Sei sulla pagina 1di 5

Top Max.

Props Forces (K)


deflection Moment (k- Max.(k)
Shear
Satges
(in) ft)
1st Level 2nd Level
1 0.36 54.55 7.00
2 1.25 99.00 11.00
3 1.24 98.00 11.00 7.14
4 0.86 144.00 23.00 141.72
5 0.90 148.00 23.50 188.47 8.41
6 0.94 154.00 39.20 181.93 363.44
7 0.92 163.00 38.00 168.32 318.37
8 0.99 231.00 50.50 156.00
9 0.98 272.00 25.33 132.42
Stage 1 Stage 2 Stage 3 Stage 4
Bracing BM (k- Shear Props BM (k- Shear Props BM (k- Shear Props BM (k-
Top Top Top
force ft/ft) (k/ft) force ft/ft) (k/ft) force ft/ft)
(ft) ft/ft) (k/ft) (in) (k) (in) (k) (in) (k)
5 21.8 2.8 -0.4 39.6 4.4 -1.3 38.8 4.3 -1.2 15.4 62.7
6 21.8 2.8 -0.4 39.6 4.4 -1.3 39.0 4.3 -1.2 6.9 59.2
6.56 21.8 2.8 -0.4 39.6 4.4 -1.3 39.0 4.3 -1.2 7.4 56.6
7 21.8 2.8 -0.4 39.6 4.4 -1.3 39.1 4.3 -1.2 8.1 54.5
8 21.8 2.8 -0.4 39.6 4.4 -1.3 39.7 4.4 -1.3 3.8 48.7
9 21.8 2.8 -0.4 39.6 4.4 -1.3 39.7 4.4 -1.3 4.0 44.5
10 21.8 2.8 -0.4 39.6 4.4 -1.3 40.0 4.4 -1.3 2.8 40.2
6.56 16 21.8 2.8 -0.4 39.6 4.4 -1.3 39.0 4.3 -1.2 7.4 56.6

6.56 18 21.8 2.8 -0.4 39.6 4.4 -1.3 39.0 4.3 -1.2 7.4 56.6

6.56 20 21.8 2.8 -0.4 39.6 4.4 -1.3 39.0 4.3 -1.2 7.4 56.6

6.56 22 21.8 2.8 -0.4 39.6 4.4 -1.3 39.0 4.3 -1.2 7.4 56.6

6.56 24 21.8 2.8 -0.4 39.6 4.4 -1.3 39.0 4.3 -1.2 7.4 56.6
Stage 4 Stage 5 Stage 6 Stage 7 Stage 8
Props BM (k- Shear Props BM (k- Shear Props BM (k- Shear Props BM (k-
Shear Top Top Top Top
force ft/ft) (k/ft) force ft/ft) (k/ft) force ft/ft) (k/ft) force ft/ft)
(k/ft) (in) (in) (in) (in)
(k) (k) (k) (k)
9.7 -0.9 138.4 61.7 9.5 -1.0 171.1 215.9 25.2 0.3 268.3 239.2 20.0 0.6 283.3 244.6
9.3 -0.9 137.4 59.4 9.3 -0.9 177.3 205.2 23.8 0.5 286.4 227.8 19.5 0.8 300.8 233.7
9.0 -0.9 144.0 58.4 9.0 -0.9 202.6 197.3 23.3 0.5 328.0 216.1 19.4 0.8 311.0 2644.2
8.8 -0.9 148.8 59.7 9.5 -1.0 220.6 191.5 22.8 0.6 331.3 197.6 19.6 0.6 352.1 202.0
8.3 -0.9 169.7 49.0 11.5 -1.0 254.7 178.2 21.0 0.5 352.6 182.1 19.1 0.6 372.2 185.9
8.3 -0.9 171.8 59.7 11.9 -1.1 272.1 162.3 19.3 0.4 383.6 175.8 18.2 0.7 389.4 186.8
8.5 -1.0 179.8 56.3 10.3 -1.1 233.7 150.3 17.7 0.3 393.3 154.0 19.6 0.3 456.6 153.5
9.0 -0.9 144.0 56.2 8.9 -0.9 206.2 103.3 17.9 -0.9 113.0 105.1 19.2 -0.9 126.3 123.9
-0.7 350.3 377.7
9.0 -0.9 144.0 56.9 9.1 -0.9 196.5 93.6 14.4 -0.9 130.2 111.9 19.8 -1.0 95.7 131.1
3.9 337.9 386.2
9.0 -0.9 144.0 57.0 9.2 -0.9 196.1 83.8 16.8 -0.9 157.6 105.1 20.0 -1.0 119.2 124.0
3.4 346.0 388.8
9.0 -0.9 144.0 57.0 9.3 -0.9 196.7 72.8 16.2 -0.9 177.2 72.8 16.3 -1.0 187.9 101.3
2.0 346.5 357.4
9.0 -0.9 144.0 58.0 927.0 -0.9 197.6 61.3 15.7 -0.9 185.2 60.3 15.5 -0.9 188.1 61.4
6.5 355.3 354.6
Stage 8 Stage 9
Shear Top Props BM (k- Shear Top Props
(k/ft) (in) force (k) ft/ft) (k/ft) (in) force (k)

19.8 0.5 295.6 2644.2 307.6 0.9 -1071.3


19.2 0.7 310.9 2644.2 309.8 1.3 -1316.0
195.7 4.7 2379.0 2644.2 190.6 4.7 2334.1
21.3 0.6 347.5 2644.2 311.0 1.7 -1612.7
19.3 0.6 367.0 191.8 20.2 0.6 385.9
17.7 0.6 382.5 195.6 19.7 0.6 405.8
21.0 0.3 473.9 162.8 25.3 0.3 484.6
16.9 -0.9 111.5 135.7 24.2 -0.9 38.8
338.2
21.2 -1.0 75.0 138.7 26.2 -0.9 -11.4
316.6
23.0 -1.0 102.4 131.7 27.0 -1.0 72.0
307.4
20.0 -1.0 141.1 110.0 26.2 -1.0 106.0
242.4
15.4 -0.9 190.1 61.0 15.5 -0.9 183.5
355.7
30
19
Ka 0.33
Kp 3 Active
Active Pressure
Pressure per pile
Depth (m) (kN/m/m) (kN/m)
0.63 3.99 2.99
1.00 6.33 4.75
2.00 12.67 9.50 1st
3.00 19.00 14.25
4.00 25.33 19.00
5.00 31.67 23.75
6.00 38.00 28.50
7.00 44.33 33.25
7.30 46.23 34.68 2nd
8.00 50.67 38.00
9.00 57.00 42.75
10.00 63.33 47.50
11.00 69.67 52.25
12.00 76.00 57.00
13.00 82.33 61.75
13.10 82.97 62.23 Exca 565.68 0.00
14.00 88.67 66.50 604.55 38.48
15.00 95.00 71.25 647.73 81.23
16.00 101.33 76.00 690.91 123.98
17.00 107.67 80.75 734.09 166.73
18.00 114.00 85.50 777.27 209.48
19.00 120.33 90.25 820.45 252.23
20.00 126.67 95.00 863.64 294.98
21.00 133.00 99.75 906.82 337.73
21.34 135.15 101.37 921.50 352.26

Potrebbero piacerti anche