Sl.

N
Descr
o
1 Earth work excavation for foundation In all soil & sub soil to full depths may be direc
complying with the relevant indian standard specifications.

a) upto 8'0" depth.

2 Filling the foundation with river sand in layers of 100mm thick including ramming, w
specifications.

SECTION 'B' P.C.C./R.C.C. WORK


3 Plain cement concrete 1:5:10 for levelling course column footing, plinth beam base et
ramming, consolidation, curing etc,,cost and conveyance of all materials complete in

a) P.C.C. 1:5:10 (for Foundation)


4 Supply and filling in basement with well gravel in layers of not more than 15cm thick
standard specifications.
6 Brick work in CM 1:6, using first class table moulded chamber burnt bricks including

Upto FFL

7 Reinforced cement concrete of M20 Mix using 20 mm hard blue broken granite meta
scaffolding materials , labour charges etc,,excluding cost and fabrication of reinforcem

i) Footing Concrete

ii) Columns
a) Ground floor

iii) Plinth beam


a) Ground floor

11 Inside wall plastering with CM 1:5, for 12mm thickness finished smoothly to one leve
specifications.
12 Outer side wall plastering with CM 1:5, for 19mm thickness finished smoothly to one
standard specifications.

11 Supplying and fabrication of steel for rcc works in all heights including straightening,
all works as per detailed relevant standard specifications.

a) Ground floor

b) Material advance(work in progress) 75% cost

Non tender items:


1 Earth work excavation for foundation In all soil & sub soil to full depths may be direc
complying with the relevant indian standard specifications.

below 8'0" level


2 Excavation for soft rock portion.(manually)
3 Refilling the excavated earth and consolidation etc .. Complete.

4 Earth work excavation for hard rock portions.(by mechanical hammer)Labour and M
5 Earth work excavation for hard rock portions.(by mechanical hammer)Labour and Ma

6 Sand Escalation

M.Sand

7 Bricks Escalation

8 Cement Escalation

9 Steel Escalation

10 Water proofing admixtures for plastering works.(Basement area)

GROSS BILL VALUE

Less TDS 2%

Less Retension amount 5% on Gross Bill Value

Less Mobilisation amount 10% on Gross Bill Value

Net Bill Value

Service Tax 10.3% on 33% of Gross Bill Value