Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
2 NO ID VILLAGIO APARTMENT
Site Cordinate Confirm Site Cordinate is Ok
planned
BUILDING NO NO NO RACK
Space availability Confirm availability Space for New Confirm
for New Rack of Plint and size Plinth & Size DC
Rectifier
&
Capacity
YES NA NA No
Yes NA NA NO
Rectifier Capacity Total Number of Batery Rating Free DC
(watts) Batteries / Bank on Breaker
Rectifier Rack
NO NO NO NO
NO NO NO NO
No of Free DC DC Power feed Gantry to Feeder
Free DC Breaker Distance to Shelter Entry plate /
Breaker Rating Rectifier Free Holes
NO NO NO NO NO
NO NO NO NO NO
Type of Mount /Tower/ mast Total Height Confirm LOS
Building/Tower/M
ast
NO 45M Yes
NO 100M Yes
Obstruction Availability of space at Confirm
Cordinate the Proposed height for Space below
the Main Antenna or Above
Proposed
Main
NO No NO
NO No NO
Availability of space at Confirm Confirm Confirming
the Proposed height for Space below Mounting Pole Earthing and
Space Antenna or Above availability, grouding
Proposed Size, & system for
Main number tower
No No NO NO
No NO NO NO
Total Length of Confirm Total IF Cable
ODU Grounding Shelter/Room length
Cable Earth Bar / (Direction(s))
Earthing on
Plinth
NO yes 30M
NO NO 120M
Risk Log
NO
NO
Remark Survey conducted by
CLEMENT/ HYCENT