Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
A
Ice : pramod Workshop Cutting pump
Boiler : Kalpesh
Gland to be filled
Agitator jammed
Chocked
2 Nozzal chok
Oil chek
.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d
Completed
Rohan, Jignesh Urmil , trial
pending
1 blower
completed,
Fatehsang Urmil
second
pending
Work
Vijay Urmil
running
sanjay Keyur
MM no not
Ajay Keyur
printed
MM no not
sanjay,Ajay Keyur
printed
MM no not
Jignesh Keyur
printed
MM no not
Ajay Keyur
printed
MM no not
Sanjay Keyur
printed
MM no not
Ajay Keyur
printed
Memo,G :
Amol,Sanjay Paresh Complet
15896
H2N P-3306
3
/
2
/
2
0
1
6
3
/ PP Nano-Filtration
2
/
2
0
1
6
C
Utility : Naresh bhai SPD Rav-403
C
Boiler : Kalpesh
Break Reason of
Problem (Notification by user dept) Down / breakdow
Pr. Maint n
Gland leakage
Nozzles choked
Line leackage
Gland to be filled
Chocked
W/P 9:30
W/P 9:00
New gasket fitted but plant side trial pending 15:00 17:20
.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d
MEMO (No.
not
Rohan Rahul mentioned Completed
/printed)
G-15961
MEMO (No.
not
Jignesh Rahul Completed
mentioned
/printed)
G-15897,
Vinamra
Rahul Height- Completed
Insulation
10592
Rahul,
Ankush Engg. W/P
VNG
G-15898,
Rohan Rahul Height- W/P
10593
MEMO (No.
not
Rahul, mentioned
Shrirang Engg. Completed
VNG /printed)
G-15962,
Hot-7308
Trial
Height- pending
Ajay Keyur
10592 from plant
side
Mm- no
Ajay Keyur completed
not printed
Mm- no
Ajay Keyur completed
not printed
Mm- no
Ajay Keyur completed
not printed
Mm- no
Ajay Keyur completed
not printed
Mm- no
Ajay Keyur completed
not printed
Shi
Date Department Plant Equipment No.
ft
A
MEE VLS-01 Drain valve
PP PP 3rd floor
Workshop
Behind Admin
H2N P 3104 A
H2N F 3104
H2N F 3102
3
/
Workshop Spare cutting pump
3
/
3
/ RMP ANF
2
0
1
6
Staff : Paresh SFD New screw conver
RMP ANF
PP P-1210
Nozzles choked
Nozzles choked
Welding leakage
Candles change
Dome opened
Bearings and shaft to be fitted
Manhole box-up
Gland to be filled
.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d
MEMO (No.
not
Jignesh Rahul mentioned Completed
/printed) G
- 15922
G-18743,
Rahul,
Jignesh Height- W/P
Upendra
9015
MEMO (No.
not
Jignesh, Ramesh Rahul mentioned Completed
/printed) G
- 15922
MEMO (No.
not
Raju, Inder Rahul mentioned Completed
/printed) G
- 15922
MEMO-
3872 G-
Shrirang Engg. Rahul Completed
19371,
Hot-7384
Rahul, G-15966,
Shrirang Engg. W/P
Hitesh Hot-3904
Pruthwa
Rahul G-18744 Completed
Construction
Hitesh,Par
Vimal G :15967 Completed
esh
Trayal
Shree rang Paresh G : 20002 work
panding
Mm no not
Vimal Keyur Completed
printed
Mm no not
Vimal Keyur Completed
printed
Mm no not
Vimal Keyur Completed
printed
Line fitting
Vimal Keyur Mm no after
dechoking
Shi
Date Department Plant Equipment No.
ft
R-1111, R-1108, T-
1205, T-1207, T-1211,
T-1303, T-1301, T-
1302, R-1103, R-1104,
Boiler : Jayendra PP & SPD
R-1105, R-1110, R-
1106, R-1204,R-1109,
A R-1201, R-1202, R-
1107
RMP P-1015
RMP Monorail
Ice Plant :
PP Plant P-1111
Indravadan
Break Reason of
Problem (Notification by user dept) Down / breakdow
Pr. Maint n
Gland leakage
Monorail taking high amperage while
operating
Pump lekage
leakage problem
Pump vecum not complet.
2 Nozzal chok
Line leakeg
Completed
W/P 9:00
W/P 9:00
attended.
Pump trayal so vecum press loo so water
cooling temp 50 so not complet vecum so 22:30 23:30
work is panding.
RAV old moter open and new moter fitting
0:00 2:30
work done.
2 Nozzal open and cilling and fitting work
2:45 4:00
complet.
.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d
MEMO (No.
not
Ajay Rahul Completed
mentioned
)
MEMO (No.
not
Ajay Rahul Completed
mentioned
)
Rahul,
Ajay Hitesh Completed
Gandhi
G-20007,
Vinamra
Rahul Height- Completed
Insulations
8701
MEMO (No.
Fitting
not
Shrirang Engg. Rahul work
mentioned
pending
)
MEMO (No.
not
Jignesh Rahul Completed
mentioned
)
Pump
fitting on
Rahul,
Ajay, Raju G-20006 position
Upendra
work
running
Rahul,
Ankush Engg. W/P
VNG
Ajay Hitesh
Rahul MEMO
Gandhi,
Jignesh Rahul, W/P
Hitesh
Patel
rohan
Paresh Paresh Panding
HDP line
welding
Ajay,Mukesh Paresh Memo
joint
leakeg
Work is
Paresh Paresh
panding
Shi
Date Department Plant Equipment No.
ft
Staff : (A)
Keyur(G) Rahul,
W/shop Strainer
Upendra (G)
Hitesh
Fitter :(A)
Sanjay,Rohan (G) Pp P-1111
Jignesh, Fatehsang
A+ FBC Boiler
G
PP P-1111
Formulation NM-1406
Formulation Blender-1
3
/
5
/
Formulation New Blender
3
/
5 MEE Catchment pit
/ MEE
area
2
0
1 Staff :Urmil SPD FD-1 air filter
6
B
RMP P-1016
Formulation NM-1406
H2N VP-3105
PP FP-1211
Abnormal sound
Vacuum problem
Gland leakage
Scafolding To be removed
Scaffolding to be removed
To be fitted on position
Blender to be boxed up
Gaskets to be fitted and box up work to
be done
To be fitted on position
Coupling broken
Valve to be open
Gland leakage
Vacuum problem
W/P 9:15
Nozzal open and cilling and fitting work done. 0:45 1:30
.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d
Rohan Keyur
Rohan Keyur
Fatehsang,
Keyur W/P
Jignesh
Sanjay Keyur
Vinmra Keyur
Pruthwa G-15972,
Rahul Completed
Construction Hot-7622
G-15973,
Vinamra
Rahul Height- Completed
Insulation
9329
MEMO (No.
Rahul,
not
Sanjay Upendra, Completed
printed) G-
Urmil
15754
G-18600,
VNG, Hot-5794,
Ankush Engg. W/P
Rahul Height-
9328
Completed
Rahul,
Sanjay , trial
Urmil
pending
Rahul,
Shree Rang Pending
Urmil
MEMO-
Gaurang Rahul Completed
4084
Gaurang,
Rahul Completed
Indrasinh
G-19372,
Shirang Engg. Rahul Completed
Hot-7385
Urmil,
Sanjay Completed
Rahul
Completed
Urmil,
Sanjay , trial
Rahul
pending
Temporary
Sanjay Urmil
done
Competed,
handle
Sanjay Urmil
welding
pending
Urmil,
Jignesh Completed
Rahul
Urmil,
Shree Rang Pending
Rahul
Jignesh,
Upendra Completed
Fatehsang
Urmil,
Sanjay, Sahdev Completed
Milan
Work in
Sanjay Urmil
progress
Bering
ching over
Vimal,Mukesh Paresh Memo
work
panding
h2n P-3113
Formulation Nm-1406
Pp Fp-1202
C
Fitter : Raju MEE Feed circulation line
Blower jam
handle to be welded
Seal leckage
Bellow to be changed
Coupling damaged
Oil make-up
box-up
Feed problem
Seal leakage problem
Pump seal leakage
Nozzle chocked
Suggeste
d PR Start
Corrective action taken End time
action if time
any
.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d
Paresh,Key
Fhatesingh, Vimal Running
ur
MM- not
Ajay Keyur Completed
printed
Keyur,
Vimal Completed
Rahul
Completed
almost.
Only
Vinamra Rahul, pending at
Insulation Keyur 2 points
due to
safety
reasons
G-15974, W/P but
Hot-5795, halted
Ankush Engg. Rahul
Height- later on for
9331 today
G-15974,
Vinamra
Rahul Height- Completed
Insulation
9331
Lobe
Fatehsingh, Vimal, Keyur,
setting to
Khuman Rahul
be done
ajay
ajay
ajay
ajay
Raju Urmil G-20013 Pending
MM- No
Raju Urmil Completed
number
Shi
Date Department Plant Equipment No.
ft
PP B-1506
PP R-1106
PP T-1206
3
/
7
/
2 Steam Line At First
Staff :Keyur PP
0 floor
1
6
0
1
6
H2N F-3102
Seal leakage
Steam leakage
Oil to be check
Overhauling work
Agitator jam
repairing
Spider damage
H2 valve leakage
Candle filter
leakage prob
Suggeste
d PR Start
Corrective action taken End time
action if time
any
.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d
Completed
, new
Jignesh Urmil
spring
needed
Fatehsang,
Urmil Completed
Jignesh
Work in
Shree Rang Urmil
progress
Work in
Shree Rang Urmil
progress
MM- no not
Shree Rang keyur
printed
MM- no not
Shree Rang keyur
printed
Vimal keyur
Vimal,Sanjay keyur
MM- no not
Vimal,Sanjay keyur
printed
Vimal keyur
vimal,viajy
vimal,viajy
vimal,viajy
vimal,viajy
vimal,viajy
Shi
Date Department Plant Equipment No.
ft
RAV-402 (Divertor
Staff : Urmil SPD
valve)
RMP P-1116
3
/
7
/ Staff :Keyur RMP P-1016
2
0
1
6
2
0
1
6
ETP P 1639 C
SPARE Gasket
PP P 1203
Break Reason of
Problem (Notification by user dept) Down / breakdow
Pr. Maint n
Seal leakage
Gland leakage
Beraing damaged
Seal leakage
Material leackage
Boxed up work
Leackege
Leakage problem
Dome box-up
Repairing
Overhauling
Leakage problem
for calendria
Suction problem
Suggeste
d PR Start
Corrective action taken End time
action if time
any
.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d
Completed
, only bolt
Fatehsang, Rohan Urmil G-15761
tightening
pending
Pump
Jignesh Urmil shifted to
workshop
Work in
Shree Rang Urmil
progress
MM-No
Jignesh Urmil Completed
number
Permit not
Jignesh Urmil
received
Sanjay,Ajay Keyur
Hitesh,Key
Jignesh
ur
sanjay Keyur
Keyur
sanjay,ajay
sanjay,ajay
shree rang
sanjay,ajay
sanjay,ajay
sanjay,ajay
sanjay,ajay
Shi
Date Department Plant Equipment No.
ft
3
/
9 Utility : Sohail RMP T-1002 side valve
/
2
0 Ice : Nikul H2N F-3102
1
6 B Boiler : Kalpesh Formulation NM-1406 vibro
0
1
6 B
RMP ANF
Boiler : Kalpesh
Break Reason of
Problem (Notification by user dept) Down / breakdow
Pr. Maint n
Cupling broken
Candla filtter
Seal leakage
Valve replacement
Dome leakage
Line choke
Gasket replacement
.
Spares
Elapsed Supervise
Consume Done by Permit No. Status
Time d by
d
Bolts of
bearing
Paresh Paresh housing
pending to
be fitted
Urmil,
Fatehsang G-18746 Completed
Hitesh
Completed
Urmil, , isolation
Vijay
Rahul removing
pending
Urmil,
Shree Rang Completed
Hitesh
Jignesh, Shree
Urmil Pending
Rang
Urmil,
Vijay Pending
Ishaan
Vijay Rahul Completed
Flange
Vijay Urmil joining
pending
MM- No
Vijay Urmil Running
number
MM- No
Shree Rang Urmil Completed
number
Vijay Keyur,Viraj MM no
MM no not
Vijay Keyur
printed
Vijay Keyur
Date Shift Department Plant Equipment No.
PP Goods lift
PP B : 1216,1217
Staff : Urmil Workshop Hydraulic trolley
3/10/2016
Fitter : Vimal, Rohan Formulation NM-1406 vibro
Pp P-1104
Mee ATFD -1
Break Reason of
Problem (Notification by user dept) Down / breakdow
Pr. Maint n
Overhauling work
PM Work
Making Vibraton
Suggeste
d PR Start
Corrective action taken
action if time
any
3 Trooly complet and trayal work done. 8:30
Titing work attind work complet but minor leakeg. 9:30
Agitator jam so attind work panding 11:30
membrane 11:15
Pump open so impeller ceiling and pump fitting work
12:13
complet.
Another spare angle plate found and cutted, pending to be
welded and fitted
Mein hool fitting work done. 6:30
2 trolley repairing done 14:30
Leakage found from welding, plant person didn't give permit
15:00
for hot work
Completed 17:30
Mee steam stopped FOR 15 minute and blind plug Applied . 0:20
Completed 1:00
Mm no not
3:05 Aajay Keyur Completed
Printed
2:00 Keyur
Date Shift Department Plant
Boiler : Kalpesh PP
A+G RMP
Formulation
Workshop
ETP
PP
3/11/2016
H2N
B
Fitter : Rajiv,Amul RMP
Completed
Completed
Attended, completed
Completed
Completed
flanch bolt open so bolt is jam so hot work bolt open and
new kloth fitting work done.
Tanker unloding work complet so hose pipe open work done.
New pump and new empler fitting and trayal work done.
Completed
Completed
Spares
Start Elapsed Permit
End time Consume Done by Supervised by
time Time No.
d
Sanjay, MEMO-
8:50 15:30 Rahul, Upendra
Fatehsang 3541
MEMO (No.
not
9:30 11:30 Jignesh Rahul`
printed)
G-15769
Sanjay,
10:45 14:00 Rahul G-15946
Indrasinh
Jignesh &
12:15 Shrirang Rahul
Engg.
Jignesh,
9:15 14:15 Rahul
Gaurang
MEMO (No.
not
15:30 17:10 Jignesh Rahul
printed)
G-20639
Fatehsang,
Ramesh,
9:30 Indrasinh & Upendra
Shrirang
Engg.
G:
Rajiv,Shree
14:30 20:30 Paresh 15948,Hot
rang
: 3907
4:15 5:15 Gurang Paresh G : 15946
Mm- no
22:50 23:50 Ajay Keyur
not Printed
Completed
Completed
Attended, but
work pending still
Completed
Completed
Completed
W/P
Completed
Completed
Completed
W/P
Complet
Complet
Panding
Complet
Complet
Complet
Complet
Completed
Completed
drop wise
leackage from
casing.
Completed
Date Shift Department Plant
Formulation
A
ETP
ETP
Formulation
3/12/2016 PP Plant
Workshop
MEE Plant
Nitrogen plant
W/P
Completed
W/P
W/P
W/P
checked found swing arm all bolts broke found so swing arm
taken off from vessel and all bolts removed by welding then #VALUE!
same box-up done.trial taken found ok.
attended.
fresh oil of atlas copco fil-up done. Trial taken but same trip
broblem .
Pump open and shifting to work shop and pump open and
new bering and new oil seil fitting and pump box up and
pump fitting and trayal work complet.
Vibro top cover open so fitting and top and botam ballow
fitting work done.
ramesh
sanjay
sanjay
fatesingh/sanjay
sanjay
fatesingh/sanjay
W/P
G-18130, Height-
W/P
9020
G-20026 Completed
G-15771 W/P
G-20640, Hot-
W/P
3663
W/P
W/P
W/P
W/P
completed.
bellow and top
cover fitting u/p.
completed.
completed.
u/p
G : 20027,Hight :
Complet
8705
G : 19381 Complet
M : 4097 Complet
M emo Complet
Memo Complet