Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
CONSTRUCTIONUNDERTHE1STRESERVELINE:ProtectionofPier,RFcable
1.Protection of Existing MRT Viaduct pier and Stump/Pile cap 2.Protection of RF cable during Barrette Installation Work
1.ProtectionofPierduringexcavation 2.ProtectionofRFcableduringsetthemachine
during Barrette and D-Wall Installation Work
Hoarding
sheet
25mm steel plate both side of RF
cable with bracing each other with
25mm rebar@2000mm
Existing Stump or
Pile Cap
Bracing with 25mm
rebar@2000mm
RF cable