3- VALVES :
Supply ,Installation and fixing Gate Valves of the following
types & sizes. This includes Lowering, Laying and Installation
of Valves in proper position, grade and alignment including
cost of jointing materials, labour, hydraulic testing etc.
complete .
6- House connections
10- Manholes :
Providing materials and construction of manholes for housing
valves in hollow concrete block masonry (20X30X30)cm. Base
in concrete ( 1: 2 : 4 ) (20) cm thickness over (10) cm crush
stone , and the roof with R.C ( 1 : 2 : 4 ) (20)cm thickness
according to the drawing and instruction of site engineer , The
price including excavation , backfilling , plastering for inside
wall not less than (2.5) cm thickness by cement - mortor ( 1 :
3 ) and CI rungs / steps made from (20)mm dia. steel bars
provided at (15) cm c/c .
a- Clear Dimension(1x1) M minimum & the depth according to
the depth of the main pipe for Pipe ( 3", 4" ) . No.
Total Cost ID
NOTE:
3-the steel bars in the manhole cover must be two layers of (12)mm and 10cm c/c in both directio
for hook
5-if the road width is more than 10m the pipes should be in both sides
6-water director is responsible for indicating the place of house hold connection and also boring of
. .
)alakn
PRICE
QTY COST I.D
I.D
1 12,000,000 12,000,000
1 1,500,000 1,500,000
13 350,000 4,550,000
12 400,000 4,800,000
10 600,000 6,000,000
6 950,000 5,700,000
3 1,400,000 4,200,000
1 1,600,000 1,600,000
2 2,500,000 5,000,000
3 750,000 2,250,000
1 800,000 800,000
1 1,000,000 1,000,000
1 600,000 600,000
1 700,000 700,000
1 1,500,000 1,500,000
1 2,500,000 2,500,000
16,361 10,000 163,610,000
29 500,000 14,500,000
15 600,000 9,000,000
5 700,000 3,500,000
1 800,000 800,000
1,388,051,500
.
Arocity Project
Water Network - BOQ
Shvan Company
1 Earth Work :
Providing Labors and required machines and equipment for
excavation of pipe trenches of suitable dimensions(as shown
below) in all type of soils (hard and stone) such as sand,clay,
black cotton soil etc. , for laying the pipes including removing
the excavated material and disposing it at suitable place as
indicated by the supervisor engineer.The trenches should be
excavated under the side walk way location & suitable for
proper laying the pipes and fixing all bends,valves and other
adjuncts connected with the pipeline and shall be suitable for
proper setting of the whole job. The price include: Supply &
laying (Detectable Underground Warning Tape),
inside excavations according to the drawing .
1-1 0.30 m wide x 0.80 m deep for HDPE (25mm) diameter pipes . m 20 6,000 120,000
1-3 0.80 m wide x 1.30 m deep for PE (180mm) diameter pipes . m 650 6,500 ###
Page 18 of 23
Arocity Project
Water Network - BOQ
Shvan Company
3-1-
1 (3inch) Dia. D.I type for (75mm) HDPE (used as washout valve) No. 2 ### 900,000
3-1-
2 (4 inch) Dia. D.I type for (125 mm) HDPE ( 3no. used as washout valve) No. 6 ### ###
3-1-
3 (6 inch) Dia. D.I type for ( 180 mm) HDPE No. 2 ### ###
Page 19 of 23
Arocity Project
Water Network - BOQ
Shvan Company
Page 20 of 23
Arocity Project
Water Network - BOQ
Shvan Company
5 Serface box
surface box for service valve with cover (following DIN 40 57),
height adjustable
6 Manholes :
Providing materials and construction of manholes for valves with
following details:
Page 21 of 23
Arocity Project
Water Network - BOQ
Shvan Company
9 Backfilling :
Backfilling with Providing Sand sorround the pipe, shall be
provided after the pipes are properly laid and jointed, Soft Sand
9-1 shall be provided all around the pipe for the full width of trench, M.L ### 5,000 ###
at bottom and at top (according to attached drawing)
11 House connection:
House connection include the following items:
Page 22 of 23
Arocity Project
Water Network - BOQ
Shvan Company
TOTAL 148,752,500
:
( HDPE) ( 2 )
.