Engineering Procedure
Example
156
4-Oct-A001 JMR
Appendix C: Engineering Procedure Example 157
Engineering Procedure
Title: Engineering Change Proposal Eng. Proc. No.: EP-02-05
Release Date: 03/15/00 Revision: B Page: 1 of 5
1.0 Purpose
Engineering Procedure:
EP-2-2 Document Number Assignment Logbook
Engineering Form:
E031 Engineering Change Proposal
Prepared By:
Engineer: Date:
Approved By:
Engineering Procedure
Title: Engineering Change Proposal Eng. Proc. No.: EP-02-05
Release Date: 04/15/00 Revision: A Page: 2 of 5
Engineering Procedure
Title: Engineering Change Proposal Eng. Proc. No.: EP-02-05
Release Date: 04/15/00 Revision: A Page: 3 of 5
4.1 Engineer
Steps
1. Prepare the Engineering Change Proposal
form E031 to submit a proposed change to
the customer for evaluation and disposition.
2. Forward the completed Engineering
Change Proposal to the Engineering
Manager for review and approval.
4.3 Engineer
4. Forward the approved Engineering Change
Proposal Form to Engineering Document
Control for the assignment of part numbers.
Engineering Procedure
Title: Engineering Change Proposal Eng. Proc. No.: EP-02-05
Release Date: 04/15/00 Revision: A Page: 4 of 5
4.5 Engineer
8. After receipt of the Engineering Change
Proposal Request form from the customer,
it shall be forwarded to the originator for
disposition.
5.0 Overview
The procedure for processing the Engineering Change
Proposal form shall be followed by each individual responsible for
entering information on the form. Each circled number below
corresponds to the circled number on the following Part Number
Request form E031.
5.1 Engineer
Engineer: Enter your name and date that
the Engineering Change Proposal form was
completed.
Engineering Procedure
Title: Engineering Change Proposal Eng. Proc. No.: EP-02-05
Release Date: 04/15/00 Revision: A Page: 5 of 5
5.4 Engineer
Priority: Check the priority of the change.
(Urgent is for line down situations only.)
Model Number: Enter the model number(s)
that are affected by this change.
Serial Number Affectivity: Enter the serial
number, part name and drawing number.
Part Number: Enter the part number, part
name and drawing number.
Reason for Change: Enter the reason for
the change.
Description of Change: Enter the
description of the change.
5.5 Customer
Priority:
Engineering Manager: Date: Routine Urgent
Model(s) affected: