Sei sulla pagina 1di 23

:

Project name: Extension water Pipes for (124 kalakn)

No. Description UNIT

Supply office for supervisor staff with all necessary (chair,


table, refrigerator, air condition, generator, fuel, service, and
lab top computer) according to instruction of supervisor
engineer and after the work finished lab top computer should
1- be returned to the water directorate warehouse the price also L.S
encuding providing pikup model not less than 2004 for
supervisour staff for all worke duration.

2- Earth Work : Providing Labors and required machines and


equipment for excavation of pipe trenches of suitable
dimensions(as shown below) in all type of soils (hard and
stone) such as sand,clay, black cotton soil etc. the price also
including breaking of surfaces such as asphelt,concrete,... etc.
for laying the pipes including removing the excavated
material and disposing it at suitable place as indicated by the
supervisor engineer.The trenches should be excavated under
the side walk way location & suitable for proper laying the
pipes and fixing all bends,valves and other adjuncts
connected with the pipeline and shall be suitable for proper
setting of the whole job.

a- 0.6 m wide x 1.0m deep for 3,4 inch diameter pipes . m3


b- 0.8m wide x 1.2m deep for 6,8 inch diameter pipes . m3
d- 1.0 m wide x 1.3m deep for 10,12,14 inch diameter pipes . m3
e- 1.1 m wide x 1.5m deep for 16,18,20 inch diameter pipes . m3

3-A Supply and Laying of Pipes:


The work includes:-Providing labours and required materials for laying and
connecting of High Density Polythene (HDPE)
Supply , laying and connecting of High Density Polythene (HDPE) pipes
suitable for drinking water supply system ( Class- 100) , (PN16) bar ,
supply and connecting of necessary fitting NP 16 bars best type such us:
Elbows, Tees, Reducers , couplers and End Cups ....etc The contractor
shall employ only specialist technical staff to perform the connections. (The
price including loading , unloading and transportation of materials to the
project site ). The pipes are the following :

HDPE Pipes 90 mm diameter, thickness 8.2 mm weight 2.15 Kg/m.l .


m.l
HDPE Pipes 125 mm outside diameter , thickness 11.4 mm weight 4.16
Kg/m.l m.l
HDPE Pipes 180 mm diameter , thickness 16.4 mm weight 8.59 Kg/m.l
m.l
HDPE pipes 250 mm outside diameter , thickness 22.7 mm weight 16.2
Kg/m.l m.l

3-B Laying of Pipes : Supply NEW pipes, fitting including End


Cups, Laying and connection of the following Ductile pipes
(The price include transportation of the pipes, fitting and
materials to the site) : Pipes for drinking water, ductile Iron,
centrifugally casted in accordance with ISO 2531-1998/EN
545, spigot/ socket (M/F) with "Tyton / standard type joint ,
servo-action type push -on joint made of elastomer rubber as
per ISO 4633-1996EN 681.1. Class of thickness K9. internally
lined with a sulphate resisting blast furance slag cement
mortor centerfugally applied and in accordance with ISO
4179-1995 external coating made of metalic zinc in
accordance with ISO 8179 part 1-1995 with the following
deviation: paint thickness 100 microns , and bitminous paint
(pore-sealer). Each pipe to be tested as per ISO 2531-1998 at
a hydrostatic pressure of 60 bars (or at 50 bars if diameter is
350 mm (14") or more ). Complete with lubrican past, non
soluble , food grade in accordance with ISO standard, and
rubber gasket joints (incl. 2% additional gasket). NP 16 bars

12 inch Diameter. ( Ductile Iron pipes )


m.l
14 inch Diameter. ( Ductile Iron pipes ) m.l

18 inch Diameter. ( Ductile Iron pipes ) m.l

Preperation of Instrruments & materiales , Exprienced


Experts for Main Pipe fiting (18") to The Tank out let By No.
Using welding .(Tank Pipe Conection)
All the above works should be carried out strictly in
accordance with the Specifications and instructions of the
Supervising Engineer

3- VALVES :
Supply ,Installation and fixing Gate Valves of the following
types & sizes. This includes Lowering, Laying and Installation
of Valves in proper position, grade and alignment including
cost of jointing materials, labour, hydraulic testing etc.
complete .

Control Valves & Wash Valves :


3-a
Supply resilient seated Gate Valves PN 16 , EN - GJS 400 - 18
made of DCI (GGG) , flanges drilled to PN 16 , epoxy powder coated ,
Wedge encapsulated with vulcanized EPDM , stainless steel spindle ,
inclusive extension spindle and protecting tube bots & nuts and flat
gaskets , HAWLE or similar , as per Specificstions .

a- 3 inch Dia. Ductile type


No.
b- 4 inch Dia. Ductile type
No.
c- 6 inch Dia. Ductile type
No.
d- 8 inch Dia. Ductile type
No.
f- 12 inch Dia. Ductile type
No.
g- 14 inch Dia. Ductile type
No.
h- 18 inch Dia. Ductile type
No.
Air Valves :
3-b
Automatic Air Valves, high air release capacity Supply
double orifice AIR Valves according to EN 1092-2 or equivalent DIN /
ISO , PN 16 , fange drilled to PN 25 made of GGG , epoxy powder
coated , HAWLE or similar as per Specifications.

a- Dia. (3") ( Ductile type ) No.


b- Dia. (4") ( Ductile type )
No.
f- Dia. (12") ( Ductile type )
No.

5- MANHOLES FOR WASH VALVE : Providing


materials and construction of manholes for washing valves in hollow
concrete block masonry (20X30X30)cm. Base in PCC beding
1:2:4(20cm) thick, with precast concrete covers (20cm ) thick
,supported on MS angles with painting, Cl rungs/steps made from
20mm dia steel bars provided at 150mmc/c.inside wall including
excavation, backfilling, plastering etc. complete as per drawings and
specifications.( Steel bars size 12 mm).The price also including
extension pipes Dia. (4") (HDPE type )from the manhole to the
seweare system with all civil workes (excavation , cavaring the pipes
by soft sand , filling the trench ...etc) .

b- Clear Dimension(1.2x1.2) M minimum & the depth


according to the depth of the main pipe for Pipe ( 6",8" ) . No.

c- Clear Dimension(1.8x1.8) M minimum & the depth


according to the depth of the main pipe for Pipe ( 10" , 12" ) . No.

6- House connections

1- Supply manpower and equipments excavate trenchs with


width at least (0.4m) and depth at least(0.6 m) m.l

2- Supply (PPR 80 ) pipe or same in specification , The price include


man power , necessary materials & accessaries(union , elbow , clamp
etc ) to connect (1/2") pipes to the main pipes ,This procedure
implemente by coapporation with DWS.

Pipes PPR80, DN 12mm , 20 mm outside diameter,13.2 .mm


.inside diameter, thickness 3.4 mm No.
3- backfilling: supply manpower , equipments for backfilling
the trenches using clean soil ( prevented from any organic
materials) by (30 cm) layers and compacting each layer , the m.l
price include removing the remaind materials to out side city
as determaind by supervisor Engineer.

4- Supply manpower, materiales and accessaries necessary to


disconnect the old pipe network using welding and other
necessary connections, also the price include disconnecting L.S
old(1/2 inch) pipes , excavation, backfilling.

7- Hydraulic Testing of Pipelines : Hydraulic testing pipeline


to specified pressure including cost of all materials, water,
Labors, operation charges etc. for testing using reciprocating
type pumps which should be able to provide specified test
pressure, gauges and other necessary equipment required for
testing. The rate under this item shall also include cost of re-
testing, if any portion of mains were found defective in the m.l
aforesaid test and the same shall be made good to the
satisfaction of the supervisor engineer . (the test pressure
should be 1.5 times the maximum allowable pressure in the
pipeline applied for a period of 30 minutes)

8- DISINFECTION OF PIPE LINE : The Contractor shall carry


out the washing out and chlorination of all water pipe work in
the works and shall provide all necessary equipment,
LS
operators and labour required.(D.W.S shall provide necessary
chemicals for conducting the same).
9- Backfilling : For all Pipes , Providing sand sorround
(encasement) shall be provided after the pipes are properly
laid and jointed.Soft Sand shall be provided all around the
pipe for the full width of trench, 100 mm thick at bottom and
200 mm thick at top (refer attached sketch). Backfilling above
top of sand layer shall be done Sub- base ( granular material )
well compacted at (250mm) each layers, free from stones,
peat, tree roots, construction debris or frozen material. Which M3
shall be thoroughly rammed as the work proceeds. The work
also includes filling up all holes and trenches which may have
been dug up, level the mounds or heaps of earth that may
have been made and clear away all rubbish accumulated
during the execution of the work.

10- Manholes :
Providing materials and construction of manholes for housing
valves in hollow concrete block masonry (20X30X30)cm. Base
in concrete ( 1: 2 : 4 ) (20) cm thickness over (10) cm crush
stone , and the roof with R.C ( 1 : 2 : 4 ) (20)cm thickness
according to the drawing and instruction of site engineer , The
price including excavation , backfilling , plastering for inside
wall not less than (2.5) cm thickness by cement - mortor ( 1 :
3 ) and CI rungs / steps made from (20)mm dia. steel bars
provided at (15) cm c/c .
a- Clear Dimension(1x1) M minimum & the depth according to
the depth of the main pipe for Pipe ( 3", 4" ) . No.

b- Clear Dimension(1.2x1.2) M minimum & the depth


according to the depth of the main pipe for Pipe ( 6" , 8" ) . No.

c- Clear Dimension(1.8x1.8) M minimum & the depth


according to the depth of the main pipe for Pipe ( 10" ,12" , No.
14" ) .
c- Clear Dimension(2x2) M minimum & the depth according to
the depth of the main pipe for Pipe ( 18" ) . No.

Total Cost ID

%2 for supervision and administration for the project as well as


11- L.S
for transportation and full

%7 for Unforssen L.S


TOTAL ID

NOTE:

1-Shovel must not use for filling


2-pipe trenches must be in shoulders

3-the steel bars in the manhole cover must be two layers of (12)mm and 10cm c/c in both directio
for hook

4-Extention water house hold connection should be in slope .

5-if the road width is more than 10m the pipes should be in both sides

6-water director is responsible for indicating the place of house hold connection and also boring of

7-all the diameterof the pipes in the drawing is inner diameter



. .

)alakn

PRICE
QTY COST I.D
I.D

1 12,000,000 12,000,000

9,425 8,000 75,400,000

3,652 9,000 32,868,000

1,579 10,000 15,790,000


1,574 11,000 17,314,000

14,732 19,000 279,908,000

977 25,000 24,425,000

2,897 45,000 130,365,000

906 85,000 77,010,000

946 140,000 132,440,000


335 175,000 58,625,000

870 280,000 243,600,000

1 1,500,000 1,500,000

13 350,000 4,550,000

12 400,000 4,800,000

10 600,000 6,000,000

6 950,000 5,700,000

3 1,400,000 4,200,000

1 1,600,000 1,600,000

2 2,500,000 5,000,000
3 750,000 2,250,000

1 800,000 800,000

1 1,000,000 1,000,000

1 600,000 600,000

1 700,000 700,000

2,655 5,000 13,275,000

885 25,000 22,125,000


2,655 3,000 7,965,000

1 1,500,000 1,500,000

21,663 500 10,831,500

1 2,500,000 2,500,000
16,361 10,000 163,610,000

29 500,000 14,500,000

15 600,000 9,000,000

5 700,000 3,500,000

1 800,000 800,000

1,388,051,500

L.S 27761030 27761030

L.S 97163605 97163605


1,512,976,135

and 10cm c/c in both direction and using (16) mm bars

onnection and also boring of the main pipe


.
Arocity Project
Water Network - BOQ
Shvan Company

Item Rate Amount


Description Unit Qua.
(ID) (ID)

1 Earth Work :
Providing Labors and required machines and equipment for
excavation of pipe trenches of suitable dimensions(as shown
below) in all type of soils (hard and stone) such as sand,clay,
black cotton soil etc. , for laying the pipes including removing
the excavated material and disposing it at suitable place as
indicated by the supervisor engineer.The trenches should be
excavated under the side walk way location & suitable for
proper laying the pipes and fixing all bends,valves and other
adjuncts connected with the pipeline and shall be suitable for
proper setting of the whole job. The price include: Supply &
laying (Detectable Underground Warning Tape),
inside excavations according to the drawing .

1-1 0.30 m wide x 0.80 m deep for HDPE (25mm) diameter pipes . m 20 6,000 120,000

0.60 m wide x 1.0 m deep for HDPE (75mm,&125mm)


1-2
diameter pipes .
m ### 6,000 ###

1-3 0.80 m wide x 1.30 m deep for PE (180mm) diameter pipes . m 650 6,500 ###

2 Supply and Laying of Pipes:

High Density Polyethylene Pipes (HDPE) :

Supply, laying and connecting of High Density Polythene


(HDPE) pipes suitable for drinking water supply system
( PE100, PN16) bar , supply and connecting of necessary
fitting PN 16 bars best type such us: Elbows, Tee, Reducer,
couplers, flange adaptor and End Cups ....etc,The contractor
shall employ specialist technical staff to perform the
connections. (The price including loading , unloading and
transportation of all materials to the project site, and
laboratory testing as required by DWS ). The pipes are the
following :

HDPE Pipes 32mm outside diameter, wall thickness not less


2-1 ML 80 11,500 920,000
than 2.9mm and weight not less than 0.272 Kg/m.l , PN 16 bars

HDPE Pipes 75mm outside diameter, wall thickness not less


2-2 ML ### 9,000 ###
than 6.8mm and weight not less than 2.50 Kg/m.l , PN 16 bars

HDPE Pipes125mm outside diameter, wall thickness not less


2-3 ML 770 21,000 ###
than 11.4mm and weight not less than 4.08 Kg/m.l , PN 16 bars

HDPE Pipes180mm outside diameter, wall thickness not less


2-4 ML 300 43,000 ###
than 12 mm and weight not less than 5 Kg/m.l , PN 16 bars

Page 18 of 23
Arocity Project
Water Network - BOQ
Shvan Company

Item Rate Amount


Description Unit Qua.
(ID) (ID)
3 Valves :
Supply ,Installation and fixing Gate Valves of the following
types & sizes. This includes Lowering, Laying and Installation of
3-1 Valves in proper position, grade and alignment including cost of
jointing materials, labour, hydraulic testing etc. complete .

Used as (Flow Control Valves ( FCV) & Washout Valves ) :

Supply resilient seated Gate Valves PN 25 bars , EN - GJS 400 - 18


made of DCI (GGG) , flanges drilled to PN 25 , epoxy powder coated ,
Wedge encapsulated with vulcanized EPDM , stainless steel spindle ,
inclusive extension spindle and protecting tube bots & nuts and flat
gaskets , Westeren Product or similar , as per Specificstions .

3-1-
1 (3inch) Dia. D.I type for (75mm) HDPE (used as washout valve) No. 2 ### 900,000

3-1-
2 (4 inch) Dia. D.I type for (125 mm) HDPE ( 3no. used as washout valve) No. 6 ### ###

3-1-
3 (6 inch) Dia. D.I type for ( 180 mm) HDPE No. 2 ### ###

3-2 Supply & install (Pressure Reducer Valve ):

DN (200mm) to be installed on the (150mm) pipe,


westeren product with following specification :

Design according to DIN EN 1074


Pressure levels: PN 25
Medium temperature - 40C
- Basic valve EN-GJS-400 No. 1 ### ###

- Epoxy coating (min. 250 m) acc. to GSK, RAL 5012


- Spindle unit INOX, EN-GJS-250
- Control line, fittings and control filter stainless steel
- control valve red bronz
4 Air release Valves :
Westeren product, with the following spec.:
Working pressure PN 16: 0,8 - 16 bar
Test pressure (body) 24 bar
Body POM (Polyoxymethylen
4-1 Valve seat Ms 58 (CuZn35Pb3As
Float POM (Polyoxymethylen)
Seal Elastomer
UV shield PE
Flange Ductile cast iron

Page 19 of 23
Arocity Project
Water Network - BOQ
Shvan Company

Item Rate Amount


Description Unit Qua.
(ID) (ID)
DN(2")- Installed on ( 150mm ) pipe No. 1 ### 600,000

Page 20 of 23
Arocity Project
Water Network - BOQ
Shvan Company

Item Rate Amount


Description Unit Qua.
(ID) (ID)

5 Serface box

surface box for service valve with cover (following DIN 40 57),
height adjustable

Product: Westeren product (Hawle) or equivalent .

Surface box consisting of base cap, drawing ring and cover,


5-1 round cover with angle seat, grey cover with epoxy powder No. 3 ### ###
coating for corrosion protection, positioning pin of stainless steel

Material: GG 25, body bituminized, grey cover with epoxy


powder coating for corrosion protection
Accessories: extension ring H = 50 mm

Note: Used for : FCV & Air release valves.

6 Manholes :
Providing materials and construction of manholes for valves with
following details:

Walls: Constructed from solid concrete block (15x20x40)cm,

Base : Constructed from concrete ( 1: 2 : 4 ) (20) cm thickness


over (10) cm crush stone .

Cover : Constructed with R.C (1:2:4) (25)cm thickness , two


layers reinforcment at top & bottom ( 12mm @ 10cm C/C both
directions) , Hooks with ( steel bars 16mm) , all according to
the drawing and instruction of the site engineer ,

And the price including excavation , backfilling , plastering for


inside wall not less than (2.5) cm thickness by cement - mortor
( 1 : 3 ) and CI rungs / steps made from (20)mm dia. steel
bars provided at (15) cm c/c .

Clear Dimension(1.0x1.0) M minimum & the depth according to


6-1 the depth of the main pipe for valves ( 2.5' & 4",) . No. 8 ### ###

Clear Dimension(1.20 x1.20) M minimum & the depth according


6-2 to the depth of the main pipe for (6" ) dutile Iron Pipe . No. 3 ### ###

7 Hydraulic testing of pipelines :


Hydraulic testing pipeline to specified pressure including cost
of all materials, water, Labors, operation charges etc. for testing
using reciprocating type pumps which should be able to provide
specified test pressure, gauges and other necessary equipment
required for testing. The rate under this item shall also include
7-1 cost of re-testing, if any portion of mains were found defective in ML ### 750 ###
the aforesaid test and the same shall be made good to the
satisfaction of the supervisor engineer . (the test pressure
should be 1.5 times the maximum allowable pressure in the
pipeline applied for a period of 30 minutes)

Page 21 of 23
Arocity Project
Water Network - BOQ
Shvan Company

Item Rate Amount


Description Unit Qua.
(ID) (ID)
8 Dsinfection of pipeline :
The Contractor shall carry out the washing out and chlorination
of all water pipe work in the works and shall provide all
8-1 necessary equipment, operators and labour required.(D.W.S LS 1 ### ###
shall provide necessary chemicals for conducting the same).

9 Backfilling :
Backfilling with Providing Sand sorround the pipe, shall be
provided after the pipes are properly laid and jointed, Soft Sand
9-1 shall be provided all around the pipe for the full width of trench, M.L ### 5,000 ###
at bottom and at top (according to attached drawing)

Bacck Filling to the Sub-Grade level : regulating the


base then compacting, backfilling above top of sand layer shall
be done with ( Sub-base Type A ), at layers not exceeding
(25cm) in thickness, free from stones, peat, tree roots,
9-2 construction debris or frozen material. & should be compcted to M,L ### 9,000 ###
a minimum of ( 90 % of MDD) by compactors and vibroplate,
The work also includes filling up all holes and trenches which
may have been dug up, level the mounds or heaps of earth that
may have been made and clear away all rubbish accumulated
during the execution of the work.
10 Jointing works :
Providing necessary materials, machine and labor for
10- Connection with Existing pipes using accessories, welding &
No. 1 ### 500,000
1 fittings needed for jointing :

11 House connection:
House connection include the following items:

1) Excavation for the pipe not less than (0.30x 0.60)m


2) Supply & Connecting house connection using (PP-R80) pipe
Inside diameter (3/4 ") and all accesseries according to
11- following specification: SDR6 , PN25, Tested according to DIN
NO. 200 35,000 ###
1 8077/8078 ,EN15874,SKZ HR 3.28 Fibre composite pipe , made
of PP-R80
3) Bacck Filling to the Sub-Grade level : regulating the base
then compacting, backfilling above top of sand layer shall be
done with ( Granular material ), at layers not exceeding
(25cm) in thickness, free from stones, peat, tree roots,
construction debris or frozen material. & should be compcted
by compactors and vibroplate, The work also includes filling up
all holes and trenches which may have been dug up, level the
mounds or heaps of earth that may have been made and clear
away all rubbish accumulated during the execution of the work.

Page 22 of 23
Arocity Project
Water Network - BOQ
Shvan Company

Item Rate Amount


Description Unit Qua.
(ID) (ID)
12 Fire Hydrant Installation
Supply & install Fire Hydrant with the following
specifications:
Above gound fire hydrant
Three outlets
Nominal Diameter: DN100

Max. working pressure : PN16 - 16 bar

12- Made from entirely Corrosion free materials, stainless steel.


1
O-rings embeded in non-corrosive material (according to DIN
3547-T1)

Minimum torque for operation (MOT<80Nm, mst>250Nm)

Hydrant can be turned from 0 - 360 degree No. 3 ### ###


Automatic drain off system with pressure control.

Drain outlet connection possible with PE pipe 32mm dia.

Resistant aginst desinfectants according to EN1074-1

Base flange according to EN 1092-1, drilled to DIN 2501

European western made ( Hawle) or simillar


The price include :
* Gate Valve Ductile iron European western made ( Hawle) or
simillar
* Surafce Box (2"),cast iron bituminize, heavy-weight
type,weight not less than (6.70 kg)
* Bend 90 double flanged
* Casting plain concrete (250 kg/cm2) ( Anchore Blocks)

* HDPE pipes - 125mm to connect the fire hydrants to the


main pipe line

TOTAL 148,752,500

:

( HDPE) ( 2 )
.

Page 23 of 23