Circuler Saw Fizikal Putus jari 2 4 8 Ls Ada SOP & MS Eng Control- Wujudkan En Rozaimi Dis 05 Tak kritikal
machine Mata alat Garisan Penghadang mata/ Servis
(With Tilting terdedah, skru keselamatan
Abor) pada pelaras
longgar,

Biological Asma / Batuk / 4 3 12 L PPD ES PPE (NR 95) perlu


Habuk/ debu Sakit Mata/ Sakit dibekalkann dibekalkan Okt 05 Kritikal
Tekak

Ergonomic
Ruang sempit Tidak selesa 4 1 4 Ls PPD MS Eng Cont - / PPE ditambah Dis 05 Tak Kritikal
dibekalkan

Psycological Stress 4 1 4 PPD MS Eng Cont- / Service Dis 05 Tak Kritikal


Bising dibekalkan

Central Dust Fizikal Terjatuh / cedera 4 1 4 Ada SOP MS Isolate / Eng Cont. Pindah En Rozaimi/ Dis 05 Kritikal
Collector Saluran ringan diluar bangunan / Servis Maintenant
penyedut Units
bocor &
menghalang
laluan

Biologikal Asma / Batuk /


Habuk Sakit Mata/ Sakit 4 2 8 Tiada MS SDA SDA
Tekak

Ergonomic
Besar / di Tidak selesa 4 1 4 SDA MS SDA SDA
tengah ruang
bengkel

Psycological
Bising Stress 4 1 4 PPD MS SDA SDA

M
S
Belt Sender Fizikal Cedera kecil / 4 1 4 Ls Ada SOP & MS Eng Control- Wujudkan En Rozaimi Dis 05 Tak kritikal
Sander Luka Garisan Penghadang / Servis
terdedah, keselamatan

Biological Asma / Batuk /


Habuk/ debu Sakit Mata/ Sakit 4 3 12 L PPD ES PPE (NR 95) perlu Okt 05 Kritikal
Tekak dibekalkann dibekalkan

Ergonomic Tidak selesa 4 1 4 Ls PPD MS Eng Cont - / PPE ditambah Dis 05 Tak Kritikal
Ruang sempit dibekalkan

Radial Arm Fizikal Putus jari 2 4 8 Ls Ada SOP & MS Eng Control- Wujudkan En R0zaimi Dis 05 Tak kritikal
Saw Laras mata Garisan Penghadang mata/ Servis
alat tidak keselamatan
berfungsi,
Pelantar bahan
potongan
terlalu kecil 4 3 12 L PPD ES PPE (NR 95) perlu
dibekalkann dibekalkan Okt 05 Kritikal
Biological Asma / Batuk /
Habuk/ debu Sakit Mata/ Sakit
Tekak

Surface Fizikal Putus jari 2 4 8 Ls Ada SOP & MS Eng Control- Wujudkan En Rozaimi Dis 05 Tak kritikal
Planer Mata alat Garisan Penghadang mata/ Servis
terdedah, keselamatan

Biological Asma / Batuk /


Habuk/ debu Sakit Mata/ Sakit 4 3 12 L PPD ES PPE (NR 95) perlu
Tekak dibekalkann dibekalkan Okt 05 Kritikal

Ergonomic
Ruang sempit Tidak selesa
4 1 4 Ls PPD MS Eng Cont - / PPE ditambah Dis 05 Tak Kritikal
dibekalkan
Psycological Stress
Bising 4 1 4 PPD MS Eng Cont- / Service Dis 05 Tak Kritikal
dibekalkan
Remarks: L Likelihood S Severity SIG Significant PIC Person in Charge

LIKELIHOOD SEVERITY PROBABILITY


RATING DETAILS RATING DETAILS
1 2 3 4
1 Yearly 1 First Aid & Near Misses Negligible damage / no repair cost involved

SEVERITY
2 6 monthly 2 Injury with 4 days or less medical leave Minor damage / RM 10 K repair cost
1 1 2 3 4
3 Weekly to Monthly 3 Injury with more than 4 days medical leave Major damage / RM 10 K x RM 50 K repair cost
4 Daily to Weekly 4 Fatality or Permanent Disability Total damage / RM 50 K repair cost 2 2 4 6 8

SPECIAL CONDITIONS:
SIGNIFICANT RATING: 3 3 6 9 12
Less / Moderate Significant automatically changed to Extremely
1 TO 3 Less Significant, Measures required within 6 to 12 months Significant when there are Legal requirements and / or not effective
6 TO 8 Moderate Significant, Measures to be taken within 1 to 6 months Existing Control 4 4 8 12 16

9 TO 16 Extremely Significant, Measures to be taken immediately Extremely lowered to Moderate or Moderate lowered to Less Significant if
Existing Control was found adequate / effective
(within 1 month)

HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL TABLE (HIRARC)


Lokasi : Bengkel Kayu PPD
Tarikh : 29/09/05
Pemeriksa: TSO Tn Hj Ghafar, En Osman, En Azmi, Cik Ziela & En Razi

IDENTIFY ASSESS CONTROL


ACTIVITY / EXISTING ADDITIONAL CONTROL DUE
HAZARD EFFECT L S RISK Legal SIG PIC STATUS
EQUIPMENT CONTROL MEASURES DATE
Ruang Kerja Fizikal
Pelajar Bahan projek -Cedera ringan 4 1 4 Ada arahan MS Administration Cont- En Rozaimi 1kali/se Tak kritikal
(brdsrkan pelajar tidak Keselamata kempen kesedaran m
soal selidik) tersusun, n
Bahan lebihan
bersepah,Peral
atan tangan
(Tools) dan
PPD
bercampur
dalam satu
ruang.

Ergonomic
Persekitaran - hilang 4 1 4 SDA MS SDA Setiap SDA
yang tidak tumpuan P&P
selesa - Kecederaan
anggota badan

Remarks: L Likelihood S Severity SIG Significant PIC Person in Charge

LIKELIHOOD SEVERITY PROBABILITY


RATING DETAILS RATING DETAILS
1 2 3 4
1 Yearly 1 First Aid & Near Misses Negligible damage / no repair cost involved

SEVERITY
2 6 monthly 2 Injury with 4 days or less medical leave Minor damage / RM 10 K repair cost
1 1 2 3 4
3 Weekly to Monthly 3 Injury with more than 4 days medical leave Major damage / RM 10 K x RM 50 K repair cost
4 Daily to Weekly 4 Fatality or Permanent Disability Total damage / RM 50 K repair cost 2 2 4 6 8

SPECIAL CONDITIONS:
SIGNIFICANT RATING: 3 3 6 9 12
Less / Moderate Significant automatically changed to Extremely
1 TO 3 Less Significant, Measures required within 6 to 12 months Significant when there are Legal requirements and / or not effective
6 TO 8 Moderate Significant, Measures to be taken within 1 to 6 months Existing Control 4 4 8 12 16

9 TO 16 Extremely Significant, Measures to be taken immediately Extremely lowered to Moderate or Moderate lowered to Less Significant if
Existing Control was found adequate / effective
(within 1 month)

HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL TABLE (HIRARC)


LOKASI : BENGKEL KAYU PPD
PEMERIKSA : EN AZMI B. ABU BAKAR
TARIHK : 2.10.05
Contoh p & p DKA 3
IDENTIFY ASSESS CONTROL
ACTIVITY / EXISTING ADDITIONAL CONTROL DUE
HAZARD EFFECT L S RISK Legal SIG PIC STATUS
EQUIPMENT CONTROL MEASURES DATE
Circuler Saw Fizikal Putus jari 2 4 8 L Ada SOP & MS Eng Control- Wujudkan Penyelia Dis 05 Tak kritikal
machine Mata alat Garisan Penghadang mata/ Servis bengkel /
(With Tilting terdedah, skru keselamatan Juruteknik /
Abor) pada pelaras En Rozaimi
longgar,

Biological Asma / Batuk / 4 3 12 L PPE ES PPE (NR 95) perlu


Habuk/ debu Sakit Mata/ Sakit dibekalkan dibekalkan Okt 05 Kritikal
Tekak

Ergonomic
Ruang sempit Tidak selesa 4 1 4 L PPE MS Eng Cont - / PPE ditambah Dis 05 Tak Kritikal
dibekalkan

Psycological Stress 4 1 4 PPE MS Eng Cont- / Service Dis 05 Tak Kritikal


Bising dibekalkan

Remarks: L Likelihood S Severity SIG Significant PIC Person in Charge

LIKELIHOOD SEVERITY PROBABILITY


RATING DETAILS RATING DETAILS
1 2 3 4
1 Yearly 1 First Aid & Near Misses Negligible damage / no repair cost involved

SEVERITY
2 6 monthly 2 Injury with 4 days or less medical leave Minor damage / RM 10 K repair cost
1 1 2 3 4
3 Weekly to Monthly 3 Injury with more than 4 days medical leave Major damage / RM 10 K x RM 50 K repair cost
4 Daily to Weekly 4 Fatality or Permanent Disability Total damage / RM 50 K repair cost 2 2 4 6 8

SPECIAL CONDITIONS:
SIGNIFICANT RATING: 3 3 6 9 12
Less / Moderate Significant automatically changed to Extremely
1 TO 3 Less Significant, Measures required within 6 to 12 months Significant when there are Legal requirements and / or not effective
6 TO 8 Moderate Significant, Measures to be taken within 1 to 6 months Existing Control 4 4 8 12 16

9 TO 16 Extremely Significant, Measures to be taken immediately Extremely lowered to Moderate or Moderate lowered to Less Significant if
Existing Control was found adequate / effective
(within 1 month)
HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL TABLE (HIRARC)

IDENTIFY ASSESS CONTROL


ACTIVITY / EXISTING ADDITIONAL CONTROL DUE
HAZARD EFFECT L S RISK Legal SIG PIC STATUS
EQUIPMENT CONTROL MEASURES DATE

Remarks: L Likelihood S Severity SIG Significant PIC Person in Charge

LIKELIHOOD SEVERITY PROBABILITY


RATING DETAILS RATING DETAILS
1 2 3 4
1 Yearly 1 First Aid & Near Misses Negligible damage / no repair cost involved

SEVERITY
2 6 monthly 2 Injury with 4 days or less medical leave Minor damage / RM 10 K repair cost
1 1 2 3 4
3 Weekly to Monthly 3 Injury with more than 4 days medical leave Major damage / RM 10 K x RM 50 K repair cost
4 Daily to Weekly 4 Fatality or Permanent Disability Total damage / RM 50 K repair cost 2 2 4 6 8

SPECIAL CONDITIONS:
SIGNIFICANT RATING: 3 3 6 9 12
Less / Moderate Significant automatically changed to Extremely
1 TO 3 Less Significant, Measures required within 6 to 12 months Significant when there are Legal requirements and / or not effective
6 TO 8 Moderate Significant, Measures to be taken within 1 to 6 months Existing Control 4 4 8 12 16

9 TO 16 Extremely Significant, Measures to be taken immediately Extremely lowered to Moderate or Moderate lowered to Less Significant if
Existing Control was found adequate / effective
(within 1 month)

HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL TABLE (HIRARC)


IDENTIFY ASSESS CONTROL
ACTIVITY / EXISTING ADDITIONAL CONTROL DUE
HAZARD EFFECT L S RISK Legal SIG PIC STATUS
EQUIPMENT CONTROL MEASURES DATE

Remarks: L Likelihood S Severity SIG Significant PIC Person in Charge

LIKELIHOOD SEVERITY PROBABILITY


RATING DETAILS RATING DETAILS
1 2 3 4
1 Yearly 1 First Aid & Near Misses Negligible damage / no repair cost involved

SEVERITY
2 6 monthly 2 Injury with 4 days or less medical leave Minor damage / RM 10 K repair cost
1 1 2 3 4
3 Weekly to Monthly 3 Injury with more than 4 days medical leave Major damage / RM 10 K x RM 50 K repair cost
4 Daily to Weekly 4 Fatality or Permanent Disability Total damage / RM 50 K repair cost 2 2 4 6 8

SPECIAL CONDITIONS:
SIGNIFICANT RATING: 3 3 6 9 12
Less / Moderate Significant automatically changed to Extremely
1 TO 3 Less Significant, Measures required within 6 to 12 months Significant when there are Legal requirements and / or not effective
6 TO 8 Moderate Significant, Measures to be taken within 1 to 6 months Existing Control 4 4 8 12 16

9 TO 16 Extremely Significant, Measures to be taken immediately Extremely lowered to Moderate or Moderate lowered to Less Significant if
Existing Control was found adequate / effective
(within 1 month)

HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL TABLE (HIRARC)


IDENTIFY ASSESS CONTROL
ACTIVITY / EXISTING ADDITIONAL CONTROL DUE
HAZARD EFFECT L S RISK Legal SIG PIC STATUS
EQUIPMENT CONTROL MEASURES DATE

Remarks: L Likelihood S Severity SIG Significant PIC Person in Charge

LIKELIHOOD SEVERITY PROBABILITY


RATING DETAILS RATING DETAILS
1 2 3 4
1 Yearly 1 First Aid & Near Misses Negligible damage / no repair cost involved

SEVERITY
2 6 monthly 2 Injury with 4 days or less medical leave Minor damage / RM 10 K repair cost
1 1 2 3 4
3 Weekly to Monthly 3 Injury with more than 4 days medical leave Major damage / RM 10 K x RM 50 K repair cost
4 Daily to Weekly 4 Fatality or Permanent Disability Total damage / RM 50 K repair cost 2 2 4 6 8

SPECIAL CONDITIONS:
SIGNIFICANT RATING: 3 3 6 9 12
Less / Moderate Significant automatically changed to Extremely
1 TO 3 Less Significant, Measures required within 6 to 12 months Significant when there are Legal requirements and / or not effective
6 TO 8 Moderate Significant, Measures to be taken within 1 to 6 months Existing Control 4 4 8 12 16

9 TO 16 Extremely Significant, Measures to be taken immediately Extremely lowered to Moderate or Moderate lowered to Less Significant if
Existing Control was found adequate / effective
(within 1 month)

HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL TABLE (HIRARC)


IDENTIFY ASSESS CONTROL
ACTIVITY / EXISTING ADDITIONAL CONTROL DUE
HAZARD EFFECT L S RISK Legal SIG PIC STATUS
EQUIPMENT CONTROL MEASURES DATE

Remarks: L Likelihood S Severity SIG Significant PIC Person in Charge

LIKELIHOOD SEVERITY PROBABILITY


RATING DETAILS RATING DETAILS
1 2 3 4
1 Yearly 1 First Aid & Near Misses Negligible damage / no repair cost involved

SEVERITY
2 6 monthly 2 Injury with 4 days or less medical leave Minor damage / RM 10 K repair cost
1 1 2 3 4
3 Weekly to Monthly 3 Injury with more than 4 days medical leave Major damage / RM 10 K x RM 50 K repair cost
4 Daily to Weekly 4 Fatality or Permanent Disability Total damage / RM 50 K repair cost 2 2 4 6 8

SPECIAL CONDITIONS:
SIGNIFICANT RATING: 3 3 6 9 12
Less / Moderate Significant automatically changed to Extremely
1 TO 3 Less Significant, Measures required within 6 to 12 months Significant when there are Legal requirements and / or not effective
6 TO 8 Moderate Significant, Measures to be taken within 1 to 6 months Existing Control 4 4 8 12 16

9 TO 16 Extremely Significant, Measures to be taken immediately Extremely lowered to Moderate or Moderate lowered to Less Significant if
Existing Control was found adequate / effective
(within 1 month)

HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL TABLE (HIRARC)


IDENTIFY ASSESS CONTROL
ACTIVITY / EXISTING ADDITIONAL CONTROL DUE
HAZARD EFFECT L S RISK Legal SIG PIC STATUS
EQUIPMENT CONTROL MEASURES DATE

Remarks: L Likelihood S Severity SIG Significant PIC Person in Charge

LIKELIHOOD SEVERITY PROBABILITY


RATING DETAILS RATING DETAILS
1 2 3 4
1 Yearly 1 First Aid & Near Misses Negligible damage / no repair cost involved

SEVERITY
2 6 monthly 2 Injury with 4 days or less medical leave Minor damage / RM 10 K repair cost
1 1 2 3 4
3 Weekly to Monthly 3 Injury with more than 4 days medical leave Major damage / RM 10 K x RM 50 K repair cost
4 Daily to Weekly 4 Fatality or Permanent Disability Total damage / RM 50 K repair cost 2 2 4 6 8

SPECIAL CONDITIONS:
SIGNIFICANT RATING: 3 3 6 9 12
Less / Moderate Significant automatically changed to Extremely
1 TO 3 Less Significant, Measures required within 6 to 12 months Significant when there are Legal requirements and / or not effective
6 TO 8 Moderate Significant, Measures to be taken within 1 to 6 months Existing Control 4 4 8 12 16

9 TO 16 Extremely Significant, Measures to be taken immediately Extremely lowered to Moderate or Moderate lowered to Less Significant if
Existing Control was found adequate / effective
(within 1 month)

HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL TABLE (HIRARC)

IDENTIFY ASSESS CONTROL


ACTIVITY / EXISTING ADDITIONAL CONTROL DUE
HAZARD EFFECT L S RISK Legal SIG PIC STATUS
EQUIPMENT CONTROL MEASURES DATE

Remarks: L Likelihood S Severity SIG Significant PIC Person in Charge

LIKELIHOOD SEVERITY PROBABILITY


RATING DETAILS RATING DETAILS
1 2 3 4
1 Yearly 1 First Aid & Near Misses Negligible damage / no repair cost involved

SEVERITY
2 6 monthly 2 Injury with 4 days or less medical leave Minor damage / RM 10 K repair cost
1 1 2 3 4
3 Weekly to Monthly 3 Injury with more than 4 days medical leave Major damage / RM 10 K x RM 50 K repair cost
4 Daily to Weekly 4 Fatality or Permanent Disability Total damage / RM 50 K repair cost 2 2 4 6 8

SPECIAL CONDITIONS:
SIGNIFICANT RATING: 3 3 6 9 12
Less / Moderate Significant automatically changed to Extremely
1 TO 3 Less Significant, Measures required within 6 to 12 months Significant when there are Legal requirements and / or not effective
6 TO 8 Moderate Significant, Measures to be taken within 1 to 6 months Existing Control 4 4 8 12 16

9 TO 16 Extremely Significant, Measures to be taken immediately Extremely lowered to Moderate or Moderate lowered to Less Significant if
Existing Control was found adequate / effective
(within 1 month)

HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL TABLE (HIRARC)

IDENTIFY ASSESS CONTROL


ACTIVITY / EXISTING ADDITIONAL CONTROL DUE
HAZARD EFFECT L S RISK Legal SIG PIC STATUS
EQUIPMENT CONTROL MEASURES DATE

Remarks: L Likelihood S Severity SIG Significant PIC Person in Charge

LIKELIHOOD SEVERITY PROBABILITY


RATING DETAILS RATING DETAILS
1 2 3 4
1 Yearly 1 First Aid & Near Misses Negligible damage / no repair cost involved

SEVERITY
2 6 monthly 2 Injury with 4 days or less medical leave Minor damage / RM 10 K repair cost
1 1 2 3 4
3 Weekly to Monthly 3 Injury with more than 4 days medical leave Major damage / RM 10 K x RM 50 K repair cost
4 Daily to Weekly 4 Fatality or Permanent Disability Total damage / RM 50 K repair cost 2 2 4 6 8

SPECIAL CONDITIONS:
SIGNIFICANT RATING: 3 3 6 9 12
Less / Moderate Significant automatically changed to Extremely
1 TO 3 Less Significant, Measures required within 6 to 12 months Significant when there are Legal requirements and / or not effective
6 TO 8 Moderate Significant, Measures to be taken within 1 to 6 months Existing Control 4 4 8 12 16

9 TO 16 Extremely Significant, Measures to be taken immediately Extremely lowered to Moderate or Moderate lowered to Less Significant if
Existing Control was found adequate / effective
(within 1 month)

HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL TABLE (HIRARC)

IDENTIFY ASSESS CONTROL


ACTIVITY / EXISTING ADDITIONAL CONTROL DUE
HAZARD EFFECT L S RISK Legal SIG PIC STATUS
EQUIPMENT CONTROL MEASURES DATE

Remarks: L Likelihood S Severity SIG Significant PIC Person in Charge

LIKELIHOOD SEVERITY PROBABILITY


RATING DETAILS RATING DETAILS
1 2 3 4
1 Yearly 1 First Aid & Near Misses Negligible damage / no repair cost involved

SEVERITY
2 6 monthly 2 Injury with 4 days or less medical leave Minor damage / RM 10 K repair cost
1 1 2 3 4
3 Weekly to Monthly 3 Injury with more than 4 days medical leave Major damage / RM 10 K x RM 50 K repair cost
4 Daily to Weekly 4 Fatality or Permanent Disability Total damage / RM 50 K repair cost 2 2 4 6 8

SPECIAL CONDITIONS:
SIGNIFICANT RATING: 3 3 6 9 12
Less / Moderate Significant automatically changed to Extremely
1 TO 3 Less Significant, Measures required within 6 to 12 months Significant when there are Legal requirements and / or not effective
6 TO 8 Moderate Significant, Measures to be taken within 1 to 6 months Existing Control 4 4 8 12 16

9 TO 16 Extremely Significant, Measures to be taken immediately Extremely lowered to Moderate or Moderate lowered to Less Significant if
Existing Control was found adequate / effective
(within 1 month)

HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL TABLE (HIRARC)

IDENTIFY ASSESS CONTROL


ACTIVITY / EXISTING ADDITIONAL CONTROL DUE
HAZARD EFFECT L S RISK Legal SIG PIC STATUS
EQUIPMENT CONTROL MEASURES DATE

Remarks: L Likelihood S Severity SIG Significant PIC Person in Charge

LIKELIHOOD SEVERITY PROBABILITY


RATING DETAILS RATING DETAILS
1 2 3 4
1 Yearly 1 First Aid & Near Misses Negligible damage / no repair cost involved

SEVERITY
2 6 monthly 2 Injury with 4 days or less medical leave Minor damage / RM 10 K repair cost
1 1 2 3 4
3 Weekly to Monthly 3 Injury with more than 4 days medical leave Major damage / RM 10 K x RM 50 K repair cost
4 Daily to Weekly 4 Fatality or Permanent Disability Total damage / RM 50 K repair cost 2 2 4 6 8

SPECIAL CONDITIONS:
SIGNIFICANT RATING: 3 3 6 9 12
Less / Moderate Significant automatically changed to Extremely
1 TO 3 Less Significant, Measures required within 6 to 12 months Significant when there are Legal requirements and / or not effective
6 TO 8 Moderate Significant, Measures to be taken within 1 to 6 months Existing Control 4 4 8 12 16

9 TO 16 Extremely Significant, Measures to be taken immediately Extremely lowered to Moderate or Moderate lowered to Less Significant if
Existing Control was found adequate / effective
(within 1 month)

HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL TABLE (HIRARC)

IDENTIFY ASSESS CONTROL


ACTIVITY / EXISTING ADDITIONAL CONTROL DUE
HAZARD EFFECT L S RISK Legal SIG PIC STATUS
EQUIPMENT CONTROL MEASURES DATE

Remarks: L Likelihood S Severity SIG Significant PIC Person in Charge

LIKELIHOOD SEVERITY PROBABILITY


RATING DETAILS RATING DETAILS
1 2 3 4
1 Yearly 1 First Aid & Near Misses Negligible damage / no repair cost involved

SEVERITY
2 6 monthly 2 Injury with 4 days or less medical leave Minor damage / RM 10 K repair cost
1 1 2 3 4
3 Weekly to Monthly 3 Injury with more than 4 days medical leave Major damage / RM 10 K x RM 50 K repair cost
4 Daily to Weekly 4 Fatality or Permanent Disability Total damage / RM 50 K repair cost 2 2 4 6 8

SPECIAL CONDITIONS:
SIGNIFICANT RATING: 3 3 6 9 12
Less / Moderate Significant automatically changed to Extremely
1 TO 3 Less Significant, Measures required within 6 to 12 months Significant when there are Legal requirements and / or not effective
6 TO 8 Moderate Significant, Measures to be taken within 1 to 6 months Existing Control 4 4 8 12 16

9 TO 16 Extremely Significant, Measures to be taken immediately Extremely lowered to Moderate or Moderate lowered to Less Significant if
Existing Control was found adequate / effective