Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
: 3444
Project: BRIDGE @ RD 43+350 JANDOLA TANAI By: Azeem
Subject: Prestressed Girder 20m span (10.4 m Wide) Chk.: AJ
Date: January, 2015
NO. OF GIRDERS= 4
NO. OF DIAPHRAGMS= 3
(i) be=Span/4.0
be= 5000 mm
be= 3110 mm
INPUT DATA
1600.00 Span 20m
1500.00
B1 = 700 mm
1400.00
1300.00 B2 = 600 mm
1200.00 B3 = 200 mm
1100.00
1000.00
B4 = 70 mm
900.00
800.00 St = 230 mm
700.00
600.00
D1 = 1450 mm
500.00 D2 = 130 mm
400.00
D3 = 70 mm
300.00
200.00 D4 = 70 mm
100.00 D5 = 200 mm
0.00
D6 = 200 mm
-100.00
500.00
-700.00
-500.00
-300.00
100.00
300.00
700.00
GIRDER SECTION
file:///conversion/tmp/scratch/358458332.xls
PROPERTIES OF EXTERIOR GIRDER
be= 2600 mm
Reduced Effective Flange Width = 2326 mm
INPUT COMPOSITE SECTION ONLY GIRDER
TOTAL DEPTH OF GIRDER = 1680 mm = 1450 mm
B SLAB = 2600 mm = mm
D SLAB = 230 mm = mm
B TOP FLANGE = 700 mm = 700 mm
D TOP FLANGE = 130 mm = 130 mm
B TOP LARGE TRIANGLE = 180 mm = 180 mm
D TOP LARGE TRIANGLE = 70 mm = 70 mm
B TOP RECTANGLE = 70 mm = 70 mm
D TOP RECTANGLE = 70 mm = 70 mm
B TOP SMALL TRIANGLE = 70 mm = 70 mm
D TOP SMALL TRIANGLE = 70 mm = 70 mm
B WEB = 200 mm = 200 mm
B BOTTOM TRIANGLE = 200 mm = 200 mm
D BOTTOM TRIANGLE = 200 mm = 200 mm
B BOTTOM FLANGE = 600 mm = 600 mm
D BOTTOM FLANGE = 200 mm = 200 mm
CONCRETE STRENGTH FOR SLAB = 28 Mpa = 28 Mpa
CONCRETE FOR GIRDER = 35 Mpa = 35 Mpa
CONCRETE FOR COMPOSITE SEC. = 35 Mpa
file:///conversion/tmp/scratch/358458332.xls
PROPERTIES OF INTERIOR DIAPHRAGM
(i) be=12hf + bw
be= 3060
be= 1950
INPUT
TOTAL DEPTH OF DIAPHRAGM (upto top of slab) = 1480 mm
B SLAB = 1950 mm
D SLAB = 230.00 mm
B WEB = 300 mm
D WEB = 1250.00 mm
OUTPUT
AREA (Ax) = 823500 mm2
y' LOCATON OF N.A FROM BOTTOM = 1028.02 mm
M.O.I (Ix) = 162644333538.3 mm4
M.O.I (Iy) = 144930937500 mm4
SHEAR AREA (Ay) = 444000 mm2
SHEAR AREA (Az) = 448500 mm2
(i) be=0.8*Span/4.0
be= 520
(i) be=12*hf/2 + bw
be= 1680
INPUT
TOTAL DEPTH OF DIAPHRAGM = 1480 mm
B SLAB = 520 mm
D SLAB = 230.00 mm
B WEB = 300 mm
D WEB = 1250.00 mm
OUTPUT
AREA (Ax) = 494600 mm2
y' LOCATON OF N.A FROM BOTTOM = 803.94 mm
x' LOCATON OF N.A FROM LEFT = 343.40 mm
M.O.I (Ix) = 99011366519.07 mm4
M.O.I (Iy) = 6604706642.405 mm4
SHEAR AREA (Ay) = 444000 mm2
SHEAR AREA (Az) = 119600 mm2
file:///conversion/tmp/scratch/358458332.xls
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 3444
Project: BRIDGE @ RD 43+350 JANDOLA TANAI By: Azeem
Subject: Prestressed Girder 20m span (10.4 m Wide) Chk.: AJ
Date: January, 2015
CALCULATION OF LOSSES
Span = 20 (m)
Wobble Coofficent, K = 0.0033 (per meter) ACI Code: for Grouted Tendons in metal
Curvature Coofficient, = 0.25 sheathing Wire Strand (Page # 270)
Anchorege Set " L"= 0.005 (m)
Relative Humidity RH = 50 %
Eccentricity e = 0.548 (m) Tendon Vertical distance from bottom at mid Span
of Tendons for girder section only 1 2 3
Approx. Losses= 25 % 125 125 125
250
App no. of Strands= 46 4 5 6
Page4of12
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 3444
Project: BRIDGE @ RD 43+350 JANDOLA TANAI By: Azeem
Subject: Prestressed Girder 20m span (10.4 m Wide) Chk.: AJ
Date: January, 2015
ELASTIC SHORTENING
ANCHORAGE SLIP
P = (Pj - Px) / x
= 12.06 (T/m)
118.33 (KN/m)
CREEP OF CONCRETE
fcds = Md * e / Ic
= 8451.22 (KN/m2)
SHRINKAGE OF CONCRETE
Page5of12
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 3444
Project: BRIDGE @ RD 43+350 JANDOLA TANAI By: Azeem
Subject: Prestressed Girder 20m span (10.4 m Wide) Chk.: AJ
Date: January, 2015
RELAXATION OF PRESTRESSING STEEL
TOTAL LOSSES
Stage 1: At Yard
Pe = 3462.46 (KN)
Pe = 3462.46 (KN)
Fb = Pe/Ac + Pe*e/Zb - (Mo + Mdp)/Zb - (Mdc + Ml)/Zbc = 2132.2 (KN/m2) 309.25 psi OK
: minus sign indicates Tension
allowable tension = -2927.3 (KN/m2) -424.57 psi
allowable compression = 13799.4 (KN/m2) 2001.44 psi
Page6of12
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 3444
Project: BRIDGE @ RD 43+350 JANDOLA TANAI By: Azeem
Subject: Prestressed Girder 20m span (10.4 m Wide) Chk.: AJ
Date: January, 2015
M D.L = Moment due to all dead loads including selfweight = 200.25 Ton-m
of girder
M L.L = Moment at mid span due to live load = 154.00 Ton-m Live + Impact
d* = Prestressing steel centroid from bottom at mid point = 0.156 m = 6.15 inches
d = Effective depth from top to prestressing steel centroid = 50.94 inches at mid section
* = factor for type of prestressing steel = 0.40 for normal relaxation steel
1 = factor for concrete strength = 0.80
= capacity reduction factor = 0.90 for post-tensioned cast in place concrete
Asf = steel area for flange overhang portion = 0.85fc'slab(b-b')t/fsu* = 6.842 inches2
Non prestressed tension reinforcement not included (included / not included)
Asr = steel area for web = As*-Asf = 1.486 inches2
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 3444
Project: BRIDGE @ RD 43+350 JANDOLA TANAI By: Azeem
Subject: Prestressed Girder 20m span (10.4 m Wide) Chk.: AJ
Date: January, 2015
Check:
Reinforcement Index = Asr fsu*/(b'd fcgirder) = 0.18
0.36 1 = = 0.29 eq.1 not valid
V L.L = For live load at critcal section from face = 26.00 Ton From Model
Vgirder+Vslab = For Dead load at critcal section from face = 27.46 Ton
Vslab = For slab load at critcal section from face = 11.23 Ton
Vsdl = For superimposed dead loads = 8.00 Ton From Model
at critcal section from face
ML.L = For live load at critcal section from face = 106.50 Ton - m From Model
Mgirder = For girder load at critcal section from face = 25.99 Ton - m
Mslab = For slab load at critcal section from face = 27.82 Ton - m
Msdl = For superimposed dead loads = 37.40 Ton - m From Model
at critcal section from face
b' = Thickness of web of the girder = 0.200 m = 7.87 inches
d = 0.8 h = 1.160 m = 45.67 inches
Vi =1.3(V dead load + V sdl + 1.67x VL.L) - (V dead load + Vsdl) = 67.08 Ton = 147.85 Kips
= 147854.42 lbs
fd = stress due to unfactored dead loads = Md / Zb = 431.01 Ton /m2 = 88.24 k /ft2
= 612.87 lbs/in2
Mmax = 1.3 (Md + Msdl + 1.67 M L.L) - (Md + Msdl) = 258.57 Ton - m = 1869.84 kip- feet
= 2.244E+07 lb - in
Shear Strength provided by concrete = lesser of Vci & Vcw = 94.71 Tons = 208.73 kips
Vc = 80.50 Tons = 177.42 kips
Vu>fVnh stirrups of pre cast girder must be extend into the deck slab
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 3444
Project: BRIDGE @ RD 43+350 JANDOLA TANAI By: Azeem
Subject: Prestressed Girder 20m span (10.4 m Wide) Chk.: AJ
Date: January, 2015
After Losses Bearing Stress = 1.15 Pe / A1 = 1367.1 Ton /m2 = 1943.7 lbs/in2
TABLE - 2
ANCHORAGE RECESS DATA
TENDON NO. ANGLE X (mm)
1 143'05'' 9
2 509'16'' 28
3 835'27'' 47
4 1035'44'' 58
5 ### 0
6 ### 0