Sei sulla pagina 1di 14

Bill of Quantities

S.No Item Description Unit Quantity


1 Excavation for Foundation Cft 808.75
2 Providing and applying Termite proofing Sft 1326.00
3 Compacted Sand Fill Cft 64.74
4 PCC in Foundation 1:4:8 Cft 212.78
5 Brick Work in Sub-structure Cft 123.73
6 Brick Work in Super Structure Cft 1397.12
7 2" Thick DPC Sft 84.00
Total=
Prepared By: Fahad Iqbal

Unit Price Amount (Rs) Remarks


0 0
0 0
0 0
0 0
0 0
0 0
0
0 Rs
Measurment Sheet
S.No Item Description No Length Width
1 Excavation for Foundation
Wall A 1 19.5 2.75
Wall B 1 13 2.75
Wall C ( Common Wall) 1 19.5 2.75
wall D 1 13 2.75
wall E 1 13 2.75
wall F 1 19.5 2.75
wall G 1 13 2.75
Wall H 1 8 2.75
Wall I 1 8 2.75
Wall J 1 28.25 2

2 Providing and applying Termite proofing


Wall A 1 19.5
Wall B 1 13
Wall C ( common Wall) 1 19.5
wall D 1 13
wall E 1 13
wall F 1 19.5
wall G 1 13
Wall H 1 0
Wall I 1 0

3 Compacted Sand Fill


Wall A 1 19.5 2.75
Wall B 1 13 2.75
wall C 1 19.5 2.75
wall D 1 13 2.75
wall E 1 13 2.75
wall F 1 19.5 2.75
Wall G 1 13 2.75
Wall H 1 8 2
Wall I 1 8 2
Wall J 1 28.25 2

4 PCC in Foundation 1:4:8


Wall A 1 19.5 2.75
Wall B 1 13 2.75
wall C 1 19.5 2.75
wall D 1 13 2.75
wall E 1 13 2.75
wall F 1 19.5 2.75
Wall G 1 13 2.75
Wall H 1 8 2.75
Wall I 1 8 2.75
Wall J 1 28.25 2.75

5 Brick Work in Sub-structure


Wall A
1st Step 1 19.5 2.25
2nd Step 1 19 1.875
Wall B
1st Step 1 13 2.25
2nd Step 1 12.75 1.875
Wall C
1st Step 1 19.5 1.5
2nd Step 1 19.75 1.125
wall D
1st Step 1 24.5 2.25
2nd Step 1 24.875 1.875
wall E
1st Step 1 28.375 2.25
2nd Step 1 28.75 1.875
wall F
1st Step 1 4.625 1.5
2nd Step 1 5 1.125
wall G
1st Step 1 4.6875 1.5
2nd Step 1 5.0625 1.125
wall H
1st Step 1 8 2.25
2nd Step 1 8 1.875
Wall I
1st Step 1 8 2.25
2nd Step 1 8 1.875

Brick Work in Super Structure


Wall A 1 19.5 0.75
Wall B 1 13 0.75
6 wall C 1 19.5 0.75
wall D 1 13 0.75
wall E 1 13 0.75
wall F 1 19.5 0.75
Wall G 1 13 0.75
Column 1 1 1.5 0.75
Column 2 1 1.5 0.75
column 3 1 1.5 0.75

2" Thick DPC


Wall A 1 19.5 0.75
Wall B 1 13 0.75
7 wall C 1 19.5 0.75
wall D 1 13 0.75
wall E 1 13 0.75
wall F 1 19.5 0.75
Wall G 1 13 0.375
Wall H 1 8 0.375
Wall I 1 8 0.375
Wall J 1 28.25 0.375
Designed By : M.Zubair
Prepared By: FAHAD IQBAL
Drawing No. Ground Floor
Height Quantity Total Quantity

2 107.25
2 71.5
2 107.25
2 71.5
2 71.5
2 107.25
2 71.5
2 44
2 44
2 113
Sub Total= 808.75 Cft

12 234
12 156
12 234
12 156
12 156
12 234
12 156
0 0
0 0
Sub Total= 1326 Sft

0.165 8.848125
0.165 5.89875
0.165 8.848125
0.165 5.89875
0.165 5.89875
0.165 8.848125
0.165 5.89875
0.165 2.64
0.165 2.64
0.165 9.3225
Sub Total= 64.741875 Cft

0.5 26.8125
0.5 17.875
0.5 26.8125
0.5 17.875
0.5 17.875
0.5 26.8125
0.5 17.875
0.5 11
0.5 11
0.5 38.84375
Sub Total= 212.78125 Cft

0.25 10.96875
0.25 8.90625

0.25 7.3125
0.25 5.9765625

0.25 7.3125
0.25 5.5546875

0.25 13.78125
0.25 11.66015625

0.25 15.9609375
0.25 13.4765625

0.25 1.734375
0.25 1.40625

0.25 1.7578125
0.25 1.423828125

0.25 4.5
0.25 3.75

0.25 4.5
0.25 3.75
Sub Total(A)= 123.732421875 cft

14 204.75
14 136.5 After subtracting Openings =
14 204.75
14 136.5
14 136.5
14 204.75
14 136.5
10.5 11.8125
10.5 11.8125
10.5 11.8125
Sub Total(B)= 1397.12109375 Cft
Total(A+B)= 1520.853515625 Cft

14.625
9.75
14.625
9.75
9.75
14.625
4.875
3
3
0
Sub Total= 84
acting Openings = 1259.12 Cft