SCHEDULE OF AIR HANDLING UNITS NOTES:

SCHEDULE OF SPLIT A/C UNITS 1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS
TREATED COOLING AIR SIDE DATA WATER SIDE DATA OTHERWISE NOTED. DO NOT SCALE THE DRAWINGS, ANY DISCREPANCIES FOUND SHOULD
SUPPLY POWER TYPE OF
FRESH EXTERNAL CAPACITY UNIT AREA SERVED NOMINAL COOLING CONSUMPTION BE REPORTED TO THE RESPONSIBLE ARCHITECT OR ENGINEER IMMEDIATELY.
AIR MIN. INDOOR UNIT REMARKS
AHU AIR COIL ENTERING COIL LEAVING CHILLED WATER CHILLED REF. CAPACITY (KW) QTY
FLOW STATIC (KW) MOTOR QTY. (kW) 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR OR BUILDERS TO ASCERTAIN AND CONFIRM
S.N. AREA SERVED LOCATED FLOW COIL TEMP. WATER
UNIT REF. ( L/S ) (Pa) AIR TEMP. AIR TEMP.
( L/S ) FLOW (kW) THAT ALL DIMENSIONS SHOWN IN THESE DRAWINGS SHALL COMPLY WITH THE SITE
TOTAL SENSIBLE TOTAL DB(C) / WB(C) DB(C) / WB(C) IN(C) / OUT(C) ( L/S ) A1-IDU-FCC FCC ROOM HI WALL MOUNTED - DIMENSIONS AND LEVELS PRIOR TO PREPARING DRAWINGS AND EXECUTING THE WORKS.
3.5 1.5 1
A1-ODU-FCC GROUND FLOOR INDOOR DECORATIVE UNIT 3. ALL WORKS ARE TO BE CARRIED OUT TO Q.C.S. AND OTHER RELEVANT CODES OF
CONSTRUCTIONS.
A1-IDU-TEL OREEDOO ROOM FLOOR STANDING TYPE ONE DUTY +
01. A1-AHU-01 AUDITORIUM - GROUND FLOOR (0042) & FIRST FLOOR ROOF FLOOR 4500 1800 500 54.70 57.80 23.0 / 16.4 13.0 / 12.3 5.55 / 12.22 2.06 4.00 01 10.5 4.0 2 4. FOR GENERAL NOTES, SYMBOLS AND ABBREVIATIONS, REFER TO DRAWING NO. M-A0-0001
A1-ODU-TEL GROUND FLOOR INDOOR DECORATIVE UNIT ONE STANDBY 5. THE FRESH AIR BRANCH SERVING TO EACH TERMINAL UNIT SHALL BE PROVIDED WITH VCD.
02. A1-AHU-02 CAFETERIA - GROUND FLOOR (0123) ROOF FLOOR 6048 2200 500 79.40 97.10 23.9 / 17.4 13.0 / 12.4 5.55 / 12.22 3.47 5.00 01 6. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH THE OTHER RELEVANT
NOTE:
1. ELECTRICAL SUPPLY 240V/1/50HZ. ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWING AND ALL RELEVANT
03. A1-AHU-03 CAFETERIA - FIRST FLOOR (1080) ROOF FLOOR 6179 2600 500 82.70 103.70 23.9 / 17.4 12.8 / 12.3 5.55 / 12.22 3.70 5.00 01 SECTIONS OF THE SPECIFICATIONS.
2. THE NOMINAL CAPACITY OF THE SPLIT UNITS SHALL BE BASED ON 27C DB/19C WB AIR ON COIL & 46C AMBIENT TEMPERATURE
7. EXACT LOCATION & DETAIL OF ELECTRO-MECHANICAL OPENING SHALL BE COORDINATED
04. A1-AHU-04 EXAM CENTER - SECOND FLOOR (2074) ROOF FLOOR 4600 1900 500 68.50 76.30 25.2 / 17.3 12.8 / 12.1 5.55 / 12.22 2.73 4.00 01 CAPABLE OF OPERATING UNDER THE SPECIFIED DESIGN AMBIENT CONDITIONS AND MAX. TEMPERATURE OF 55C.
WITH ELECTRO-MECHANICAL ENGINEER.
3. THE UNITS SHALL BE SUITABLE FOR TROPICAL CLIMATE CAPABLE OF OPERATING UNDER 8. DIMENSION AND LOCATION OF SERVICES COORDINATED WITH RESPECTIVE ARCHITECTURAL
05. A1-AHU-05 EXAM CENTER - SECOND FLOOR (2021) ROOF FLOOR 4600 1900 500 68.50 76.30 25.2 / 17.3 12.8 / 12.1 5.55 / 12.22 2.73 4.00 01
THE SPECIFIED DESIGN AMBIENT CONDITIONS 46C & AND COMPLETE WORKING WITHOUT TRAPPING AT TEMPERATURE OF 55C. AND SERVICES DRAWINGS PRIOR TO COMMENCEMENT OF ANY WORK. ANY DISCREPANCY
(*A)
06. A1-AHU-06 AUDITORIUM - GROUND / FIRST & SECOND FLOOR ROOF FLOOR 12000 2550 500 142.90 171.95 23.0 / 16.9 12.9 / 12.4 5.55 / 12.22 6.14 10.00 01 4. THE AC UNITS SHALL BE WITH OZONE FRIENDLY REFRIGERANT ONLY. FOUND SHOULD BE BROUGHT TO THE NOTICE OF THE CONCERNED ENGINEER.
(*A) 9. REFER TO SCHEDULE OF FINISHES FOR FLOORS, WALLS AND CEILINGS.
07. A1-AHU-07 AUDITORIUM - GROUND / FIRST & SECOND FLOOR ROOF FLOOR 12000 2550 500 142.90 171.95 23.0 / 16.9 12.9 / 12.4 5.55 / 12.22 6.14 10.00 01 10. ALL LEVELS INDICATED IN PLANS, ELEVATIONS & SECTIONS ARE BASED IN QATAR NATIONAL
DATUM (QND).
NOTE:-
11. QND LEVELS ARE INDICATIVE ONLY AND TO BE VERIFIED ON SITE BY THE APPOINTED
1. ELECTRICAL MOTOR SUPPLY SHALL BE SUITABLE FOR 415V/3/50HZ. CONTRACTOR BASED ON SITE CONDITIONS. THE REQUIRED/RELEVANT ADJUSTMENTS ON
2. AHU'S SHALL BE WEATHER PROOF FLOOR MOUNTED MODULAR TYPE AND HOUSING THE FOLLOWING SECTION: DRAWINGS FOR ALL DISCIPLINES (ARCH,CIVIL, MEP)TO BE DONE BY THE APPOINTED
CONTRACTOR WITHOUT TIME AND COST IMPACT.
- FILTER SECTION HOUSING 2-INCH WASHABLE FLAT FILTER.
12. THE CONTRACTOR SHOULD MAKE THE REQUIRED CHANGES PER LATEST ID LAYOUT WITHOUT
- FINAL BAG FILTER SECTION OF EFFICIENCY AS PER SPECIFICATIONS. ANY VARIATION CLAIM.
- MIXING BOX WITH MOTORIZED DAMPERS FOR ALL INLET AND OUTLET TO CONTROL THE REQUIRED AIR QUANTITY.
- COOLING COIL SECTION COMPLETE WITH DRIFT ELIMINATOR AT EXIT.
- SUPPLY FAN SECTION COMPLETE WITH DRAW THRU BACKWARD CENTRIFUGAL FAN OF SUITABLE SIZE TO DELIVER THE REQUIRED AIR QUANTITY.
3. ALL AHU'S SHALL BE PROVIDED WITH SMOKE DETECTOR AT MAIN RETURN DUCT AND CONNECTED TO FIRE ALARM SYSTEM TO SHUTDOWN IN CASE OF FIRE.
4. THE CONTRACTOR SHALL VERIFY THE FANS STATIC PRESSURE AS PER FINAL SELECTED EQUIPMENT AND APPROVED SHOP DRAWINGS.
(*A) THIS UNIT WILL HAVE VFD AIR FLOW WITH TREATED FRESH-AIR PROVIDED FROM A1-FAHU-05. EACH UNIT WILL BE PROVIDED WITH RETURN FAN & MOTORIZED DAMPER'S ON OUTSIDE-AIR DUCT, RETURN-AIR DUCT & ON THE
EXTRACT-AIR DUCT. AIR QUANTITIES (FRESH-AIR, RETURN-AIR & EXTRACT-AIR) SHALL VARY VIA C02 SENSOR WITHIN RETURN-AIR DUCT. ELECTRIC REHEAT COIL WILL BE PROVIDED IN THE AHU FOR HUMIDITY CONTROL.

SCHEDULE OF FRESH AIR HANDLING UNITS WITH HEAT RECOVERY WHEELS


GENERAL COOLING CAPACITY AIR SIDE DATA WATER SIDE DATA
SUPPLY AIR ESP EXTRACT (KW) AIR ON AIR OFF UNIT VARIABLE ELECTRICAL POWER ELECTRICAL POWER
CHILLED WATER CHILLED
SL.NO. UNIT REF. AREA SERVED LOCATED FLOW COOLING COIL COOLING COIL SPEED QTY. CONSUMPTION CONSUMPTION REMARKS
(Pa) AIR FLOW CONFIGURATION COIL TEMP. WATER
(L/S) FLOW DRIVE SUPPLY FAN SUPPLY FAN
(L/S) SENSIBLE TOTAL
DB (C) WB (C) DB (C) WB (C) IN(C) / OUT(C) (KW) (KW)
( L/S )

GROUND FLOOR -TO- SECOND FLOOR HORIZONTAL DRAW THROUGH FLOOR MOUNTED
01. A1-FAHU-01 ROOF FLOOR 11330 500 9900 188.0 375.0 25.4 21.2 12.9 12.6 5.55 / 12.22 13.40 YES 1 18.0 12.0
FCU'S & AHU'S UNIT SHALL BE PROVIDED WITH WEATHER CANOPY

GROUND FLOOR -TO- SECOND FLOOR HORIZONTAL DRAW THROUGH FLOOR MOUNTED
02. A1-FAHU-02 ROOF FLOOR 10000 500 8510 171.0 340.0 25.8 21.4 12.9 12.6 5.55 / 12.22 12.15 YES 1 16.0 10.0 -WITH 20% SAFETY FACTOR ADDED ON THE FAHU COOLING
FCU'S & AHU'S UNIT SHALL BE PROVIDED WITH WEATHER CANOPY
COIL SENSIBLE & TOTAL LOADS.
GROUND FLOOR -TO- SECOND FLOOR HORIZONTAL DRAW THROUGH FLOOR MOUNTED -COONECTED WITH GEF-1
03. A1-FAHU-03 ROOF FLOOR 9350 500 8205 152.0 305.0 25.1 21.1 12.9 12.7 5.55 / 12.22 10.90 YES 1 15.0 10.0
FCU'S & AHU'S UNIT SHALL BE PROVIDED WITH WEATHER CANOPY

GROUND FLOOR -TO- SECOND FLOOR HORIZONTAL DRAW THROUGH FLOOR MOUNTED
04. A1-FAHU-04 ROOF FLOOR 9320 500 8535 140.0 282.0 24.2 20.6 12.9 12.7 5.55 / 12.22 10.10 YES 1 15.0 10.0
FCU'S & AHU'S UNIT SHALL BE PROVIDED WITH WEATHER CANOPY

GROUND FLOOR -TO- SECOND FLOOR HORIZONTAL DRAW THROUGH FLOOR MOUNTED
05. A1-FAHU-05 ROOF FLOOR 7300 500 6410 120.0 244.0 25.3 21.3 12.9 12.7 5.55 / 12.22 8.70 YES 1 13.0 9.0
FCU'S & AHU-06 & 07 UNIT SHALL BE PROVIDED WITH WEATHER CANOPY

NOTES:
1. FAN EXTERNAL STATIC HEAD IS ESTIMATED ONLY. CONTRACTOR SHALL ESTABLISH ACTUAL HEAD AND SUBMIT CALCULATIONS TO ENGINEER FOR APPROVAL. COOLING COIL SHALL BE SELECTED AT 6.2C. ENTERING
WATER/15.2C. LEAVING WATER CONDITIONS.
2. THE AIR FILTERS IN THE A/C MACHINES SHALL BE AS FOLLOW
PRE FILTER MERV-8
BAG FILTER MERV-13
3. ELECTRICAL SUPPLY SHALL BE 415V/3/50HZ.
4. TREATED FRESH AHU'S SHALL BE EQUIPPED WITH 2-WAY VALVE.
5. FAHU'S SHALL BE PROVIDED WITH SMOKE DETECTOR AT MAIN RETURN DUCT AND CONNECTED TO ELECTRICAL ALARM SYSTEM TO SHUTDOWN IN CASE OF FIRE .
6. TFAHU'S USED TO SUPPLY CONDITIONED AIR TO ALL FCU'S INSIDE THE BUILDING AND TO EXHAUST AIR FROM THE TOILET AREAS AND A/C SPACES INSIDE THE BUILDING AND SHALL CONSIST OF INDIRECT RECOVERY UNIT
(THERMAL WHEEL HEAT EXCHANGER) TO TRANSFER HEAT FROM FRESH AIR STREAM TO THE EXHAUST AIR STREAM. WITH SUITABLE ARRANGEMENT OF SUPPLY AND EXHAUST SYSTEMS (BESIDE EACH OTHER) TO ACHIEVE
COMPLETELY SEPARATED AIR STREAMS BETWEEN SECTIONS OF FRESH AND EXHAUST AIR (NOT LESS THAN 99%) AND HOUSING THE FOLLOWING :

DISCLAIMER: The CAD data is being supplied only to assist in production of the Sub-Consultant/Trade Contractor's work. It may contain some discrepancies and hence it should always be cross-checked with other relevant documents applying due diligence. Users are solely responsible for anything they produce using all or part of
FRESH AIR PATH WAY SECTION :
SAND TRAP INTAKE LOUVER AS A STANDARD ACCESSORY.
PRE-WASHABLE AND PRELIMINARY BAG FILTER SECTION AT THE INLET OF OUTSIDE FRESH AIR COMPLETE WITH MOTORIZED VOLUME CONTROL DAMPER
VARIABLE SPEED DRAW THROUGH FAN SECTION WITH FAN FOR FRESH AIR SUPPLY COMPLETE WITH VARIABLE FREQUENCY DRIVE.
COOLING COIL SECTION WITH CAPACITY AS INDICATED IN THE SCHEDULE ABOVE.
MOISTURE (DRIFT) ELIMINATOR AFTER COOLING COIL EXIT IN CASE OF THE FACE VELOCITY ON THE COIL MORE THAN 2.5 M/S .

EXHAUST AIR PATH WAY SECTION :


SYNTHETIC FLAT FILTER SECTION AT THE INLET OF EXHAUST SIDE AIR.
VARIABLE SPEED DRAW THROUGH EXHAUST FAN FOR EXHAUST AIR FROM TOILETS AND A/C SPACES INSIDE THE BUILDING COMPLETE WITH VARIABLE FREQUENCY DRIVE.
SENSIBLE HEAT RECOVERY WHEEL WORK AS FOLLOWING:
TRANSFER INDIRECTLY THE COOLING ENERGY CARRIED BY COOLING AIR STREAM FROM THE SPACES TO THE OUTSIDE FRESH AIR STREAM AT HIGH SEPARATION LEVEL BETWEEN TWO STREAMS OF NOT LESS THAN 99%
HEAT EXCHANGER EFFICIENCY NOT LESS THAN 65% & RELATIVE HUMIDITY OF EXHAUST AIR AROUND 45% AND THE PERCENTAGE OF (SUPPLY AIR/ EXHAUST AIR) AROUND 1.1 .

SCHEDULE OF TREATED FRESH AIR HANDLING UNITS WITH HEAT PIPE


FRESH COOLING COIL CHILLED WATER CHILLED WATER
CAPACITY HEAT PIPE PRECOOL SECTION COOLING COIL SECTION HEAT PIPE REHEAT SECTION FLOW RATE CONDITION ESP MIN. POWER
UNIT AIR FLOW CONSUMPTION
AREA SERVED (KW) ENT. TEM. LEV. TEM. ENT. TEM. LEV. TEM. ENT. TEM. LEV. TEM. (L/S) (Pa) QTY. REMARKS
REF. (L/S) (KW)
TOTAL SENSIBLE DB/WB (C) DB/WB (C) DB/WB (C) DB/WB (C) DB/WB (C) DB/WB (C) PER UNIT IN (C) OUT (C)

GROUND FLR
(*1) FAHU'S SHALL BE PROVIDED
& 1ST FLOOR
A1-FAHU-KIT-01 1800 120.0 53.0 46.0 / 30.0 37.3 / 28.2 37.3 / 28.2 13.3 / 12.9 13.3 / 12.9 22.0 / 15.0 4.30 5.55 12.22 500 6.5 1 WITH WEATHER CANOPY.
-CAFETERIA-
KITCHEN

1ST FLOOR &

the provided CAD data. CAD data is not intended to be issued to any third party without AEB's written consent for the same. In providing you with this CAD data, AEB does not assume any liability whatsoever unless expressed otherwise.
(*2) FAHU'S SHALL BE PROVIDED
A1-FAHU-LAB-01 3300 211.0 98.0 46.0 / 30.0 37.3 / 28.2 37.3 / 28.2 13.3 / 12.9 13.3 / 12.9 22.0 / 16.2 7.52 5.55 12.22 500 6.0 1 WITH WEATHER CANOPY.
2ND FLOOR
-LAB'S

NOTES:
1. ELECTRICAL SUPPLY SHALL BE 415V/3/50HZ.
2. TREATED FRESH AHU'S SHALL BE EQUIPPED WITH 2-WAY VALVE.
3. AHU'S SHALL BE PROVIDED WITH SMOKE DETECTOR AT MAIN RETURN DUCT AND CONNECTED ELECTRICAL ALARM SYSTEM TO SHUTDOWN IN CASE OF FIRE.
4. TFAHU'S USED TO SUPPLY CONDITIONED AIR TO ALL FCU'S INSIDE THE BUILDING AND TO EXHAUST AIR FROM THE TOILET AREAS AND A/C SPACES INSIDE THE BUILDING AND SHALL CONSIST OF INDIRECT RECOVERY UNIT (THERMAL
WHEEL HEAT EXCHANGER ) TO TRANSFER HEAT FROM FRESH AIR STREAM TO THE EXHAUST AIR STREAM. WITH SUITABLE ARRANGEMENT OF SUPPLY AND EXHAUST SYSTEMS ( BESIDE EACH OTHER) TO ACHIEVE COMPLETELY
SEPARATED AIR STREAMS BETWEEN SECTIONS OF FRESH AND EXHAUST AIR ( NOT LESS THAN 99% ) AND HOUSING THE FOLLOWING :

FRESH AIR PATH WAY SECTION :


-SAND TRAP INTAKE LOUVER AS A STANDARD ACCESSORY.
-PREWASHABLE AND PRELIMINARY BAG FILTER SECTION AT THE INLET OF OUTSIDE FRESH AIR COMPLETE WITH MOTORIZED VOLUME CONTROL DAMPER
-VARIABLE SPEED DRAW THROUGH FAN SECTION WITH FAN FOR FRESH AIR SUPPLY COMPLETE WITH VARIABLE FREQUENCY DRIVE.
-COOLING COIL SECTION WITH CAPACITY AS INDICATED IN THE SCHEDULE ABOVE. -MOISTURE (DRIFT) ELIMINATOR AFTER COOLING COIL EXIT IN CASE OF THE FACE VELOCITY ON THE COIL MORE THAN 2.5 M/S .
-HEAT PIPE COIL SECTION OF COPPER PIPE TUBE WITH ALUMINUM FINS AND R134a COOLING MEDIA OF SUITABLE DIMENSIONS TO SUIT THE UNIT SELECTED SIZE TO SAVE THE ENERGY NEEDED FOR REHEATING AND TO MINIMIZE THE
OUTPUT HUMIDITY TO ACCEPTABLE LIMITS AROUND (70 % ).

EXHAUST AIR PATH WAY SECTION : 0 MAY 2017 ISSUED FOR SCHEMATIC TENDER AM
-SYNTHETIC FLAT FILTER SECTION AT THE INLET OF EXHAUST SIDE AIR.
NO. DATE DESCRIPTION APPROVED
-VARIABLE SPEED DRAW THROUGH EXHAUST FAN FOR EXHAUST AIR FROM TOILETS AND A/C SPACES INSIDE THE BUILDING COMPLETE WITH VARIABLE FREQUENCY DRIVE.
AEB STAMP PLANNING APPROVAL
-CROSS FLOW PLATE HEAT EXCHANGER TO WORK AS FOLLOWING:
-TRANSFER INDIRECTLY THE COOLING ENERGY CARRIED BY COOLING AIR STREAM FROM THE SPACES TO THE OUTSIDE FRESH AIR STREAM AT HIGH SEPARATION LEVEL BETWEEN TWO STREAMS OF NOT LESS THAN 99%
-HEAT EXCHANGER EFFICIENCY NOT LESS THAN 65 % & RELATIVE HUMIDITY OF EXHAUST AIR AROUND 45 % AND THE PERCENTAGE OF ( SUPPLY AIR/ EXHAUST AIR) AROUND 1.1 .

(*1) SCHEDULE IS ESTIMATED ONLY, BASED ON ESTIMATED FLOW RATES FOR KITCHEN HOOD & MAKE-UP AIR, CONTRACTOR SHALL CALCULATE THE ACTUAL LOAD FOR THE UNIT BASED ON ACTUAL REQUIREMENT OF THE CAFETERIA
KITCHEN IN COORDINATION WITH THE KITCHEN EQUIPMENT CONSULTANT.
(*2) SCHEDULE IS ESTIMATED ONLY, BASED ON ESTIMATED FLOW RATES FOR EXTRACT HOOD & MAKE-UP AIR, CONTRACTOR SHALL CALCULATE THE ACTUAL LOAD FOR THE UNIT BASED ON ACTUAL REQUIREMENT OF THE SCIENCE
LAB'S IN COORDINATION WITH THE LABORATORY EQUIPMENT CONSULTANT.

SCHEDULE OF CLOSE CONTROL AC UNIT CONSULTANT:

WITH REMOTE AIR COOLED CONDENSOR (CCU)


AIR ON
COOLING COIL ELECTRICAL
ELECTRICAL
TOTAL ELECTRICAL Arab Engineering Bureau
SUPPLY CAPACITY REHEAT CHILLED QTY. AEB HEADQUARTERS:
POWER
S.N. REF.No. AREA SERVED AIR COOLING COIL STEAM WATER (NOS.) UNIT CONFIGURATION P.O. Box 1148 Doha, Qatar Tel +974 4406 88 88 Fax +974 4447 78 68
SENSIBLE TOTAL CONSUMPTION Email aeb@aeb-qatar.com Web www.aeb-qatar.com
FLOW COIL CAPACITY HUMIDIFIER FLOW RATE
COOLING COOLING (ESTIMATED) OTHER BRANCHES:
(L/s) (CDB/CWB) (KW) (KG/HR) (L/s)
(KW) (KW) (KW) ABU DHABI * MANILA * KUALA LUMPUR * MUSCAT

RACK ROOM - FIRST FLOOR DOWN FLOW DISCHARGE WITH


24 2 PROJECT :
1 A1-CCU-01 1515 22.2 / 16.2 16.0 16.2 6.0 9.0 0.58 FREE TOP RETURN WITH DUAL
& SECOND FLOOR COILS (CHILLED WATER + DX) DANAT EDUCATION-1
NOTE:
1. CONTRACTOR SHALL ESTABLISH ACTUAL HEAD AND SUBMIT CALCULATIONS TO THE COMAPNY FOR APPROVAL
OWNER :
2. CHILLED WATER COIL SHALL BE SELECTED FOR INLET CHILLED WATER TEMPERATURE OF 5.55C AND OUTLET CHILLED WATER TEMPERATURE OF 14.44C MR. ALI AL FARDAN
3. CONDENSER SHALL BE SELECTED AT 46C OUTSIDE AIR TEMPERATURE SITE :
MESAIMEER, DOHA QATAR
4. THE COMPRESSOR SHALL BE FITTED WITHIN THE INDOOR UNIT
TITLE :
5. THE UNIT SHALL BE WITH CHW AND DX COILS, BOTH COILS SHOULD BE SELCTED TO PROVIDE THE COOLING CAPACITIES AS MENTIOED IN THE TABLE
EQUIPMENT SCHEDULE

DRAWN BY : DESIGN BY : CHECKED BY : APPROVED BY :


SSR MSZ AM AMR
DATE : SCALE @ A0:
MAY 2017 N.T.S
REVISION
PROJECT NO : DRAWING NO :

1314-17 M-A1-0400B 0