Contents
Safety Precautions -------------------------------------------------------------------------------------- 1
Installation ------------------------------------------------------------------------------------------------- 6
Ratings ---------------------------------------------------------------------------------------------------- 30
Please follow this Safety Precautions surely so that any failure to observe
these precautions could result in severe personal injury, death or equipment WARNING
damage.
1. Inspection and maintenance have to be performed by a qualified electrician.
Otherwise, there is the danger of malfunction, severe physical injury or electric shock.
This symbol indicates the instant death or
DANGER serious injury if you dont follow instructions. 2. When the circuit breaker is in service, dont open the front cover.
Otherwise, there is the danger of severe physical injury or electric-shock.
This symbol indicates the possibility of 3. When the circuit breaker is in service, dont insert or withdraw the circuit
WARNING death or serious injury. breaker.
Otherwise, there is the danger of severe physical injury or electric-shock.
5. When making bolts and screw assembling, follow the instruction with
The meaning of each symbol in this manual and on your equipment recommended torque values.
is as follows. Otherwise, there is the danger of over heating or fire.
This is the safety alert symbol. 6. After performing installation, maintenance or inspection, remove some
Read and follow instructions carefully to avoid dangerous situation. foreign objects like tools, test leads or bolts, instruments.
This symbol alerts the user to the presence of dangerous voltage Otherwise, there is the danger of short circuit or fire.
inside the product that might cause harm or electric shock. 7. When performing a maintenance, make a power-off of the circuit breaker
and maintain test position.
Otherwise, there is the danger of electric shock.
DANGER
8. Do not move the circuit breaker by handling main circuit bus terminals.
Do not touch charged parts electrically like conductors and connector parts of Otherwise, there is the danger of an electric accidents by temperature rise.
terminals, under any of energized condition.
Otherwise, there is the danger of severe physical injury, or electrocution is caused by electric shock.
1 2
Pro-MEC VCB Pro-MEC VCB
Safety Precautions Receiving & Unpacking, Service Conditions
Receiving & Unpacking
1. When unpacking the package, take care to handle
CAUTION the main contactor, standard components and
accessories and certify standard component
described in this manual (Load wire for user :
18sets)
1. Dont alter the control circuit at discretion. 2. Certify that the instruction manual and a test
Otherwise, there is the danger of malfunction or damage to products. report of final testing were packed inside each
PVC envelop.
2. The circuit breakers must be kept in dry condition and dont reach water. 3. If damage or breakage of products are founded,
Otherwise there is the danger of deterioration of insulation. immediately notify LSIS sales office or service
representatives.
4. If damage or breakage of products by the carrier are
3. This products must be stored at the place with no corrosive gas.
founded, immediately file a claim with the carrier
Otherwise there is the danger of a damage of products (discoloration, increase in contact resistance).
and notify the shipping company.
3 4
Pro-MEC VCB Pro-MEC VCB
Moving, Storage and Disposal Installation
Moving For safe and normal operation of circuit breaker installed in switchgear, a very careful
and special installation should be followed.
Handle with care when raising up by lift, etc. because circuit breaker lurches.
When installing a fixed type of circuit breaker into switchgear, fix the contactor with
1. When performing a maintenance, make a power-off of contactor same torque value by passing through mounting holes (6-14) after inserting spring
and maintain it at the test position. washers into head of bolt without high pressure or alteration.
may result in electric shock.
Take care not to apply pressure or permanent tension by bus bars or others to main
1. For lifting or moving the circuit breaker, a specified lifting device should be used. bus terminals.
2. When lifting the withdraw type of circuit breakers with a cradle, it should be Keep the terminal of bushing horizontal and centered, otherwise the tulip contacts
raised at the state of running position. of circuit breaker may result in overheating and burns in use.
Remove dust or other foreign substances.
Storage When bolting, follow the recommended torque value specified in Table 1.
CAUTION
WARNING
1. The circuit breakers must be stored in clean, dry, dust and
condensation- free environment. 1. When making bolts and screw assembling, follow the instruction
may cause a weakness of insulation. with recommended torque values
may result in over heating or burns.
2. The products must be stored at the place with no corrosive gas.
2. Do not alter the control circuit at ones discretion.
may cause a damage of product s (discoloration, increase in contact resistance) may cause of malfunction or damage to products.
1. When making a disposal, dispose it at a designated place with M3 7.3 (6.2 - 8.4) 4.3 (3.7 - 4.9)
no affection to environment. M 3.5 11.2 (9.5 - 12.9) 6.6 (5.6 -7.6)
may cause an environmental pollution M4 16.8 (14.2 - 19.3) 9.8 (8.4 - 11.3)
5 6
Pro-MEC VCB Pro-MEC VCB
Structure and operation Structure and operation
1.1 Operating method for operating mechanism
1. Front Parts The operating mechanism is designed to be operated by manual and/or electrical
motor.
7 8
Pro-MEC VCB Pro-MEC VCB
Structure and operation Structure and operation
ON
Motor
OFF
Charging
Closing spring
Discharging
Charging
Opening spring
Discharging
ON
Closing coil
OFF
ON
Opening coil
OFF
ON
Circuit break
OFF
9 10
Pro-MEC VCB Pro-MEC VCB
Structure and operation Structure and operation
11 12
Pro-MEC VCB Pro-MEC VCB
Structure and operation Structure and operation
<Figure 5.1> <Figure 5.2>
2) Main circuit is open
1) Main circuit is is open.
The closing and opening spring The closing spring is charged
are discharged The opening spring is discharged
15
7 16
13 14
Pro-MEC VCB Pro-MEC VCB
Structure and operation Structure and operation
15 16
Pro-MEC VCB Pro-MEC VCB
Structure and operation Insertion/Withdrawal Operation (E,F Class)
4. Vacuum Interrupter (V.I.) The withdrawable circuit-breaker can be positioned at two following positions in a cradle.
Movable terminal
Test Position (TEST)
Run Position (RUN)
1. Method of insertion
Movable end plate
1) Verify that the contact position indicator is at OFF by pressing the trip button on
Bellows
the front of circuit-breaker.
2) Insert both wheel of a circuit-breaker inside both guide rail of a cradle, then push and
Bellows shield
insert a circuit-breaker to the Test Position (TEST).
3) Hold the interlocking lever up on the front of circuit-breaker with enough, then the
Ceramic interlocking bar will be pull out of from a rectangular hole of interlocking plate in a
cradle.
Contact 4) At the condition of holding the interlocking lever up, hold the handle of circuit-
Arc shield breaker and insert a circuit breaker into a cradle. It is not necessary to hold the
interlocking lever after moving it in variable distance(about 10mm)
End shield
5) Insert the withdrawal lever into the withdrawal plate, then push and insert the
interlocking lever to the arrow direction in Figure 8 to insert the interlocking lever
inside a rectangular hole of the Run Position (RUN) in a cradle.
Fixed end
6) If it is connected completely the interlocking lever is inserted inside a rectangular hole
header
of a cradle. It is Run Position (RUN)
17 18
Pro-MEC VCB Pro-MEC VCB
Insertion/Withdrawal Operation (E,F Class) Insertion/Withdrawal Operation (G Class)
CAUTION
For
withdrawal 1. Do not position a circuit-breaker on any position besides
the Run Position(RUN) and/or Test Position(TEST).
It may cause of malfunction or damage to products.
Interlocking Interlocking
Lever Bar Screw for withdrawal
Handle
Wheels
<Figure 8> Operation drawing of circuit- breakers insertion/withdrawal sliding plate
<Figure 9.1> Test Position(TEST) of withdrawable assembly
19 20
Pro-MEC VCB Pro-MEC VCB
Insertion/Withdrawal Operation (G Class) Insertion/Withdrawal Operation
If the circuit-breaker is inserted, the Lock Pin(Fig.10.1/No.2) is disconnected from the Nut
(Fig.10.1/No.3) according that the interlocking bar(Fig.10.1/No.5) move the Plate(Fig.10.1
No.6) to left-hand position.
At this condition the Nut Assembly(Fig.10.1/No.4) can not be moved even if rotating the
withdrawal screw(Fig.10.1/No.1) and the withdrawal screw(Fig.10.1/No.1) and the Nut
(Fig.10.1/No.3) are to be run-idle.
For this reason it is not possible to operate the circuit-breaker for withdrawal and/or
insertion at the status of running idle I.e. at the closed status of circuit-breaker.
Withdrawal But it may be possible to be withdrawn or inserted so that the Nut Assembly(Fig.10.1/No4)
Stroke : can be moved before and behind.
225 mm (7.2kV)
21 22
Pro-MEC VCB Pro-MEC VCB
Insertion/Withdrawal Operation Maintenance inspection
DANGER
23 24
Pro-MEC VCB Pro-MEC VCB
Maintenance Inspection Maintenance Inspection
2. Usual inspection
CAUTION Make an inspection for the contactor on service between the periodic inspection.
Be careful for not getting in touch with any energized parts when opening the door
of switchgear.
1. Do not alter the control circuit at ones discretion.
may cause of malfunction or damage to products. Item Check list Method Solution
Switching indicator Verifying a normal operation Visual Investigating the cause and repair
Control circuit Verifying a connection of connectors Visual Investigating the cause and repair
<Table 2> Period of maintenance and inspection
Operating counter Verifying a time of operation Visual Check the contactor if exceeding 10,000 operations
Maintenance and inspection interval
Item Others Verifying abnormal noise,smell Visual After disconnecting the main power, investigating and repair
Normal condition Abnormal condition
(dusty and wet places)
3. Periodic inspection
Usual inspection 6 months 1 month
<Table 4> Items of periodic inspection (1)
6 months after an
installation. A periodic inspection Item Check list Method Solution Frequency
Periodic inspection
Once 3years after that Check abnormal assembling
If necessary parts
Special inspection If necessary Every a
periodic
Check parts to be lubricated
inspection,
Operation and Verify a smooth Clean and grease
Equipment parts Check dust and foreign operation by
Every 5000
material visual or manual Replace if necessary
operations
Check whether C-Rings,
spring pins and divider
pins are wrinkled or missed
25 26
Pro-MEC VCB Pro-MEC VCB
Maintenance Inspection Maintenance Inspection
item Check list Method Solution Frequency
item Check list Method Solution Frequency
Measure a contact resistance 1. Dismantle the contactors
Check all connections Check the torque, Every a periodic The voltage drop
Main circuit of main circuit after drawing 2. Clean the discoloration,
Visual Replace if method (DC 100A)
terminals Check the corrosion, inspection out the VCB corrosion or heated
necessary -Measure with
discoloration Contact - It must be less than 120% parts of arc
inserting the same Annually
Vacuum integrity resistance of of final inspection report 3. Clean the contactor
size copper bar
Vacuum Testing method. Replace V.I. main circuit value (make a jig for
surface after removing
V.I Check the vacuum density if necessary Every a periodic
integrity Check - The variation resistance foreign substances
inspection, measuring if
the withstand test between phases must be 4. Apply specified grease
necessary) *Specification:
Check fixed bolts. Every 5000 less than 25%
Aux. Switching Check the normal operation HITALUBE280G
Visual Replace if operations
Device Indictor necessary Check the temp. rising of
contacted and connection parts As
Clean it after Visual Carry out a close
Main circuit: Over 500M 1000V Megger Temperature *The max. available limit of occasion
finding the cause. Every a periodic temp. rising Infrared camera inspection
Insulation rising demands
Resistance Replace if inspection - Contacted part: 65K
Control circuit: Over 2M 500V Megger
necessary - Connected part: 75K
Test and check Every a periodic Notice) Replacement of contactors
Withstand Main circuit: 1.5 x R.Voltage with a withstand Clean and replace
inspection, every The replacement of contactors must be decided with a close inspection and carried out by LGIS service
voltage test for 10 min. if necessary
voltage tester 5000 operations staff. Please follow below 1, 2, 3 when the contactors are replaced.
Testing for trip/close Perform the Inspect and repair
Operating electrical testing if finding a matter. Every a periodic 1. Apply specified grease after replacement. (specification: HITALUBE280G)
Testing for trip-free
Characteristics after a manual Replace if inspection, 2. Measure the contact resistance of main circuit with no-load mechanical operating test after replacement.
Check the minimum of
test operation test necessary. Every 1~2 years The measured values should be compared with the measured values before replacement and they should
operating voltage
be put on record.
Check the sectional traces of Replace. 3. If there are traces of arc when replacing contactors, the terminals should be replaced . In case that there
heat or discoloration. Visual Every a periodic arent any traces, wipe clean on terminal surface.
Contact Apply grease on
Check the damage of arc. (Use a microscope inspection,
Finger contact surface. <Table 5> Items of periodic inspection (2)
Check the condition of if necessary.) Annually
*Specification:
applied grease on the con- HITALUBE280G
Item Check list Method Solution
tactor surface. Check condensation, Visual
Common Insulated frame Wipe it
Check the sectional traces of components of the Insulated tube humidity, stain, Clean it, then clearly with a
Con- heat or discoloration. Visual contactor discoloration and measure the
Contact Every a periodic Heat shrinkable tube dry cloth
tact Check the damage of arc. (Use a microscope Replace. damage insulation resistance
Spring inspection,
part Check transformation or if necessary.)
Annually
mechanical crack of a coil. 4. Special inspection
Make a special inspection in case of situation as Table 6
Check the sectional traces of <Table 6> Special inspection
heat or discoloration. Replace.
VCB Check the damage of arc. Visual Every a periodic NO Inspection item Inspection method
& (Use a microscope Apply grease on When interrupting short-circuit(fault) current
Check mutual eccentricity inspection, Check wearing contacts of vacuum
Cradle between terminals. if necessary.) contact part 1
Annually several times interrupter
Terminal - Tulip type: within 3mm Coherence *Specification:
HITALUBE280G 2 In case of appearing a abnormal situation Check defective parts
- Clip type: within 2mm at service operation
27 28
Pro-MEC VCB Pro-MEC VCB
Maintenance Inspection Rating
5. Lubricant Points for Operating Parts <Table 7-1> Ratings Table
When using the circuit-breaker for long period, lubricate the grease for mechanical Rating LVB 06 - 20D/06,12,20 LVB 06 - 25D/06,12,20
device on the surface of operating parts and frictional parts so that the operating
mechanism parts have been operated with high-speed. The important parts are Rated voltage (kV) 7.2
indicated by the mark of in the following figure. Rated current (A) 630 1250 2000 630 1250 2000
When lubricating clean the points to be lubricated and check the condition of
wear,then lubricate the grease not to be covered on wiring connection part of Rated frequency (Hz) 50/60
control circuit. Rated interrupting current (kA) 20 25
Frequency (kV) 20
Withstand
Lightning Impulse
voltage 60
(kV/1.250)
<Figure 13> The charging status of Current of motor operation (A) 7 (at 24Vdc 15)
opening/closing spring of main circuit
Control current for closing (A) 5 (at 24Vdc 10)
NO Lubricant Point Control current for tripping (A) 5 (at 24Vdc 10)
1 Fixing part of opening spring Motor Charging Time (s) 12(at 24Vdc 15)
2 Fixing part of closing spring Pole distance (mm) 150
3 Closing latch roller and crank arm
4 Connecting pin of linkage Weight (kg) 95 98 135 95 98 135
5 Trip latch and roller Installation type P,E,F,G,M
6 Guide pin for O.D.P
Applicable standard IEC 62271-100
29 30
Pro-MEC VCB Pro-MEC VCB
Rating Rating
<Table 7-2> Ratings Table <Table 7-3> Ratings Table (The models is under development)
Rating LVB 06 - 32D/12,20 LVB 06 - 40D/12,20 Rating LVB 06 - 32D/30 LVB 06 - 40D/30
Rated current (A) 1250 2000 1250 2000 Rated current (A) 3150 3150
Rated interrupting current (kA) 31.5 40 Rated interrupting current (kA) 31.5 40
Rated interrupting capacity (MVA) 390 500 Rated interrupting capacity (MVA) 390 500
Rated short-time current (kA) 31.5/3sec 40/3sec Rated short-time current (kA) 31.5/3sec 40/3sec
Rated making current (kA) 82 104 Rated making current (kA) 82 104
TRV increasing rate (kV/) 0.24 TRV increasing rate (kV/) 0.24
TRV Max. Value (kV) 12.3 TRV Max. Value (kV) 12.3
Control voltage for closing (V) DC 24,48,110,125,220V Control voltage for closing (V) DC 24,48,110,125,220V
Control voltage for tripping (V) DC 24,48,110,125,220V Control voltage for tripping (V) DC 24,48,110,125,220V
Rated opening time (s) 0.04 Rated opening time (s) 0.04
No-load closing time (s) 0.06 No-load closing time (s) 0.06
Current of motor operation (A) 7 (at 24Vdc 15) Current of motor operation (A) 7 (at 24Vdc 15)
Control current for closing (A) 5 (at 24Vdc 10) Control current for closing (A) 5 (at 24Vdc 10)
Control current for tripping (A) 5 (at 24Vdc 10) Control current for tripping (A) 5 (at 24Vdc 10)
Motor Charging Time (s) 12(at 24Vdc 15) Motor Charging Time (s) 12(at 24Vdc 15)
Weight (kg) 130 135 135 140 Weight (kg) 210 210
31 32
Pro-MEC VCB
Circuit diagram
1. AMP jack
33
Pro-MEC VCB
Circuit diagram
2. Phoenix jack
34