DESIGN OF R.C.

C DRAIN (750x1314)
0 Surcharge = 1 t/m

1389
1314

1.189 0.317

1.314 0.350
150 (at face) (at face)

750 1x1.389 1/3x1.389x0.8 1/2x1


150 150 = 1.389 t/m2 , = 0.3704 t/m , = 0.50

MAXM. DEPTH OF DRAIN = 1.31 m


WIDTH OF DRAIN = 0.75 m
GRADE OF CONCRETE M25= 25 N/mm
GRADE OF STEEL = Fe500= 500 N/mm
SUBMERGED UNIT WT. OF SOIL = g sub = 0.8 t/m
g water = 1 t/m
WALL THICKNESS= 150 mm
BASE SLAB THICKNESS= 150 mm
CLEAR COVER = 20 mm
EFFECTIVE DEPTH (d)= 125 mm
WIDTH (b) = 1000 mm

DESIGN OF SIDE WALL: 150 THK


MOMENT CALCULATION AT FACE OF BASE SLAB
DUE TO WATER = 0.5x1.314x1.314x(1.314/3)
= 0.378 t-m/m
DUE TO SUBMERGED SOIL = 0.5 x0.35x1.314x(1.314/3)
= 0.101 t-m/m
DUE TO SURCHARGE = 0.5x1.314x(1.314/2)
= 0.432 t-m/m
TOTAL MOMENT M = 0.378+0.101+0.432
= 0.911 t-m/m

Mu/bd = (1.5x0.911x10^7)/(1000x125^2)
= 0.875 N/mm
Pt req= 0.210 %
Pt min= 0.120 %
Ast req = 2.624 cm
PROVIDE, 10 mm DIA 200 mm c/c (= 3.93 cm)/m AS MAIN REINFORCEMENT
8 mm dia 200 mm c/c (= 2.51 cm)/m , AS DISTRIBUTION STEEL

CHECK FOR SHEAR


SHEAR CALCULATION AT DISTANCE "d" FROM FACE OF SUPPORT
DUE TO WATER = 0.5 x1.189x(1.314-0.125)
= 0.707 t-m/m
DUE TO SUBMERGED SOIL = 0.5 x0.317x(1.314-0.125)
= 0.188 t-m/m
DUE TO SURCHARGE = =0.5x(1.314-0.125)
= 0.595 t-m/m
TOTAL SHEAR V= 0.707+0.188+0.595
= 1.490 t/m
SHEAR STRESS (t v) = (1.5x1.49x10^4)/(1000x125)
= 0.179 N/mm
tc = 0.403 > 0.179N/mm2 O.K
DESIGN OF BASE SLAB: 150 THK
SELF WT. OF DRAIN = (((2x1314x150)+(750+150+150)x150)x2.5)/(10^6)
= 1.379 t/m
SELF WT. OF PRECAST SLAB = 0x(750+50x2)x2.5/10^6
= 0 t/m
LIVE LOAD OVER DRAIN = 1.000 t/m

TOTAL = 1.379+0+1
= 2.379 t/m
NET UPWARD PRESSURE = 2.379x1000/(750+150x2)
= 2.266 t/m
B.M AT SPAN M = ((2.266x(750+150)^2)/8)/10^6 +0.911
= 1.140 t-m/m
Mu/bd= (1.5x1.14x10^7)/(1000x125^2)
= 1.094 N/mm
Pt req= 0.266 %
Pt min= 0.12 %
Ast req = 3.325 cm
PROVIDE, 10 mm DIA 200 mm c/c (= 3.93 cm)/m AS MAIN REINFORCEMENT
8 mm dia 200 mm c/c (= 2.51 cm)/m , AS DISTRIBUTION STEEL

CHECK FOR SHEAR

SHEAR AT FACE OF WALL V= ((2.266x750)/2)/10^3)


= 0.85 t
SHEAR STRESS (t v) = (1.5x0.85x10^4)/(1000x125)
= 0.102 N/mm
tc = 0.403 > 0.102N/mm2 O.K
DESIGN OF CABLE TRENCH (1350x1200)
0 Surcharge = 2 t/m

1262.5
1200

0.396

0.432
125

1350 1/3x1.2625x1.08 1/2x2


125 125 = 0.4545 t/m , = 1.00

MAXM. DEPTH = 1.20 m


WIDTH = 1.35 m
GRADE OF CONCRETE M25= 25 N/mm
GRADE OF STEEL = Fe500= 500 N/mm
SUBMERGED UNIT WT. OF SOIL = g sub = 1.08 t/m
g water = 1 t/m
WALL THICKNESS= 125 mm
BASE SLAB THICKNESS= 125 mm
CLEAR COVER = 20 mm
EFFECTIVE DEPTH (d)= 100 mm
WIDTH (b) = 1000 mm

DESIGN OF SIDE WALL: 125 THK


MOMENT CALCULATION AT FACE OF BASE SLAB
DUE TO WATER = 0.5xx1.2x(1.2/3)
= 0 t-m/m
DUE TO SUBMERGED SOIL = 0.5 x0.432x1.2x(1.2/3)
= 0.104 t-m/m
DUE TO SURCHARGE = 1x1.2x(1.2/2)
= 0.72 t-m/m
TOTAL MOMENT M = 0+0.104+0.72
= 0.824 t-m/m

Mu/bd = (1.5x0.824x10^7)/(1000x100^2)
= 1.236 N/mm
Pt req= 0.303 %
Pt min= 0.120 %
Ast req = 3.025 cm
PROVIDE, 10 mm DIA 150 mm c/c (= 5.24 cm)/m AS MAIN REINFORCEMENT
8 mm dia 150 mm c/c (= 3.35 cm)/m , AS DISTRIBUTION STEEL

CHECK FOR SHEAR


SHEAR CALCULATION AT DISTANCE "d" FROM FACE OF SUPPORT
DUE TO WATER = 0.5 x0x(1.2-0.1)
= 0 t-m/m
DUE TO SUBMERGED SOIL = 0.5 x0.396x(1.2-0.1)
= 0.218 t-m/m
DUE TO SURCHARGE = =1x(1.2-0.1)
= 1.1 t-m/m
TOTAL SHEAR V= 0+0.218+1.1
= 1.318 t/m
SHEAR STRESS (t v) = (1.5x1.318x10^4)/(1000x100)
= 0.198 N/mm
tc = 0.498 > 0.198N/mm2 O.K
DESIGN OF BASE SLAB: 125 THK
SELF WT. = (((2x1200x125)+(1350+125+125)x125)x2.5)/(10^6)
= 1.250 t/m
SELF WT. OF PRECAST SLAB = 0x(1350+50x2)x2.5/10^6
= 0 t/m
LIVE LOAD = 1.000 t/m

TOTAL = 1.25+0+1
= 2.250 t/m
NET UPWARD PRESSURE = 2.25x1000/(1350+125x2)
= 1.406 t/m
B.M AT SPAN M = ((1.406x(1350+125)^2)/8)/10^6 +0.824
= 1.206 t-m/m
Mu/bd= (1.5x1.206x10^7)/(1000x100^2)
= 1.809 N/mm
Pt req= 0.458 %
Pt min= 0.12 %
Ast req = 4.58 cm
PROVIDE, 10 mm DIA 150 mm c/c (= 5.24 cm)/m AS MAIN REINFORCEMENT
8 mm dia 150 mm c/c (= 3.35 cm)/m , AS DISTRIBUTION STEEL

CHECK FOR SHEAR

SHEAR AT FACE OF WALL V= ((1.406x1350)/2)/10^3)


= 0.949 t
SHEAR STRESS (t v) = (1.5x0.949x10^4)/(1000x100)
= 0.142 N/mm
tc = 0.498 > 0.142N/mm2 O.K