Sei sulla pagina 1di 1

PRESA O MURO DE CONTENSION

PROYECTO : AYACUCHO
EXPEDIENTE:

DATOS (MTS)
B= 1.50
T= 0.30
h= 0.00 4
H= 9.00
E= 20.00
G= 5.00
D= 11.00
F= 9.50
M= 0.00
N= 0.00

0.95
2.205
3.155
252.4
23.978
276.378
443.52

Peso especifico del concreto,=(w) 2.30 T/m3


Peso especifico suelo o Agua=(&)= 1.95 T/m3
Angulo de Friccion ()= 40.00 Grados
Presion admisible de terreno=(q) 2.25 Kg/cm2
Coeficiente Friccion (f) 0.40

P PESOS (Ton) Brazo Giro(m) P*X


P1 218.50 13.33 2913.33
P2 7.59 20.15 152.94
P3 109.25 22.80 2490.90
P4 0.00 0.75 0.00
P5 14.63 22.80 333.45
P6 213.04 23.63 5034.79
P7 0.00 25.30 0.00
TOTAL 563.00 128.77 10925.41
N Mr

Ka=tg2(45-O/2)= 0.217

Ha=1/2Ka*&*Hp^2= 17.173 Ma= 51.52 T-m

VERIFICACION AL DESLIZAMIENTO Y AL VOLTEO

FSD=Hr/Ha=f*N/Ha= 13.11 >1,5 CONFORME

FSV=Mr/Ma= 212.07 >1,75 CONFORME

VERIFICACION DE PRESIONES EN EL TERRENO

Xo=(Mr-Ma)/P= 19.31 m

e=B/2-Xo -18.56 m
B/6= 0.25 m
Se cumple? -18.56 <B/6 CONFORME

q1=N(1+6*e/B) -27495.70 T/m2

q2=N(1-6*e/B) 28246.37 T/m2

q1 < q admisible CONFORME

Potrebbero piacerti anche