A) GENERAL START-UP
1. All the valves were ensured closed except the ventilation valve V13.
2. All the gas connections were checked whether they are properly fitted.
3. The valve on the compressed air supply line was opened. The supply pressure was
set between 2 to 3 bar by turning the regulator knob clockwise.
4. The shut-off valve on the CO2 gas cylinder was opened. The CO2 cylinder was
checked whether the pressure is sufficient.
5. The power for the control panel was turned on.
RESULT TABLE
Flow Rate
Presurre Drop (mmH2O)
(L/min)
Air
20 40 60 80 100 120 140 160 180
Water
1.0
2.0
3.0
CHE 523
EXPERIMENT : GAS ABSORPTION