Orion - Crew Exploration Vehicle
• Avionics LM LaRC
• Integrated System • LAS Liaison Office
Health Management
• Crew Interface
KSC
• Mission Ground Ops Support
• Final Assembly
• Checkout
• Acceptance Test
• Sustaining Engineering
• Program Management • Spacecraft Refurbishment
• Systems Integration
• Operator Interfaces
• Crew & Service Module Development Michoud
• Ground Processing
• Qualification Test
• Mission Flight Planning • CM and SM
• Software Development
• Software Development Structures
Orion Spacecraft General Arrangement
Mission
MissionSummary
Summary
No.
No.Crew 44(lunar),
Crew (lunar),66(ISS)
(ISS)
Crewed
CrewedMission
MissionDuration 18 days (lunar)
Duration 18 days (lunar)
Quiescent
QuiescentDuration
Duration 210
210days
days SM
TotalΔV
Total 6250
ΔV 6250ft/s
ft/s
Configuration CM
ConfigurationSummary
Summary
Diameter
Diameter(CM
(CM&&SM) 16.5
SM) 16.5ftft 3
Pressurized
PressurizedVolume
Volume(Total) 691.8
(Total) 691.83ftft3 SA
Habitable
HabitableVolume
Volume(Net) 361
(Net) 361ftft3 LAS
SM
SMPropellant MMH/N 2OO 4
Propellant MMH/N 2 4
CM
CMPropellant GO 2 /GCH 4
Propellant GO2/GCH4
Payload
Payload(Lunar
(LunarReturn) 220
Return) 220lbs
lbs
Block
Block22Mass
MassProperties
PropertiesSummary
Summary
GLOW 62031.5
GLOW 62031.5lblb
EMO
EMO(1/6
(1/6LAS
LASPartial) 50684.6
Partial) 50684.6lblb
Flight Test Schedule – Latest Look
2007 2008 2009 2010 2011 2012 2013 2014
PDR 3/08 CDR 6/09
Component Qualification (Qual)
Integrated
Docking
Simulator
Nozzle Actuators
Ergonomics
LM Command Select
RCS
Simulator Full-Scale CM Mockup
Integrated with Avionics Lab