Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Date :
Project Name Done by: FAISAL RAI
Maximum hourly water demand takes into account the daily cycles of water.
Maximum hourly water demand =
3 (Average community daily water demand)
GPD ### 1,125.00
Note :
While the maximum daily water demand is used to size the treatment facility,
the maximum hourly water demand should be used to size the distribution system.
The distribution system should be of an adequate size to carry Max. Hourly w. demand
3. Fire Flow
The fire flow is calculated as follows:
Fire flow (gpm) = 1020 *( P/1000)^0.5 * ( 1- GPM 1,233.94
Where "P" is the population in 1,000's of people.
4. Total Flow
Total flow = Maximum daily water demand + GPD ###
Note that I converted the fire flow value from gpm to MGD to match
the maximum daily water demand units.
5. Duration of Fire Flow
Duration = Fire Flow /1000 Hours 1
METHOD 2
Area ( A ) 2000 SQM
C 1.5 WOOD CONSTRUCTION
1 NORMAL CONSTRUCTION
0.8 FIRE RESIST MAT.
0.6 FIRE RESIST. CONSTRUCTION
FAISAL RAI
April . 2009
Fire Flow
FAISAL RAI
April . 2009
1. Response Time by Fire Department.
Type Of Fire Department Response Value
On-Site (within 1.6 km 1
On-Site (over 1.6 km but less than 4.8 km 2
On-Site (4.8 km or greater) 3
Off-Site (less than 3.2 km 2
Off-Site (3.2 km or greater) 3
Single Story 1
Two or more stories 2
4. Separation Distances.
Separation Distance meter (feet) Value
18.3 (60) or more 1
6.4 (21) to 18 (59) 2
6.1 (20) or less 4
FAISAL RAI
April . 2009
6.Firefighting Access.
Maximum Hose Layout (meter) (feet) Value
(first three stories)
55 (180)or less 1
55.1 (181) to 70 (230) 2
Greater than 70 (230) 4
FAISAL RAI
April . 2009