PROJECT DEFINITION:-...........................................................................................................................2
PROJECT SUMMARY:-.............................................................................................................................2
AIM OF THE PROJECT.....................................................................................................................2
OBJECTIVES:...................................................................................................................................2
PRESUMPTION...............................................................................................................................2
HAZARDS.......................................................................................................................................2
PRICE:-...................................................................................................................................................2
TIME PERIOD:-.......................................................................................................................................2
COMPANY:.....................................................................................................................................2
PROJECT OUTLINE:-...............................................................................................................................3
PROJECT SCOPE:-...................................................................................................................................3
GOALS AND OBJECTIVES:-......................................................................................................................3
GOALS:...........................................................................................................................................3
OBJECTIVES:-.........................................................................................................................................3
DEPARTMENTAL STATEMENTS OF WORK (SOW):-.................................................................................3
COMPANY IMPACTS:-.............................................................................................................................4
DUE DATES OF WORK DEPARTMENT:-...................................................................................................4
PROJECT EXPECTATION:-........................................................................................................................4
PROJECT OUTCOMES:-...........................................................................................................................5
RISKS:-....................................................................................................................................................5
ESTIMATED COST:-.................................................................................................................................6
PROJECT TEAM PLANS AND WORKING:-................................................................................................6
PROJECT DEFINITION:-
This project charter is being made for the installation of boilers and heat
exchanger to get the required information for the investment which are made
on this project. It is a contract between project manager and project team
which is focused on three main components which are scope, budget and
schedule with quality agreed upon project. It is very important as it shows over
all approach for starting project, executing, budget, quality, team work. It
covers up everything from materials to work which is procurement, Shell and
Tue exchangers, boiler installation, commissioning.
PROJECT SUMMARY:-
PRICE: - 13440$
PROJECT SCOPE:-
OBJECTIVES:-
COMPANY IMPACTS:-
COMPANY IMPACTS
EQUIPMENT ENGINEERING LIMITED CUSTOMER OR CLIENT MUST BE
NZ SATISFIED SO THAT COMPANY WILL
GET MORE SIMILAR OR BIG PROJECTS
IN FUTURE.
PROJECT EXPECTATION:-
Procurement of materials and equipments must be provided on time.
The site must be supervised and must be issued within the given time of
span
PROJECT OUTCOMES:-
RISKS:-
Plans and layouts documents must be arranged per planned risk
mitigation.
Machines must be operated safely in the site.
Due date or sequences must be tracked and then work progress
according to that.
Every stake holder must be informed about the current progress of the
project or about the risks ongoing.
Every work must be carried in a safe and proper manner
Arrangement for every coverage must be done.
If any risk occurs, important steps to be taken.
Risk analysis must be done to avoid upcoming risk and it will also help in
future risk problems.
The communication must be done properly between each and every
members of management.
ESTIMATED COST:-
TITLES COST ($)
DESIGNING 1040 $
INSTALLATION 7520$
TESTING 2640$
PROJECT TEAM PLANS AND WORKING:-
JOB TITLE NAME OF TEAM JOB RESPONSIBILITIES
MEMBER
PLAN EXECUTING ABHISHEK THE PROJECT MUST BE
MADE SATISYING
CLIENT NEEDS AND
DEADLINES.
DESIGNING HARRY TO DESIGN THE
PROJECT LAYOUT OR
DRAWINGS TO MEET
THE CLIENTS AND
BUISNESS
REQUIREMENTS.
INSTALLATION OF RAJAT, CHETAN, RAHUL, TO INSTALL THE
EQUIPMENTS NEERAJ, SOURAV MATERIALS AND
EQUIPMENTS WHICH
ARE HEAT EXCHANGER
AND BOILERS.
TESTING OF MATERIALS GOURAV, TRENT TO TEST THE MATERIALS
OR EQUIPMENTS OR EQUIPMENTS IN A
DETAILED MANNER SO
THAT IT DOES NOT
CREATE ANY PROBLEM
LIKE LEAK IN PIPE OR
CRACK IN A HEAT
EXCHANGER.
BY THE RUNNING OF
DRY BOILER THE TEST
WILL BE PERFORMED
FOR 2 DAYS.