izkfo/kku%& vkx.ku esa fuEufyf[kr dk;ksZa dk izko/kku fd;k x;k gS %&


1- Repair of Plaster
2- Waterproofing on roof top
3- Flush door
4 Flooring with PCC 1:4:8
5 PVC Water tank, GI Pipe, WC Seat, Cistern, etc

njsa%& ;g vkx.ku tuin y[ku gsrq Lohd`r orZeku 'ksM~;wy vkWQ jsV~l
U;wure cktkj njksa ij vk/kkfjr fo'ysf"kr njksa ij xfBr fd;k x;k gSA

fof'kf"V;kWa leLr dk;Z yksd fuekZ.k foHkkx ds foLr`r fof'kf"V;ksa ds vuqq:i lE


%& djk;s tk;saxsA

vr% mijksDr dk;Z dk vkx.ku - -2281/32-4-12-8./13.., Dated-10-07-20


ykxr #0- 0.50 yk[k ek= dk Lohd`fr gsrq izLrqr fd;k tk jgk gSA

voj vfHk;Urk
vuqj{k.k [k.M lgk;d vfHk;Urk
vuqj{k.k [k.M vf/k'kklh
vuqj{k.k vfHk;Urk
[k.M
ua0&1flfoy ua0&1flfoy ua0&1flfoy
yks0fu0fo0] y[ku yks0fu0fo0] y[ku yks0fu0fo0] y[ku

fd;k x;k gS %&

sM~;wy vkWQ jsV~l ,oa


a ij xfBr fd;k x;k gSA

'kf"V;ksa ds vuqq:i lEikfnr

./13.., Dated-10-07-2013
d;k tk jgk gSA

vf/k'kklh
vuqj{k.k vfHk;Urk
[k.M
ua0&1flfoy
yks0fu0fo0] y[ku
CHECKING PROFORMA
Preliminary and Detailed Estimate
Sl.No. Particulars
1 Report-
(a) Proper reference have been quoted and attested copies attached with the estimate.

(b) In case of revised estimate the amounts of excess has been given Item wise in the
comparative statement with detailed reasons.
(c) Signatures of A.E., E.E., & S.E. exist.
(d) Details of forest land with name of village & chainage.
(e) Required certificates are mentioned or not.
(f) Name of JE/AE who surveyed the work for preparaion of estimate.

2 Specifications-
(a) Detailed specifications for each item of work are included in the estimate.

(b) Signatures of A.E., E.E., & S.E. exist.


3 Designs-
(a) These have been prepared as per standard practices and C.E's instructions.

(b) Each design has been signed by E.E. & S.E. in the end, and important designs by C.E. as
well.
4 Analysis of Rates-
(a) Analysis of non-schedule items are based on the market rates is attached or not.

(b) Each analysis have been signed by J.E.,A.E., E.E. & S.E. in the end.
5 Details of measurements-
Each page has been signed by J.E.,A.E. & by E.E. in the end of each set.
6 Bill of Quantity-
Each page has signature of J.E. , A.E. and E.E. at the end of each set.
7 Summary of estimated cost-
These have been signed by J.E., A.E., E.E. & S.E.
8 Plans-
These have been signed by J.E., A.E., E.E. & S.E.
9 General-
1- Name and designation should exist, below all signature and corrections.
2- Each page of the design, analysis of rates, details of the measurements, bill of quantity and
summary of estimated cost should be certified 'checked and corrected' by JE(T) of
divisional office and circle office with their signature at the end.

10 Designation-
Divisional Office:- Construction Division No. 1, P.W.D., Lucknow
S.No. Name Designation
1 Er. Vijay Kumar Junior Engineer, M.D.-1 (civil), UPPWD, Lucknow.

2 Er. Assistant Engineer, M.D.-1 (civil), UPPWD, Lucknow.

3 Er. R.M. Sharma Junior Engineer(T), M.D.-1 (civil), UPPWD, Lucknow.


4 Er. Satyavir Singh Executive Engineer, M.D.-1 (civil), UPPWD, Lucknow.
Compliance

Yes/NA

Yes/NA
Yes
NA
Yes

Er.Vijay Kumar/ Er.

Yes
Yes

Yes/NA

Yes/NA

Yes/NA
Yes

Yes

Yes

Yes

Yes/NA

Yes

Yes

ucknow
Signature
Summarey of Estimated Cost
: Ykksd fuekZ.k foHkkx izeq[k vfHk;ark dk;kZy; ifjlj esa

Sl. No. Particulars

1 As per Billof Quantity.


2 Add Labour Cess 1% on 1
3 Add Cost Depreciation on Machinery @ 1.5% on 1

Total = Rs.
Say Rs. In Lacs

Junior Engineer Assistant Engineer


Maint. Division No. 1(Civil) Maint. Division No. 1(Civil)
P.W.D. Lucknow P.W.D. Lucknow
ted Cost
ark dk;kZy; ifjlj esa

Amount

277101.45
2771.01
4156.52

284028.99
2.84

Executive Engineer
Maint. Division No.-1(Civil)
P.W.D. Lucknow
fo"k; lwph
dz0la0 en dk fooj.k

1 'kh"kZd i`"B

2 tkap izi=

3 fo"k; lwph

4 izfrosnu

5 lUnHkZ

6 fof'kf"V;kW

7 nj fo'ys"k.k

8 ekiksa dk fooj.k ,oa ek=kvksa dk ns;d

9 ykxr dk lkjka'k

10 ekufp=
i`"B la[;k

--------
fof'kf"V;kW

leLr dk;Z yksd fuekZ.k foHkkx dh foLr`r


fof'kf"V;ksa ,oe~ izeq[k vfHk;Urk] yks0fu0fo0 ds uohure
ifji=ksa ds vuq:i lEikfnr djk;s tk;saxsA

voj vfHk;Urk lgk;d vfHk;Urk flfoy vf/k'kklh vfHk;Urk


vuqj{k.k [k.M ua0&1 flfoy vuqj{k.k [k.M ua0&1 flfoy vuqj{k.k [k.M ua0&1
yks0fu0fo0] y[ku yks0fu0fo0] y[ku
fof'kf"V;kW

leLr dk;Z yksd fuekZ.k foHkkx dh foLr`r


fof'kf"V;ksa ,oe~ izeq[k vfHk;Urk] yks0fu0fo0 ds uohure
ifji=ksa ds vuq:i lEikfnr djk;s tk;saxsA

voj vfHk;Urk lgk;d vfHk;Urk flfoy vf/k'kklh vfHk;Urk


vuqj{k.k [k.M ua0&1 flfoy vuqj{k.k [k.M ua0&1 flfoy vuqj{k.k [k.M ua0&1 flfoy
yks0fu0fo0] y[ku yks0fu0fo0] y[ku
k.M ua0&1 flfoy
DETAILS OF ROOF TOP AREA
Ykksd fuekZ.k foHkkx izeq[k vfHk;ark dk;kZy; ifjlj esa
:

Sl. No. Description MEASUREMENT


N0. L. B. H.
1 World Bank New Building 1 1 48.50 18.8
1 1 8.30 5.4
1 1 4.60 2.5
TOTAL AREA=
AILS OF ROOF TOP AREA
izeq[k vfHk;ark dk;kZy; ifjlj esa

UNIT
QTY.
911.80 Sqm
44.82 Sqm
11.50 Sqm
968.12 Sqm
DESIGN
: Ykksd fuekZ.k foHkkx izeq[k vfHk;ark dk;kZ

Sl.No. Description
1 Roof Toop Total Area
2 Average annual Rain Fall
3 Run-off co-efficient
4 Total availability of Water from roof
top area taken in to consideration

5 Water available for recharge annually

6 Average No. of mansoon days


7 Static ground water level (S.W.L.)
8 Decline in ground water annually
9 Hydro-geological setup

10 Type of aquifer
11 Proposed recharge structure
12 Rain water collecting system
13 Re-charge tank
14 Filtration chamber
15 Recharge well

16 Quantum of water to be recharged in


one year
17 Quantum of water to be recharged in
20 year
DESIGN
foHkkx izeq[k vfHk;ark dk;kZy; ifjlj esa

Specification
988.12 Sqm
963.00 mm
0.80
988.12 x 0.963 = 951.56 cum/year

951.56 x 0.80 = 761.25 cum/year

40 days
32.00 mtr
0.56 cm/year
Quaternary alluvium clay, kanker, silt
and sand
Unconfined

PVC Pipe
4.00 mt x 3.00 mt x 2.25 mt = 1 No
1.00 mt x 3.00 mt x 1.25 mt = 2 Nos
110 mm dia (100mm nominal size) 35
mt deep )=1 No
761.25 cumt

15225.00 cumt
DETAILS OF MEASUREMENTS AND BILL OF QUANTITY
: Ykksd fuekZ.k foHkkx izeq[k vfHk;ark dk;kZy; ifjlj esa

Sl. ITEM OF WORK MEASUREMENT UNIT
No. N0. L. B. H. QTY. RATE
1 Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means over areas (exceeding 30cm in depth.
1.5 m in width as well as 10 sqm on plan) including disposal of
excavated earth, lead upto 50m and lift upto 1.5m, disposed earth
to be levelled and neatly dressed.All kinds of soil (Item Code DSR-
2013-2.6.1)

Storage/Re-charge tank 1 1 4.00 3.00 2.25 27.00 Cum


Filtration chamber 1 2 1.00 3.00 1.25 7.50 Cum
Total= 34.50 Cum 146.50
2 Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering-all work upto plinth
level 1:4:8 (1 cement:4 coarse sand:8 graded stone aggregate
40mm nominal size)

Re-charge tank 1 1 4.00 3.00 0.15 1.80 Cum


Filtration chamber 1 2 1.00 3.00 0.15 0.90 Cum
Total= 2.70 Cum 5100.00
3 Class- 150 brick work in 1:4 mortar (1 cement:4 coarse sand) in
foundation and plinth including supply of all materials, labour, T&P
etc. required for proper completion of the work.

Re-charge tank 1 2 4.00 0.345 2.05 5.66 Cum


1 2 3.00 0.345 2.05 4.24 Cum
Filtration chamber 2 2 1.00 0.345 1.05 1.45 Cum
2 1 3.00 0.345 1.05 2.17 Cum
Total= 13.52 Cum 4750.00
4 20 mm Cement plaster in single coat on rough side of single or half
brick wall for interior plastering upto floor two level including internal
rounded angles chamfers, and rounded angles not exceeding 80
mm. in girth and finished even and smooth.( 1 Cement :3 coarse
sand ) including Extra for providing and mixing water proofing
material in cement plaster work in proportion recommended by the
manufacturers.

Re-charge tank 2 2 4.00 2.05 32.80 Sqm


2 2 3.00 2.05 24.60 Sqm
Filtration chamber 4 2 1.00 1.05 8.40 Sqm
2 2 3.00 1.05 12.60 Sqm
Total= 78.40 Sqm 236.50
5 R.C.C. works with cement approved coarse sand 2cm (3/4") gauge
approved stone ballast in the proporation 1:1.5:3 ( 1 cement :4.5
aggregate) in slabs excluding supply of reinforcement and its
bending the same with 24 B.W. G.G.I. binding wire and includuing
necessary centering and shuttering etc. and also including supply
of all materials, labour, T&P etc. required for proper completion of
works. Strength of the concrete shall not be less than M- 20.

Re-charge tank 1 1 4.00 3.00 0.15 1.80 Cum


Filtration chamber 1 2 1.00 3.00 0.15 0.90 Cum
Total= 2.70 Cum 8317.00
Sl. ITEM OF WORK MEASUREMENT UNIT
No. N0. L. B. H. QTY. RATE
6 R.C.C. works with cement approved coarse sand 2cm (3/4") gauge
approved stone ballast in the proporation 1:1.5:3 ( 1 cement :4.5
aggregate) in slabs excluding supply of reinforcement and its
bending the same with 24 B.W. G.G.I. binding wire and includuing
necessary centering and shuttering etc. and also including supply
of all materials, labour, T&P etc. required for proper completion of
works. Strength of the concrete shall no be less than M- 20.

Item No-4 2.700 cum


Total 2.700 cum
Qty Of Reinforcement Steel 2.700 x7850x1.5% 317.93 Kg 68.00
7 Providing and fixing factory made precast RCC perforated drain
covers, having concrete of strength not less than M-25, of size
1000 x 450x50 mm, reinforced with 8 mm dia four nos longitudinal
& 9 nos cross sectional T.M.T. hoop bars, including providing 50
mm dia perforations @ 100 to 125 mm c/c, including providing
edge binding with M.S. flats of size 50 mm x 1.6 mm complete, all
as per direction of Engineer-in-charge. ( Item Code DSR-2013-
24.9)

In Tank 1 5 5.00 Nos


Total= 5.00 Nos 958.80
8 Supplying, filling, spreading & leveling stone boulders of size range 5 cm
to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all
complete as per direction of Engineer-in-charge.

Filtration chamber 2 1 1.00 3.00 0.30 1.80 cum


outer side of wall 1 2 4.00 0.30 2.00 4.80 cum
1 2 3.00 0.30 2.00 3.60 cum
2 2 1.00 0.30 1.00 1.20 cum
2 2 3.00 0.30 1.00 3.60 cum
15.00 cum 1897.00
9 Supplying, filling, spreading & leveling gravels of size range 5 mm to 10
mm, in the recharge pit, over the existing layer of boulders, in required
thickness, for all leads & lifts, all complete as per direction of Engineer-in-
charge

Filtration chamber 2 1 1.00 3.00 0.30 1.80 cum


1.80 cum 1897.00

10 Supplying, filling, spreading & leveling coarse sand of size range 1.5 mm
to 2 mm in recharge pit, in required thickness over gravel layer, for all
leads & lifts, all complete as per direction of Engineer -in-charge

Filtration chamber 2 1 1.00 3.00 0.30 1.80 cum


1.80 cum 1897.00
11 supply of Stainless steel wire guage (Grade-304) aperture 1.4 mm and
0.50 mm dia wire ( Item Code DSR-2013-8737)

Filtration chamber 2 1 1.00 3.00 6.00 Sqm


6.00 Sqm 830.00
12 Boring/drilling bore well of required dia for casing/ strainer pipe, by
suitable method prescribed in IS: 2800 (part I), including collecting
samples from different strata, preparing and submitting strata chart/
bore log, including hire & running charges of all equipments, tools,
plants & machineries required for the job, all complete as per
direction of Engineer -in-charge, upto 90 metre depth below ground
level.All types of soil 300 mm dia ( Item Code DSR-2013-24.1.1.1

main Bore Hole 1 1 35.00 35.00 Mtr


Total= 35.00 Mtr 398.25
Sl. ITEM OF WORK MEASUREMENT UNIT
No. N0. L. B. H. QTY. RATE
13 Supplying, assembling, lowering and fixing in vertical position in
bore well, unplasticized PVC medium well casing (CM) pipe of
required dia, conforming to IS: 12818, including required hire and
labour charges, fittings & accessories etc. all complete, for all
depths, as per direction of Engineer -in-charge. 100 mm nominal
size dia ( Item Code DSR-2013-24.3.1)

main Bore Hole 1 1 20.00 20.00 Mtr


Total= 20.00 Mtr 423.85
14 Supplying, assembling, lowering and fixing in vertical position in
bore well unplasticized PVC medium well screen (RMS) pipes
with.ribs, conforming to IS: 12818, including hire & labour charges,
fittings & accessories etc. all complete, for all depths, as per
direction of Engineer-in-charge. 100 mm nominal size dia ( Item
Code DSR-2013-24.4.1)

main Bore Hole 1 1 15.00 15.00 Mtr


Total= 15.00 Mtr 447.25
15 Development of tube well in accordance with IS : 2800 (part I) and
IS: 11189, to establish maximum rate of usable water yield without
sand content (beyond permissible limit), with required capacity air
compressor, running the compressor for required time till well is
fully developed, measuring yield of well by "V" notch method or any
other approved method, measuring static level & draw down etc. by
step draw down method, collecting water samples & getting tested
in approved laboratory, i/c disinfection of tubewell, all complete,
including hire & labour charges of air compressor, tools &
accessories etc., all as per requirement and direction of Engineer-
in-charge. ( Item Code DSR-2013-24.12)

main Bore Hole 1 12 12.00 Hr.


Total= 12.00 Hr. 614.75
16 Providing and fixing M.S. clamp of required dia to the top of casing/
housing pipe of tubewell as per IS: 2800 (part I), including
necessary bolts & nuts of required size complete.100 mm clamp .
( Item Code DSR-2013-24.14.1)

main Bore Hole 1 6 6.00 Nos


Total= 6.00 Nos 1092.20
17 Providing and fixing on wall face unplasticised Rigid PVC rain water pipes
6.0 kg.cm2 pressure conforming to IS : 13592 Type A, including jointing
with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal
expansion, (i) Single socketed pipes.including all fittings 110mm dia

Rain water pipe


1 4 18.00 72.00 Mtr
Total 72.00 Mtr 360.00
Sl. ITEM OF WORK MEASUREMENT UNIT
No. N0. L. B. H. QTY. RATE
18 Constructing masonry Chamber 60x45x50 cm inside, in brick work
in cement mortar 1:4 (1 cement : 4 coarse sand) for water meter
complete with C.I. double flap surface box 400x200x200 mm
(inside) with locking arrangement and RCC top slab 1:2:4 mix (1
cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal
size) , i/c necessary excavation, foundation concrete 1:5:10 ( 1
cement : 5 fine sand:10 graded stone aggregate 40 mm nominal
size) and inside plastering with cement mortar 1:3 (1 cement : 3
coarse sand) 12 mm thick, finished with a floating coat of neat
cement complete as per standard design : With common burnt clay
F.P.S.(non modular) bricks of class designation 7.5 . ( Item Code
DSR-2013-18.37.1)

For connecting Rain water Down Pipe 1 3 3.00 Nos


Total= 3.00 Nos 5737.40
19 Providing and fixing Bail plug/ Bottom plug of required dia to the
bottom of pipe assembly of tubewell as per IS:2800 (part I)..100
mm dia . ( Item Code DSR-2013-24.15.1)

main Bore Hole 1 1 1.00 Nos


Total= 1.00 Nos 195.70
G. Total =
EMENTS AND BILL OF QUANTITY
ark dk;kZy; ifjlj esa

AMOUNT

5054.25

13770.00

64220.00

18541.60

22455.90
AMOUNT

21618.90

4794.00

28455.00

3414.60

3414.60

4980.00

13938.75
AMOUNT

8477.00

6708.75

7377.00

6553.20

25920.00
AMOUNT

17212.20

195.70
277101.45
BILL OF QUANTITY
dk;Z dk uke & fo'oS'ojS;k izs{kk x`g ds lq/kkjhdj.k ,oa lkSn
dk;ZA

Date of Calling tender: 06.01.2014 Date of Opening Ten

Cost of Tender form: Rs 225/-+VAT+500/- Earnest Money:

Validity period: 90 Days Time of completion:

Sl. No. ITEM OF WORK


Unit

1 Earth work in excavation by mechanical means (Hydraulic excavator) / manual


means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm
on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m,
disposed earth to be levelled and neatly dressed.All kinds of soil (Item Code Cum
DSR-2013-2.6.1)

2 Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering-all work upto plinth level 1:4:8 (1 cement:4
coarse sand:8 graded stone aggregate 40mm nominal size) Cum

3 Class- 150 brick work in 1:4 mortar (1 cement:4 coarse sand) in foundation and
plinth including supply of all materials, labour, T&P etc. required for proper
completion of the work. Cum

4 20 mm Cement plaster in single coat on rough side of single or half brick wall for
interior plastering upto floor two level including internal rounded angles
chamfers, and rounded angles not exceeding 80 mm. in girth and finished even
and smooth.( 1 Cement :3 coarse sand ) including Extra for providing and mixing
water proofing material in cement plaster work in proportion recommended by Sqm
the manufacturers.

5 R.C.C. works with cement approved coarse sand 2cm (3/4") gauge approved
stone ballast in the proporation 1:1.5:3 ( 1 cement :4.5 aggregate) in slabs
excluding supply of reinforcement and its bending the same with 24 B.W. G.G.I.
binding wire and includuing necessary centering and shuttering etc. and also
including supply of all materials, labour, T&P etc. required for proper completion Cum
of works. Strength of the concrete shall not be less than M- 20.
6 R.C.C. works with cement approved coarse sand 2cm (3/4") gauge approved
stone ballast in the proporation 1:1.5:3 ( 1 cement :4.5 aggregate) in slabs
excluding supply of reinforcement and its bending the same with 24 B.W. G.G.I.
binding wire and includuing necessary centering and shuttering etc. and also
including supply of all materials, labour, T&P etc. required for proper completion Kg
of works. Strength of the concrete shall no be less than M- 20.

7 Providing and fixing factory made precast RCC perforated drain covers, having
concrete of strength not less than M-25, of size 1000 x 450x50 mm, reinforced
with 8 mm dia four nos longitudinal & 9 nos cross sectional T.M.T. hoop bars,
including providing 50 mm dia perforations @ 100 to 125 mm c/c, including
providing edge binding with M.S. flats of size 50 mm x 1.6 mm complete, all as Each
per direction of Engineer-in-charge. ( Item Code DSR-2013-24.9)

8 Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20


cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as
per direction of Engineer-in-charge. Cum

9 Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in


the recharge pit, over the existing layer of boulders, in required thickness, for all
leads & lifts, all complete as per direction of Engineer-in-charge
Cum

10 Supplying, filling, spreading & leveling coarse sand of size range 1.5 mm to 2
mm in recharge pit, in required thickness over gravel layer, for all leads & lifts, all
complete as per direction of Engineer -in-charge Cum

11 supply of Stainless steel wire guage (Grade-304) aperture 1.4 mm and 0.50 mm
Sqm
dia wire ( Item Code DSR-2013-8737)
12 Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable
method prescribed in IS: 2800 (part I), including collecting samples from different
strata, preparing and submitting strata chart/ bore log, including hire & running
charges of all equipments, tools, plants & machineries required for the job, all
complete as per direction of Engineer -in-charge, upto 90 metre depth below Rmt
ground level.All types of soil 300 mm dia ( Item Code DSR-2013-24.1.1.1

13 Supplying, assembling, lowering and fixing in vertical position in bore well,


unplasticized PVC medium well casing (CM) pipe of required dia, conforming to
IS: 12818, including required hire and labour charges, fittings & accessories etc.
all complete, for all depths, as per direction of Engineer -in-charge. 100 mm
nominal size dia ( Item Code DSR-2013-24.3.1) Rmt
14 Supplying, assembling, lowering and fixing in vertical position in bore well
unplasticized PVC medium well screen (RMS) pipes with.ribs, conforming to IS:
12818, including hire & labour charges, fittings & accessories etc. all complete,
for all depths, as per direction of Engineer-in-charge. 100 mm nominal size dia Rmt
( Item Code DSR-2013-24.4.1)

15 Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to
establish maximum rate of usable water yield without sand content (beyond
permissible limit), with required capacity air compressor, running the compressor
for required time till well is fully developed, measuring yield of well by "V" notch
method or any other approved method, measuring static level & draw down etc.
by step draw down method, collecting water samples & getting tested in
approved laboratory, i/c disinfection of tubewell, all complete, including hire &
labour charges of air compressor, tools & accessories etc., all as per Hr.
requirement and direction of Engineer-in-charge. ( Item Code DSR-2013-24.12)

16 Providing and fixing M.S. clamp of required dia to the top of casing/ housing pipe
of tubewell as per IS: 2800 (part I), including necessary bolts & nuts of required
size complete.100 mm clamp . ( Item Code DSR-2013-24.14.1) Each

17 Providing and fixing on wall face unplasticised Rigid PVC rain water pipes 6.0
kg.cm2 pressure conforming to IS : 13592 Type A, including jointing with seal
ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single Rmt
socketed pipes.including all fittings 110mm dia

18 Constructing masonry Chamber 60x45x50 cm inside, in brick work in cement


mortar 1:4 (1 cement : 4 coarse sand) for water meter complete with C.I. double
flap surface box 400x200x200 mm (inside) with locking arrangement and RCC
top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size) , i/c necessary excavation, foundation concrete 1:5:10 ( 1 cement :
5 fine sand:10 graded stone aggregate 40 mm nominal size) and inside
plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick,
finished with a floating coat of neat cement complete as per standard design : Each
With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 .
( Item Code DSR-2013-18.37.1)

19 Providing and fixing Bail plug/ Bottom plug of required dia to the bottom of pipe
assembly of tubewell as per IS:2800 (part I)..100 mm dia . ( Item Code DSR-
2013-24.15.1) Each

TOTAL AMOUNT
Say
GENERAL CONDATATION
1 All the work shall be carried out as per latest P.W.D. specifications and as per instructions of Eng
2 VAT/Trade Tax and Income tax/Labour Cess shall be deduct as per rule.
3 T-I and T-II form will part of the agreement.
4 The quantities given in the bill of quantity are approximate and are liable to wide variation either
compensation shall be considered expect a resonable extension of time for increased quantities

5 Each tender should accompany general stamp of Rs. 100/- alongwith 1/- revenue stamp pasted

6 Conditional tender are liable to be rejected.


7 Contractor are liable to pay for any recovery by TAC.

/ " " / ...............( )...............


/ /

Sig. Of Officer Sig. Of Officer


Calling Opening
Tender Tender
ITY
hdj.k ,oa lkSn;hZZdj.k ,oa fofHkUu

Date of Opening Tender: 14.02.2014

Earnest Money: Rs. 68000-00

Time of completion: 02 Months

Bill of Qty
Qty. Rate AMOUNT (in Rs.)

34.50 146.50 5054.25

2.70 13770.00
5100.00

13.52 4750.00 64220.00

78.40 236.50 18541.60

2.70 8317.00 22455.90


300.00 68.00 20400.00

5.00 958.80 4794.00

15.00 1897.00 28455.00

1.80 1897.00 3414.60

1.80 1897.00 3414.60

6.00 830.00 4980.00

35.00 398.25 13938.75

20.00 423.85 8477.00


15.00 447.25 6708.75

12.00 614.75 7377.00

6.00 1092.20 6553.20

72.00 360.00 25920.00

3.00 5737.40 17212.20

1.00 195.70 195.70

275882.55
Rs. 275,883.00
ION
as per instructions of Engineer-in-charge
e to wide variation either side for which no claim or
e for increased quantities.

- revenue stamp pasted and duly signed by contractor.

)............... ( ) /

Sig. of Contractor
with name and address

icer Sig. Of Officer


g Recommending
r Tender
o`Rr dk uke : 39okW o`Rr] yksd fuekZ.k foHkk

[k.M dk uke vuqj{k.k [k.M ua0&1flfoy yks

sssys[kk kh"kZd 8443 fMikftVA

dk;Z dk uke
- 04
.

vuqekfur ykxr :0 1.04 yk[k


ksd fuekZ.k foHkkx] y[kuA