00
280.00
280.00
300.00
300.00
300.00
300.00
280.00
313.48
313.48
313.48
313.48
313.48
313.48
313.48
313.48
313.48 9,644.78 34.86%
320.00
320.00
313.48
280.00
300.00
300.00
280.00
300.00
300.00
280.00
280.00
280.00
280.00
280.00
280.00
280.00
340.00
320.00
320.00
160.00
160.00
160.00 6,133.48 22.17%
313.48
313.48
313.48
313.48 1,253.91 4.53%
6,500.00 6,500.00 23.50%
4,132.00 4,132.00 14.94%
27,664.16 27,664.16 100.00%
NEMETSA
(m2)
300.00
300.00
280.00
280.00
310.00
310.00
300.00
360.00
300.00
300.00
313.48
280.00
280.00
310.00
280.00
280.00
280.00
280.00
300.00
300.00
300.00
300.00
280.00
313.48
313.48
313.48
313.48
313.48
313.48
313.48
313.48
313.48 9,644.78 34.86%
320.00
320.00
313.48
280.00
300.00
300.00
280.00
300.00
300.00
280.00
280.00
280.00
280.00
280.00
280.00
280.00
340.00
320.00
320.00
160.00
160.00
160.00 6,133.48 22.17%
313.48
313.48
313.48
313.48 1,253.91 4.53%
6,500.00 23.50%
4,132.00 14.94%
27,664.16
27,664.16
Plazo de ejecucin das 195
Linieros 25 5 cuadrillas
Residente 2
Seguridad 1
Supervisores 3
Tcnico mecnico 1
Administrador 1
Almacenero 1
Seguridad 1
Asistentes 2
Choferes 5
Total personal 42
Camionetas 3
Combi 2
INDURON
PINTADO AO 2016 Diciembre 2015-Junio 2016
Mano de obra (M/O + Aliment + aloj) 651,734.00 39.17% 227,219.16 144,497.27 29,540.59 153,132.09 97,344.89 651,734.00 33.45
Equipos (transporte) 217,620.00 13.08% 75,870.58 48,248.97 9,863.88 51,132.22 32,504.36 217,620.00 13.60
Materiales (mat. + imprevistos) 238,280.80 14.32% 83,073.71 52,829.72 10,800.35 55,986.70 35,590.31 238,280.80 13.13
Pintura (pint. + viaje) 556,238.99 33.43% 193,925.98 123,324.87 25,212.17 130,694.48 83,081.48 556,238.99 39.82
COSTO DIRECTO 1,663,873.79 100.00% 580,089.43 368,900.83 75,416.99 390,945.49 248,521.04 1,663,873.79
Gastos Generales 15% 249,581.07 87,013.41 55,335.12 11,312.55 58,641.82 37,278.16 249,581.07
Utilidad 10% 166,387.38 58,008.94 36,890.08 7,541.70 39,094.55 24,852.10 166,387.38
SUB TOTAL 2,079,842.24 725,111.79 461,126.04 94,271.24 488,681.87 310,651.30 2,079,842.24
IGV 18% 374,371.60 130,520.12 83,002.69 16,968.82 87,962.74 55,917.23 374,371.60
TOTAL 2,454,213.84 855,631.91 544,128.72 111,240.07 576,644.60 366,568.54 2,454,213.84
359566776.xls ANEXO 13
Planilla
ANEXO 11
359566776.xls
ALOJAMIENTO
Personal Costo Diario Noches P. Parcial
S/. 22,680.00
COMUNICACIONES - consumo
Cantidad mes costo mes Parcial
S/. 4,640.00
ALOJAMIENTO
US$
T/C 3.4 8,035.29
Alojm-Almac-Comunic.
359566776.xls ANEXO 09
COMBUSTIBLE
Cant. Das Costo diario Parcial Adicional Total
Camioneta 4 x 4 3.00 120.00 45.00 16,200.00 2,500.00 18,700.00
Furgoncito para adm.(Hafei) 120.00 25.00 - -
Camin 4 toneladas - 120.00 50.00 - -
Combi 15 pasajeros 2.00 120.00 45.00 10,800.00 1,000.00 11,800.00
Grupo electrgeno 7,5kW 5.00 120.00 50.00 30,000.00 30,000.00 60,500.00
MANTENIMIENTO
Cant. Das Costo diario Parcial Adicional Total
Camioneta 4 x 4 3.00 120.00 10.00 3,600.00 - 3,600.00
Furgoncito para adm.(Hafei) - 120.00 8.00 - -
Camin 4 toneladas - 120.00 15.00 - - -
Combi 15 pasajeros 2.00 120.00 10.00 2,400.00 - 2,400.00
Grupo Electrgeno 6,5kv 5.00 120.00 7.00 4,200.00 - 4,200.00 10,200.00
TRASLADO DE PERSONAL
Cant. viajes Costo viaje Parcial Adicional Total
Personal Staff 7.00 8.00 120.00 6,720.00 - 6,720.00
Personal obra 35.00 8.00 70.00 19,600.00 - 19,600.00 26,320.00
Transporte y G.E.
359566776.xls ANEXO 05
ALIMENTACION
Alimentacion
AO 2015 42.00 TOTAL PERSONAL
7.00 STAFF
2.00 VARIOS
3.00 SUPERVISORES
5.00 CHOFERES
PROYECTO PINTADO DE TORRES 56 25.00 LINIEROS
AREA 16,718.68
TIEMPO ESTIMADO 4 MESES
Precio
Item Descripcin Und. Cant. Total
unitario S/.
MATERIALES DE IMPORTACION
1 Calibrador de espesor hmedo - K-Tator Und. 112.00 9.00
2 Kit de Medicin de Contaminantes Salinos Kit. 2.00 675.00
3 Parche Bresle - K-Tator Und. 112.00 22.40
4 Removedor de Sales - Chlor*rid Gln. 56.00 194.40
EQUIPOS TECNICOS
1 Binoculares Unid. 3.00 356.40
2 Cmaras Digitales Fugi film Und. 3.00 700.00
3 Equipo de medicin y control de humedad Und. 2.00 1,800.00
4 Equipo de medicin y control de vientos Und. 2.00 305.10
5 Impresora laserjet HP multifuncional Unid. 2.00 1,000.00
6 Laptop Und. 4.00 2,160.00
7 Medidor de espesor de galvanizado Micrmetro Und. 2.00 2,548.80
8 Radios porttiles Unid. - 796.50
9 Termmetros Magnticos Und. 2.00 245.08
MATERIALES DIVERSOS
1 Alicate mecnico 6" Unid 4.00 10.17
2 Ampollas de agua destilda 5 cc pza 56.00 0.68
3 Archivador de palanca Unid.. 28.00 3.49
4 Block de notas cuadriculado tamao A4. Unid. 28.00 2.30
5 Bolsa plstica 14x22 Chicas Unid 0.05
6 Bolsa plstica x 20 lt para tapar letreros Unid 0.08
7 Bolsa plstica x 70 lt para almacigo Grueso para basura Unid 336.00 0.10
8 Botiqun c/medicinas de lona Unid. 5.00 9.75
9 Botiquin c/medicinas de madera Unid. 5.00 101.69
10 Camarotes 1.1/2 plaza Unid 18.00 203.39
11 Camas individuales 1.1/2 plz Unid 7.00 118.64
12 Camilla de madera Unid. 3.00 281.50
13 Camisa para personal staff con logo Nemetsa manga larga Unid. 14.00 35.00
14 Carbones R JC KR35363 WS/E125 Und. 7.80
15 Casaca Jean para personal staff Pza. 7.00 80.00
16 Casas prefabricadas de madera (6 X 4 mts.) Unid 2,000.00
17 Cinta aislante 3M 1600 amarillo Unid 1.00 3.05
18 Cinta aislante 3M 1600 Blanco Unid 1.00 3.05
19 Cinta aislante 3M 1600 Negro Unid 10.00 3.05
20 Cinta aislante 3M 1600 Rojo Unid 1.00 3.05
21 Cinta de peligro Roja x 300 mts Rollo 4.00 27.73
22 Cinta para embalaje , 2" x 110 ydas. Unid. 45.00 3.81
23 Cinta strech film 3"x18x380 mts Unid. 2.00 6.78
24 Colchas de 1 1/2 plaza de hilo grueso. Unid. 42.00 13.56
25 Colchones 1.1/2 plz, 5" , Unid 84.00 57.29
26 Compresora 3.2 HP Cambell pza 1.00 1,592.12
27 Conos de seguridad naranja 28" Pza. 8.00 26.00
28 Costalillo de polietileno x 70 lts. Unid 100.00 1.36
29 Desarmador estrella 8" Unid 4.00 13.56
30 Desarmador plano de 8" long. Unid 4.00 13.56
31 Desarmador Torr N 15 Unid 4.00 6.78
32 Detergente Industrial Kls. 45.00 3.39
33 Driza 3/16 mts 250.00 0.06
34 Enchufe Vulcanizado 15 Amp Unid. 25.00 4.24
35 Engranaje para esmeril Kress Unid. 189.00
36 Enchufe vulcanizado 15 AMP Unid. 4.24
37 Escritorio de madera tipo secretaria 1,20x0,60 para Almacen Pza 2.00 200.00
38 Escritorios de madera tipo secretaria 1.20x0.60 para oficina Pza 3.00 200.00
39 Esmeril de banco 1/2 HP Pit bull Unid 1.00 165.68
40 Estante de madera de 4 divisiones 1.20x0.90 Unid. 2.00 200.00
41 Estuche con herr. Kamasa km-626 de 13pza y 11 pza Unid 2.00 66.02
42 Estuche de dados y llaves X 24 piezas Jgo. 2.00 77.90
43 Extension de cable Nlt 14 x 10Mts Pza 25.00 42.71
44 Extension de cable Nlt 14 x 120Mts Unid. 2.00 410.00
45 Extension de cable Nlt 14 x 50Mts Pza 2.00 176.27
46 Extinguidor de 02 Kls. Unid 5.00 46.19
47 Extinguidor de 04 Kls. Unid 5.00 63.47
48 Extinguidor de 06 Kls. Unid 5.00 70.25
49 Folder Manila A4 Pza 70.00 0.17
50 Frazadas Unid 42.00 13.56
51 Funda tela drill p lentes Unid 30.00 2.90
52 Funda tela drill p visor c/belcro Unid 30.00 4.80
53 Hojas de sierra N 18 SANDVIK Pza. - 3.81
54 Jean para personal staff Pza. 7.00 50.00
55 Lampas tipo Cuchara Tramontina und 3.00 23.98
56 Lapicero color negro Unid. 15.00 0.42
57 Llave Francesa 12" STANLEY Pza 5.00 29.66
58 Llave mixta 1/2 Pza 5.00 11.02
59 Llave mixta 17mm pza 5.00 11.02
60 Llave mixta 24mm Pza 5.00 12.71
61 Llave mixta 27mm pza 5.00 16.95
62 Llave Torr 9 PIEZAS Jgo. 2.00 12.71
63 Malla de seguridad 1.10 X 45 Mts. Rollos 4.00 45.00
64 Mosquitero de 1 1/2 plaza , 4 puntas Unid 42.00 21.19
65 Paos de limpieza X88 Kimberly 70/80 Rollos 19.60
66 Papel bond A4 Mill 22.71
67 Papel tamao A4 (imp. detalle hoja de trabajo ) Millar 4.00 22.71
68 Pernos / tuerca plstico 1/2 x 2" Unid. 1.02
69 Pizarra Acrilica 1,20 x 1,20 Pza 4.00 67.80
70 Protector de tela con visor con delcron Unid
71 Sbanas 1.1/2" Plz algodn Jgo. 84.00 22.03
72 Serrucho Pza 2.00 52.46
73 Soga Driza nylon 1/2" (servicio) x m de Nylon Rollo 4.00 4.75
74 Soga Trenzada 5/8 para linea de vida Mts. 200.00 5.76
75 Tablillas de madera Pza 9.00 15.00
76 Taladro manual 700w Black & decker Pza 600.00
77 Tanque de Fibra de 1000 litros und 1.00 593.22
78 Taper de plastico con tapa Jgo. 84.00 2.37
79 Televisor de Magnavox20" Unid. 2.00 600.00
80 Terminales para Amoladoras Kress Unid 5.85
81 Tijera 6 Und. 2.00 5.50
82 Toner para impresora laser (compatible) Pza 20.00 70.00
83 Tomacorriente de Baquelita de 04 tomas Unid. 5.08
84 Wincha de 5Mts Pza 2.00 12.71
OTAL PERSONAL Epps completos
2.00
UPERVISORES 3.00
25.00
30.00
Costo
Asignacin Sub Total S/. Total
Parcial S/.
8 TTAT X DIA
8 TTAT X DIA
3 TTAT X DIA
14 TTAT
10 TTAT
3 TTAT
6 TTAT X DIA
6 TTAT X DIA
6 TTAT X DIA
t/c 3.4
S/. 10,710.00
ANALISIS DE COSTO TOTAL
22.17% 4.53% 23.50% 14.94% 100%
6,133.48 1,253.91 6500 4,132.00 27,664.16
L-2090 Chilca-Cantera
L-2244/2245 Ventanilla-Chavarria
SSEE Chiclayo
SSEEOeste
Paramonga Nueva 3.4
698.39 142.78 740.13 470.49 3,150.00
S/. 2,374.54 S/. 485.44 S/. 2,516.43 S/. 1,599.68 S/. 10,710.00
GARANTIAS, SEGUROS