Sei sulla pagina 1di 116

Shi

Date Department Plant Equipment No.


ft

Staff : Urmil PP P-1202

Fitter : Rohan, Vijay SFD Screw conveyor gear

Utility : Arif, Sohail ETP Diffuser blower

A
Ice : pramod Workshop Cutting pump

Boiler : Kalpesh

Staff : Keyur Workshop Cutting pump

Fitter: Ajay,Sanjay Rmp P-1015


3
/
1
/ Utility : Jayanti Rmp T-1002
2
0
1
Ice : Nikul SPD Nozzle-11061
6

Boiler : jayendra Rmp Top line


B
B
KoH Tank bottom
Pp
valve

Rmp SCR Steam line

Staff : Paresh H2N P : 3121

Fitter : Sanjay,Amol RMP R-1001 Stem line

C Utility : Naresh bhai SPD Nozzal

Ice : Usman PP Plant T-1209,1210

Boiler : Jayandra H2N P :3104 A


Break Reason of
Problem (Notification by user dept) Down / breakdow
Pr. Maint n

Body bolt broken

Gear teeth worn out

Both blower air leakage from line

Spare pump to be ready

Pump boxed up work

Gland to be filled

Agitator jammed

Chocked

Line to be opened and Closed


Valve passed

SCR Steam line to be open and closed

Pump seal leakeg

Stem line leakeg

2 Nozzal chok

Oil chek

Pump discher line leakeg


Suggeste
d PR Start
Corrective action taken End time
action if time
any

Pump opened and bolts taken out by welding


and new bolts fitting done, isolation removed, 9:00 12:30
trial pending

Idle gear taken out and SFD started 7:00 8:00

1 blower line clamp tightened and


completed, second blower bellow fitting 9:00 12:00
pending

Old pump stuffing box and impeller taken


out, new pump bearing husing not properly
8:00 -
fitted, so proper fitting done, stuffing box
fitting pending

Stuffing box fitted and Gland filling done.Also


3:00 18:30
Casing fitting work done.

completd 17:40 18:00

Tried to move Agitator with pipe range but


19:30 20:00
not moved so need to steaming.

Nozzle opened, Cleaned and fitted 16:00 16:50

completd 18:45 19:25


Valve replaced 20:10 20:40

completd 21:00 21:25

Pump open and seal open so chek seal


complet so seal cilling and fitting and pump 23:00 1:30
fitting so trayal work done.

Line leakeg attind work done. 22:30 23:30

2 Nozzal chok so nozzal open and cilling and


2:00 3:30
fitting work done.
Oil leval complet work done 3:30 4:00
Line leakeg so new gasket fitting but not
leakeg attind so chek stub bend damage so 4:00 5:00
work is panding.

.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d

Completed
Rohan, Jignesh Urmil , trial
pending

Rohan, Vijay Urmil -

1 blower
completed,
Fatehsang Urmil
second
pending

Work
Vijay Urmil
running

sanjay Keyur

MM no not
Ajay Keyur
printed

MM no not
sanjay,Ajay Keyur
printed

MM no not
Jignesh Keyur
printed

MM no not
Ajay Keyur
printed
MM no not
Sanjay Keyur
printed

MM no not
Ajay Keyur
printed

Memo,G :
Amol,Sanjay Paresh Complet
15896

Sanjay Paresh Memo Complet

Amol,Mukesh Paresh Memo Complet

Amol Paresh Complet

Sanjay,Amol Paresh M : 3120 Panding


Shi
Date Department Plant Equipment No.
ft

Staff : Rahul PP P-1208

Fitter : Rohan, Vijay SPD Nozzle - 47, 60, 61

Utility : Suhel ETP Diffuser Blower

Drum Filling System -


Ice : Usmaan Formulation
3

Boiler : Kalpesh Utility OBA CT


A

SFD New Screw Conveyor

H2N H2N Tankfarm Area

SPD New ATFD

H2N P-3306

3
/
2
/
2
0
1
6
3
/ PP Nano-Filtration
2
/
2
0
1
6

Staff : Keyur H2N Pnt line

Fitter: Ajay,Vijay RMP P-1012

Utility : Jayanti SPD Nozzle -60

B Ice : pramod Formulation Nm-1406

Boiler : Kalpesh PP SFD

Staff : Keyur RMP P-1015

Fitter : Ajay PP SFD

C
Utility : Naresh bhai SPD Rav-403
C

Ice : Indravadan PP Hydraulic trolley

Boiler : Kalpesh
Break Reason of
Problem (Notification by user dept) Down / breakdow
Pr. Maint n

Gland leakage

Nozzles choked

Bellow fitting to be done

Corrugated hose leakage

Gearbox oil level to be checked and to


be replenished on scarcity

New Screw Conveyor lifting, shifting and


fitting work

Scaffolding to be mounted near P-3305

Fabrication & Erection work

Gasket leakage on discharge side of


pump, in an half inch valve and one
flange joint gasket leakage in tankfarm
area at height to be attended
Nano filtration cartridge filter line
leakage, to be welded

Line leackage

Gland to be filled

Chocked

Bottom cone leackage

Gear to be removed and bearing to be


checked

heavy leackage from gland

Gear to be removed and bearing to be


checked

Material not coming from Rav


Overhauluing work
Suggeste
d PR Start
Corrective action taken End time
action if time
any

Gland tightened, trial taken, heavy leakage


observed. So, new gland fitted but
meanwhile, NRV was also found to be passed,
so due to material backflow the new gland
7:10 8:30
couldn't sustain in its position well. Hence,
whole discharge header was drained first and
then gland was fitted. Thereafter, trial was
taken and found to be satisfactory.

Nozzles opened, cleaned, dechoked and then


10:30 12:00
re-fitted again. Work completed

Completed 9:20 10:10

Replaced with new hose. Work completed 10:35 11:30

Oil make-up done 9:00 9:20

W/P 9:30

Completed 10:15 12:10

W/P 9:00

Gasket replaced in pump discharge line, rest


10:30
further work under progress
Completed 11:30 12:25

New gasket fitted but plant side trial pending 15:00 17:20

Completed 18:00 18:25

Nozzle opened,cleaned,and fitted 19:15 20:00

Welding done and vibro open for removing


19:30 20:40
strip and Again vibro fitted
Two gear removed and main shaft gear hard
21:10 -
to removed so w/p

New glan filled and checked found ok. 22:35 22:55

Damaged Gear removed and New gear fitted


23:20:00,2
(idle gear fitting work pending ) bearing to be 1:00,5:40
:45
checked

Rav opened and chcked found ok so checked


recycle line before rav was chocked. So Line 1:10 2:30
opened and dechocked and fitted.
Plant person neeed urgent reparing of trolley
3:45 5:00
so trolley repaired and h/o to plant

.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d

MEMO (No.
not
Rohan Rahul mentioned Completed
/printed)
G-15961

MEMO (No.
not
Jignesh Rahul Completed
mentioned
/printed)

Gaurang Rahul MEMO Completed

Gaurang Rahul MEMO Completed

Rohan, Khuman Rahul Completed

Shrirang Engg. & Rahul, G-15963,


W/P
Jignesh, Ramesh Hitesh Hot-7307

G-15897,
Vinamra
Rahul Height- Completed
Insulation
10592
Rahul,
Ankush Engg. W/P
VNG

G-15898,
Rohan Rahul Height- W/P
10593
MEMO (No.
not
Rahul, mentioned
Shrirang Engg. Completed
VNG /printed)
G-15962,
Hot-7308

Trial
Height- pending
Ajay Keyur
10592 from plant
side

Mm- no
Ajay Keyur completed
not printed

Mm- no
Ajay Keyur completed
not printed

Shree rang ,Ajay Keyur Hot-7309 completed

Ajay,Jignesh Keyur Running

Mm- no
Ajay Keyur completed
not printed

Ajay Keyur Running

Mm- no
Ajay Keyur completed
not printed
Mm- no
Ajay Keyur completed
not printed
Shi
Date Department Plant Equipment No.
ft

Staff : (A) Rahul,


Upendra (G) PP P-1215
Hitesh

Fitter :Jignesh, Raju RMP Monorail

Utility : Arif, Suhel SPD Nozzle 11046, 11059

Ice : Indravadan SPD Nozzle 11049, 11060

Boiler : Kalpesh PP P-1208

A
MEE VLS-01 Drain valve

PP PP 3rd floor

Workshop

Behind Admin

H2N P 3104 A

H2N F 3104

H2N F 3102

3
/
Workshop Spare cutting pump

3
/
3
/ RMP ANF
2
0
1
6
Staff : Paresh SFD New screw conver

Fitter: Vimal,Rohan RMP Monorail

Utility : Jayanti H2N P 3104 A

Ice : Usman PP Plant Cutting pump

Boiler : Jayandra SPD New RAV


B

H2N F-3104 candle filtter

RMP ANF

Staff : Keyur RMP P-1015

Fitter : Vimal RMP T-1002

Utility : Naresh bhai Pp New goods lift

Ice : Pramod SPD Vfbd Rav


C
C

PP P-1210

Boiler : Jayandra Workshop Trolley

Etp Filter press feed pump


Break Reason of
Problem (Notification by user dept) Down / breakdow
Pr. Maint n

Heavy gland leakage

Rope winding problem/ forward-reverse


problem

Nozzles choked

Nozzles choked

Oil level found low

Welding leakage

Filter Press trolly wheel repairing and


fitting work

Compiling Daily Work Report and


organizing permits

RCC and PCC Civil work

Discharge line leakage

Candles change

Dome opened
Bearings and shaft to be fitted

Manhole box-up

New screw conver fitting and trayal work


done.

Roop damage so roop cutting and fitting

Discharge line leakage

Cutting pump shifting to pp plant and


fitting work done trayal work panding.

New RAV fitting.

Candle fitting and doom fitting

Men hole leakeg

Gland to be filled

Hot water line to be connect Air line to


be removed

Door not opned at 3rd Floor

Motor position to be changed


not giving flow

Trolley Overhauling work

Suction line to be opened for Dechoking


Suggeste
d PR Start
Corrective action taken End time
action if time
any

Gland tightened but still leaking, so new


8:15 9:15
gland fitted. Trial taken work completed.

Rope damaged found so work under progress 9:30

Nozzels opened, cleaned, dechoked and


9:45 11:00
fitted again. Found ok on trial

Nozzels opened, cleaned, dechoked and


11:30 12:40
fitted again. Found ok on trial

Oil make-up done 10:45 11:05

Welding work completed 11:45 12:40

Housekeeping near trolly area done, rest


further trolly repairing and fitting work 12:30
pending to be carried out

Completed 6:45 7:30

Completed 10:00 12:30

dismentling done after welding to be fitted. 12:00

work u/p. 10:00

dome opened. 10:00


Old bearings removed out, new bearings and
11:20 11:45
shaft fitting work pending

manhole box-up done. Nipples two nos fitted.


Front manhole gasket fitted. h/o to process 7:00 10:00
50nb valve new fitted.

Completed 14:30 20:00

Roop damage so roop cutting and fitting


trayal work done so lemit scweh setting work 14:30 18:00
panding.

Discharge line leakeg so new stub band


16:00 17:00
welding and line fitting trayal work done.

Cutting pump shiftting to plant and fitting


16:00 19:00
work done and trayal work panding

New RAV fitting so moter chen scoket not


21:00 21:45
complet so chein fitting work panding.

Candle fitting and doom fitting work done


14:30 21:30
trayal work panding.

Leakeg attind work done. 21:00 21:45

Completed 22:30 22:55

Completed 1:00 1:35

Checked lock not operate so lock system


23:30 0:35
removed and Door opned

Motor position Adjusted For connection


1:45 2:40
purpose
Checked found one body bolt was broken so
5:20 5:40
leackage from there W/p

2 Nos Trolley made ready. 2:45 4:40

Line opened ,fitting will be done After


4:40 5:15
dechoking

.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d

MEMO (No.
not
Jignesh Rahul mentioned Completed
/printed) G
- 15922

G-18743,
Rahul,
Jignesh Height- W/P
Upendra
9015

MEMO (No.
not
Jignesh, Ramesh Rahul mentioned Completed
/printed) G
- 15922

MEMO (No.
not
Raju, Inder Rahul mentioned Completed
/printed) G
- 15922

Inder Rahul Completed

MEMO-
3872 G-
Shrirang Engg. Rahul Completed
19371,
Hot-7384

Rahul, G-15966,
Shrirang Engg. W/P
Hitesh Hot-3904

Rahul Rahul Completed

Pruthwa
Rahul G-18744 Completed
Construction

Shrirang Engg. Upendra u/p

Shrirang Engg. Upendra u/p

Shrirang Engg. Upendra u/p


New
bearing
Gaurang Rahul fitting
work
pending

Raju, Jignesh Upendra

Hitesh,Par
Vimal G :15967 Completed
esh

Jignesh Paresh G : 18743 Completed

Shree rang Paresh G :20004 Completed

Jignesh Paresh Completed

Vimal,Rohan Paresh Panding

Trayal
Shree rang Paresh G : 20002 work
panding

Vimal,Rohan Paresh Memo Completed

Mm no not
Vimal Keyur Completed
printed

Mm no not
Vimal Keyur Completed
printed

Mm no not
Vimal Keyur Completed
printed

Vimal Keyur Completed


Mm no not
Vimal Keyur W/p
printed

Vimal Keyur Completed

Line fitting
Vimal Keyur Mm no after
dechoking
Shi
Date Department Plant Equipment No.
ft

Staff : (A) Rahul


Workshop Hydraullic trolly
(G) Hitesh

Fitter :(A) Ajay (G)


RMP T-1002
Jignesh, Fatehsang

Utility : Naresh SFD

Ice : Nikul PP P-1210

R-1111, R-1108, T-
1205, T-1207, T-1211,
T-1303, T-1301, T-
1302, R-1103, R-1104,
Boiler : Jayendra PP & SPD
R-1105, R-1110, R-
1106, R-1204,R-1109,
A R-1201, R-1202, R-
1107

PNT line near H2N


H2N
Tankfarm area
OBA Tankfarm P-1501, P-1502

OBA Tankfarm P-1510


3
/
4
/
2 H2N P-3113
0
1
6
SPD New ATFD

RMP P-1015

RMP Monorail

Staff : Upendra H2N P 3113

Fitter: rohan,rajesh P.P. P 1210

Utility : Jayanti RMP Y-strainer


Ice : Usman
B Boiler : Jayandra
Staff : Paresh H2N VP : 3105

Utility : Arif SPD VFBD RAV Moter

Fitter : Ajay,Mukesh SPD Nozzal

Boiler : Jayandra ETP Final discher line

Ice Plant :
PP Plant P-1111
Indravadan
Break Reason of
Problem (Notification by user dept) Down / breakdow
Pr. Maint n

4 Trolley repairing work

Hot water line to be removed and air


line to be connected

Electrical motor fitting work

Discharge not obtained

Oil make up to be done

Insulation to be done and scaffoding to


be removed
Reducers of 3x2 to be made and fitted

Handle in suction valve to be fitted

Seal leakage problem

New ATFD Fabrication & Erection work

Gland leakage
Monorail taking high amperage while
operating

Seal leakage problem

Pump lekage

leakage problem
Pump vecum not complet.

Rav moter fitting.

2 Nozzal chok

Line leakeg

Pump very hight shound


Suggeste
d PR Start
Corrective action taken End time
action if time
any

1 trolly completed and handed over to plant


and remaining 2 already completed trollies 6:35 7:00
also handed over to plant

Completed 7:05 7:25

Completed 7:35 8:00

Pump operated and discharge valve closed,


material discharging properly. In fact, it was
found that material leakage was occuring
near suction side of pump. So its bolts
checked, 1 bolt found broken, hence for
carrying out further work, pump needed to
opened. But as material hold up was there in
8:15
the pump, so told to the shift incharge to
drain and flush the holdup material in the
suction and discharge sides of pump. Then,
pump wasn't given for maintenance for a few
hours due to some plant work. Thereafter,
the pump has been opened and further work
is under progress.

Completed

Completed 10:00 12:00


Reducers made, but fitting work pending 10:30 12:30

Completed 9:45 10:10

Pump dismantled, shifted to workshop,


11:00
repaired and then boxed up again

W/P 9:00

Completed 12:30 12:50

W/P 9:00

new seal fitted and pump box-up done on


position. Alignment done.h/o to p/d.

checked found two nos bolt broken found in


body so pump totally dismentling done. Then
after new bolt fitted same box-up done.

attended.
Pump trayal so vecum press loo so water
cooling temp 50 so not complet vecum so 22:30 23:30
work is panding.
RAV old moter open and new moter fitting
0:00 2:30
work done.
2 Nozzal open and cilling and fitting work
2:45 4:00
complet.

Line Attind work done. 4:00 5:15

Pump bering damage so work is panding 2:00

.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d

MEMO (No.
not
Ajay Rahul Completed
mentioned
)

MEMO (No.
not
Ajay Rahul Completed
mentioned
)
Rahul,
Ajay Hitesh Completed
Gandhi

Ajay, Jignesh Rahul G-15969 W/P

Indrasinh Rahul Completed

G-20007,
Vinamra
Rahul Height- Completed
Insulations
8701
MEMO (No.
Fitting
not
Shrirang Engg. Rahul work
mentioned
pending
)
MEMO (No.
not
Jignesh Rahul Completed
mentioned
)

Pump
fitting on
Rahul,
Ajay, Raju G-20006 position
Upendra
work
running
Rahul,
Ankush Engg. W/P
VNG
Ajay Hitesh
Rahul MEMO
Gandhi,
Jignesh Rahul, W/P
Hitesh
Patel

rajesh/ rohan upendra

rajesh/ rohan upendra

rohan
Paresh Paresh Panding

Ajay,Mukesh Paresh Memo Complet

Ajay,Mukesh Paresh Memo Complet

HDP line
welding
Ajay,Mukesh Paresh Memo
joint
leakeg
Work is
Paresh Paresh
panding
Shi
Date Department Plant Equipment No.
ft

Staff : (A)
Keyur(G) Rahul,
W/shop Strainer
Upendra (G)
Hitesh

Fitter :(A)
Sanjay,Rohan (G) Pp P-1111
Jignesh, Fatehsang

Utility : Sohel H2N VP-3105

Ice : Indravadan RMP P-1016


Boiler : Jayendra H2n F-3104

SPD 2nd floor and


SPD
ground floor

A+ FBC Boiler
G

Air filter of FD-Blower


SPD
-1

SPD New ATFD

PP P-1111

Formulation NM-1406

Formulation Blender-1

3
/
5
/
Formulation New Blender
3
/
5 MEE Catchment pit
/ MEE
area
2
0
1 Staff :Urmil SPD FD-1 air filter
6

Fitter: Sanjay PP P-1111

Utility : Jayanti Security Main Gate

Ice : Pramod ETP 30 HP valve

Boiler : Jayandra Formulation New RST

B
RMP P-1016

Formulation NM-1406

H2N VP-3105

ETP Final Discharge line

PP FP-1211

Workshop Hydraulic trolley

Staff : Paresh SPD Bag filtter RAV

Utility : Arif SPD Nozzal


C

Fitter : Vimal,Mukesh Workshop Strainer


C

Boiler : Jayandra PP plant P : 1111


Ice Plant : Usman ETP Plastic dram
Break Reason of
Problem (Notification by user dept) Down / breakdow
Pr. Maint n

Strainer Jali to be fitted

Abnormal sound

Vacuum problem

Gland leakage
Scafolding To be removed

Chemical leviring and RCC work

Scaffolding to be removed

Air filter to be opened, and boxed up


after cleaning

New ATFD fabrication and erection work

To be fitted on position

Vibration observed in gearbox

Blender to be boxed up
Gaskets to be fitted and box up work to
be done

Monkey ladder to be fitted and drilling


work to be done

Filter bags fitting work

To be fitted on position

Coupling broken

Valve to be open

Leakage from screw conveyor

Gland leakage

Vibration observed in gearbox

Vacuum problem

Leakage from flange

Press not closing properly

Trolley not working

Bag filtter Bay pass RAV jam

49 Number nozzal chok.

Strainer Jali to be fitted


Pump trayal work done.
Cutting work done.
Suggeste
d PR Start
Corrective action taken End time
action if time
any

Completed 6:40 8:50

Pump Opened checked bearing damaged so


changed and Pump made ready ,Fitting on 9:20 1:00
position Pending

Pump opened, vanes checked, found


damaged, so new vanes fitted and oil seal 9:30 -
also changed. Pump box-up work pending.

Completed 9:00 9:30


Completed 9:30 10:30

Completed 9:30 17:30

Completed 9:45 11:45

Completed 13:00 14:30

W/P 9:15

Completed, trial pending 15:00 16:00

Checked, gearbox bolts tightening done, but


vibration is there, need to take vessel entry 15:45 16:30
to check
New missing gaskets fitted and blender
10:40 11:30
boxed up
Completed

Completed 12:30 13:15

Completed 14:30 15:00

Completed, trial pending 15:00 16:00

L-100 coupling with 24 mm bore not found so


old coupling fitted with clamp, new coupling 16:00 18:30
need to bore

Found valve handle broken, so valve opened,


17:20 17:40
handle need to be weld

Spaces filled with cotton waste, trial taken,


18:45 20:00
only little leakage prevails

Completed 15:15 16:30

Checked, gearbox bolts tightening done, but


vibration is there, need to take vessel entry 15:45 16:30
to check

Attended 14:30 17:30

Gasket changed 14:30 15:30

Oil level checked, pump not maintaining


pressure so informed to inst. Person, 20:30 21:00
completed

Work in progress 21:10 -

RAV chek so moter and gear bering complet


so RAV mein shaft bering broken so rotar
22:30 0:45
open and cover fitting but bering ching over
work panding.

Nozzal open and cilling and fitting work done. 0:45 1:30

Complet 2:00 4:30


Complet 0:00 0:15
1 Dram cutting work done. 4:30 5:00

.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d

Rohan Keyur

Rohan Keyur

Fatehsang,
Keyur W/P
Jignesh

Sanjay Keyur
Vinmra Keyur

Pruthwa G-15972,
Rahul Completed
Construction Hot-7622

G-15973,
Vinamra
Rahul Height- Completed
Insulation
9329

MEMO (No.
Rahul,
not
Sanjay Upendra, Completed
printed) G-
Urmil
15754

G-18600,
VNG, Hot-5794,
Ankush Engg. W/P
Rahul Height-
9328

Completed
Rahul,
Sanjay , trial
Urmil
pending

Rahul,
Shree Rang Pending
Urmil

MEMO-
Gaurang Rahul Completed
4084
Gaurang,
Rahul Completed
Indrasinh

G-19372,
Shirang Engg. Rahul Completed
Hot-7385

Urmil,
Sanjay Completed
Rahul
Completed
Urmil,
Sanjay , trial
Rahul
pending

Temporary
Sanjay Urmil
done

Competed,
handle
Sanjay Urmil
welding
pending

Sanjay Urmil Completed

Urmil,
Jignesh Completed
Rahul

Urmil,
Shree Rang Pending
Rahul

Jignesh,
Upendra Completed
Fatehsang

Shree Rang Urmil Completed

Urmil,
Sanjay, Sahdev Completed
Milan

Work in
Sanjay Urmil
progress

Bering
ching over
Vimal,Mukesh Paresh Memo
work
panding

Vimal,Mukesh Paresh Memo Complet

Vimal,Mukesh Paresh Complet


Paresh Paresh Complet
Vimal,Mukesh Paresh Complet
Shi
Date Department Plant Equipment No.
ft

Staff : Paresh Work shop Cutting pump

Fitter : Fhatesingh,Vimal,Ajay Work shop ETP Blower

Utiliyt : Naresh Fo tank yard Fo tanker

Ice : Usman RMP plant P : 1015,1012

Areation tank Bottom


Boiler : Naradan ETP
line valve

h2n P-3113

Formulation Nm-1406

Pp Fp-1202

Main gate Motor Coupling


A+
G
Work shop

PNT Line nearin


H2N
tankfarm area
SPD New ATFD

3 SPD 3rd floor & near


/ SPD
2nd floor
6
/
2
0 Workshop ETP Lobe Blower
1
6

Staff :Upendra H2N P-3113

Fitter: ajay PP F.P. 1211 / 1001

Utility : naresh SPARE Johnson pump

Ice : nikul PP P 1204


Boiler : Jaymin H2N P-3113
B
Staff : Urmil H2N P-3113

Utility : Arif MEE P-1904

C
Fitter : Raju MEE Feed circulation line

Boiler : Jayendra ETP P-1640

Ice Plant : Nikul PP P-1201

SPD Nozzle- 49,59


Break Reason of
Problem (Notification by user dept) Down / breakdow
Pr. Maint n

New bering fitting and pump box up


work done

Blower jam

Tanker unloding work done.

Pump gland leakeg.

handle to be welded

Seal leckage

Bellow to be changed

Air Hose Leackage

Coupling damaged

Compiling Daily Utility Report

Cladding work to be done


New ATFD Fabrication & Erection work

Scaffolding to be mounted near New


ATFD

Blower jammed, to be overhauled and


freed

Seal leakage problem

Oil make-up

box-up

Feed problem
Seal leakage problem
Pump seal leakage

Pump making noise

Blind to be applied in line

Pump not taking suction

Line leakage from discharge

Nozzle chocked
Suggeste
d PR Start
Corrective action taken End time
action if time
any

New bering fitting and pump complet box up


6:30 7:45
work done.

Blower open and cleaning work and fitting


8:15
work running.

Tanker unloding work done. 9:00 10:00

Pump gland leakeg so attind work done. 8:30 9:00

Complted 10:00 11:30

Pump opened and seal fitted, Alignment


11:00 13:15
pending

2 bellow replaced 11:30 12:30

Air hose replaced 10:10 11:00

Checked Coupling Slide backward so presenly


9:30 10:20
clamp fitted and trial taken Found ok.

Completed 9:10 11:45

Completed most of the points, still two points


left pending, due to material spillage safety 10:30 12:00
issues
W/P but halted later on for today 9:00 14:00

Completed 11:30 16:30

Blower cleaned and boxed up, freed almost


still stucking at some point once during a 9:00 16:30
rotation

Pump alignment done and motor fitted. Trial


taken found seal leakage so again
dismentling done of seal then tension
14:30 18:00
provided properly . After box-up trial taken
but still dropwise leakage from seal. h/o for
temporary base to transfer batch.

oil make-up done.

spare pump bearing housing make ready .

checked found running ok 21:00 21:20


Pump dismentling work done. 21:30 22:00
Pump opened and seal checked, faces are
OK, sleeve found damage, new sleeve not
22:20 3:30
found, so again box up done, pump to be
open after transfer is completed

Checked and found, gland pusher was


removed from position, so new nut fitted, 23:00 0:00
completed

Completed 1:00 2:00

Completed 3:30 3:45

Checked and found leakage from stubend,


4:20 4:30
welding needed

Dechoking done 4:30 5:40

.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d

Vimal,Ajay Paresh Complet

Paresh,Key
Fhatesingh, Vimal Running
ur

Ajay Paresh Complet

Ajay Paresh Complet

Shree rang Paresh Complet

Jignesh Paresh Running

Vimal Keyur MM-4085 Completed

MM- not
Ajay Keyur Completed
printed

Keyur,
Vimal Completed
Rahul

Rahul Rahul Completed

Completed
almost.
Only
Vinamra Rahul, pending at
Insulation Keyur 2 points
due to
safety
reasons
G-15974, W/P but
Hot-5795, halted
Ankush Engg. Rahul
Height- later on for
9331 today

G-15974,
Vinamra
Rahul Height- Completed
Insulation
9331

Lobe
Fatehsingh, Vimal, Keyur,
setting to
Khuman Rahul
be done

ajay, jignesh upendra

ajay

ajay

ajay
ajay
Raju Urmil G-20013 Pending

Raju Urmil MM-3873 Completed

Raju Urmil MM-3874 Completed

Raju Urmil Completed

Raju Urmil Pending

MM- No
Raju Urmil Completed
number
Shi
Date Department Plant Equipment No.
ft

Staff : Urmil Formulation NM-1406 vibro

Fitter : Fatehsang H2N P-3113

Utiliyt : Arif PP P-1201

Ice : Pramod PP P-1201

Boiler : Jayendra PP 1st floor and 2nd floor

PP B-1506

PP R-1106

PP T-1206

3
/
7
/
2 Steam Line At First
Staff :Keyur PP
0 floor
1
6
0
1
6

Fitter: Vimal,Sanjay PP P-1201

Utility : Jayenty ETP 30 hp G.box

Ice : Pramod W/shop Hydraulic trolley

B Boiler : Jayendra Rmp T-1002

H2N F-3102

Ice plant -2 Rack gear

Staff : Upendra PP Spare pallet trolley

Utility : Arif H2N P3113


Fitter : vimal,vijay H2N R 3106
C
Boiler : H2N F-3102
Ice Plant : ETP Final Dis. Pump
Break Reason of
Problem (Notification by user dept) Down / breakdow
Pr. Maint n

Spring removed from position

Seal leakage

Discharge line leakage

1.5" line fitting in Distance piece

Steam leakage

Water line leakage

Chain block removing

Chain block fitting work

Steam Line leackge


1 1/2 taping to be given

Oil to be check

Overhauling work

Agitator jam

Candle to be fitted and boxed up work

Pedestral bearing Bolt broken

repairing

Spider damage
H2 valve leakage
Candle filter
leakage prob
Suggeste
d PR Start
Corrective action taken End time
action if time
any

New spring not available so old spring fitted,


11:10 12:30
still noise prevails

Old sleeve fitted and tension adjusted, trial


6:45 11:00
taken no leakage found

Welding done 10:00 11:00

Work in progress 11:30 -


Stream-1,2 header manual valve closed, 2nd
floor steam leakage attended, 1st floor 10:00 -
pending

Attended 9:30 11:30

Completed 12:00 13:00

Work in progress 13:00 -

Gasket replaced Trial taken found ok 14:30 15:45


Completed 14:30 15:30

Oil make up done. 15:30 16:00


16:00,20:1 17:15,21:3
Completed
5 0

Tried to oved with pipe range but not moved


18:00 19:30
Iron was still jammed

Candle fitted,Boxed up done trial taken


15:20 21:20
Leckage found to be tighted

New bolt fitted 15:00 15:20

two nos hand pallet trolley repairing work


23:00 3:00
done.
spider replaced. 5:00 6:00
attended. 4:00 4:45
tightening done. 23:30 1:00
gland tightening done. 1:30 2:15

.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d

Completed
, new
Jignesh Urmil
spring
needed

Fatehsang,
Urmil Completed
Jignesh

Shree Rang Urmil Completed

Shree Rang Urmil Pending

Work in
Shree Rang Urmil
progress

Shree Rang Urmil Completed

Shree Rang Urmil Completed

Work in
Shree Rang Urmil
progress

MM- no not
Shree Rang keyur
printed
MM- no not
Shree Rang keyur
printed

Vimal keyur

Vimal,Sanjay keyur

MM- no not
Vimal,Sanjay keyur
printed

Shree Rang,sanjay keyur Height-

Vimal keyur

vimal,viajy

vimal,viajy
vimal,viajy
vimal,viajy
vimal,viajy
Shi
Date Department Plant Equipment No.
ft

RAV-402 (Divertor
Staff : Urmil SPD
valve)

Fitter : Fatehsang, Rohan RMP P-1011

Utiliyt : Sohail H2N All reactors

Ice : Usmaan H2N F-3102

Boiler : Kalpesh PP P-1107


A

RMP P-1116

3
/
7
/ Staff :Keyur RMP P-1016
2
0
1
6
2
0
1
6

Fitter: Ajay,Sanjay RMP P-1011

Utility : Sohel PP Fp-1202

Ice : Indravadan Mee Calendria-3


B Boiler : Kalpesh H2n FP-3102

Staff : Upendra PP SFD

Utility : Arif PP P 1210


Fitter : sanjay, ajay Mee Calendria-3
C Boiler : PP TROLLEY
Ice Plant : RMP P 1015

ETP P 1639 C

SPARE Gasket
PP P 1203
Break Reason of
Problem (Notification by user dept) Down / breakdow
Pr. Maint n

Shaft bearing to be change

Seal leakage

All reactors gearbox oil checking and


cleaning

Leakage from dome

Gland leakage

Pump gland leakage

Beraing damaged
Seal leakage

Material leackage

Boxed up work

Leackege

Overload trip problem

Leakage problem
Dome box-up
Repairing
Overhauling

Leakage problem

for calendria
Suction problem
Suggeste
d PR Start
Corrective action taken End time
action if time
any

Bearing changed, trial taken, found gearbox


coupling bolts loose, so bolt tightening to be 8:45 12:30
done

Pump opened and shifted to workshop 10:30 11:30

Completed 9:45 11:00

Work in progress 11:00 -

New gland filled 9:30 10:10

Gland tightening done, trial taken, found


gland pusher removing from position due to
vibration, so checked for play and found that 11:10 11:45
there is play in shaft, so asked plant person
to make permit.

P-1015 opened and fitted at P-1016 position


14:30 19:15
trial taken Found ok
New Face fitted and Pump boxed up done and
fitted at position Trial taken with hot water 14:30 17:00
Found ok.
Scaper Adjusted And Checked Material not
coming from Scraper But At Drum Drop wise 19:20 21:20
Came.
Gasket Fitted and Boxed up running 21:00 -
Dome opened And Gasket fitted dome
17:30 21:15
fitting pending

screw conveyor cover opened found heavy


22:35 23:30
material chocked so dechocking done.

attended. 0:00 0:30


completed 22:00 0:00
completed 4:00 5:00
pump dismentling done.
pump bearing housing replaced and new seal
1:00 3:30
fitting done. h/o to process
one gasket cutting done.
suction strainer opened . Work u/p. 5:15 6:00

.
Spares
Elapsed Supervise Permit
Consume Done by Status
Time d by No.
d

Completed
, only bolt
Fatehsang, Rohan Urmil G-15761
tightening
pending

Pump
Jignesh Urmil shifted to
workshop

Gaurang, Indra Urmil MM-3918 Completed

Work in
Shree Rang Urmil
progress
MM-No
Jignesh Urmil Completed
number

Permit not
Jignesh Urmil
received

Sanjay,Ajay Keyur
Hitesh,Key
Jignesh
ur

sanjay Keyur

Keyur

Shree rang Keyur

sanjay,ajay

sanjay,ajay
shree rang
sanjay,ajay
sanjay,ajay

sanjay,ajay

sanjay,ajay
Shi
Date Department Plant Equipment No.
ft

Staff : Paresh Meain get Meain get

Fitter : Raju,Rohan RMP P : 1015

Utiliyt : Arif Work shop P : 1015

Ice : Pramod H2N F-3102

Boiler :Jayandra ETP P : 1641 A

Staff: Urmil RMP P-1002

Fitter: Vijay RMP P-1015

3
/
9 Utility : Sohail RMP T-1002 side valve
/
2
0 Ice : Nikul H2N F-3102
1
6 B Boiler : Kalpesh Formulation NM-1406 vibro
0
1
6 B

SPD Divertor Rav

4" Line near


ETP
secondary clarifier

RMP ANF

P-1012 Sample point valve

Staff : Keyur Formulation NM-1406 vibro

Fitter: Vijay RMP ANF

Utility : Sohel Etp P-1641A


C

Ice : Usman Work shop P-3101B

Boiler : Kalpesh
Break Reason of
Problem (Notification by user dept) Down / breakdow
Pr. Maint n

Cupling broken

Pump open to work shop

Pump bearing damage

Candla filtter

Pump suction promble

Seal leakage

Pump alignment to be done

Valve replacement

Dome leakage

Vibro making noise


Bolt broken

Line choke

Gasket replacement

Leakage from welding

Vibro making noise

Gasket to be cut And Fitted

Suction Line And Pump To be fitted

Pump Boxed up work


Suggeste
d PR Start
Corrective action taken End time
action if time
any

New cupling fitting and trayal work complet. 6:30 10:000

Pump fitting and shifting to RMP plant pump


fitting complet but cupling fitting work
9:30 12:00
pending as shift incharge told to halt the
work for the time being

Replaced with new bearing pump boxed up.


Only the bolts of bearing housing are pending 10:00 12:30
to be fitted

Candla filtter open and new gasket fitting and


9:30 13:15
titing work panding.
Pump open so work is panding 12:00 13:15

New pump with mechanical seal fitted 15:00 17:00

Completed, isolation to be remove 15:00 16:30

Completed 14:30 16:00

Dome tightening done, trial taken pressure


14:30 19:30
drop found, then again tightening done

Attended, then again at 21:45 abnormal


18:00 19:30
sound started
Bolt fitting done 16:45 17:30

Flange opened, dechoking done from plant


19:30 20:10
side, flange joining pending

Work in progress 21:00 -

Distance piece dismental and welding done 16:00 17:00

3 Spring Changed and Trial taken No


abnormal sound found. Sound came Only 22:35 0:15
When gate valve not closed.
Gasket cut and itted trial taken with Air
3:00 4:00
Pressure of 1 Kg No leackage found.
Pump fitted, Alignment Done And Suction
0:30 2:50
Line fitted.

Bearing fitted And Bearing Housing Made


4:15 5:25
ready , Oil seal and seal fitting pending

.
Spares
Elapsed Supervise
Consume Done by Permit No. Status
Time d by
d

Gaurav Paresh G : 18748 Complet

Rohan Paresh W/P

Bolts of
bearing
Paresh Paresh housing
pending to
be fitted

Shree rang Paresh Running

Rajiv Paresh G : 20636 Running

Urmil,
Fatehsang G-18746 Completed
Hitesh

Completed
Urmil, , isolation
Vijay
Rahul removing
pending

Urmil,
Shree Rang Completed
Hitesh

Jignesh, Shree
Urmil Pending
Rang

Urmil,
Vijay Pending
Ishaan
Vijay Rahul Completed

Flange
Vijay Urmil joining
pending
MM- No
Vijay Urmil Running
number
MM- No
Shree Rang Urmil Completed
number

Vijay Keyur,Viraj MM no

MM no not
Vijay Keyur
printed

Vijay Keyur G-20636

Vijay Keyur
Date Shift Department Plant Equipment No.

Staff : Paresh Work shop Trooly


Fitter : Rajiv H2N Candal filtter
Utility : Arif RMP T : 1002
Ice : Pramod Neno membrane
A
Boiler : Jayandra ETP P : 1641 A

PP Goods lift

PP B : 1216,1217
Staff : Urmil Workshop Hydraulic trolley
3/10/2016
Fitter : Vimal, Rohan Formulation NM-1406 vibro

Utility : Arif PP FP-1202


Raw Water line on admin
Ice : Nikul Utility
B terrace
Boiler : Jayendra Formulaiton NM-1406
SFD Twin screw conveyor
PP Goods lift
H2N F-3102
ETP P : 1641 A
Staff : Keyur SFD Twin screw conveyor

Fitter: Vimal,Ajay ETP P : 1641 A

Steam line near FO


Utility : jayenty Utility
Boiler
Ice : Nikul W/shop Kgen 16/6

C Boiler : Kalpesh PP P-1106

Pp P-1104

Mee ATFD -1
Break Reason of
Problem (Notification by user dept) Down / breakdow
Pr. Maint n

Trooly under men.


Candle filtter leakeg
T : 1002 tank jam
Membrane leakeg

Pump suction problem

Angle plate damaged

Tank mein hool open


Trolley repairing

Leakage from vibro

Squeezing line fitting

Line leakage from water meter

Belt making noise


Screw not rotating
Angle plate welding
Candle filtter leakege
Pump suction problem
Gear box coupling Bolt to be fitted

Pump suction problem

Heavy leackage At trap line

Overhauling work

PM Work

Gland heavy leackage

Making Vibraton
Suggeste
d PR Start
Corrective action taken
action if time
any
3 Trooly complet and trayal work done. 8:30
Titing work attind work complet but minor leakeg. 9:30
Agitator jam so attind work panding 11:30
membrane 11:15
Pump open so impeller ceiling and pump fitting work
12:13
complet.
Another spare angle plate found and cutted, pending to be
welded and fitted
Mein hool fitting work done. 6:30
2 trolley repairing done 14:30
Leakage found from welding, plant person didn't give permit
15:00
for hot work
Completed 17:30

m-seal applied, trial pending 16:00

Found belt touching guard, so guard taken out 18:45


Found coupling taken back, so coupling done 20:00
Welding done 14:30
Attended, trial taken OK 14:30
Pending, sludge not coming in aereator 14:30
Completed 22:30
Pump taking suction and found flow at pit but not at
23:15
aeriation tank.

Mee steam stopped FOR 15 minute and blind plug Applied . 0:20

Completed 1:00

Pump opened and Checked Found Threads wound on


Impeller, Also checked Impeller Condition ,Bearing,Found 3:15
ok. Oil make up done And Pump Fitted.

New Gland Filling Done. 2:40

Flushing done and trial taken still heavy vibration


1:30
observed.So ATFD -1 Stopped.
Spares
Elapsed Supervise Permit
End time Consume Done by Status
Time d by No.
d

11:00 Rajiv Paresh Complet


11:30 Shree rang Paresh Panding
12:30 Shree rang Paresh Panding
13:15 Jignesh Paresh Running

13:30 Rajiv Paresh G : 20636 Complet

8:00 Rajiv Paresh M emo Complet


16:00 Rohan Urmil Completed

15:20 Rohan Urmil Pending

18:30 Rohan Urmil Completed

17:00 Rohan Urmil Completed

19:15 Rohan Urmil Completed


21:45 Rohan Urmil Completed
16:00 Shree Rang Urmil Completed
18:00 Shree Rang Urmil Completed
17:30 Rahul Pending
22:50 Ajay Keyur

0:10 Vimal Keyur Pending

0:45 Vimal Keyur Completed

2:30 Ajay,Vimal Keyur Completed

5:20 Ajay,Vimal Keyur G-15768 Completed

Mm no not
3:05 Aajay Keyur Completed
Printed

2:00 Keyur
Date Shift Department Plant

Staff : Rahul (A+G)


Workshop
Upendra (G)

Fitter : (A) Sanjay (G)


Workshop
Jignesh, Fatehsang

Utility : Jayanti PP plant

Ice : Pramod H2N

Boiler : Kalpesh PP

A+G RMP

Formulation

Workshop

ETP

PP
3/11/2016

H2N

Staff : Paresh PP plant

B
Fitter : Rajiv,Amul RMP

Utility : Arif H2N


B
Ice : Pramod ETP

Boiler : Kalpesh PP plant


Ice plant
Formulition

Staff : Keyur SPD

Fitter: Ajay Rmp

C Utility : Arif H2n

Ice : Nikul W/shop


Boiler : Kalpesh
Break
Equipment No. Problem (Notification by user dept) Down /
Pr. Maint

Hydraullic Trolly 2 Trolly repairing

Bearing cover box up and bolt tightening


Spare pump of P-1015
work

R-1105 Handles of steam trap valves to be provided

Material unloading was to be done, but


Tanker
leakage found near threaded connection

P-1203 Gasket leakage from flange joint

Tanker Connection to be done for unloading

Vibro of NM-1406 Vibro welding leakage from welding joints

New impeller and mechanical seal to be


Spare pump of P-1641 A
fitted

P-1641 A Pump flow not received till Aeration Tank

Hose to be opened for party personnel's


Nanofiltration
work

VP-3103 Pump to be boxed up and fitted

FP : 1205 And plat kloth damage


HCL Tanker Hose pipe open.

VP : 3103 Pump trayal

P :1641 Pump suction promble

Neno Memring hose pipe open work done.


Plant No : 1 Reack gear problem
Vibro Vibro cilling work

Nozzle -11048 Nozzle chocked

Pp Filter Press Oil to be make up

P-3109 Seal leackage

Kgen 16/6 Overhauling work


Suggeste
Reason of
d PR
breakdow Corrective action taken
action if
n
any

Completed

Completed

Attended, but work pending still

Attended, completed

Replaced with new gasket, still leakage occurred, so


improvisation work to rectifying leakage done. Work
completed. But later on leakage from pump's distant piece
at discharge side started occuring

2 bellows and 1 reducer connected for unloading. Work


Completed

Vibro isolated, dismantled and shifted to Shrirang workshop


for welding work. Then, a bellow directly connecting the Silo
to the draining pot was connected

Completed

Spare KGEN pump which was boxed up in workshop was


shifted and fitted on position. Trial taken, found ok.

Completed

Completed. Trial taken, slightly high amperage and low


vacuum found on trial. W/P

flanch bolt open so bolt is jam so hot work bolt open and
new kloth fitting work done.
Tanker unloding work complet so hose pipe open work done.

Pump trayal so botam side 570 and second pump start to


700 VP Press

New pump and new empler fitting and trayal work done.

All hose pipe open work done.


Reck gear aliment work done and trayal work done.
Vibro open and fitting work done.

Nozzle opened ,Cleaned Amd Fiited.

Completed

Pump opened And checked found Rotay Face damaged so


Rotary face replaced and pump fitted. Trial taken found no
leackage from seal but drop wise leackage from casing.

Completed
Spares
Start Elapsed Permit
End time Consume Done by Supervised by
time Time No.
d

6:45 8:00 Sanjay Rahul

7:50 08::10 Sanjay Rahul

8:20 8:35 Sanjay Rahul

Sanjay, MEMO-
8:50 15:30 Rahul, Upendra
Fatehsang 3541

MEMO (No.
not
9:30 11:30 Jignesh Rahul`
printed)
G-15769

Sanjay,
10:45 14:00 Rahul G-15946
Indrasinh

Jignesh &
12:15 Shrirang Rahul
Engg.

Jignesh,
9:15 14:15 Rahul
Gaurang

MEMO (No.
not
15:30 17:10 Jignesh Rahul
printed)
G-20639

16:05 16:35 Amol Rahul

Fatehsang,
Ramesh,
9:30 Indrasinh & Upendra
Shrirang
Engg.

G:
Rajiv,Shree
14:30 20:30 Paresh 15948,Hot
rang
: 3907
4:15 5:15 Gurang Paresh G : 15946

21:00 21:30 Paresh Paresh

15:00 16:00 Amul Paresh

16:00 17:30 Amul Paresh


15:00 21:00 Amul Paresh
19:00 21:00 Rajiv Paresh

Mm- no
22:50 23:50 Ajay Keyur
not Printed

23:55 0:40 Ajay,Sahdev Keyur

0:15 3:15 Ajay Keyur G-20025

3:30 5:20 Ajay Keyur


Status

Completed

Completed

Attended, but
work pending still

Completed

Completed

Completed

W/P

Completed

Completed

Completed

W/P

Complet
Complet

Panding

Complet

Complet
Complet
Complet

Completed

Completed

drop wise
leackage from
casing.

Completed
Date Shift Department Plant

Staff : Rahul (A+G)


ETP
Upendra (G)

Fitter : (A) Sanjay,


SPD
Fatehsang (G) Jignesh

Utility : Arif Workshop

Ice : Nikul SPD

Boiler : Kalpesh H2N

Formulation

A
ETP

ETP

Formulation

3/12/2016 PP Plant

Workshop

MEE Plant

Staff : UPENDRA ETP


Fitter : sanjay H2N
Utility : jayanti FORMULATION

Ice : Pramod FORMULATION


B

Boiler : jaymin ETP

Nitrogen plant

Staff : Paresh H2N

Fitter: Vimal MEE Plant

C Utility : jayanti FORMULATION

Ice : Pramod PP Plant

Boiler : Jayandra SPD


Break
Equipment No. Problem (Notification by user dept) Down /
Pr. Maint

P-1643 A Pump tripped

Nozzle-11049 Nozzle choked

Spare KGEN pump Pump to be boxed up

New ATFD New ATFD's drain line to be fitted

Scaffolding to be removed from F-3105 and


F-3105 & F-3104
to be mounted on F-3104

Bushes of vibro were broken and a few


Vibro of NM-1406
springs needed to be replaced

Treated Water Tank &


HDPE Line repairing work
Ferrous Sulphate Tank

P-1639 C Spider broken

Vibro of NM-1425 Vibro not discharging material to be drained

New membranes box-up work to be done


Nano Filtration Unit and old membranes to be shifted to
workshop

Spare AODD pump Pump checked, not discharging air

Insulation and cladding work

P1639 Spider damage


hose connection hose connection
Vibro 1406 vibro box-up

NM 1425 Vessel entry

Line leakage Line leakage

tripping problem oil level low

Candal filtter : 4 Filtter open

P : 1918 Pump bering damge

NM : 1406 Vibro vibro box-up

P : 1208 Gland have leakeg

Nozzal Nozzal chok


Suggeste
Reason of
d PR
breakdow Corrective action taken
action if
n
any

Attended. Work completed

Nozzle opened, cleaned, dechoked, orifice changed and


nozzle fitted again.

Impeller replaced with a new one, mechanical seal fitted.


Whole pump boxed up, only 8mm allen key bolt of the
impeller is pending to be fitted. W/P

W/P

Completed

Old bushes opening and removing work running. New


bushes and a few springs also provided. W/P

W/P

Replaced with a new spider

Control valves checked by instrumentation personnel, found


ok. Then, further it was also found that vibro wasn't
operating, and was heavily loaded with material, so pending
to be checked from electrical side also and then carrying out
the further required procedure. W/P

W/P

Pump overhauled, NRVs checked. Garbage found in


discharge ducts. Garbage removed. Pump boxed up again
and trial taken, found ok. Work completed

W/P

alignment done and spider replaced


hose connection done but leakage found
vibro box-up work done with new spring and new bushes.

checked found swing arm all bolts broke found so swing arm
taken off from vessel and all bolts removed by welding then #VALUE!
same box-up done.trial taken found ok.

attended.
fresh oil of atlas copco fil-up done. Trial taken but same trip
broblem .

Candal filtter open and all candal open work done.

Pump open and shifting to work shop and pump open and
new bering and new oil seil fitting and pump box up and
pump fitting and trayal work complet.

Vibro top cover open so fitting and top and botam ballow
fitting work done.

Pump new gland fitting and leakeg attind work done.

Nozzal de chok work done.


Spares
Start Elapsed
End time Consume Done by Supervised by
time Time
d

6:45 7:30 Fatehsang Rahul

7:15 9:10 Sanjay Rahul

9:15 Jignesh, Gaurang Rahul

10:00 Shrirang Engg. Rahul

10:20 12:25 Vinamra Insulation Rahul

11:30 Jignesh Rahul

11:30 Ankit Lining Rahul

11:15 11:35 Fathesang Rahul

12:30 Fatehsang Rahul, Ketan

Sanjay VNG, Rahul

9:20 10:40 Sanjay Rahul

9:30 Vinamra Insulation Rahul

ramesh
sanjay
sanjay

fatesingh/sanjay

sanjay

fatesingh/sanjay

22:30 2:30 Vimal Paresh

23:00 3:00 Paresh Paresh

2:00 4:00 Vimal,Mukesh Paresh

4:00 4:45 Vimal Paresh

5:00 5:50 Vimal Paresh


Permit No. Status

MEMO (No. not


printed/mentione Completed
d)

MEMO (No. not


printed/mentione Completed
d)

W/P

G-18130, Height-
W/P
9020

G-20026 Completed

G-15771 W/P

G-20640, Hot-
W/P
3663

MEMO (No. not


printed/mentione Completed
d)

W/P

W/P

W/P

W/P

completed.
bellow and top
cover fitting u/p.

completed.

completed.

u/p

G : 20027,Hight :
Complet
8705

G : 19381 Complet

M : 4097 Complet

M emo Complet

Memo Complet