Data Collection Survey on The Project for Construction of Yangon Urban Expressway (YUEX)
FINAL REPORT
APPENDIX 1-2
PRESENTATION MATERIAL(2)
ProjectforComprehensiveUrbanTransportPlanoftheGreaterYangon AGGENDA OF DISCUSSION YUEX
YANGON URBAN EXPRESSWAY
OULINE OF YUEX
(Wai Za Yantar Road)
What is YUEX ?
3 4
1. BACKGROUND OF THE PROPOSAL YUEX YUEX
YANGON URBAN EXPRESSWAY YANGON URBAN EXPRESSWAY
ElevatedRadiaalRoad
Road]
Constructionof
[Inner RingR
Improvement
ofEW Corriror2
Le ge n d: Le ge n d: Le ge n d:
: Road to be constructed : Road to be constructed : Road to be constructed
: Completed Road : Completed Road : Completed Road
: Existing Road : Existing Road : Existing Road
5 Source:TheProjectforComprehensiveUrbanTransportPlanoftheGreaterYangon,JICA,2014 6
Source:TheProjectfortheStrategicUrbanDevelopmentPlanoftheGreaterYangon,JICA,2013
1)STRATEGICLAYOUTOFYUEXTOWARD2025 4lanesUrbanExpresswaysonExisting6lanesAarterialroads
ExpansionofRoadCapacityinthedensebuiltuparea
L
Legend:
d
Elevatedviaductstructure
Elevated viaduct structure on
on theexistingwidearterialroads
the existing wide arterial roads
:Proposed Expresswayby 2025 (CURRENTARTERIALROADS)
:Proposed ArterialRoadImprovementby 2025
:Proposed/OngoingNewSubCenters 6lanesroad(widthofeachlaneisapprox.3.6m.)
:Proposed LogisticTerminal/Depot
30m
RoadNo.7Improvement plannedby YCDC
RRoad No.3
Newtown(16,000acrelot)under
( , ) YCDC
NewLogistic Terminal/Depot
7 8
YUEX YUEX
2)CROSSSECTIONALCONCEPTOFYUEX YANGON URBAN EXPRESSWAY 2)CROSSSECTIONALCONCEPTOFYORR YANGON URBAN EXPRESSWAY
(AtgradedSection)
F
Fornonbuilduparea,at
b ild t (AtgradedSection)
(At graded Section)
gradedexpresswaycanbe Fornonbuilduparea(most
proposed. sectionofYORR),atgraded
expresswaycanbe
b
proposed.
(ElevatedSection)
Forbuilduparea,elevated
viaductexpresswayis (FlyoverSection)
p p
proposed. Forcrossingthearterial
roads,elevatedviaduct
expresswayisproposed.
Proposedroute(arterialroads)isstillnotsocongested
and the construction of the viaduct could be possible
andtheconstructionoftheviaductcouldbepossible
now
9 10
3)TRAFFICDEMANDFORECASTBYYUTRA(2014) YUEX
YANGON URBAN EXPRESSWAY
Theresultsofthetrafficdemandforecastindicated;;
1) MostofthemajorarterialroadswillbesaturatedinDONOTHINGcase.
2) Thecapacityofthearterialroadsneedtobeextendedbutthewideningwillbeadifficult
measureduetolandacquisition.
d t l d i iti
3) InYUTRA/SUDP,viaductringroadwasproposedtoextendthecapacityofthearterialroads.
AlsothemodalsplittoMRTwasconsideredinthetrafficanalysis.
YORR
Ticketing Payment Distance/Area
13 14
Y-N-M Expressway
EIRR 18%
15 16
3. PROPOSED ALIGNMENT OF YUEX YUEX 3. PROPOSED ALIGNMENT OF YUEX YUEX
YANGON URBAN EXPRESSWAY YANGON URBAN EXPRESSWAY
DoubleTrumpetICs(infuture) Flyovers for"Uturn"
IC01
Sections General Features and
(Length) Applied Cross Sections IC02A JCT01
N
R1 Section
(Figure 2.5.1) is applied.
(14.5km)
(Sta.16+500-31+000)
Mostly in build-up area and the elevated cross section
E Section
(Figure 2.5.1) is applied.
(6.9km)
(Sta.31+000-37+900)
R2 Section Mostly in build-up area and the elevated cross section
M Section
MSection
(24 3k )
(24.3km) (Fi
(Figure 2
2.5.1)
5 1) iis applied.
li d
W Section Mostly in non build-up area and the cross sections
(7.9km) (Figure 2.5.2 and 2.5.3) are applied.
M Section Mostly in build-up area and the elevated cross section
(6.7km) (Figure 2.5.1) is applied.
S Section Mostly in build-up area and the elevated cross section (Key Location Map)
(9.5km) (Figure 2.5.1) is applied.
17 18
N
Realigned
Realigned
JCT04
Stadium Realigned
IC11
miRd.
IC08A Realigned
IC08B IC09A
Param
Realigned IC13A
IC13B IC12B IC12A
ExistingFlyovers
JCT02
IC05B JCT03 BayintnaungTruckTerminal
IC07B IC14A
Rd.
IC06A IC07A
IC06B
IC 06B Thudhammar Rd
ThudhammarRd.
ParamiR
IC14B JCT05
RadioStationRd. (toYIA) KabaayePagodaRd.
IC16B IC16A
IC15A
IC15B
Stadium Realigned
IC09A
JCT04
ExistingRailwayBridge
Realigned N
New Sub center
NewSubcenter Realigned
(DagonMyothit) Realigned
JCT02
IC10A
IC09B ThanthumarRd. IC17B IC18A IC18B
IC17A
ExistingRoadBridge
19 20
3. PROPOSED ALIGNMENT OF YUEX YUEX 4. PROPOSED VIADUCT STRUCTURES YUEX
YANGON URBAN EXPRESSWAY YANGON URBAN EXPRESSWAY
N
1)SuperstructureforStandardSection
IC19
Flyovers for"Uturn" PrecastingPCGirderwhichis
Pre casting PC Girder which is
IC20A
IC20B
DenselyBuildup Area
fabricatedatfactoryand/orgirder
IC21A YUEXMSection gy q y
castingyardunderqualitycontrolare
JCT05
IC22A IC22B
JCT03
extractedsincemanynumberofgirders
hastobefabricatedinshorttime.
IC21B IC23B
IC23A
Realigned Realigned
InyaLake
PC
PCIICompositeGirder:35m
Composite Girder : 35m
YangonCentralStation
RailwayDepot
IC09CA
(applicablelength:2540m)
(Mahlwagon)
PCUCompositeGirder:40m
(applicablelength:3560m)
Realigned
SteelBoxGirder:50m
(
(applicablelength:40m)
li bl l th 40 )
21 22
YUEX YUEX
SuperstructureforStandardSection YANGON URBAN EXPRESSWAY SuperstructureforStandardSection YANGON URBAN EXPRESSWAY
23 24
YUEX YUEX
2)SuperstructureforSpecialSection YANGON URBAN EXPRESSWAY YANGON URBAN EXPRESSWAY
Superstructure for Special Section
SuperstructureforSpecialSection
SteelBoxGirderlessthan7080mspanlength,generallySteel
p g ,g y
BoxGirderwithRCslabbecomeseconomicalthanSteelBox
GirderwithsteelPlatedeck.
25 26
YUEX YUEX
SuperstructureforSpecialSection YANGON URBAN EXPRESSWAY 3)SubstructureforStandardSection YANGON URBAN EXPRESSWAY
Theshapeofsubstructureadopts1Column&TshapeType.
, g g
Inthiscase,therearethefollowingadvantages.
Detourprocedureissimpledueto1stepdetour.
Fenceisstraightandfixedduringconstruction
F i t i ht d fi d d i t ti
CrosssectionImageatJCT04onYUEXR1Section(Sta.32+000)
periodforPierColumnandFoundation
Duetosmoothlineoffence,trafficflowis
smooth.
smooth
CrosssectionImageatYUEXR2Section(Sta9+960)
27
DetourPlaninPileCapConstruction 28
YUEX YUEX
SubstructureforStandardSection YANGON URBAN EXPRESSWAY SubstructureforStandardSection YANGON URBAN EXPRESSWAY
RotationSteelPiletypeisselectedastherecommendedfoundation
However,asforPCPileandPCWellfoundation,
typeatareawhereisdifficulttosecureenoughconstructionyard.
those foundation type also can be the eco friendly type and
thosefoundationtypealsocanbetheecofriendlytypeand
constructioncostmightbecheaperthanotherfoundationtypesin
f
future,
,
whenfabricationfactoryofPCPileandPCWellisestablishedin
Yangon.
Therefore,moredetailedcomparisonstudyshallbecarriedoutin
consideration of the possibility of application of PC pile and PC
considerationofthepossibilityofapplicationofPCpileandPC
Wellinnextstage.
29 30
YUEX YUEX
SubstructureforStandardSection YANGON URBAN EXPRESSWAY 4)SubstructureforInsideRiver YANGON URBAN EXPRESSWAY
31 32
YUEX 4. OPERATION AND MAINTENANCE OF YUEX
SubstructureforInsideRiver YANGON URBAN EXPRESSWAY YANGON URBAN EXPRESSWAY
EXPRESSWAY
1) Traffic Control
1)TrafficControl
2) Toll Collection
2)TollCollection
3)InspectionandMaintenance
)
Reference
DevelopmentofRingRoads
Development of Ring Roads
SafetyFacilities
33 34
VMS
TrafficCounter Highway
Weatherinformation
Radio
JARTIC
TrafficPatrol JapanRoadTrafficInformation TV,Radio
Center
Otherexpressway
MLITetc. Smartphone
companies 35 36
Toll Collection YUEX 3)Inspection and Maintenance YUEX
YANGON URBAN EXPRESSWAY YANGON URBAN EXPRESSWAY
Effects of ETC installment by Japanese Experiences
EffectsofETCinstallmentbyJapaneseExperiences Current Situation of YangonMandalay
CurrentSituationofYangon MandalayExpressway
Expressway
Causesofcongestiononexpressways Visualbaseinspectiononly
Before
Others
Simpleroutinemaintenance(Cleaningetc.)andrehabilitationsofpavementetc.
7%
Merging TollPlaza
Point 31% 31% of congestion is ForappropriateinspectionandmaintenanceforYUEX
22% due to inadequate Suitableandwellplannedinspection/maintenanceframeworkshouldbeestablished
p p /
capacity at toll gates. Propertiesandconditionofroadstructuresshouldbemanagedbydatabasesystem
Sag&Tunnel
40% Education/Trainingforinspection/maintenanceshouldbeconducted
Inspection Framework
InspectionFramework BMS/PMS and Strategic Maintenance
BMS/PMSandStrategicMaintenance
TimeLoss
EffectsofETCinstallation
ETCUsage
After
98%decrease
year
37 38
Cleaning(Tunnel)
DecentralizeTrafficfromUrbantoSuburb
Area
PavementInspection
MoveDirectlybetweenSuburbAreas
RehabilitationofConcretedamagedbySalt
Nondestructiveinspection
KeepDiversionunderEmergency
Situation
39 40
(Reference)SafetyFacilities YUEX
YANGON URBAN EXPRESSWAY
Example of Safety Facilities on Japanese Expressway
TrafficLight GuardRail SignBoard
LightemittingType ExpandedMetal
Notonlysafetyfacilities,butalsomanymeasuresarerequiredtoarchivesafe
expressway Length No of Deaths per Billion
Traffic Volume Year
(km) Deaths Vehicle KM Traveled
Yangon-
587 78 Approx.
pp 4,500
, 2012 40.3
Mandala
Mandalay
NEXCO East 3,720 70 Approx. 26,500 2012 1.5
41