Sei sulla pagina 1di 3

RESUME

PERSONAL DATA

Position Desired : TIG/ARC Welder


Name : Robert E. Soledad
City Address : Villanueva,
Province : Cagayan De Oro City
Date of Birth : January 27, 1976
Place of Birth : Cauayan
Civil Status : Married
Citizenship : Filipino
Height : 52
Weight : 160 lbs.
Religion : Catholic
Sex : Male
Father : Lope C. Soledad
Mother : Celidonia E. Soledad

EDUCATIONAL BACKGROUND DATE GRADUATED

Elementary : Libuna Elementary School 1984 - 1990


Bukidnon

High School : Aplaya National High School 1992 1996

Vocational : Southern Institute of Technology 1997 1998

EMPLOYMENT RECORD

OBJECTIVES : TO WORK FOR A COMPANY THAT HAS A CLEAR


RESPECTIVE OBTAINING GOOD CLIENT SERVICE
AND HAVE SYSTEMATIC PLAN IN ACHIEVING THE
APPLICABLE IDEA IN TOMMOROWS INNOVATION
AS TIME GOES BY NOT JUST IN RESULT FOR THE
BENEFITS OF THE COMPANY BUT
COMMENSURATE VALUE TO THE EMPLOYEES AS
WELL.

SUMMARY OF
QUALIFICATIONS : KNOWLEDGE IN MECHANICAL AND PIPING
INSTALLATION PARTICULARLY WELDING
ACTIVITY. FAMILIAR IN WELDING OF VARIOUS
METAL SUCH AS STAINLESS STEEL, CARBON
STEEL, LOW TEMPERATURE CARBON STEEL,
CUPRO NICKEL, VARIOUS SIZES USING SMAW
AND GTAW AS PER WELDING PROCEDURE
SPECIFICATION AND ASME IX AND PROJECT
REWUIREMENT.

Company : DAEWOO ENGINEERING AND CONSTRUCTION


Address : State Portion 152, Papa Lea Lea, Central Province
Papua New Guinea
Inclusive Date : December 30, 2011 July 15, 2012
Position Held : GTAW/ SMAW Welder
Job Description : Full welding on Carbon Steel Piping joint2 up to 48 with
radio graphic test Sched. 40 up to 80 GTAW/ SMAW and
stainless piping joint, up to 3 all TIG Sched.20 up to
Sched.60 with radio graphic test for Papua Liquidfied
Natural Gas Project)

Company : WOOLIM PLANT


Duration : July 11, 2010 July 11, 2011
Designation : GTAW/SMAW
Location : KARAN GAS FACILITIES PROJECT KSA
Project : ARAMCO KSA
Job Description : Responsible in welding of pipe various sizes thickness such
as welding of stainless pipe 6 inch to 30 inch using GTAW
Filler 308L for rooting and SMAW ELECTODE E308-16
for cappig as per WPS.

Company : AKER SOLUTION CO./ AGIP CO.


Address : Kashagan, Kazakhstan
Inclusive Date : October 9, 2009 October 9, 2010
Position Held : GTAW/SMAW Welder
Job Description : Full welding of 2 dia. up to 48 dia schedule 40, 60, 80,
120 in oil gas line piping joint at module 10 and 12 going
to pipe rock in all position. With 100% radio graphic test of
oil experimental exploration plant, in offshore project at
Kashagan, Kazakhstan.

Company : IREM S.P.A SAUDI ARABIA L.T.D.


Duration : June 9, 2007 June 9, 2008
Designation : TIG GTAW/SMAW Welder
Location : Yanbu, National; Petro Chemical
Project : YANSUB KSA
Job Description : Assign in welding of carbon steel pipe using filter 70S-2 in
GTAW for rooting and E7016 in SMAW process for filling
to capping in a accordance with the approved welding
procedure specification.

Company : HIAP SENG ENGINEERING


Duration : March 29, 2005 March 17, 2007
Designation : TIG GTAW/SMAW WELDER
Location : 19 Tuas Cresent, Singapore
Project : SINGAPORE
Job Description : Being a welder Im responsible for full welding of water
treatment pipeline to see it that parameters of welding
procedures specification (WPS) with 100% X-RAY
requested by the client.

Company : SEJONG EMIRATES


Duration : August 21, 2008 August 23, 2009
Designation : TIG Welder
Location : DOOSAN/SEJONG EMIRATES, JEBEL ALI, UAE
Project : JEBEL ALI, UAE
Job Description : Assign in fabrication for welding of carbon steel pipe using
GTAW/SMAW process from 6 and over dia inch schedule
40 and over using ER70S-2 for root pass and using 4.0 MM
which is subject to 100% radiographic and ultrasonic test
respectively.

Company : EEI CORPORATION


Duration : January 4, 2002 January 4, 2004
Designation : TIG Welder
Location : Cagayan de Oro Misamis Oriental
Project : KAWASAKI HEAVY INDUSTRIES 210 MW Coal Fired
Power Plant Project
Job Description : Full welding on Carbon Steel Piping joint 2 up to 48
with radio graphic test Sched.40 up to 80 GTAW/SMAW
and stainless piping joint 3/4 up to 3 all TIG Sched. 20
up to Sched. 60 with radio graphic test for Cagayan de Oro
Project, Misamis Oreintal Power Plant.

Potrebbero piacerti anche