Re: PUNCH LIST #2 Job #420054: 2015/2016 Milling and Overlay of Various Streets
Dear Mr. Fuller
This project has been inspected for acceptance. Before this project can be accepted, the following items need to be
completed. Repairs are now needed for the following locations:
808S. BUCHANAN ST. P.O. BOX 1971 AMARILLO,TEXAS 79105-1971 (806)378-6025 FAX (806)378-9363 TDD (806)378-4229
23 The paving tie WBL at the access road at station 38+50 +/- is a jump up from the existing
pavement.
24. The pavement tie in the WBL at the 1-27 underpass has failed.
25. Cracks along the entire project.
Bell: l-40toSW11th.
1 Construction debris on walks, approaches, alley aprons and in the flow line of gutter along the east
side of Bell between I-40 and Lawrence.
2. Pavement failure NBL at Lawrence and Bell.
3. Pavement failure in the SBL at Westwind
4 Construction Debris on walks, approaches, alley aprons and flow line of gutter along the west side of
Bell between SW11th and I-40
5 Pot hole in the SBL at Westgate
6. Cracks along the entire length of Bell
Please contact, Juan Gonzalez, Project Representative II at 680-9251 with a plan to accomplish this work.
Sincerely,
CITY OF AMARILLO
INTERNAL USE ONLY
All Items Completed On: |
Contractor Date
TN/ms