Engineering Site Survey Report

Etisalat IP Network Expansion Project

Site
Name: DSO Exchange
Survey Date: 07-Aug-16
Survey Time: 9:00 AM
Report
Edition: 1

Representative Mail Phone


Etisalat

Nokia/MassilaTech
05666465
Tausif Rizwan tausif.rizwan@massilatech.com 64

Edition Date Prepared by


1 07/08/2016 Tausif Rizwan
Table of Contents

1. Site Information

2. SR-12 Equipment Location

3. Distance from SR-12 to ODF

4. Free Ports in ODF

5. Power Cable Length

6. Grounding Cable Length


1. Site Information

1.1. Address: DSO Exchange, Dubai.

1.2. Special Access Permit


Required:
Yes X No
State (Ex: Military site etc)

1.3. Site Reach:


Car X 4x4
Trailer Walking

1.4. Equipment Storage Area


Available:
Yes X No
1.5. Person to Contact
on Site:
Etisal
Name at
Phone
Referenc
e
1.6. Building
Information: (incase site inside building)
(m
# Floors Ground Height )
2. SR-12 Equipment Location
The rack available for New SR-12e is in Ground floor of network room in Row F
Cab 4.
3. Distance from SR-12 to ODF

The distance from SR-12e to ODF (16 and 17) is 30m.


4. Free Ports in ODF
New ODF to be installed.
5.Power Cable Distance.

DB is not finalized till now. Max length to any


DB is 25m for main and 25m for standby.

6.Grounding Bar.
Grounding cable required from SR-12e to
Earth bar is 15M.