Financial Management | October 2014 47

RESOURCE
STudy & tech notes/the institute/events

study
In this issue
Paper E1 Enterprise
Operations and

notes
paper P2 Performance
Management, p51

Paper E2
and, as with all projects, the situation
will be partly down to circumstances
that are under your control and others

Enterprise that you cannot influence. It is possible


that your preparations have gone exact-

Management
ly to plan so far and you are right on
course for success. If so, congratulations
lets hope it stays that way. But even
This is the second and final article in a series designed to show you the best-planned projects can go off
how to apply the theories of project management to a real scenario track, so Im going to assume that it
hasnt all been perfect and that you have
that every student can relate to: that of your own exam preparations
encountered a problem somewhere
By Paul Wyatt ACMA, CGMA down the line. It might be relatively

Y
minor, such as missing a study session
a setback from which you should be
ou may recall that by the on the next page, the execution stage able to recover over the course of your
end of the first article in (where you deliver against the project project. Or it could be something more
this series on project plan) and the controlling stage (where drastic, such as the discovery that youre
management, published you keep track of progress and carry out soon to be made redundant. But lets
in Septembers FM app, remedial work if the project is not going assume that the severity of your problem
you had formed a strong to plan) are closely linked. In some cases, has fallen somewhere in between these
plan to help you prepare for your exams you may need to go all the way back to two extremes.
and were poised to start the execution the planning stage and produce a revised In the first article I used an example
stage of your project to pass them. plan for the rest of the project. Lets now Gantt chart to illustrate your 10-week
This article is designed to help you see how yours is working out. project. Lets assume that you were ill
move through the remaining three stages for the whole of week six. Because of this,
of the project management life-cycle: Executing and controlling you missed two days of a revision course
executing, controlling and closing. As There are clearly several possibilities as with your learning provider, as well as
you can see from the life-cycle diagram to how your project may be progressing several self-study sessions that you
48 Financial
Financial
Management
Management
| September
| October 2014
2013

The project life-cycle Alternatively, instead of fitting in a


couple of full days of extra work, maybe
you could add an hour on to several
Initiating Planning individual study sessions and still have
your weekend off. However you decide
to make up the time, you need to ensure
that you dont overwork yourself and
become tired, because this would reduce
Controlling Executing the quality of your studies.
If youre simply finding some extra
time for your studies, its unlikely to add
to the cost of your project. But another
way to reduce the impact of losing week
Closing six may be to book an extra revision
session with a learning provider if one
is available. This is likely to incur an
extra cost, but it could be a quicker
had planned. This has put you signifi- stressed and cause you to lose focus. method of making up the lost time than
cantly behind schedule and you have What you can do, though, is turn this merely studying on your own. Its a
also missed out on valuable classroom into positive energy and look at the trade-off between time and cost.
time with your tutor. options available for getting your project When it comes to quality, Ive already
One of the benefits of using the Gantt back on track. And were going to con- mentioned that you should take care not
chart as a project management tool is sider these options in the context of the to reduce the effectiveness of your stud-
that you can plot planned and actual iron triangle of time, cost and quality ies by adding too many extra hours to
activity on it, so that you can see clearly that I discussed in the first article. your sessions. But it is possible to obtain
how the project is progressing at any Because your project has a fixed end more quality from fewer hours. For
point. The revised Gantt chart below date ie, that of the exam, you cannot i nstance, make doubly sure that you
r eflects the scenario I have just de- simply add a week on to the end of it. wont be interrupted during your study
scribed, as at the end of week six. You But your project plan should not have sessions. This should enable you to
can see the planned and actual timings been so tightly scheduled that you stayreally focused on the job at hand.
for the first six weeks, but only the needed to spend every waking hour stud- Another tactic is to ensure that youre
original planned timings for weeks seven ying. So its likely that you can borrow completely up to date with your non-
to 10, as we havent yet decided what some time from other non-project project tasks, so that you arent thinking
remedial action to take. a ctivities. For instance, it may be that about what household chores you still
The first thing to do, as should be the you were going to give yourself a treat need to do, say, while youre trying to
case when any project falls behind by taking the weekend of week eight off, focus on your studies.
schedule, is to stay calm. Whats hap- to spend time with friends. Perhaps you Whatever actions you decide to take,
pened has happened and you cant can consider postponing this for a couple you will need to revise your plan for the
change that. Worrying about what has of weeks something to look forward to remainder of the project to reflect these
already occurred will only get you after you have taken the exam, perhaps. changes. It may well be useful to draw

Sample Gantt chart for exam project showing planned and actual timings as at the end of week six

Task Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10

Enrol with learning provider

Register for exam

Attend classes

Study

Take progress test

Take mock exam

Sit exam
50 Financial Management | October 2014

up a revised Gantt chart showing your need to take with you on exam day, such you achieved the required level of qual-
replanned activities and schedule for as pens (black or blue), including spares, ity, was it a comfortable pass? If you
weeks seven to 10. calculator and ruler (depending upon failed, how close were you to achieving
the exam), a bottle of water, a copy of the pass mark?
The closing stage your notification from CIMA confirming l Reviewing the budget. If you overspent
The main activities that take place at the your exam entry, photo ID etc. or underspent, what were the reasons?
final stage of a project are completion l Put all of your study materials some- l Reviewing the time taken to deliver
and a post-completion audit. Both are where safe. After all of your meticulous your project. Did you meet all of your
important in your scenario. preparations, you should pass the exam, target dates. If not, why not?
The completion phase normally but dont tempt faith by throwing Considering all these factors will help
involves the work thats required to pass e verything away just yet. These notes you to improve your chances of success
the projects final deliverable (project are also likely to be of use as you prepare in future projects. In a workplace pro-
management jargon for product) from for future exams. ject, a formal post-completion audit
the project team over to the operational l Reflect back on the project to see what report would cover all the factors listed
team. In this case, youre responsible for went well and what didnt go as planned, above while also analysing the effective-
both. This means that youre carrying so that you can learn vital lessons for ness of any particular project manage-
out the final steps to prepare yourself for your next project in this case, prepar- ment methods that have been used. It
exam day so that youre ready for the ing for your next exam. would include input from end users and
final deliverable of passing the exam. Other key tasks, if this were a work- members of the project team, too.
The key tasks that come into considera- place project, would include obtaining I hope that this series will enable you
tion at this point are as follows: written approval from various stakehold- to apply your p roject management
l Ensuring that you have done all your ers, writing a report that refers back to knowledge more effectively when sitting
final revision. Have you done everything the feasibility study and obtaining feed- E2 and also to prepare yourself better
you can to ensure that you are sufficient- back on how successful the project has for any exam. The key point to remem-
ly well equipped to pass the exam? been at achieving its objectives. ber is that, while knowledge is impor-
l Make a preparatory journey to the Although it is vital that you prepare tant, your ability to apply it effectively
exam centre if you are using it for the yourself for exam day, this is not yet the in an exam will have a big impact on
first time, or check whether there have end of your project. Before you finally whether you pass or fail, especially at
been any changes since the previous bring proceedings to a close, it is impor- Management level and above.
time you visited it that might affect your tant to conduct a post-completion audit.
transport arrangements eg, roadworks Key steps here include the following: Paul Wyatt is a training and man-
Getty Images

or alterations to the railway timetable. l Reviewing your exam results compared agement consultant at Wyatt Busi-
l Check that you have everything you with the outcome you were expecting. If ness Solutions