HOJA DE METRADOS OBRAS PROVISIONALES

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

01.01 OBRAS PROVISIONALES


01.01.01 ALMACEN, DEPOSITO 1.00 5.00 5.00
01.01.02 CARTEL DE OBRA 1.00
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN
01.01.03 1.00
EL TRABAJO
01.02 TRABAJOS PRELIMINARES 1.00
01.02.01 TRAZO Y REPLANTEO PARA LINEAS Y REDES 1.00
01.02.02 LIMPIEZA DE TERRENO MANUAL 1.00
01.02.03 FLETE TRANSPORTE DE TUBERIA Y ACCESORIOS, MATERIALES PARA LA OBRA 1.00
01.03 SEGURIDAD Y SALUD
01.03.01 EQUIPO DE PROTECCION PERSONAL 1.00
01.03.02 SEALIZACION TEMPORAL DE SEGURIDAD 1.00
01.03.03 CAPACITACION EN SEGURIDAD Y SALUD 1.00
01.03.04 RECURSOS PARA RESPUESTAS ANTENEMERGENCIAS EN SEGURIDAD Y SALUD DURANTE E 1.00
DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

25.00 25.00 m2
1.00 und

1.00 gbl

49.145 KM
49144.52 m2
1 GLB

80 und
1 GLB
1 GLB
1 GLB
MEMORIADEMETRADO
CAPTACIONC1
02.01 TRABAJOSPRELIMINARES NCAPTACIONES
02.01.01 LIMPIEZADETERRENOMANUAL
2.661 * 3.321 = 8.837 m2
02.02|.01 Trazoyreplanteopreliminar
2.461 * 3.121 = 7.681 m2
02.01.02 MOVIMIENTODETIERRAS
02.01.02.01 EXCAVACIONMANUALENMATERIALSUELTO
CAJAHUMEDA 1.450 * 1.000 * 0.763 = 1.106 m3
CAJAVALVULA 0.500 * 0.400 * 0.275 = 0.055 m3
ALEROS 3.521 + 1.400 * 1.361 * 0.763 = 2.553 m3
2 3.714 m3
02.01.02.02 REFINEYNIVELACIONENTERRENONORMAL
1.450 * 1.000 = 1.450 m2
02.01.02.03 ELIMINACIONDEMATERIALEXCEDENTEDPROM=30M
EXACAVACION 3.714 * 1.300 = 4.828 m3
RELLENO 0.200 * 1.000 * 4.000 = 0.800 m3
0.100 * 0.400 * 3.000 = 0.120 m3
0.400 * 1.361 * 1.000 = 0.544 m3
3.363 m3
02.01.03 OBRASDECONCRETOSIMPLE
02.01.03.01 Solado e=2" 1.450 * 1.000 = 1.450 m2

02.01.03.02 CubiertadefiltroF'c=140kg/cm2
3.121 + 1.000 * 0.150 * 1.061 = 0.328 m3
2
02.01.03.03 ConcretobajofiltroF'c=100kg/cm2
0.850 + 3.121 * 0.500 * 1.061 = 1.053 m3
2
02.01.04 OBRASDECONCRETOARMADO 0.15

1.50
1.06 CORTE A-A'

0.15
0.10 0.05
0.30 0.70
A A 0.40
0.10
0.15 0.10

1.06
0.10 0.15 0.70 0.15
0.30 0.10 0.15
1.06 0.30
PLANTA 0.20
02.01.04.01 ConcretoF'c=175kg/cm2(losadefondoymuros)
Losafondo 1.000 * 1.000 * 0.150 = 0.150 m3
Losacasetavalvula 0.400 * 0.500 * 0.100 = 0.020 m3
Dentellones 1.000 * 0.200 * 0.200 = 0.040 m3
1.000 * 0.350 * 0.200 = 0.070 m3
muros
Cajacaptacion 1.000 * 0.950 * 0.150 * 2.000 = 0.285 m3
0.700 * 0.950 * 0.150 * 2.000 = 0.200 m3
Cajavalvula 0.400 * 0.400 * 0.100 * 2.000 = 0.032 m3
0.300 * 0.400 * 0.100 * 1.000 = 0.012 m3
Aleros 1.500 * 1.450 * 0.150 * 2.000 = 0.653 m3
1.461 m3
02.01.04.02 Encofradoydesencofrado(muros)
Cajacaptacin 0.700 * 0.950 * 5.000 = 3.325 m2
1.000 * 0.950 * 3.000 = 2.850 m2
Cajavlvula 0.300 * 0.400 * 3.000 = 0.360 m2
0.500 * 0.400 * 1.000 = 0.200 m2
0.400 * 0.400 * 2.000 = 0.320 m2
Aleros 1.500 * 1.100 * 4.000 = 6.600 m2
0.150 * 1.100 * 2.000 = 0.330 m2
13.985 m2
02.01.04.03 AceroF'y=4200kg/cm2(losadefondoymuros)

L1= 1.050 * 5.000 * 2.000 * 0.580 = 6.09


L2= 1.250 * 5.000 * 4.000 * 0.580 = 14.50
L3= 1.350 * 5.000 * 4.000 * 0.580 = 15.66
L4= 0.700 * 3.000 * 3.000 * 0.580 = 3.65
L5= 0.950 * 3.000 * 1.000 * 0.580 = 1.65
L6= 0.600 * 3.000 * 2.000 * 0.580 = 2.09
43.65
02.01.04.04 ConcretoF'c=175kg/cm2(losatapa)

0.05
0.15
0.05

0.60 1.10

0.05
0.15
0.05
0.05
0.05 0.15 0.60 0.10 0.15

Tapacaptacin 1.100 * 1.100 * 0.000 = m3


0.050 * 1.100 * 0.500 = 0.028 m3
0.050 * 1.000 * 0.500 = 0.025 m3
0.053 m3

02.01.04.05 Encofradoydesencofrado(losatapa)
1.100 * 1.100 = 1.210 m2
1.100 * 0.125 * 4.000 = 0.550 m2
1.000 * 0.050 * 4.000 = 0.200 m2
1.960 m2

02.01.04.06 AceroF'y=4200kg/cm2(losatapa)

1.300 * 12.000 * 2.000 * 0.280 = 8.74


8.74
02.01.05 TARRAJEOSENLUCIDOSYMOLDURAS
02.01.05.01 Tarrajeosconimpermeabilizante
MUROS 0.700 * 0.950 * 4.000 = 2.660 m2
LOSAPISO 0.700 * 0.700 * 1.000 = 0.490 m2
3.150 m2
02.01.05.02 Tarrajeoseninterioresyexterior
Cajacaptacin 1.000 * 0.950 * 3.000 = 2.850 m2
Cajavalvulas 0.400 * 0.400 * 2.000 = 0.320 m2
0.500 * 0.400 * 1.000 = 0.200 m2
0.300 * 0.400 * 3.000 = 0.360 m2
Aleros 1.500 * 0.950 * 2.000 = 2.850 m2
6.580 m2
02.01.06 FILTROS
102.01.06.01 Filtrodearena
0.850 + 3.121 * 1.061 * 0.200 = 0.421 m3
2 2 (Refacciondeunacamaradecaptacion)
02.01.06.02 Filtrodegrava
0.850 + 3.121 * 1.061 * 0.300 = 0.632 m3
2 (Refacciondeunacamaradecaptacion)
02.01.07 VALVULASYACCESORIOS
02.01.07.01 VlvulasyAccesoriosdecaptacin
CANASTILLA DE BRONCE DE 3/4" 1.0000 und
CONO DE REBOSE 4"X2" 1.0000 und
CINTA TEFLON 2.0000 und
UNION UNIVERSAL DE Fo. GALV. DE 3/4" 2.0000 und
NIPLE FG 3/4" X 11/2" 2.0000 und
TUBERIA PVC SAP CLASE 7.5 DE 2" 3.0000 m
ADAPTADOR PVC SAP 3/4" 2.0000 und
CODO PVC SAP 2" X 90 1.0000 und
VALVULA COMPUERTA BRONCE 3/4" 1.0000 und
02.01.08 VARIOS
02.01.08.01 MarcoyTapametlicadeinspeccinde0.60x0.60 1.0 Und.
02.01.08.02 TuberadeventilacinFG2" 1.0 Und.
02.01.08.03 CercoperimetricoMallaOlimpica
L= 3.000 B= 3.000 = = 12.000 m
02.01.08.04 Pinturaenexteriores
muros 1.000 * 0.950 * 3.000 = 2.850 m2
cajavalvulas 0.400 * 0.400 * 3.000 = 0.480 m2
3.330 m2
O

= 2

* 2 = 17.67 m2

* 2 = 15.36 m2

* 2 7.43 m3

* 2 2.90 m2

* 2 6.73 m3

* 2 2.90 m2

* 2 0.66 m3

* 2 2.11 m3

0.075
0.50

0.95

0.15

0.20 0.35

0.70 0.20

* 2 = 2.92 m3

* 2 27.97 m2

fondolosa
fondolosa
murocamarahumeda
murocamarahumeda
murocamaraseca
murocamaraseca
* 2 = 87.29 kg
* 2 = 0.11 m3

* 2 3.92 m2

losaprefabricada
* 2 = 17.47 kg

* 2 = 6.30 m2

* 2 = 13.16 m2

* 2 = 0.84 m3
(Refacciondeunacamaradecaptacion)

* 2 = 1.26 m3
(Refacciondeunacamaradecaptacion)

* 2 = 2.00 und.
* 2 = 2.00 und.
* 2 = 4.00 und.
* 2 = 4.00 und.
* 2 = 4.00 und.
* 2 = 6.00 und.
* 2 = 4.00 und.
* 2 = 2.00 und.
* 2 = 2.00 und.

* 2 = 2.00 und.
* 2 = 2.00 und.
* 2 24.00 m

* 2 = 6.66 m2
HOJA RESUMEN DE METRADOS DE CAPTACIONES

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Localidad : HUISAPATA Distrito : OCORURO


Provincia : ESPINAR Departamento : CUSCO

03 CONSTRUCCION DE CAPTACION TIPO DOSADOR 0.5 M3 (11 und)


03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL M2 0.00
03.01.02 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE M2 0.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE) M3 0.00
03.02.02 EXCAV. PARA CUNETA DE CORONACION a= 0.50 x b= 0.30 x h= 0.50 mts ML 0.00
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS. M3 0.00
03.02.04 REFINE Y NIVELACION EN TERRENO NORMAL M2 0.00
03.02.05 RELLENO COMPACTADO MANUAL PROPIO M3 0.00
03.03 OBRAS DE CONCRETO SIMPLE
03.03.01 CONCRETO PARA RELLENO F'C= 100 KG/CM2 CON HORMIGON M3 0.00
03.03.02 CONCRETO F'C= 175 KG/CM2 CON HORMIGON M3 0.00
03.03.03 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON M3 0.00
03.03.04 ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS M2 0.00
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 CONCRETO F'C= 175 KG/CM2 CON HORMIGON M3 0.00
03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE) m2 0.00
03.04.03 ACERO CORRUGADO de 1/4" FY= 4,200 KG/CM2 GRADO 60 KG 0.00
03.05 REVESTIMIENTOS
03.05.01 TARRAJEO CON IMPERMEABILIZANTES M2 0.00
03.05.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA M2 0.00
3.06 VALVULAS Y ACCESORIOS
3.06.01 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CAPTACION S/CAJA DE VALVULAS DE 0.60x0.60m, SAL=1 1/2" UND 0.00
03.07 LECHO FILTRANTE
03.07.01 RELLENO CON MATERIALPERMEABLE 1" - 2" M3 0.00
03.07.02 RELLENO CON MATERIALPERMEABLE 1/2" - 3/4" M3 0.00
03.08 TAPAS SANITARIAS
03.08.01 TAPA SANITARIA METALICA 0.60 x 0.60 mts, UND 0.00
03.08.02 TAPA SANITARIA METALICA 0.40 x 0.40 mts UND 0.00
03.09 LIMPIEZA Y DESINFECCION
03.09.01 LIMPIEZA Y DESINFECCION EN CAPTACIONES GLB 0.00
03.10 PINTURA
03.10.01 PINTURA CON LATEX EN MUROS EXTERIORES m2 0.00
03.10.02 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS m2 0.00
03.11 PROTECCION DE CAPTACION
03.11.01 CERCO PERIMETRICO C/MALLA GALVANIZADA M2 0.00

HOJA DE METRADOS DE CAPTACION SIN CAJA DE VALVULAS DE ( 0.60X0.60 m.)

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OC

Localidad : HUISAPATA Distrito : OCORURO


Provincia : ESPINAR Departamento : CUSCO

PARTIDA DESCRIPCION VECES SUB-TOTAL UNID.

03 CAPTACION DE MANANTE ###


03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2
### 8.75
03.01.02 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE m2
ALEROS
### 0.54
CAMARA HUMEDA
### 1.10
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE) m3
ALEROS
### 0.81
LECHO FILTRANTE
### 6.10
CAMARA HUMEDA
### 1.65
DADO DE CONCRETO
### 0.03
TUBERIA DE LIMPIA
### 0.27
03.02.02 EXCAV. PARA CUNETA DE CORONACION a= 0.50 x b= 0.30 x h= 0.50 mts ml
### 12.00
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS. m3
### 7.33
03.02.04 REFINE Y NIVELACION EN TERRENO NORMAL m2
ALEROS
### 0.54
LECHO FILTRANTE
### 4.06
CAMARA HUMEDA
### 1.10
DADO DE CONCRETO
### 0.09
TUBERIA DE LIMPIA
### 0.90
03.02.05 RELLENO COMPACTADO MANUAL PROPIO m3
ALEROS
### 0.81
LECHO FILTRANTE
### 6.10
CAMARA HUMEDA
### 1.65
DADO DE CONCRETO
### 0.03
TUBERIA DE LIMPIA
### 0.27
03.03 OBRAS DE CONCRETO SIMPLE
03.03.01 CONCRETO PARA RELLENO F'C= 100 KG/CM2 CON HORMIGON m3
LOSA FONDO DE ALEROS
### 0.78
03.03.02 CONCRETO F'C= 175 KG/CM2 CON HORMIGON m3
ALEROS
### 0.81
CAMARA DE FILTROS
### 0.61
LOSA FONDO CAMARA HUMEDA
### 0.22
03.03.03 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON m3
### 0.03
03.03.04 ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS m2
ALEROS
### 10.74
LOSA FONDO CAMARA HUMEDA
### 0.44
LOSA FONDO CAMARA HUMEDA
### 0.40
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 CONCRETO F'C= 175 KG/CM2 CON HORMIGON m3
MUROS DE FRENTE
### 0.35
MUROS DE FRENTE
### 0.14
MUROS DE FRENTE
### 0.05
MUROS LATERALES
### 0.33
### 0.17
03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE) m2
MUROS
### 3.47
MUROS
### 4.41
MUROS INTERIORES
### 0.77
MUROS INTERIORES
### 0.32
LOSA DE FONDO
### 0.33
03.04.03 ACERO CORRUGADO de 1/4" FY= 4,200 KG/CM2 GRADO 60 kg
PLANILLA DE METRADOS ACERO
### 16.80
03.05 REVESTIMIENTOS
03.05.01 TARRAJEO CON IMPERMEABILIZANTES m2
ALEROS
### 5.37
MUROS
### 4.41
LOSA FONDO
### 1.10
03.05.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA m2
ALEROS
### 5.37
MUROS EXTERIORES CAMARA HUMEDA
### 3.47
3.06 VALVULAS Y ACCESORIOS
3.06.01 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CAPTACION S/CAJA DE VALVULAS DE 0.60x0.60m, SAL=1 1/2" 1.00 und
CANASTILLA NTP 399.019 DE 114.0 A 60.0 mm (2" a 1 1/2")
### 1.00 und
UNION SIMPLE NTP 399.019 DE 60.2 mm (1 1/2")
### 2.00 und
TUBERIA NTP 399.02 DE 60.0 mm (1 1/2")
### 8.00 ml
REDUCCION SP NTP 399.019 DE 114.0 A 60.0 mm (4" a 1 1/2")
### 1.00 und
CODO SP NTP 399.019 DE 60.0 mm (1 1/2"X45)
### 2.00 und
03.07 LECHO FILTRANTE
03.07.01 RELLENO CON MATERIALPERMEABLE 1" - 2" m3
### 1.22
03.07.02 RELLENO CON MATERIALPERMEABLE 1/2" - 3/4" m3
### 1.63
03.08 CARPINTERIA METALICA
03.08.01 TAPA SANITARIA METALICA 0.60 x 0.60 mts, ### 1.00 und
03.08.02 TAPA SANITARIA METALICA 0.40 x 0.40 mts 1.00 und
03.09 LIMPIEZA Y DESINFECCION
03.09.01 LIMPIEZA Y DESINFECCION EN CAPTACIONES gbl
### 1.00
03.10 PINTURA
03.10.01 PINTURA CON LATEX EN MUROS EXTERIORES m2
ALEROS
### 5.37
MUROS EXTERIORES CAMARA HUMEDA
### 3.47
03.10.02 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS m2
TAPA SANITARIA METALICA 0,60 x 0,60 mts.
### 0.36
03.11 PROTECCION DE CAPTACION m

3.01 CERCO TIPO MALLA OLIMPICA N 10

### 9.00
ARMADO CAPTACION DE 0.60 X 0.60 SIN CAJA DE VALVULAS

LONGITUD VECES LONG. POR


ARMADURA DE MURO Y LOSA DE FONDO
1/4" 3/8"
0.05

1.07 1.07 1/4 3.04 5.00 15.20

0.80

0.050

1.070 1.07 1/4 3.04 5.00 15.20

0.80

0.10

1.10 0.10

1/4 4.60 8.00 36.80


1.10
1.10

1.10

PESO POR / ML. 0.25 0.58

LONG. TOTAL POR 67.20 0.00


RESUMEN GENERAL
PESO TOTAL POR 16.80 0.00
PESO TOTAL 16.80 Kg

ARMADO CAPTACION DE 0.70 X 0.70 SIN CAJA DE VALVULAS

LONGITUD VECES LONG. POR


ARMADURA DE MURO Y LOSA DE FONDO
1/4" 3/8"
0.05 0.15

1.04 1.04 1/4 3.18 5.00 15.90

0.90

0.050

1.040 1.04 1/4 3.08 7.00 21.56

0.90

0.10

0.90 0.10

1/4 3.80 8.00 30.40


0.90
0.90

0.90

PESO POR / ML. 0.25 0.58

LONG. TOTAL POR 67.86 0.00


RESUMEN GENERAL
PESO TOTAL POR 16.97 0.00
PESO TOTAL 16.97 Kg
ARMADO CAPTACION DE 0.80 X 0.80 CON CAJA DE VALVULAS

LONGITUD VECES LONG. POR


ARMADURA DE MURO Y LOSA DE FONDO
1/4" 3/8"
0.05 0.25

1.04 1.04 1/4 3.38 6.00 20.28

1.00

0.150

1.040 1.04 1/4 3.38 8.00 27.04

1.00

0.10

1.00 0.10

1/4 4.20 8.00 33.60


1.00
1.00

1.00

PESO POR / ML. 0.25 0.58

LONG. TOTAL POR 80.92 0.00


RESUMEN GENERAL
PESO TOTAL POR 20.23 0.00
PESO TOTAL 20.23 Kg

ARMADO CAPTACION - DOSADOR DE 0.50 m3

LONGITUD VECES LONG. POR EN ML.


ARMADURA DE MURO Y LOSA DE FONDO
1/4" 3/8"

1.00 1/4 1.00 5.00 5.00

0.05 0.45

1.04 1.04 1/4 3.78 6.00 22.68

1.20

0.250 0.250

1.040 1.04 1/4 3.78 8.00 30.24

1.20

0.10

1.20 0.10

1/4 5.00 8.00 40.00


1.20
1.20

1.20

PESO POR / ML. 0.25 0.58

LONG. TOTAL POR 97.92 0.00


RESUMEN GENERAL
PESO TOTAL POR 24.48 0.00
RESUMEN GENERAL

PESO TOTAL 24.48 Kg


VALVULAS

LONG. POR EN ML.


1/2" 5/8"

1.02 1.55
0.00 0.00
0.00 0.00
16.80 Kg

VALVULAS

LONG. POR EN ML.


1/2" 5/8"

1.02 1.55
0.00 0.00
0.00 0.00
16.97 Kg
VALVULAS

LONG. POR EN ML.


1/2" 5/8"

1.02 1.55
0.00 0.00
0.00 0.00
20.23 Kg

m3

LONG. POR EN ML.


1/2" 5/8"

1.02 1.55
0.00 0.00
0.00 0.00
24.48 Kg
HOJA DE METRADOS
CAMARA DE REUNION

05.01 TRABAJOS PRELIMINARES N CAJA


05.01.01 Limpieza de terreno
1.20 * 0.90 = 1.08

05.01.02 Trazo y replanteo preliminar


1.20 * 0.90 = 1.08

05.02 MOVIMIENTO DE TIERRAS


05.02.01 Excavacin de material suelto en terreno seco
1.200 * 0.900 * 0.950 = 1.026

05.02.02 Refine y Nivelacion y Compactado


1.20 * 0.90 = 1.08

05.02.03 Acarreo de material excedente D = 30 M.


Excavacin 1.026
Relleno 0.672
0.354 * 1.3 = 0.460

05.03 OBRAS DE CONCRETO SIMPLE


05.03.01 Solado e=2" 1.200 * 0.900 = 1.080

0
0.15

0.7

0.15
0

0.15 0.7 0.15 0

05.04 OBRAS DE CONCRETO ARMADO


05.04.01 Concreto F'c=175 kg/cm2
muros 1.00 * 0.80 * 0.15 * 2.00 = 0.24
0.70 * 0.80 * 0.15 * 2.00 = 0.17
Losa fondo 1.00 * 1.00 * 0.15 * 1.00 = 0.15
Losa techo 0.400 * 0.700 * 0.080 = 0.02
0.58

05.04.02 Encofrado y desencofrado


muros exteriores 1.000 * 0.800 * 2.000 = 1.600
muros exteriores 0.700 * 0.800 * 2.000 = 1.120
muros interiores 0.800 * 0.800 * 2.000 = 1.280
muros interiores 0.500 * 0.800 * 2.000 = 0.800
losa tapa 0.40 * 0.70 = 0.28
losa tapa 0.40 * 0.70 * 0.08 = 0.18
5.256

05.04.03 Acero F'y=4200 kg/cm2

2
0.85 1 0.85 2 0.85

3/8a 0.20 m .
3/8a 0.20 m .

0.85 0.60
3/8a 0.20m .

0.35
0.1 0.05

0.1

4 1/4" a 0.10m.

0.10 0.10
1) 1/4" 2.55 * 3 = 7.65 * 0.25 kg/cm2 = 1.9125
2) 1/4" 2.55 * 6 = 15.30 * 0.25 kg/cm3 = 3.825
3) 1/4" 3.10 * 4 = 12.40 * 0.25 kg/cm4 = 3.1
3) 1/4" 0.45 * 6 = 5.40 * 0.25 kg/cm5 = 1.35
40.75 m 10.1875

05.05 REVOQUES ENLUCIDOS Y MOLDURAS


05.05.01 Tarrajeo con impermeabilizante
Interior 0.800 * 0.600 * 2.000 = 0.960
Interior 0.500 * 0.600 * 2.000 = 0.600
1.560

05.06 VALVULAS Y ACCESORIOS


05.06.01 Suministro y colocacion de accesorios
1.0
Valvula ccompuerta de D= 11/2" 2.00
transicion pvc de 11/2" 6
codo de pvc de 3"x90 1
cono de revose de 3" 1
unio simple pvc de 3" 1
unio simple pvc de 11/2"" 2
canastilla pvc 2" 1
Niple de FG 2" 2
union universal de2" 2
tuberia pvc sal de 3" 5
tuberia pvc sal de 2" 1
tapa metalica 0.70x0.70m 1
tapa metalica 0.40x0.40m 1
S
N

= 1

m2 * 1 = 1.08 m2

m2 * 1 = 1.08 m2

m3 * 1 = 1.03 m3

m2 * 1 = 1.08 m2

m3 * 1 = 0.46 m3

m2 * 1 = 1.08 m2

0.08

0.80

0.15

m3
m3
m3
m3
m3 * 1 = 0.58 m3

m2
m2
m2
m2
m2
m2
m2 * 1 = 5.26 m2
3

0.6

0.05

#
#
#

* 1 = 10.19 kg

m2 * 1 = 1.56 m2

* 1 = 1.00 und

* 1 6 und
* 1 1 und
* 1 1 und
* 1 1 und
* 1 2 und
* 1 1 und
* 1 2 und
* 1 2 und
* 1 5 ml
* 1 1 ml
* 1 1 und
* 1 1 und
05 CAMARA DE REUNION (02 UND)

05.01 TRABAJOS PRELIMINARES


05.01.01 LIMPIEZA DE TERRENO MANUAL
05.01.02 TRAZO Y REPLANTEO
05.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO
05.02.02 REFINE Y NIVELACION EN TERRENO NORMAL
05.02.03 ELIMINACION DE MATERIAL EXCEDENTE D PROM = 30M
05.03 CONCRETO SIMPLE
05.03.01 SOLADO E = 3" MEZCLA 1:12 CEMENTO-HORMIGON
HOJA DE METRADOS
CAMARA DISTRIBUIDORA

09 CAMARA DISTRIBUIDORA
09.01 TRABAJOS PRELIMINARES N CAJA =
09.01.01 Limpieza de terreno
1.70 * 1.30 = 2.21 m2 *

09.01.02 Trazo y replanteo preliminar


1.70 * 1.30 = 2.21 m2 *

09.02 MOVIMIENTO DE TIERRAS


09.02.01 Excavacin de material suelto en terreno seco
1.700 * 1.300 * 1.050 = 2.321 m3 *

09.02.02 Refine y Nivelacion y Compactado


1.70 * 1.30 = 2.21 m2 *

09.02.03 Acarreo de material excedente D = 30 M.


Excavacin 2.321
Relleno 1.200
1.121 * 1.3 = 1.457 m3 *

09.03 OBRAS DE CONCRETO SIMPLE


09.03.01 Solado e=2" 1.700 * 1.300 = 2.210 m2 *

0.05
0.15

0.7
0.65 0.4 0.55
0.5
0.15
0.1 0.05

0.05 0.15 1.2 0.15 0.05

09.04 OBRAS DE CONCRETO ARMADO


09.04.01 Concreto F'c=175 kg/cm2
muros 1.00 * 0.90 * 0.15 * 2.00 = 0.27 m3
1.20 * 0.90 * 0.15 * 2.00 = 0.32 m3
vertedero 0.70 * 0.50 * 0.15 * 1.00 = 0.05 m3
0.65 * 0.55 * 0.15 * 1.00 = 0.05 m3
Losa fondo 1.60 * 1.10 * 0.15 * 1.00 = 0.26 m3
Losa techo 1.500 * 1.000 * 0.080 = 0.12 m3
1.08 m3 *

09.04.02 Encofrado y desencofrado


muros exteriores 1.500 * 0.900 * 2.000 = 2.700 m2
muros exteriores 1.000 * 0.900 * 2.000 = 1.800 m2
muros interiores 1.200 * 0.900 * 2.000 = 2.160 m2
muros interiores 0.700 * 0.900 * 2.000 = 1.260 m2
losa tapa 1.20 * 0.70 = 0.84 m2
losa tapa 1.50 * 1.00 * 0.08 = 0.40 m2
9.160 m2 *

09.04.03 Acero F'y=4200 kg/cm2

0.95 1 0.95 2 1.3

3/8a 0.20 m . 3
3/8a 0.20 m .

1.3 0.80 0.80


3/8a 0.20m .

1.40
0.2 0.05 0.05

0.2
4 1/4" a 0.10m.

0.2
1) 3/8" 3.20 * 4 = 12.80 * 0.56 kg/c = 7.168 #
2) 3/8" 3.20 * 6 = 19.20 * 0.56 kg/c = 10.752 ###
3) 3/8" 4.40 * 4 = 17.60 * 0.56 kg/c = 9.856 ###
4) 3/8" 1.50 * 6 = 9.00 * 0.56 kg/c = 5.04
3/8" 0.80 * 5 = 4.00 * 0.56 kg/c = 2.24
58.60 m 32.816 *

09.05 REVOQUES ENLUCIDOS Y MOLDURAS


09.05.01 Tarrajeos con impermeabilizante
Interior 1.200 * 0.900 * 2.000 = 2.160
Interior 0.700 * 0.900 * 2.000 = 1.260
3.420 m2 *
09.05.02 Tarrajeos en exteriores
exterior 1.500 * 0.900 * 2.000 = 2.700
exterior 1.000 * 0.900 * 2.000 = 1.800
4.500 m2 *

09.06 VALVULAS Y ACCESORIOS


09.06.01 INST. ACCESORIOS EN CAMARA DE DISTRIBUCION DE CAUDALES
1.0 *

09.07 VARIOS
09.07.01 Marco y Tapa metalica 0.60 x 0.60 m
1.0 *
3

3 = 6.63 m2

3 = 6.63 m2

3 = 6.96 m3

3 = 6.63 m2

3 = 4.37 m3

3 = 6.63 m2

0.08

0.90

0.15

3 = 3.25 m3
3 = 27.48 m2

3 = 98.45 kg

3 = 10.26 m2

3 = 13.50 m2

3 = 3.00 und

3 = 3.00 und.
MEMORIA DE METRADO
CANTIDAD 0
CAMARA ROMPE PRESION TIPO 7

10.01 TRABAJOS PRELIMINARES


10.01.01 Limpieza de terreno
1.40 * 2.20 = 3.08 m2

10.01.02 Trazo y replanteo preliminar


1.00 * 1.80 = 1.80 m2

10.02 MOVIMIENTO DE TIERRAS


10.02.01 Excavacin de material suelto en terreno seco
1.00 * 1.80 * 0.40 = 0.72 m3

10.02.02 Refine, nivelacin y compactacin


1.00 * 1.80 = 1.80 m2

10.02.03 Acarreo de material excedente

Excavacin 0.00 = 0.00 * 1.30 = 0.000

10.03 OBRAS DE CONCRETO SIMPLE


10.03.01 SOLADO E = 3" MEZCLA 1:12 CEMENTO-HORMIGON
1.00 * 1.80 = 1.80 m2

10.04 CONCRETO ARMADO

0.05 0.15 1.00 0.15 0.05

0.1 0.3 0.05

0.15

0.1
0.3 0.60 0.90

0.1
0.15

0.05

0.08

1.00

0.15

0.05 0.15 1.00 0.15 0.05

10.04.01 Concreto F'c=175 kg/cm2 (losa de fondo y muros)


Losa fondo 1.00 * 1.40 * 0.15 = 0.21 m3
muros 0.90 * 1.00 * 0.15 * 2.00 = 0.27 m3
0.60 * 1.00 * 0.15 * 2.00 = 0.18 m3

10.04.02 Encofrado y desencofrado ( losa de fondo y muros)


muros 0.90 * 1.00 * 4.00 = 3.60 m2
0.60 * 1.00 * 4.00 = 2.40 m2
10.04.03 Acero F'y=4200 kg/cm2 (losa de fondo y muros)

LOSA DE FONDO MUROS LATERALES

0.20 0.20

0.20 1.05 L3= 1.25 vertical


0.20 3/8" 0.30 m

3/8"a 0.20 m 3/8" 0.25 m

1.20 3/8"a 0.25 m 0.10

0.05 0.05 horizontal


L1= 1.30 0.70 3/8" 0.25 m

0.05 L4= 1.50

0.90 3/8" 0.25 m 0.10

L2= 1.05

L1 3/8" 1.30 * 6 * 2.00 = 14.56 * 0.58 kg/m = 8.44


L2 3/8" 1.05 * 6 * 4.00 = 23.52 * 0.58 kg/m = 13.64
L3 3/8" 1.25 * 2 * 4.00 = 11.67 * 0.58 kg/m = 6.77
L4 3/8" 1.50 * 4 * 4.00 = 24.00 * 0.58 kg/m = 13.92
L5 3/8" 0.950 * 3 * 1.00 * 0.580 = 1.65 = 1.65
L6 3/8" 0.600 * 3 * 2.00 * 0.580 = 2.09 = 2.09

10.04.04 CONCRETO F'C = 210 KG/CM2, (LOSA TECHO)


losa superior 0.08 * 0.90 * 0.70 = 0.05 m3
losa superior 0.08 * 0.30 * 0.60 = 0.01 m3
0.06 m3
10.04.05 ENCOFRADO Y DESENCOFRADO (LOSA TECHO)
0.55 * 0.90 = 0.50 m2
0.60 * 0.10 * 4.00 = 0.24 m2
1.10 * 0.10 * 4.00 = 0.44 m2

10.04.06 ACERO F'Y= 4200 KG/CM2 (LOSA TECHO)


0.05 0.05

0.90 L6= 0.55

3/8" 0.2 m

0.90

2 3/8" L7= 0.90

L7 3/8" 0.55 * 2 * 2.00 = 1.65 * 0.58kg/cm2 = 0.96


L8 3/8" 0.90 * 2 * 2.00 = 2.70 * 0.58kg/cm2 = 1.57

10.05 TARRAJEOS ENLUCIDOS Y MOLDURAS


10.05.01 Tarrajeos con impermeabilizante
0.60 * 1.00 * 3.00 = 1.80 m2
1.00 * 1.00 * 2.00 = 2.00 m2
10.05.02 Tarrajeos exterior
1.30 * 1.00 * 2.00 = 2.60 m2
0.90 * 1.00 * 2.00 = 1.80 m2
10.06 VALVULASYACCESORIOS
10.06.01 VlvulasyAccesoriosdecaptacin
CANASTILLA DE BRONCE DE 3/4" 1.0000 und =
CONO DE REBOSE 4"X2" 1.0000 und =
CINTA TEFLON 2.0000 und =
UNION UNIVERSAL DE Fo. GALV. DE 3/4" 2.0000 und =
NIPLE FG 3/4" X 11/2" 2.0000 und =
TUBERIA PVC SAP CLASE 7.5 DE 2" 3.0000 m =
ADAPTADOR PVC SAP 3/4" 2.0000 und =
CODO PVC SAP 2" X 90 3.0000 und =
VALVULA COMPUERTA BRONCE 3/4" 1.0000 und =
10.07 VARIOS
10.07.01 Marco y Tapa metlica de inspeccin =
0.00 m2

0.00 m2

0.00 m3

0.00 m2

0.00 m3

0.00 m2

0.48 m3

3.60 m2
kg
kg
kg
kg
muro camara seca
muro camara seca
0.00 kg

0.00 m3

0.74 m2

kg
kg
0.00 kg

1.80 m2

0.00 m2

1.0000 und
1.0000 und
2.0000 und
2.0000 und
2.0000 und
3.0000 m
2.0000 und
3.0000 und
1.0000 und

17.00 Und.
HOJA RESUMEN DE METRADOS CAMARA ROMPE PRESION TIPO VI

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE

Localidad : HUISAPATA
Provincia : ESPINAR

05 CAMARA ROMPEPRESION TIPO VI


5.01 TRABAJOS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL
05.01.02 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
5.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
05.02.02 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (< 2'')
05.02.03 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
5.03 OBRAS DE CONCRETO SIMPLE
05.03.01 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
SOLADO E = 3" MEZCLA 1:12 CEMENTO-HORMIGON
5.04 OBRAS DE CONCRETO ARMADO
05.04.01 CONCRETO F'C= 175 KG/CM2 CON HORMIGON
05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
05.04.03 ACERO CORRUGADO = 1/4", FY= 4,200 KG/CM2 GRADO 60
5.05 REVESTIMIENTOS
05.05.01 TARRAJEO CON IMPERMEABILIZANTES
05.05.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA
5.06 VALVULAS Y ACCESORIOS EN CRP - T06
05.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CRP TIPO VI: 01 E=1.5"-S= 1.5"
05.06.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN CRP TIPO VI: 01; E=2"-S=2"
5.07 TAPAS SANITARIAS
05.07.01 TAPA SANITARIA METALICA 0.60 x 0.60 mts,
5.08 LIMPIEZA Y DESINFECCION
05.08.01 LIMPIEZA Y DESINFECCION EN ESTRUCTURAS HIDRAULICAS
5.09 PINTURA
05.09.01 PINTURA CON LATEX EN MUROS EXTERIORES
05.09.02 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
HOJA DE METRADOS DE CAMARA ROMPE PRESIONES TIPO - 6

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PR

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION

5.00 CAMARA ROMPE PRESION TIPO VI 3.00 UNID


5.01 TRABAJOS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL
1.00 1.05 1.05
05.01.02 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
BASE CRP 1.00 0.85 0.85
5.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
BASE CRP 1.00 1.05 1.05 1.10
05.02.02 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (< 2'')
ZANJAS PARA TUBERIA 1.00 3.00
05.02.03 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
DE EXCAVACION MANUAL 1.30 4.69
5.03 OBRAS DE CONCRETO SIMPLE
05.03.01 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO DE CONCRETO 1.00 0.30 0.30 0.30
SOLADO E = 3" MEZCLA 1:12 CEMENTO-HORMIGON
1.00 1.00 1.00
5.04 OBRAS DE CONCRETO ARMADO
05.04.01 CONCRETO F'C= 175 KG/CM2 CON HORMIGON
BASE CRP 1.00 1.05 1.05 0.15
MUROS CRP 2.00 0.85 0.15 1.05
MUROS CRP 2.00 0.60 0.15 1.05
05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MUROS INTERIORES CRP 4.00 0.60 1.05
MUROS EXTERIORES CRP 4.00 0.85 0.50
05.04.03 ACERO CORRUGADO = 1/4", FY= 4,200 KG/CM2 GRADO 60
ACERO EN PLANILLA DE METRADO 1.00 20.75
5.05 REVESTIMIENTOS
05.05.01 TARRAJEO CON IMPERMEABILIZANTES
MUROS INTERIORES CRP 4.00 0.60 1.05
BASE 1.00 0.60 0.60
05.05.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA
MUROS EXTERIORES CRP 4.00 0.85 0.50
5.06 VALVULAS Y ACCESORIOS EN CRP - T06
05.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CRP TIPO VI: 01 E=1.5"-S= 1.5" 2.00
TUBERIA NTP 399.002 DE 33 mm (1.5") 3.00
CODO SP NTP 399.019 DE 33.0 mm X 90 (1.5") 3.00
UNION SIMPLE SP NTP 399.019 DE 33.2 mm (1.5") 1.00
UNION SIMPLE SP NTP 399.019 DE 60.2 mm (1.5") 1.00
ADAPTADOR UPR NTP 339.019 DE 33.2 mm (1.5") 1.00
CANASTILLA SP NTP 399.002 DE 60 mm A 33.2 mm (1.5" A 1.5") 1.00
TUBERIA NTP 399.002 DE 60 mm (1.5") 5.00
REDUCCION SP NTP DE 114 mm A 60 mm ( 1.5" A 1.5") 1.00
CODO SP NTP 399.019 DE 60.0 mm X 45 (1.5") 2.00
TUBERIA DE VENTILACION DE F G DE 1.5" 1.00
05.06.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN CRP TIPO VI: 01; E=2"-S=2" 1.00
TUBERIA NTP 399.002 DE 21.0 mm (2") 3.00
CODO SP NTP 399.019 DE 21.2 mm X 90 (2") 3.00
UNION SIMPLE SP NTP 399.019 DE 21.2 mm (2") 1.00
UNION SIMPLE SP NTP 399.019 DE 60.2 mm (2") 1.00
ADAPTADOR UPR NTP 339.019 DE 21.2 mm (2") 1.00
CANASTILLA SP NTP 399.002 DE 33.2 mm A 21.0 mm (2" A 2") 1.00
TUBERIA NTP 399.002 DE 60 mm (2") 5.00
REDUCCION SP NTP DE 114 mm A 60 mm ( 2" A 2") 1.00
CODO SP NTP 399.019 DE 60.0 mm X 45 (2") 2.00
TUBERIA DE VENTILACION DE F G DE 2" 1.00
5.07 TAPAS SANITARIAS
05.07.01 TAPA SANITARIA METALICA 0.60 x 0.60 mts,
TAPA SANITARIA METALICA 0,60 x 0,60 mts. 1.00
5.08 PINTURA
05.08.01 LIMPIEZA Y DESINFECCION EN ESTRUCTURAS HIDRAULICAS
LIMPIEZA Y DESINFECCION EN CRP 1.00
5.09 PINTURA
05.09.01 PINTURA CON LATEX EN MUROS EXTERIORES
MUROS EXTERIORES CRP 4.00 0.85 0.50
05.09.02 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.60 0.60
I

STRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

M2 3.31
M2 2.17

M3 3.64
ML 9.00
M3 18.28

M3 0.08
M2 3.00

M3 1.87
M2 9.72
KG 62.25

M2 8.64
M2 5.10

UND 2.00
UND 1.00

UND 3.00

UND 3.00

M2 5.10
M2 2.16
Distrito : OCORURO
Departamento : CUSCO

TOTAL UNID.

3.31 m2
1.10
2.17 m2
0.72

3.64 m3
1.21
9.00 ml
3.00
18.28 m3
6.09

0.08 m3
0.03

3.00 m2

1.87 m3
0.17
0.27
0.19
9.72 m2
2.52
0.72
62.25 kg
20.75

8.64 m2
2.52
0.36 m2
5.10
1.70 m2

2.00 unid
6.00 ml
6.00 und
2.00 und
2.00 ml
2.00 und
2.00 und
10.00 ml
2.00 und
4.00 und
2.00 ml
1.00 unid
3.00 ml
3.00 und
1.00 und
1.00 und
1.00 und
1.00 und
5.00 ml
1.00 und
2.00 und
1.00 ml

3.00 unid
1.00

3.00 unid
1.00

5.10 m2
1.70
2.16 m2
0.72
HOJA DE METRADOS
LINEA DE CAPTACION

0.00 TRABAJOS PRELIMINARES


04.01.01 Trazo, nivelacin y replanteo zanjas

04.02 MOVIMIENTO DE TIERRAS


04.02.01 Excavacin manual de zanjas en terreno normal 191.10 0.50
04.02.02 Excavacin manual de zanjas en roca suelta 81.90 0.50
04.02.03 Refine, nivelacin y fondo para tuberia
04.02.04 Cama de apoyo (material sarandeado)
04.02.05 Relleno, apisonado de zanja con material propio 273.00 0.5

04.03 SUMINISTRO E INSTALACION DE TUBERIAS


Suministro e Inst. Tubera PVC SAP Clase 7.5 D = 1 " NTP 399.003
04.03.02 Suministro e Inst. Tubera PVC SAP Clase 7.5 D = 1 1/2" NTP 399.003
04.03.03 Prueba hidrulica + escorrentia de tuberia a zanja tapada

04.04 VALVULAS Y ACCESORIOS


04.04.01 Accesorios (Linea de captacion)
METRADOS
A DE CAPTACION

= 273.00 ml

0.8 76.44 m3
0.8 32.76 m3
= 273.00 ml
= 273.00 ml
0.8 = 109.20 m3

0.00 ml
= 273.00 ml
= 273.00 ml

1.0000 und
HOJA DE METRADOS
LINEA DE CONDUCCION

0.00 TRABAJOS PRELIMINARES


04.01.01 Trazo, nivelacin y replanteo zanjas

04.02 MOVIMIENTO DE TIERRAS


04.02.01 Excavacin manual de zanjas en terreno normal 5437.60 0.50
04.02.02 Excavacin manual de zanjas en roca suelta 2330.40 0.50
04.02.03 Refine, nivelacin y fondo para tuberia
04.02.04 Cama de apoyo (material sarandeado)
04.02.05 Relleno, apisonado de zanja con material propio 7768.00 0.5

04.03 SUMINISTRO E INSTALACION DE TUBERIAS


04.03.01 Suministro e Inst. Tubera PVC SAP Clase 10 D = 2" NTP 399.002
Suministro e Inst. Tubera PVC SAP Clase 10 D = 1" NTP 399.002
04.03.02 Suministro e Inst. Tubera PVC SAP Clase 10 D = 1 1/2" NTP 399.003
04.03.03 Prueba hidrulica + escorrentia de tuberia a zanja tapada

04.04 VALVULAS Y ACCESORIOS


04.04.01 Accesorios (Linea de Conduccion)
METRADOS
DE CONDUCCION

= 7768.00 ml

0.8 2175.04 m3
0.8 932.16 m3
= 7768.00 ml
= 7768.00 ml
0.8 = 3107.20 m3

= 1028.00 ml
614.00
= 6126.00 ml
= 7768.00 ml

1.0000 und
HOJA DE METRADOS
RESERVORIO APOYADO CAP. 1 m3
1.- NOMBRE DEL PROYECTO :

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA CO


HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

2.- UBICACIN : Cusco - Espinar - OCORURO


3.- LUGAR : HUISAPATA

Partida Especificaciones N de MEDIDAS


N veces Largo Ancho Altura

2.04 RESERV.APOYADO CAP. 1 m


2.04.01 TRABAJOS PRELIMINARES
2.04.01.01 Limpieza del terreno 1 1.80 1.80
2.04.01.02 Trazo y replanteo preliminar 1 1.80 1.80

2.04.02 MOVIMIENTO DE TIERRAS


2.04.02.01 Excavacion manual terreno roca suelta 1 1.80 1.80 1.25
2.04.02.02 Refine, nivelacion y compactacin 1 1.80 1.80
2.04.02.03 Acarreo y eliminacion de material Excedente Dprom=30m

Proyecccion caseta 0.20


de vlvulas 0.20

s=1%

A s=1% 1.00 1.80

s=1%

0.20
Proyecccion buzon 0.20
de Inspeccin.
0.20 0.20 1.00 .20 .20

1.80

PLANO EN PLANTA

2.04.03 OBRAS DE C SIMPLE.


2.04.03.01 Empedrado para solados h=20 cm. con p.g. 8" 1 1.80 1.80 0.20
2.04.03.02 Solados concreto f'c=100 kg/cm2 h=2", sobre empedrado 1 1.80 1.80

2.04.04 OBRAS DE C ARMADO


2.04.04.01 C f'c=210 kg/cm, losa fondo 1 1.80 1.80 0.30

2.04.04.02 C f'c=210 kg/cm, Muros Reservorio 2 1.40 0.20 1.55


2 1.00 0.20 1.55
HOJA DE METRADOS
RESERVORIO APOYADO CAP. 1 m3
1.- NOMBRE DEL PROYECTO :

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA CO


HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

2.- UBICACIN : Cusco - Espinar - OCORURO


3.- LUGAR : HUISAPATA

Partida Especificaciones N de MEDIDAS


N veces Largo Ancho Altura

Tapa registro 0.6x0.60m Techo F'c=210Kg/*cm2


Volado del techo

b
Muro F'c=210 Kg/cm2

Proy. Caseta vlvulas

Nivel terreno Hipoclorador difuso

Enlucido mortero 1:2 +Sika

s=1%

Piso F'c=210 Kg/cm2


Solado F'c=100Kg/cm2, e=4" 1.00

1.80

CORTE A - A'

2.04.04.03 Encofrado y Desenc. Muros ( 2 caras) 4 1.40 1.55


4 1.00 1.55

2.04.04.04 C F'c=210 kg/cm, Losa macisa techo 1 1.60 1.60 0.10

2.04.04.05 Encofrado y Desenc. Loza macisa Techo 1 1.40 1.40


4 1.60 0.10

2.04.04.06 Acero F'y = 4200 Kg/Cm2; (Pared + techo) HOJA METRADO DE ACERO-RESERVORIO

2.04.05 REVOQUES Y ENLUCIDOS


2.04.05.01 Tarraj.c/impermeab.Mezcla 1:1; Pared int.reserv. 4 1.40 1.55
2.04.05.02 Tarraj.c/impermeab.Mezcla 1:1; Pend. Fondo 1 1.40 1.40
2.04.05.03 Tarrajeo en Exteriores Mortero 1:5 4 1.00 1.55

2.04.06 SUMINISTRO Y COLOC. VALV - ACCESORIOS


2.04.06.01 Tubo de Ventilacion FG D=2" 1
2.04.06.02 Tapa metalica de Inspeccin .60X.60 mts. 1

2.04.07 PINTURA
2.04.07.01 Pintura con latex en muros exteriores 4 1.00 1.55
2.04.07.02 Pintura anticorrosiva para tapas sanitarias metlicas 1 0.60 0.60

2.04.08 LIMPIEZA Y DESINFECCION


2.04.08.01 Limpieza y desinfeccion en reservorio 1 - -

2.04.09 PROTECCION DE RESERVORIO


2.04.09.01 Limpieza de terreno manual 1 6.75 0.80
1 7.79 0.80
HOJA DE METRADOS
RESERVORIO APOYADO CAP. 1 m3
1.- NOMBRE DEL PROYECTO :

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA CO


HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

2.- UBICACIN : Cusco - Espinar - OCORURO


3.- LUGAR : HUISAPATA

Partida Especificaciones N de MEDIDAS


N veces Largo Ancho Altura
2.04.09.02 Trazo, nivel y replanteo 1 6.75 0.80
HOJA DE METRADOS
RESERVORIO APOYADO CAP. 1 m3
1.- NOMBRE DEL PROYECTO :

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA CO


HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

2.- UBICACIN : Cusco - Espinar - OCORURO


3.- LUGAR : HUISAPATA

Partida Especificaciones N de MEDIDAS


N veces Largo Ancho Altura
1 7.79 0.80
2.04.09.03 Excavacion manual en terreno compacto 12 0.30 0.30 0.45
2.04.09.04 Eliminacion material excedente (d=30 m) 1.25 0.49
2.04.09.05 Concreto f'c= 140 kg/cm2 + 40 % pg con piedra chancada en dados 12 0.30 0.30 0.45
2.04.09.06 Cerco perimetrico c/malla galbanizada 2 6.55
2 7.59
2.04.09.07 Puerta metalica con alambre de pas 1 1.00
ISPOSICION DE EXCRETAS EN LA COMUNIDAD DE
CIA DE ESPINAR - CUSCO

Parcial Total total Und.


parcial

3.00 UND

3.24 3.24 9.72 m


3.24 3.24 9.72 m

4.05 4.05 12.15 m


3.24 3.24 9.72 m
5.06 15.19 m

A'

0.65 0.65 1.94 m3


3.24 3.24 9.72 m2

0.97 0.97 2.92 m

0.43 0.87
0.31 0.62
1.49 4.46 m
ISPOSICION DE EXCRETAS EN LA COMUNIDAD DE
CIA DE ESPINAR - CUSCO

Parcial Total total Und.


parcial

FV 1/2" a 0.30

bl =

0.38

2.17 8.68
1.55 6.20
14.88 44.64 m

0.26 0.26 0.26 m

1.96 1.96
0.16 0.64
2.60 2.60 m

112.29 112.29 kg

2.17 8.68 8.68 m


1.96 1.96 1.96 m
1.55 6.20 6.20 m

- 1.00 1.00 und


- 1.00 1.00 und

1.55 6.20 6.20 m2


0.36 0.36 0.36 m2

- 1.00 1.00 glb

5.40 5.40 11.63 m2


6.23 6.23
ISPOSICION DE EXCRETAS EN LA COMUNIDAD DE
CIA DE ESPINAR - CUSCO

Parcial Total total Und.


parcial
5.40 5.40 11.63 m2
ISPOSICION DE EXCRETAS EN LA COMUNIDAD DE
CIA DE ESPINAR - CUSCO

Parcial Total total Und.


parcial
6.23 6.23
0.04 0.49 0.49 m3
0.49 0.61 0.61 m3
0.04 0.49 0.49 m3
6.55 13.10 28.28 ml
7.59 15.18
1.00 1.00 1.00 und
HOJA DE METRADOS
RESERVORIO APOYADO CAP. 1.5 m3
1.- NOMBRE DEL PROYECTO :

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA CO


HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

2.- UBICACIN : Cusco - Espinar - OCORURO


3.- LUGAR : HUISAPATA

Partida Especificaciones N de MEDIDAS


N veces Largo Ancho Altura

2.04 RESERV.APOYADO CAP. 1.5 m


2.04.01 TRABAJOS PRELIMINARES
2.04.01.01 Limpieza del terreno 1 1.95 1.95
2.04.01.02 Trazo y replanteo preliminar 1 1.95 1.95

2.04.02 MOVIMIENTO DE TIERRAS


2.04.02.01 Excavacion manual terreno roca suelta 1 1.95 1.95 1.25
2.04.02.02 Refine, nivelacion y compactacin 1 1.95 1.95
2.04.02.03 Acarreo y eliminacion de material Excedente Dprom=30m

Proyecccion caseta 0.20


de vlvulas 0.20

s=1%

A s=1% 1.15 1.95

s=1%

0.20
Proyecccion buzon 0.20
de Inspeccin.
0.20 0.20 1.15 .20 .20

1.95

PLANO EN PLANTA

2.04.03 OBRAS DE C SIMPLE.


2.04.03.01 Empedrado para solados h=20 cm. con p.g. 8" 1 1.95 1.95 0.20
2.04.03.02 Solados concreto f'c=100 kg/cm2 h=2", sobre empedrado 1 1.95 1.95

2.04.04 OBRAS DE C ARMADO


2.04.04.01 C f'c=210 kg/cm, losa fondo 1 1.95 1.95 0.30

2.04.04.02 C f'c=210 kg/cm, Muros Reservorio 2 1.55 0.20 1.55


2 1.15 0.20 1.55
HOJA DE METRADOS
RESERVORIO APOYADO CAP. 1.5 m3
1.- NOMBRE DEL PROYECTO :

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA CO


HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

2.- UBICACIN : Cusco - Espinar - OCORURO


3.- LUGAR : HUISAPATA

Partida Especificaciones N de MEDIDAS


N veces Largo Ancho Altura

Tapa registro 0.6x0.60m Techo F'c=210Kg/*cm2


Volado del techo

b
Muro F'c=210 Kg/cm2

Proy. Caseta vlvulas

Nivel terreno Hipoclorador difuso

Enlucido mortero 1:2 +Sika

s=1%

Piso F'c=210 Kg/cm2


Solado F'c=100Kg/cm2, e=4" 1.15

1.95

CORTE A - A'

2.04.04.03 Encofrado y Desenc. Muros ( 2 caras) 4 1.55 1.55


4 1.15 1.55

2.04.04.04 C F'c=210 kg/cm, Losa macisa techo 1 1.75 1.75 0.10

2.04.04.05 Encofrado y Desenc. Loza macisa Techo 1 1.55 1.55


4 1.75 0.10

2.04.04.06 Acero F'y = 4200 Kg/Cm2; (Pared + techo) HOJA METRADO DE ACERO-RESERVORIO

2.04.05 REVOQUES Y ENLUCIDOS


2.04.05.01 Tarraj.c/impermeab.Mezcla 1:1; Pared int.reserv. 4 1.55 1.55
2.04.05.02 Tarraj.c/impermeab.Mezcla 1:1; Pend. Fondo 1 1.55 1.55
2.04.05.03 Tarrajeo en Exteriores Mortero 1:5 4 1.15 1.55

2.04.06 SUMINISTRO Y COLOC. VALV - ACCESORIOS


2.04.06.01 Tubo de Ventilacion FG D=2" 1
2.04.06.02 Tapa metalica de Inspeccin .60X.60 mts. 1

2.04.07 PINTURA
2.04.07.01 Pintura con latex en muros exteriores 4 1.15 1.55
2.04.07.02 Pintura anticorrosiva para tapas sanitarias metlicas 1 0.60 0.60

2.04.08 LIMPIEZA Y DESINFECCION


2.04.08.01 Limpieza y desinfeccion en reservorio 1 - -

2.04.09 PROTECCION DE RESERVORIO


2.04.09.01 Limpieza de terreno manual 1 6.75 0.80
1 7.79 0.80
HOJA DE METRADOS
RESERVORIO APOYADO CAP. 1.5 m3
1.- NOMBRE DEL PROYECTO :

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA CO


HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

2.- UBICACIN : Cusco - Espinar - OCORURO


3.- LUGAR : HUISAPATA

Partida Especificaciones N de MEDIDAS


N veces Largo Ancho Altura
2.04.09.02 Trazo, nivel y replanteo 1 6.75 0.80
HOJA DE METRADOS
RESERVORIO APOYADO CAP. 1.5 m3
1.- NOMBRE DEL PROYECTO :

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA CO


HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

2.- UBICACIN : Cusco - Espinar - OCORURO


3.- LUGAR : HUISAPATA

Partida Especificaciones N de MEDIDAS


N veces Largo Ancho Altura
1 7.79 0.80
2.04.09.03 Excavacion manual en terreno compacto 12 0.30 0.30 0.45
2.04.09.04 Eliminacion material excedente (d=30 m) 1.25 0.49
2.04.09.05 Concreto f'c= 140 kg/cm2 + 40 % pg con piedra chancada en dados 12 0.30 0.30 0.45
2.04.09.06 Cerco con postes metalicos y alambre de puas 2 6.55
2 7.59
2.04.09.07 Puerta metalica con alambre de pas 1 1.00
ISPOSICION DE EXCRETAS EN LA COMUNIDAD DE
CIA DE ESPINAR - CUSCO

Parcial Total total Und.


parcial

2.00 UND

3.80 3.80 7.61 m


3.80 3.80 7.61 m
-
-
4.75 4.75 9.51 m
3.80 3.80 7.61 m
5.94 11.88 m

A'

0.76 0.76 1.52 m3


3.80 3.80 7.61 m2

1.14 1.14 2.28 m

0.48 0.96
0.36 0.71
1.67 3.35 m
ISPOSICION DE EXCRETAS EN LA COMUNIDAD DE
CIA DE ESPINAR - CUSCO

Parcial Total total Und.


parcial

FV 1/2" a 0.30

bl =

0.38

2.40 9.61
1.78 7.13
16.74 16.74 m

0.31 0.31 0.31 m

2.40 2.40
0.18 0.70
3.10 3.10 m

126.95 126.95 kg

2.40 9.61 9.61 m


2.40 2.40 2.40 m
1.78 7.13 7.13 m

- 1.00 1.00 und


- 1.00 1.00 und

1.78 7.13 7.13 m2


0.36 0.36 0.36 m2

- 1.00 1.00 glb

5.40 5.40 11.63 m2


6.23 6.23
ISPOSICION DE EXCRETAS EN LA COMUNIDAD DE
CIA DE ESPINAR - CUSCO

Parcial Total total Und.


parcial
5.40 5.40 11.63 m2
ISPOSICION DE EXCRETAS EN LA COMUNIDAD DE
CIA DE ESPINAR - CUSCO

Parcial Total total Und.


parcial
6.23 6.23
0.04 0.49 0.49 m3
0.49 0.61 0.61 m3
0.04 0.49 0.49 m3
6.55 13.10 28.28 ml
7.59 15.18
1.00 1.00 1.00 und
HOJA DE METRADOS
RESERVORIO APOYADO CAP. 3 m3
1.- NOMBRE DEL PROYECTO :

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA CO


HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

2.- UBICACIN : Cusco - Espinar - OCORURO


3.- LUGAR : HUISAPATA

Partida Especificaciones N de MEDIDAS


N veces Largo Ancho Altura

2.04 RESERV.APOYADO CAP. 3 m


2.04.01 TRABAJOS PRELIMINARES
2.04.01.01 Limpieza del terreno 1 2.35 2.35
2.04.01.02 Trazo y replanteo preliminar 1 2.35 2.35

2.04.02 MOVIMIENTO DE TIERRAS


2.04.02.01 Excavacion manual terreno roca suelta 1 2.35 2.35 1.25
2.04.02.02 Refine, nivelacion y compactacin 1 2.35 2.35
2.04.02.03 Acarreo y eliminacion de material Excedente Dprom=30m

Proyecccion caseta 0.20


de vlvulas 0.20

s=1%

A s=1% 1.55 2.35

s=1%

0.20
Proyecccion buzon 0.20
de Inspeccin.
0.20 0.20 1.55 .20 .20

2.35

PLANO EN PLANTA

2.04.03 OBRAS DE C SIMPLE.


2.04.03.01 Empedrado para solados h=20 cm. con p.g. 8" 1 2.35 2.35 0.20
2.04.03.02 Solados concreto f'c=100 kg/cm2 h=2", sobre empedrado 1 2.35 2.35

2.04.04 OBRAS DE C ARMADO


2.04.04.01 C f'c=210 kg/cm, losa fondo 1 2.35 2.35 0.30

2.04.04.02 C f'c=210 kg/cm, Muros Reservorio 2 1.95 0.20 1.55


2 1.55 0.20 1.55
HOJA DE METRADOS
RESERVORIO APOYADO CAP. 3 m3
1.- NOMBRE DEL PROYECTO :

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA CO


HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

2.- UBICACIN : Cusco - Espinar - OCORURO


3.- LUGAR : HUISAPATA

Partida Especificaciones N de MEDIDAS


N veces Largo Ancho Altura

Tapa registro 0.6x0.60m Techo F'c=210Kg/*cm2


Volado del techo

b
Muro F'c=210 Kg/cm2

Proy. Caseta vlvulas

Nivel terreno Hipoclorador difuso

Enlucido mortero 1:2 +Sika

s=1%

Piso F'c=210 Kg/cm2


Solado F'c=100Kg/cm2, e=4" 1.55

2.35

CORTE A - A'

2.04.04.03 Encofrado y Desenc. Muros ( 2 caras) 4 1.95 1.55


4 1.55 1.55

2.04.04.04 C F'c=210 kg/cm, Losa macisa techo 1 2.15 2.15 0.10

2.04.04.05 Encofrado y Desenc. Loza macisa Techo 1 1.95 1.95


4 2.15 0.10

2.04.04.06 Acero F'y = 4200 Kg/Cm2; (Pared + techo) HOJA METRADO DE ACERO-RESERVORIO

2.04.05 REVOQUES Y ENLUCIDOS


2.04.05.01 Tarraj.c/impermeab.Mezcla 1:1; Pared int.reserv. 4 1.95 1.55
2.04.05.02 Tarraj.c/impermeab.Mezcla 1:1; Pend. Fondo 1 1.95 1.95
2.04.05.03 Tarrajeo en Exteriores Mortero 1:5 4 1.55 1.55

2.04.06 SUMINISTRO Y COLOC. VALV - ACCESORIOS


2.04.06.01 Tubo de Ventilacion FG D=2" 1
2.04.06.02 Tapa metalica de Inspeccin .60X.60 mts. 1

2.04.07 PINTURA
2.04.07.01 Pintura con latex en muros exteriores 4 1.55 1.55
2.04.07.02 Pintura anticorrosiva para tapas sanitarias metlicas 1 0.60 0.60

2.04.08 LIMPIEZA Y DESINFECCION


2.04.08.01 Limpieza y desinfeccion en reservorio 1 - -

2.04.09 PROTECCION DE RESERVORIO


2.04.09.01 Limpieza de terreno manual 1 6.75 0.80
1 7.79 0.80
HOJA DE METRADOS
RESERVORIO APOYADO CAP. 3 m3
1.- NOMBRE DEL PROYECTO :

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA CO


HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

2.- UBICACIN : Cusco - Espinar - OCORURO


3.- LUGAR : HUISAPATA

Partida Especificaciones N de MEDIDAS


N veces Largo Ancho Altura
2.04.09.02 Trazo, nivel y replanteo 1 6.75 0.80
HOJA DE METRADOS
RESERVORIO APOYADO CAP. 3 m3
1.- NOMBRE DEL PROYECTO :

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA CO


HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

2.- UBICACIN : Cusco - Espinar - OCORURO


3.- LUGAR : HUISAPATA

Partida Especificaciones N de MEDIDAS


N veces Largo Ancho Altura
1 7.79 0.80
2.04.09.03 Excavacion manual en terreno compacto 12 0.30 0.30 0.45
2.04.09.04 Eliminacion material excedente (d=30 m) 1.25 0.49
2.04.09.05 Concreto f'c= 140 kg/cm2 + 40 % pg con piedra chancada en dados 12 0.30 0.30 0.45
2.04.09.06 Cerco con postes metalicos y alambre de puas 2 6.55
2 7.59
2.04.09.07 Puerta metalica con alambre de pas 1 1.00
ISPOSICION DE EXCRETAS EN LA COMUNIDAD DE
CIA DE ESPINAR - CUSCO

Parcial Total total Und.


parcial

- UND

5.52 5.52 - m
5.52 5.52 - m

6.90 6.90 - m
5.52 5.52 - m
8.63 - m

A'

1.10 1.10 - m3
5.52 5.52 - m2

1.66 1.66 - m

0.60 1.21 -
0.48 0.96 -
2.17 - m
ISPOSICION DE EXCRETAS EN LA COMUNIDAD DE
CIA DE ESPINAR - CUSCO

Parcial Total total Und.


parcial

FV 1/2" a 0.30

bl =

0.38

3.02 12.09
2.40 9.61
21.70 21.70 m

0.46 0.46 0.46 m

3.80 3.80
0.22 0.86
4.66 4.66 m

169.12 169.12 kg

3.02 12.09 12.09 m


3.80 3.80 3.80 m
2.40 9.61 9.61 m

- 1.00 1.00 und


- 1.00 1.00 und

2.40 9.61 9.61 m2


0.36 0.36 0.36 m2

- 1.00 1.00 glb

5.40 5.40 11.63 m2


6.23 6.23
ISPOSICION DE EXCRETAS EN LA COMUNIDAD DE
CIA DE ESPINAR - CUSCO

Parcial Total total Und.


parcial
5.40 5.40 11.63 m2
ISPOSICION DE EXCRETAS EN LA COMUNIDAD DE
CIA DE ESPINAR - CUSCO

Parcial Total total Und.


parcial
6.23 6.23
0.04 0.49 0.49 m3
0.49 0.61 0.61 m3
0.04 0.49 0.49 m3
6.55 13.10 28.28 ml
7.59 15.18
1.00 1.00 1.00 und
MEMORIA DE METRADO

CASETA DE VALVULAS PARA 1M3

08.01 TRABAJOS PRELIMINARES N CASETAS = 3


08.01.01 Limpieza de terreno
1.15 * 1.40 = 1.61 m2 * 3 =

08.01.02 Trazo y replanteo preliminar


1.15 * 1.40 = 1.61 m2 * 3 =

08.02 MOVIMIENTO DE TIERRAS


08.02.01 Excavacin manual
* caja 1.400 * 1.150 * 0.400 = 0.644 m3 * 3 =

08.02.02 Refine y Nivelacion y Compactado


1.15 * 1.40 = 1.61 m2 * 3 =

08.02.03 Acarreo de material excedente


Excavacin 0.644 * 1.30 = 0.837 m3
Relleno 0.100 * 3.450 * 0.400 = 0.138 m3
0.699 m3 * 3 =
08.03 OBRAS DE CONCRETO SIMPLE
08.03.01 Solado e=2"
caja 1.40 * 1.15 = 1.610 m2 * 3 =

08.04 OBRAS DE CONCRETO ARMADO

0.10 0.075

0.15

0.90 0.9

0.15

0.10 0.15

0.100.15 0.90

08.04.01 CONCRETO F'C = 210 KG/CM2, (LOSA TECHO)


Losa fondo 1.400 * 1.150 * 0.150 = 0.242 m3

Muros 1.200 * 0.900 * 0.150 * 1.000 = 0.162


0.900 * 0.900 * 0.150 * 2.000 = 0.243
0.647 m3 * 3 =
08.04.02 Encofrado y desencofrado (muros)
Interior 0.900 * 0.900 * 3.000 = 2.430 m2
Exterior 1.200 * 0.900 * 3.000 = 3.240 m2
5.670 m2 * 3 =

08.04.03 Acero de refuerzo F'y=4200 kg/cm2 (losa fondo y muro)

3/8" 0.2 m

1.00 3/8" 0.2 m


L1= 1.00 1.20 0.20
1 3
0.20

3/8" 0.2 m 0.200


L2= 1.30
2 4
1.00 1.25 3/8" 0.2 m

0.3 0.200
L1 1.00 * 5.00 * 2 * 0.58 = 5.80 kg
L2 1.30 * 5.50 * 3 * 0.58 = 12.44 kg
L3 1.60 * 5.50 * 2 * 0.58 = 10.21 kg
L4 1.65 * 5.50 * 1 * 0.58 = 5.26 kg
33.713 * 3 =
08.04.04 CONCRETO F'C = 210 KG/CM2, (LOSA TECHO)
Tapa 1.250 * 1.100 * 0.075 = 0.103 m3
0.103 m3 * 3 =
08.04.05 Encofrado y desencofrado (losa tapa)
1.25 * 1.10 = 1.38 m2
1.35 * 1.200 * 0.075 = 0.38 m2
1.76 m2 * 3 =
08.04.06 Acero F'y=4200 kg/cm2 (losa tapa)

1/4"a 0.1 m

1.15

1 1.15 * 12.00 * 2 * 0.28 = 7.73 m * 3 =

05.00 REVOQUES ENLUCIDOS Y MOLDURAS


08.05.01 Tarrajeos interior y exterior
interior 0.90 * 0.90 * 2 = 1.62 m2
0.90 * 0.90 * 2 = 1.62 m2
exterior 1.20 * 0.90 * 1 = 1.08 m2
1.05 * 0.90 * 2 = 1.89 m2 6.21 m2 * 3 =

08.06 VALVULAS Y ACCESORIOS INGRESA CON 1" Y SALE CON 1 1/2"


08.06.01 Vlvula de bronce + accesorios de caseta de vlvulas
Ingreso de 1"
Adaptador 1" PVC - FG = 1.0 und. * 3 =
Tee F G 1" x 1" = 1.0 und. * 3 =
Codo F G 1" x 90 = 4.0 und. * 3 =
Brida rompe agua F.G. 1" = 1.0 und. * 3 =
Vlvula compueta de bronce 1" = 1.0 und. * 3 =
Unin Universal FG 1" = 2.0 und. * 3 =
Niples FG 1" = 2.0 und. * 3 =
Tuberia F G 1'' = 3.0 ml * 3 =
Salida de 1 1/2"
Canastilla de Bronce de 11/2'' a 1" = 1.0 und. * 1 =
Vlvula compueta de bronce 1" = 1.0 und. * 1 =
Unin Universal FG 1" = 2.0 und. * 1 =
Niples FG 1" = 2.0 und. * 1 =
Adaptador 1" PVC - FG = 1.0 und. * 1 =
Brida rompe agua F.G. 1" = 1.0 und. * 1 =
Tee F G 1" x 1" = 1.0 und. * 1 =
Tuberia F G 1'' = 2.0 ml * 1 =
Salida de 1"
Canastilla de Bronce de 11/2'' a 1" = 1.0 und. * 2 =
Vlvula compueta de bronce 1" = 1.0 und. * 2 =
Unin Universal FG 1" = 2.0 und. * 2 =
Niples FG 1" = 2.0 und. * 2 =
Adaptador 1" PVC - FG = 1.0 und. * 2 =
Brida rompe agua F.G. 1" = 1.0 und. * 2 =
Tee F G 1" x 1" = 1.0 und. * 2 =
Tuberia F G 1'' = 2.0 ml * 2 =

Revose
Cono de rebose PVC 2" x 4" = 1.0 und. * 3 =
Codo PVC SAP 2" x 90 = 2.0 und. * 3 =
Tuberia F G 2'' = 2.0 ml * 3 =
Brida rompe agua 2" = 1.0 und. * 3 =

Limpia
Tee F G 2" x 2" = 1.0 und. * 3 =
Vlvula compueta de bronce 2" = 1.0 und. * 3 =
Unin Universal FG 2" = 2.0 und. * 3 =
Adaptador 2" PVC - FG = 2.0 und. * 3 =
Brida rompe agua 2" = 1.0 und. * 3 =
Niples FG 2" = 2.0 und. * 3 =
Tuberia F G 2'' = 1.5 ml * 3 =

Cruce en casos de limpieza


Vlvula compueta de bronce 3/4" = 1.0 und. * 3 =
Unin Universal FG 3/4" = 2.0 und. * 3 =
Niples FG 3/4" = 2.0 und. * 3 =
Reduccion FG 1" x 3/4" = 1.0 und. * 3 =
4.83 m2

4.83 m2

1.93 m3

4.83 m2

2.10 m3

4.83 m2

0.10

1.30

0.20

0.10

1.94 m3

17.01 m2

L3= 1.60

L4= 1.65
101.14 kg

0.31 m3

5.27 m2

23.18 kg

18.63 m2

3.00 und.
3.00 und.
12.00 und.
3.00 und.
3.00 und.
6.00 und.
6.00 und.
9.00 ml

1.00 und.
1.00 und.
2.00 und.
2.00 und.
1.00 und.
1.00 und.
1.00 und.
2.00 ml

2.00 und.
2.00 und.
4.00 und.
4.00 und.
2.00 und.
2.00 und.
2.00 und.
4.00 ml

3.00 und.
6.00 und.
6.00 ml
3.00 und.

3.00 und.
3.00 und.
6.00 und.
6.00 und.
3.00 und.
6.00 und.
4.50 ml

3.00 und.
6.00 und.
6.00 und.
3.00 und.
MEMORIA DE METRADO

CASETA DE VALVULAS PARA 2M3

08.01 TRABAJOS PRELIMINARES N CASETAS = 2


08.01.01 Limpieza de terreno
1.15 * 1.40 = 1.61 m2 * 2 =

08.01.02 Trazo y replanteo preliminar


1.15 * 1.40 = 1.61 m2 * 2 =

08.02 MOVIMIENTO DE TIERRAS


08.02.01 Excavacin manual
* caja 1.400 * 1.150 * 0.400 = 0.644 m3 * 2 =

08.02.02 Refine y Nivelacion y Compactado


1.15 * 1.40 = 1.61 m2 * 2 =

08.02.03 Acarreo de material excedente


Excavacin 0.644 * 1.30 = 0.837 m3
Relleno 0.100 * 3.450 * 0.400 = 0.138 m3
0.699 m3 * 2 =
08.03 OBRAS DE CONCRETO SIMPLE
08.03.01 Solado e=2"
caja 1.40 * 1.15 = 1.610 m2 * 2 =

08.04 OBRAS DE CONCRETO ARMADO

0.10 0.075

0.15

0.90 0.9

0.15

0.10 0.15

0.100.15 0.90

08.04.01 CONCRETO F'C = 210 KG/CM2, (LOSA TECHO)


Losa fondo 1.400 * 1.150 * 0.150 = 0.242 m3

Muros 1.200 * 0.900 * 0.150 * 1.000 = 0.162


0.900 * 0.900 * 0.150 * 2.000 = 0.243
0.647 m3 * 2 =
08.04.02 Encofrado y desencofrado (muros)
Interior 0.900 * 0.900 * 3.000 = 2.430 m2
Exterior 1.200 * 0.900 * 3.000 = 3.240 m2
5.670 m2 * 2 =

08.04.03 Acero de refuerzo F'y=4200 kg/cm2 (losa fondo y muro)

3/8" 0.2 m

1.00 3/8" 0.2 m


L1= 1.00 1.20 0.20
1 3
0.20

3/8" 0.2 m 0.200


L2= 1.30
2 4
1.00 1.25 3/8" 0.2 m

0.3 0.200
L1 1.00 * 5.00 * 2 * 0.58 = 5.80 kg
L2 1.30 * 5.50 * 3 * 0.58 = 12.44 kg
L3 1.60 * 5.50 * 2 * 0.58 = 10.21 kg
L4 1.65 * 5.50 * 1 * 0.58 = 5.26 kg
33.713 * 2 =
08.04.04 CONCRETO F'C = 210 KG/CM2, (LOSA TECHO)
Tapa 1.250 * 1.100 * 0.075 = 0.103 m3
0.103 m3 * 2 =
08.04.05 Encofrado y desencofrado (losa tapa)
1.25 * 1.10 = 1.38 m2
1.35 * 1.200 * 0.075 = 0.38 m2
1.76 m2 * 2 =
08.04.06 Acero F'y=4200 kg/cm2 (losa tapa)

1/4"a 0.1 m

1.15

1 1.15 * 12.00 * 2 * 0.28 = 7.73 m * 2 =

05.00 REVOQUES ENLUCIDOS Y MOLDURAS


08.05.01 Tarrajeos interior y exterior
interior 0.90 * 0.90 * 2 = 1.62 m2
0.90 * 0.90 * 2 = 1.62 m2
exterior 1.20 * 0.90 * 1 = 1.08 m2
1.05 * 0.90 * 2 = 1.89 m2 6.21 m2 * 2 =

08.06 VALVULAS Y ACCESORIOS INGRESA CON 2" Y SALE CON 1 1/2"


08.06.01 Vlvula de bronce + accesorios de caseta de vlvulas
Ingreso
CODO SP NTP399.019 X 90 33.2 mm (1") = 3.00 und. * 2 =
ADAPTADOR UPR NTP399.019 33.2 mm (1") = 2.00 und. * 2 =
UNION UNIVERSAL DE F G DE 1" = 2.00 und. * 2 =
NIPLE DE F G DE 1" = 2.00 und. * 2 =
VALVULA ESFERICA DE BRONCE PESADA DE 1" = 1.00 und. * 2 =
TUBERIA NTP399.002 DE 33.0 mm (1") = 2.00 und. * 2 =
Salida
CANASTILLA NTP399.019 48.0 mm (1 1/2") X 26.5 mm (1") = 1.00 und. * 2 =
UNION SP NTP399.019 26.7 mm (1") = 1.00 und. * 2 =
ADAPTADOR UPR NTP 399.019 26.7 mm (1") = 2.00 und. * 2 =
UNION UNIVERSAL DE F G (1") = 2.00 und. * 2 =
NIPLE DE F G DE 50 mm (1") = 2.00 und. * 2 =
VALVULA ESFERICA DE BRONCE PESADA (1") = 1.00 und. * 2 =
TUBERIA NTP399.002 26.7 mm (1") = 2.00 und. * 2 =
Revose
Cono de rebose PVC 2" x 4" = 1.0 und. * 2 =
Codo PVC SAP 2" x 90 = 2.0 und. * 2 =
Tuberia F G 2'' = 2.0 ml * 2 =
Brida rompe agua 2" = 1.0 und. * 2 =

Limpia
Tee F G 2" x 2" = 1.0 und. * 2 =
Vlvula compueta de bronce 2" = 1.0 und. * 2 =
Unin Universal FG 2" = 2.0 und. * 2 =
Adaptador 2" PVC - FG = 2.0 und. * 2 =
Brida rompe agua 2" = 1.0 und. * 2 =
Niples FG 2" = 2.0 und. * 2 =
Tuberia F G 2'' = 1.5 ml * 2 =

Cruce en casos de limpieza


Vlvula compueta de bronce 3/4" = 1.0 und. * 2 =
Unin Universal FG 3/4" = 2.0 und. * 2 =
Niples FG 3/4" = 2.0 und. * 2 =
Reduccion FG 1" x 3/4" = 1.0 und. * 2 =
3.22 m2

3.22 m2

1.29 m3

3.22 m2

1.40 m3

3.22 m2

0.10

1.30

0.20

0.10

1.29 m3

11.34 m2

L3= 1.60

L4= 1.65
67.43 kg

0.21 m3

3.52 m2

15.46 kg

12.42 m2

6.00 und.
4.00 und.
4.00 und.
4.00 und.
2.00 und.
4.00 und.

2.00 und.
2.00 und.
4.00 und.
4.00 und.
4.00 und.
2.00 und.
4.00 und.

2.00 und.
4.00 und.
4.00 ml
2.00 und.

2.00 und.
2.00 und.
4.00 und.
4.00 und.
2.00 und.
4.00 und.
3.00 ml

2.00 und.
4.00 und.
4.00 und.
2.00 und.
HOJA RESUMEN DE METRADOS PASE AEREO

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO,

Localidad : HUISAPATA
Provincia : ESPINAR

14 PASES AEREOS EN EL SISTEMA 01, y 02


14 PASES AEREOS FG CON DADOS DE CONCRETO, L= 6 M, = 1 1/2"
14.01 TRABAJOS PRELIMINARES
14.01.01 LIMPIEZA DE TERRENO MANUAL M2
14.01.02 TRAZO NIVELES Y REPLANTEO M2
14.02 MOVIMIENTO DE TIERRAS
14.02.01 EXCAVACION DE ZANJAS M3
14.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS. M3
14.03 OBRAS DE CONCRETO SIMPLE
14.03.01 CONCRETO f'c=140 kg/cm2 PARA ANCLAJES Y/O DADOS CON HORMIGON M3
14.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE) M2
14.04 ACCESORIOS DE PASE AEREO
14.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS PARA PASE AEREO 1 DIAM= 1 1/2", 1", 3/4" L=6M. GLOBAL

HOJA DE METRADOS DE PASE AEREO 6 ML

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO,

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO


14 PASES AEREOS FG CON DADOS DE CONCRETO, L= 6 M, = 1 1/2" 4.00 UNID
14.01 TRABAJOS PRELIMINARES
14.01.01 LIMPIEZA DE TERRENO MANUAL
LIMPIEZA DE TERRENO MANUAL 2.00 0.70 0.60
14.01.02 TRAZO NIVELES Y REPLANTEO
BASE ZAPATA DADO ANCLAJE 2.00 0.50 0.40
14.02 MOVIMIENTO DE TIERRAS
14.02.01 EXCAVACION DE ZANJAS
BASE ZAPATA DADO ANCLAJE 2.00 0.50 0.40
14.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
TOTAL EXCAVACION 1.30 0.40 1.00
14.03 OBRAS DE CONCRETO SIMPLE
14.03.01 CONCRETO f'c=140 kg/cm2 PARA ANCLAJES Y/O DADOS CON HORMIGON
DADOS DE ANCLAJE 2.00 0.50 0.40
14.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MUROS DADOS 1 2.00 0.40
MUROS DADOS 2 2.00 0.50
14.04 ACCESORIOS DE PASE AEREO
14.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS PARA PASE AEREO 1 DIAM= 1 1/2", 1", 3/4" L=6M.
CINTA TEFLON 4.00
UNION SIMPLE FG D= 1 1/2" 2.00
ADAPTADOR UPR NTP 339.019 DE 26.7 mm D= 1 1/2" 2.00
TUBERIA DE FIERRO GALV- D= 1 1/2" 6.00
UNION SIMPLE FG D= 1 " 2.00
ADAPTADOR UPR NTP 339.019 DE 26.7 mm D= 1" 2.00
TUBERIA DE FIERRO GALV- D= 1" 6.00
UNION SIMPLE FG D= 3/4 " 2.00
ADAPTADOR UPR NTP 339.019 DE 26.7 mm D= 3/4" 2.00
TUBERIA DE FIERRO GALV- D= 3/4" 6.00
PATA, DISTRITO DE OCORURO,

Distrito : OCORURO
Departamento : CUSCO

3.36
1.60

0.40
2.08

0.80
1.44

1.00

PATA, DISTRITO DE OCORURO,

Distrito : OCORURO
Departamento : CUSCO

ALTURA
SUB-TOTAL TOTAL UNID.

3.36 m2
0.84 m2
1.60 m2
0.40 m2

0.40 m3
### 0.10 m3
2.08 m3
### 0.52 m3

0.80 m3
### 0.20 m3
1.44 m2
### 0.16 m2
### 0.20 m2

1.00 GLB
4.00 roll
6.00 und
6.00 und
18.00 ml
4.00 und
4.00 und
12.00 ml
2.00 ml
2.00 ml
6.00 ml
MEMORIADEMETRADO

CRUCEAEREOL=25m

CANTIDAD = 2
15.01 TRABAJOSPRELIMINARES
15.01.01 LimpiezadeTerreno
2 1.40 1.00
2 1.00 ###

15.01.02 Trazoyreplanteo
2 1.40 1.00
2 1.00 ###
15.02 MOVIMIENTODETIERRAS
15.02.01 Excavacinmanualenterrenonormal
Zapata 2 1.40 1.00 1.20
Dadosdeancjlaje 2 1.00 ### 1.20

15.02.02 Refinenivelacinycompactacin 2 1.40 1.00


2 1.00 ###

15.02.03 Acarreomaterialexcedentemax30m. 1 5.76 1.30

15.03 OBRASDECONCRETOSIMPLE
15.03.01 Soladoparazapatae=2" 1 4.80

15.03.02 CCamaradeAnclajefc140Kgr/cm2+30%P.G. 2 1.00 ### 0.90

15.04 OBRASDECONCRETOARMADO
15.04.01 CZapatasfc175Kgr/cm2 2 1.40 1.00 0.50

15.04.02 CONCRETOF'C=210KG/CM2.PARACOLUMNAS 2 0.40 ### 3.80

15.04.03 Encofradoydesencofradocolumnas 2 1.60 3.80

15.04.04 Acerofy=4200kg/cm2Columnas
cantidad longitud peso
Columnas 2 8.00 4.50 1.02
2 13.00 1.30 0.58
15.05 TARRAJEOSENLUCIDOSYMOLDURAS
15.05.01 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-A 1 12.16

15.06 SUPERESTRUCTURADECRUCEAEREO
15.06.01 INSTALACION DE ACCESORIOS EN SUPERESTRUCTURA DE PASE AEREO
CablePrincipaltipoBOA3/8" 1 33.00
CableSecundariotipoBOA1/4" 1 20.00
PendolasTipoBOA1/4" 1 25.00
Abrazaderassujecioncable 1 19.00
Abrazaderassujeciontuberia 1 19.00
Aceromacizoparaanclajetemplador 1 4.00
TuberiaFG11/2" 1 30.00
TuberiaFG1" 1 30.00

ColocacinaccesoriosFG 1 1.00
SuministroaccesoriosFG 1 1.00

15.07 PINTURA
15.07.01 PinturaTorresdeSuspensionEsmalte 1 12.16
4.80 9.60 m2
1.40 2.80
1.00 2.00

4.80 9.60 m2
1.40 2.80
1.00 2.00

5.76 11.52 m3
1.68 3.36
1.20 2.40

1.40 2.80
1.00 2.00
4.80 9.60 m2

7.49 7.49 14.98 m3

4.80 4.80 9.60 m2

0.90 1.80 3.60 m3

0.70 1.40 2.80 m3

0.61 1.22 2.43 m3

6.08 12.16 24.32 m2

93.04 186.09 kgr

36.72 73.44
9.80 19.60

12.16 24.32 m2

42.80 85.60 ml
25.00 50.00 ml
25.80 51.60 ml
19.00 24.00 48.00 und
19.00 24.00 48.00 und
4.00 4.00 8.00 und
30.00 60.00 ml
30.00 60.00 ml

1.00 1.00 2.00 und


1.00 1.00 2.00 und

12.16 24.32 m2
HOJA DE METRADOS
LINEA DE ADUCCION

0.00 TRABAJOS PRELIMINARES


04.01.01 Limpieza de Terreno =
04.01.01 Trazo, nivelacin y replanteo zanjas =

04.02 MOVIMIENTO DE TIERRAS


04.02.01 Excavacin manual de zanjas en terreno normal 9879.10 0.50 0.8
04.02.02 Excavacin manual de zanjas en roca suelta 4233.90 0.50 0.8
04.02.03 Refine, nivelacin y fondo para tuberia =
04.02.04 Cama de apoyo (material sarandeado) =
04.02.05 Relleno, apisonado de zanja con material propio 14113.00 0.5 0.8 =

04.03 SUMINISTRO E INSTALACION DE TUBERIAS


04.03.01 Suministro e Inst. Tubera PVC SAP Clase 10 D = 1" NTP 399.002 =
Suministro e Inst. Tubera PVC SAP Clase 15 D = 1" NTP 399.002
Suministro e Inst. Tubera PVC SAP Clase 10 D = 1.5" NTP 399.002
Suministro e Inst. Tubera PVC SAP Clase 15 D = 1.5" NTP 399.002
04.03.02 Suministro e Inst. Tubera PVC SAP Clase 10 D = 3/4 " NTP 399.003 =
04.03.03 Prueba hidrulica + escorrentia de tuberia a zanja tapada =

04.04 VALVULAS Y ACCESORIOS


04.04.01 Accesorios (Linea de Aduccion)
14113.00 ml
14113.00 ml

3951.64 m3
1693.56 m3
14113.00 ml
14113.00 ml
5645.20 m3

4957.00 ml
2720.00
562.00
4653.00
1221.00 ml
14113.00 ml

1.0000 und
HOJA DE METRADOS
RED DE DISTRIBUCION

11 RED DE DISTRIBUCION ( 3,895.0 ) ml.


11.01 TRABAJOS PRELIMINARES
01.07.01.02 Trazo, nivelacin y replanteo zanjas = 3895.00

11.01.01 MOVIMIENTO DE TIERRAS


11.02.01 Excavacin manual de zanjas en terreno normal 1090.60
2726.5 0.50 0.80 1090.6
11.02.02 Excavacin manual en roca suelta 467.40
1168.5 0.50 0.80 467.4
11.02.03 Refine, nivelacin y fondo para tuberia = 3895.00
11.02.04 Cama de apoyo (material sarandeado) = 3895.00
11.02.05 Relleno, compactado de zanjas para tuberia de agua = 1558.00

11.03 SUMINISTRO E INSTALACION DE TUBERIAS


11.03.01 tuberia PVC C 10 DN 1" = 811.00
11.03.02 tuberia PVC C 10 DN 1.5" = 650.00
11.03.03 tuberia PVC C 10 DN 3/4" = 2434.00
=
11.03.05 Prueba hidrulica en Tuberias = 3895.00

Resumen tuberia (por unidad de 6.0 m.)


Dimetro longitud (m) Ms desp. 3% long/tubo (m.) tubo (unidad)
1" 811.00 835.33 5.85 139 tubos
1 1/2" 650.00 669.50 5.85 111 tubos
3/4" 2434.00 2507.02 5.85 416 tubos

11.04 VALVULAS Y ACCESORIOS


11.04.01 Suministro y Colocacion de Accesorios (Red de distribucion) 1.0000
ml

m3

m3

ml
ml
m3

ml
ml
ml
ml
ml

und
MEMORIA DE METRADO

CAJA VALVULAS DE PURGA


12.01 TRABAJOS PRELIMINARES N CAJA =
12.01.01 Limpieza de terreno
0.80 * 0.80 = 0.64 m2 *

12.01.02 Trazo y replanteo preliminar


0.80 * 0.80 = 0.64 m2 *

12.02 MOVIMIENTO DE TIERRAS


12.02.01 Excavacin de material suelto en terreno seco
0.800 * 0.800 * 0.800 = 0.512 m3 *

12.02.02 Refine y Nivelacion y Compactado


0.80 * 0.80 = 0.64 m2 *

12.02.03 Eliminacion de material excedente d prom= 30 m


Excavacin 0.512
Relleno 0.000
0.512 * 1.3 = 0.666 m3 *

12.03 OBRAS DE CONCRETO SIMPLE


12.03.01 Solado e=2" 0.800 * 0.800 = 0.640 m2 *
DADO DE CONCRETO 0.30X0.30X0.40

TAPA DE CONCRE
CODO 3/4" X 90

TAPON PVC 3/4"


FIERRO LISO DE 1/4" @ 0.10 C/LADO

NIPLE PVC 3/4" X 3/4"


0.1
0.1 ANGULO DE FIERRO 2" X 2" X 1/8"

0.4
MURO DE CONCRETO VALV. DE COMPUERTA
TUBERIA 3" PVC
F'c=175 KG/CM2
RED DE DISTRIBUCION

TAPON PVC 3/4"


0.1
0.1 TEE PVC 3/4" X 3/4"

TUBERIA 1" PVC 0.4 0.1 0.1


DE PURGA

12.04 OBRAS DE CONCRETO ARMADO


12.04.01 Concreto F'c=175 kg/cm2 (losa fondo y muros)
muros 0.60 * 0.70 * 0.10 * 2.00 = 0.08 m3
0.40 + 0.70 * 0.10 * 2.00 = 0.06 m3
Losa fondo 0.80 * 0.80 * 0.10 * 1.00 = 0.06 m3
Dado 0.30 * 0.30 * 0.40 * 1.00 = 0.04 m4
0.24 m3 *

12.04.02 Encofrado y desencofrado (losa fondo y muros)


exteriores 0.600 * 0.700 * 4.000 = 1.680 m2
interiores 0.400 * 0.700 * 4.000 = 1.120 m2
2.800 m2 *
12.04.03 Acero F'y=4200 kg/cm2 (losa fondo y muros)

1 2
0.75 0.75 0.55
3/8a 0.20 m . 3
3/8a 0.20 m .

0.55 0.55 3/8a 0.20m . 0.55

1) 1/4" 2.05 * 4 = 8.20 * 0.25 kg/cm2 = 2.05 #


2) 1/4" 2.05 * 3 = 6.15 * 0.25 kg/cm3 = 1.5375 #
3) 1/4" 2.40 * 4 = 9.60 * 0.25 kg/cm4 = 2.4 #
23.95 m 5.9875 *

12.05 TARRAJEOS
12.05.01 Tarrajeos interior y exterior
Interior 0.400 * 0.700 * 4.000 = 1.120 m2 *

12.06 VALVULAS Y ACCESORIOS


12.06.01 VALVULA DE COMPUERTA 11/2" PURGA
Adaptador PVC - FG 1 1/2" 2.0 *
Niples FG 1 1/2" 2.0 *
Unin universal FG 1 1/2" 2.0 *
Valvula de compuerta de Bronce 1 1/2" 1.0 *
Tee FG 1 1/2" 1.0 *
Tapn 1 1/2" 1.0 *
12.06.02 TAPA METALICA 0.40 X 0.40m. 1.0 *
22

22 = 14.08 m2

22 = 14.08 m2

22 = 11.26 m3

22 = 14.08 m2

22 = 14.64 m3

22 = 14.08 m2
DADO DE CONCRETO 0.30X0.30X0.40

TAPA DE CONCRETO PREFABRICADO

FIERRO LISO DE 1/4" @ 0.10 C/LADO

0.05
ANGULO DE FIERRO 2" X 2" X 1/8"

0.70
CONCRETO VALV. DE COMPUERTA
175 KG/CM2

0.10

22 = 5.28 m3

22 = 61.60 m2
22 = 131.73 kg

22 = 24.64 m2

22 = 44.00 und.
22 = 44.00 und.
22 = 44.00 und.
22 = 22.00 und.
22 = 22.00 und.
22 = 22.00 und.
22 = 22.00 und.
PROYECTO:
PROYECTISTA: FECHA:

PLANILLA DE METRADOS
ITEM Especificaciones Und. Cant.

#REF! ESTRUCTURA: VALVULA CONTROL

DATOS:
LADO PLANTA (A) = 0.10
LADO PLANTA (B) = 0.40
LADO PLANTA (C) = 0.10
LADO PLANTA (D) = 0.40
LADO PLANTA (E) = 0.10
LADO CORTE (F) = 0.15
LADO CORTE (G) = 0.50

ITEM Especificaciones Und. Cant.


#REF! VALVULA DE CONTROL (9 UND) 9
#REF! TRABAJOS PRELIMINARES
#REF! LIMPIEZA DE TERRENO MANUAL

Se considera el Total mximo, en este caso se hace referencia al m2 1.00


contorno adicional 0.10m a cada lado
#REF! TRAZO Y REPLANTEO
Similar al tem de Limpieza de Terreno manual m2 1.00
#REF! MOVIMIENTO DE TIERRAS
#REF! EXCAVACIN PARA ESTRUCTURAS
Caseta de Vlvulas m3 1.00
Dado Mvil Incluye zanja m3 1.00
#REF! REFINE NIVELACION Y COMPACTACION
Caseta de Vlvulas y Cmara de carga m2 1.00
Dado Mvil Incluye zanja m2 1.00
#REF! ELIMIN. DE MATERIAL EXCED. D= 30.M (A MANO C/ CARRETILLA)

Se considera la diferencia de Volumen excavado con el volumen m3 1.00


utilizado en relleno, multiplicado por el factor de Esponjamiento.
#REF! CONCRETO SIMPLE
#REF! ENCOFRADO Y DESENCOFRADO NORMAL
Caseta de Vlvulas
Muros interiores m2 2.00
m2 2.00
Muros Exteriores m2 2.00
m2 2.00
#REF! CONCRETO F'C=175 Kg/cm2

Muros Transversal m2 2.00


Muros Longitudinal m2 2.00
#REF! PIEDRA 4" ASENTADA CON MEZCLA C:H 1:8
Para proteccion del Dado Mvil m2 1.00
#REF! REVOQUES, ENLUCIDOS Y MOLDURAS
#REF! TARRAJEO INTERIOR CON IMPERMEABILIZANTE
Caseta de Vlvulas
Muros interiores m2 4.00
#REF! TARRAJEO DE EXTERIORES, 1:5, E=1.5 cm.
Caseta de Vlvulas
Muros Exteriores m2 4.00
#REF! VALVULAS Y ACCESORIOS
#REF! VLVULAS Y ACCESORIOS 1 1/2" PVC SAP
Lista de Accesorios:
Adaptadores UPR PVC de 1 1/2" Und 2.00
Vlvula de Compuerta de 1 1/2" Und 1.00
Tub. PVC SAP C-10, de 1 1/2" m 1.00
Niple PVC SAP de 1 1/2" de L=2" Und 2.00
Union Universal PVC SAP de 1 1/2" Und 2.00
Otros Complementos Glb 1.00
#REF! VLVULAS Y ACCESORIOS 1" PVC SAP
Lista de Accesorios:
Adaptadores UPR PVC de 1" Und 2.00
Vlvula de Compuerta de 1" Und 1.00
Tub. PVC SAP C-10, de 1" m 1.00
Niple PVC SAP de 1" de L=2" Und 2.00
Union Universal PVC SAP de 1" Und 2.00
Otros Complementos Glb 1.00
#REF! VLVULAS Y ACCESORIOS 3/4" PVC SAP
Lista de Accesorios:
Adaptadores UPR PVC de 3/4" Und 2.00
Vlvula de Compuerta de 3/4" Und 1.00
Tub. PVC SAP C-10, de 3/4" m 1.00
Niple PVC SAP de 3/4" de L=2" Und 2.00
Union Universal PVC SAP de 3/4" Und 2.00
Otros Complementos Glb 1.00
#REF! VARIOS
#REF! TAPA SANITARIA METALICA DE 0.40X0.40 M
Lista de Accesorios:
Caseta de vlvulas Und 1.00
#REF! LECHO DE GRAVA

m3 1.00
Para el drenaje de posibles fugas en las conexiones
#REF! CURADO DE CONCRETO
Tarrajeo Interior con Impermeabilizante m2 1.00
Tarrajeo en exteriores m2 1.00
RESPONSABLE:

METRADOS
Largo Ancho Alto rea Parcial TOTAL

9.00 UND

m. PROFUNDIDAD DE EXCAV= 0.50 m.


m.
m.
m.
m.
m.
m.

Largo Ancho Alto rea Parcial TOTAL

UND: M2 CANT: 4.41

0.70 0.70 0.49 0.49

UND: M2 CANT: 4.41


0.70 0.70 0.49 0.49

UND: M3 CANT: 2.52


0.60 0.60 0.50 0.18 0.28
1.00 0.50 0.20 0.10
UND: M2 CANT: 7.74
0.60 0.60 0.36 0.86
1.00 0.50 0.50
UND: M3 CANT: 3.15

Vol= 0.28 Fact: 1.25 0.35 0.35

UND: M2 CANT: 18.00


2.00
0.40 0.50 0.40
0.40 0.50 0.40
0.60 0.50 0.60
0.60 0.50 0.60
UND: M3 CANT: 0.90
0.10
0.40 0.10 0.50 0.04
0.60 0.10 0.50 0.06
UND: M2 CANT: 9.00
1.00 1.00 1.00 1.00

UND: M2 CANT: 7.20


0.80
0.40 0.50 0.80
UND: M2 CANT: 10.80
1.20
0.60 0.50 1.20

UND: UND CANT: 0.00


0.00
0.00
0.00
1.50 0.00
0.00
0.00
0.00
UND: UND CANT: 4.00
4.00
8.00
4.00
1.50 4.00
8.00
8.00
4.00
UND: UND CANT: 5.00
5.00
10.00
5.00
1.50 5.00
10.00
10.00
5.00

UND: UND CANT: 9.00


1.00
1.00
UND: M3 CANT: 0.22

0.40 0.40 0.15 0.02 0.02

UND: M2 CANT: 18.00


0.80 0.80 2.00
1.20 1.20
HOJA DE METRADOS
#REF! VALVULA DE AIRE (3 unidades)

#REF! TRAZO, NIVELACION Y REPLANTEO PRELIMINAR


M2 12 1 0.70 0.70

#REF! EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA M3


Camara 12 1 0.70 0.70 0.65

#REF! ENCOFRADO Y DESENCOFRADO M2


Caja de recoleccion de agua M2 12 8 0.70 0.65

09.07.04 ACERO KG

09.07.05 CONCRETO FC=210 KG/CM3 M3


Caja de recoleccion de agua M3 12 4 0.70 0.15 0.60
Piso de caja de recoleccin M3 12 1 0.70 0.70 0.15

09.07.06 TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5 CM M2


Caja de recoleccion de agua M2 12 4 0.70 0.60

09.07.07 TAPA SANITARIA METALICA DE 40 X 40 X 1/8" UND 12

09.07.08 ACCESORIOS VALVULA DE AIRE D=1" GLB 1

09.07.09 ACCESORIOS VALVULA DE AIRE D=3/4" GLB 2

09.07.10 COLOCACION DE ACCESORIOS PROMEDIO GLB 12 9

09.07.11 PINTURA DE MUROS EXTERIORES LATEX LAVABLE M2


M2 12 4 0.70 0.60

Pgina 95
5.88 M2
5.88

3.82 M3
3.82

43.68 M2
43.68

7.63 91.56 KG

3.91 M3
3.02
0.88

20.16 M2
20.16

12.00 12.00 UND

1.00 1.00 GLB

2.00 2.00 GLB

108.00 108.00 GLB

20.16 M2
20.16

Pgina 96
HOJA DE METRADOS
CONEXIONES DOMICILIARIAS Y VALVULA DE PASO
UND 39
x 30 x 25 CMS.e= 0.10 TRABAJOS PRELIMINARES

04.01.01 Limpieza de Terreno =


04.01.01 Trazo, nivelacin y replanteo zanjas =

04.02 MOVIMIENTO DE TIERRAS


04.02.01 Excavacin manual de zanjas en terreno normal 2076.20 0.40 0.5
04.02.02 Excavacin manual de zanjas en roca suelta 889.80 0.40 0.5
04.02.03 Refine, nivelacin y fondo para tuberia =
04.02.04 Cama de apoyo (material sarandeado) =
04.02.05 Relleno, apisonado de zanja con material propio 2966.00 0.4 0.5 =

04.03 SUMINISTRO E INSTALACION DE TUBERIAS


04.03.01 Suministro e Inst. Tubera PVC SAP Clase 10 D = 1/2" NTP 399.002 =
Suministro e Inst. Tubera PVC SAP Clase 10 D = 3/4" NTP 399.002 =
Suministro e Inst. Tubera PVC SAP Clase 10 D = 1" NTP 399.002
04.03.03 Prueba hidrulica + escorrentia de tuberia a zanja tapada =

04.04
04.04.01
ULA DE PASO PARTIDA DESCRIPCION

VALVULAS Y ACCESORIOS
SUMINISTRO E INST. VALVULA DE PASO EN CONEXION DOMICILIARIA

CAJA DE CSN P/VALVULA DE PASO DE 25 x 30 x 25 CMS.e= 0.10


2966.00 ml
2966.00 ml VALVULA DE PASO 1/2" EN PVC P/CONEXIN DOM.
TAPA METALICA DE 25 x 30 cms.
ADAPTADOR UPR NTP 399.166 DE 21.2 mm (D= 1/2")
415.24 m3 UNION UNIVERSAL NTP 399.166 DE 43 mm (D= 1/2")
177.96 m3 NIPLE NTP 399.166 DE 18.4 mm x 40 mm (D= 1/2")
2966.00 ml ADAPTADOR UPR NTP 399.166 DE 21.2 mm (D= 3/4")
2966.00 ml UNION UNIVERSAL NTP 399.166 DE 43 mm (D= 3/4")
593.20 m3 NIPLE NTP 399.166 DE 18.4 mm x 40 mm (D= 3/4")
ADAPTADOR UPR NTP 399.166 DE 21.2 mm (D= 1")
UNION UNIVERSAL NTP 399.166 DE 43 mm (D= 1")
2684.00 ml NIPLE NTP 399.166 DE 18.4 mm x 40 mm (D= 1")
282.00 ml
0.00 ml
2966.00 ml
VECES LONG. ANCHO ALTURA SUB-TOTAL TOTAL UNID.

1.00 1.00 39.00 und

1.00
1.00
1.00 1.00
1.00 2.00
1.00 2.00
1.00 2.00
1.00 2.00
1.00 2.00
1.00 2.00
1.00 2.00
1.00 2.00
1.00 2.00
1.00 2.00
HOJA RESUMEN DE METRADOS EN LINEA DE CONDUCCION

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Localidad : HUISAPATA
Provincia : ESPINAR

03 LINEA DE CONDUCCION SISTEMA 1, 2, 3, 4, 5, y 8


03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts. ML
03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML
03.01.03 DESBROCE ML
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (<=2") ML
03.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A=0.50m H=0.70m (< 2'') ML
03.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M ML
03.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M ML
03.02.05 CAMA DE APOYO P/TUB. H= 0.10 M (HASTA 2") ML
03.02.06 RELLENO CON MATERIAL PROPIO SELECCIONADO A=0.5, H=0.70 ML
03.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21.0 mm ( 1/2") ML
03.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4") ML
03.03.03 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 33 mm ( 1") ML
03.03.04 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 60 mm ( 2") UND
03.03.05 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE CONDUCCION CHALLCHA GBL
03.03.06 COLOCACION DE ACCESORIOS PVC EN LINEA DE CONDUCCION UND
3.04 PRUEBA HIDRAULICA Y DESINFECCION
03.04.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1/2" ML
03.04.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4" ML
03.04.03 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1" ML
03.04.04 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 2" ML
HOJA DE METRADOS DE LINEA DE CONDUCCION 01

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

03 LINEA DE CONDUCCION
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL LINEA DE CONDUCCION 1.00 1,153.00
03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL LINEA DE CONDUCCION 1.00 1,153.00
03.01.03 DESBROCE
TOTAL LINEA DE CONDUCCION 1.00 1,153.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (<=2")
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 807.10
03.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A=0.50m H=0.70m (< 2'')
TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 345.90
03.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 807.10

03.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M


TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 345.90
03.02.05 CAMA DE APOYO P/TUB. H= 0.10 M (HASTA 2")
TOTAL LINEA DE CONDUCCCION 1.00 1,153.00
03.02.06 RELLENO CON MATERIAL PROPIO SELECCIONADO A=0.5, H=0.70
TOTAL LINEA DE CONDUCCION 1.00 1,153.00
03.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.03.03 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 33 mm ( 1")
TOTAL TUBERIA NTP 399.002 DE 33mm C-10 ( 1") 1.00 1,047.00
03.03.04 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 60 mm ( 2")
TOTAL TUBERIA NTP 399.002 DE 60mm C-10 ( 2") 1.00 106.00
03.03.05 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE CONDUCCION CHALLCHA 1.00
CODO SP NTP 399.002 DE 33.5 mm(1") x 45 10.00
CODO SP NTP 399.002 DE 60.5 mm(2") x 45 1.00
03.03.06 COLOCACION DE ACCESORIOS PVC EN LINEA DE CONDUCCION
TOTAL DE ACCESORIOS 1.00 11.00
3.04 PRUEBA HIDRAULICA Y DESINFECCION
03.04.03 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1"
TOTAL TUBERIA NTP 399.002 DE 33mm C-10 ( 1") 1.00 1,047.00
03.04.04 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 2"
TOTAL TUBERIA NTP 399.002 DE 60mm C-10 ( 2") 1.00 106.00

HOJA DE METRADOS DE LINEA DE CONDUCCION 02

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

03 LINEA DE CONDUCCION
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL LINEA DE CONDUCCION 1.00 46.00
03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL LINEA DE CONDUCCION 1.00 46.00
03.01.03 DESBROCE
TOTAL LINEA DE CONDUCCION 1.00 46.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (<=2")
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 32.20
03.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A=0.50m H=0.70m (< 2'')
TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 13.80
03.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 32.20
03.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 13.80
03.02.05 CAMA DE APOYO P/TUB. H= 0.10 M (HASTA 2")
TOTAL LINEA DE CONDUCCCION 1.00 46.00
03.02.06 RELLENO CON MATERIAL PROPIO SELECCIONADO A=0.5, H=0.70
TOTAL LINEA DE CONDUCCION 1.00 46.00
03.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.03.03 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 33 mm ( 1")
TOTAL TUBERIA NTP 399.002 DE 33mm C-10 ( 1") 1.00 46.00
3.04 PRUEBA HIDRAULICA Y DESINFECCION
03.04.03 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1"
TOTAL TUBERIA NTP 399.002 DE 33mm C-10 ( 1") 1.00 46.00

HOJA DE METRADOS DE LINEA DE CONDUCCION 03

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

03 LINEA DE CONDUCCION
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL LINEA DE CONDUCCION 1.00 56.00
03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL LINEA DE CONDUCCION 1.00 56.00
03.01.03 DESBROCE
TOTAL LINEA DE CONDUCCION 1.00 56.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (<=2")
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 39.20
03.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A=0.50m H=0.70m (< 2'')
TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 16.80
03.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 39.20

03.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M


TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 16.80
03.02.05 CAMA DE APOYO P/TUB. H= 0.10 M (HASTA 2")
TOTAL LINEA DE CONDUCCCION 1.00 56.00
03.02.06 RELLENO CON MATERIAL PROPIO SELECCIONADO A=0.5, H=0.70
TOTAL LINEA DE CONDUCCION 1.00 56.00
03.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.03.04 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 60 mm ( 2")
TOTAL TUBERIA NTP 399.002 DE 60mm C-10 ( 2") 1.00 56.00
3.04 PRUEBA HIDRAULICA Y DESINFECCION
03.04.04 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 2"
TOTAL TUBERIA NTP 399.002 DE 60mm C-10 ( 2") 1.00 56.00

HOJA DE METRADOS DE LINEA DE CONDUCCION 04

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

03 LINEA DE CONDUCCION
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL LINEA DE CONDUCCION 1.00 2,850.00
03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL LINEA DE CONDUCCION 1.00 2,850.00
03.01.03 DESBROCE
TOTAL LINEA DE CONDUCCION 1.00 2,850.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (<=2")
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 1,995.00
03.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A=0.50m H=0.70m (< 2'')
TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 855.00
03.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 1,995.00

03.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M


TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 855.00
03.02.05 CAMA DE APOYO P/TUB. H= 0.10 M (HASTA 2")
TOTAL LINEA DE CONDUCCCION 1.00 2,850.00
03.02.06 RELLENO CON MATERIAL PROPIO SELECCIONADO A=0.5, H=0.70
TOTAL LINEA DE CONDUCCION 1.00 2,850.00
03.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21.0 mm ( 1/2")
TOTAL TUBERIA NTP 399.002 DE 21.0mm C-10 ( 1/2") 1.00 401.00
03.03.03 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 33 mm ( 1")
TOTAL TUBERIA NTP 399.002 DE 33mm C-10 ( 1") 1.00 2,449.00
03.03.05 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE CONDUCCION CHALLCHA 1.00
CODO SP NTP 399.002 DE 21.0 mm(1/2") x 45 15.00
CODO SP NTP 399.002 DE 33.0 mm(1") x 45 10.00
03.03.06 COLOCACION DE ACCESORIOS PVC EN LINEA DE CONDUCCION
TOTAL DE ACCESORIOS 1.00 25.00
3.04 PRUEBA HIDRAULICA Y DESINFECCION
03.04.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1/2"
TOTAL TUBERIA NTP 399.002 DE 21.0mm C-10 ( 1/2") 1.00 401.00
03.04.03 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1"
TOTAL TUBERIA NTP 399.002 DE 33mm C-10 ( 1") 1.00 2,449.00

HOJA DE METRADOS DE LINEA DE CONDUCCION 05

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

03 LINEA DE CONDUCCION
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL LINEA DE CONDUCCION 1.00 98.00
03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL LINEA DE CONDUCCION 1.00 98.00
03.01.03 DESBROCE
TOTAL LINEA DE CONDUCCION 1.00 98.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (<=2")
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 68.60
03.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A=0.50m H=0.70m (< 2'')
TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 29.40
03.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 68.60

03.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M


TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 29.40
03.02.05 CAMA DE APOYO P/TUB. H= 0.10 M (HASTA 2")
TOTAL LINEA DE CONDUCCCION 1.00 98.00
03.02.06 RELLENO CON MATERIAL PROPIO SELECCIONADO A=0.5, H=0.70
TOTAL LINEA DE CONDUCCION 1.00 98.00
03.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.03.04 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 60 mm ( 2")
TOTAL TUBERIA NTP 399.002 DE 60mm C-10 ( 2") 1.00 98.00
03.03.05 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE CONDUCCION CHALLCHA 1.00
CODO SP NTP 399.002 DE 60.5 mm(2") x 45 1.00
03.03.06 COLOCACION DE ACCESORIOS PVC EN LINEA DE CONDUCCION
TOTAL DE ACCESORIOS 1.00 1.00
3.04 PRUEBA HIDRAULICA Y DESINFECCION
03.04.04 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 2"
TOTAL TUBERIA NTP 399.002 DE 60mm C-10 ( 2") 1.00 98.00

HOJA DE METRADOS DE LINEA DE CONDUCCION 05

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

03 LINEA DE CONDUCCION
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL LINEA DE CONDUCCION 1.00 153.00
03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL LINEA DE CONDUCCION 1.00 153.00
03.01.03 DESBROCE
TOTAL LINEA DE CONDUCCION 1.00 153.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (<=2")
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 107.10
03.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A=0.50m H=0.70m (< 2'')
TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 45.90
03.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 107.10

03.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M


TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 45.90
03.02.05 CAMA DE APOYO P/TUB. H= 0.10 M (HASTA 2")
TOTAL LINEA DE CONDUCCCION 1.00 153.00
03.02.06 RELLENO CON MATERIAL PROPIO SELECCIONADO A=0.5, H=0.70
TOTAL LINEA DE CONDUCCION 1.00 153.00
03.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.03.04 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 60 mm ( 2")
TOTAL TUBERIA NTP 399.002 DE 60mm C-10 ( 2") 1.00 153.00
3.04 PRUEBA HIDRAULICA Y DESINFECCION
03.04.04 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 2"
TOTAL TUBERIA NTP 399.002 DE 60mm C-10 ( 2") 1.00 153.00

HOJA DE METRADOS DE LINEA DE CONDUCCION 07

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

03 LINEA DE CONDUCCION
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL LINEA DE CONDUCCION 1.00 168.00
03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL LINEA DE CONDUCCION 1.00 168.00
03.01.03 DESBROCE
TOTAL LINEA DE CONDUCCION 1.00 168.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (<=2")
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 117.60
03.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A=0.50m H=0.70m (< 2'')
TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 50.40
03.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 117.60

03.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M


TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 50.40
03.02.05 CAMA DE APOYO P/TUB. H= 0.10 M (HASTA 2")
TOTAL LINEA DE CONDUCCCION 1.00 168.00
03.02.06 RELLENO CON MATERIAL PROPIO SELECCIONADO A=0.5, H=0.70
TOTAL LINEA DE CONDUCCION 1.00 168.00
03.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.03.03 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 33 mm ( 1")
TOTAL TUBERIA NTP 399.002 DE 33mm C-10 ( 1") 1.00 168.00
3.04 PRUEBA HIDRAULICA Y DESINFECCION
03.04.03 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1"
TOTAL TUBERIA NTP 399.002 DE 33mm C-10 ( 1") 1.00 168.00

HOJA DE METRADOS DE LINEA DE CONDUCCION 08

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

03 LINEA DE CONDUCCION
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL LINEA DE CONDUCCION 1.00 125.00
03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL LINEA DE CONDUCCION 1.00 125.00
03.01.03 DESBROCE
TOTAL LINEA DE CONDUCCION 1.00 125.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (<=2")
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 87.50
03.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A=0.50m H=0.70m (< 2'')
TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 37.50
03.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 87.50

03.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M


TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 37.50
03.02.05 CAMA DE APOYO P/TUB. H= 0.10 M (HASTA 2")
TOTAL LINEA DE CONDUCCCION 1.00 125.00
03.02.06 RELLENO CON MATERIAL PROPIO SELECCIONADO A=0.5, H=0.70
TOTAL LINEA DE CONDUCCION 1.00 125.00
03.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.03.03 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 33 mm ( 1")
TOTAL TUBERIA NTP 399.002 DE 33mm C-10 ( 1") 1.00 125.00
3.04 PRUEBA HIDRAULICA Y DESINFECCION
03.04.03 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1"
TOTAL TUBERIA NTP 399.002 DE 33mm C-10 ( 1") 1.00 125.00

HOJA DE METRADOS DE LINEA DE CONDUCCION 09

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

03 LINEA DE CONDUCCION
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL LINEA DE CONDUCCION 1.00 335.00
03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL LINEA DE CONDUCCION 1.00 335.00
03.01.03 DESBROCE
TOTAL LINEA DE CONDUCCION 1.00 335.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (<=2")
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 234.50
03.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A=0.50m H=0.70m (< 2'')
TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 100.50
03.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 234.50

03.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M


TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 100.50
03.02.05 CAMA DE APOYO P/TUB. H= 0.10 M (HASTA 2")
TOTAL LINEA DE CONDUCCCION 1.00 335.00
03.02.06 RELLENO CON MATERIAL PROPIO SELECCIONADO A=0.5, H=0.70
TOTAL LINEA DE CONDUCCION 1.00 335.00
03.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA NTP 399.002 DE 26.5mm C-10 (3/4") 1.00 335.00
03.03.05 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE CONDUCCION CHALLCHA 1.00
CODO SP NTP 399.002 DE 26.5 mm(3/4") x 45 3.00
03.03.06 COLOCACION DE ACCESORIOS PVC EN LINEA DE CONDUCCION
TOTAL DE ACCESORIOS 1.00 3.00
3.04 PRUEBA HIDRAULICA Y DESINFECCION
03.04.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA NTP 399.002 DE 26.5mm C-10 (3/4") 1.00 335.00

HOJA DE METRADOS DE LINEA DE CONDUCCION 09

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

03 LINEA DE CONDUCCION
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL LINEA DE CONDUCCION 1.00 252.00
03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL LINEA DE CONDUCCION 1.00 252.00
03.01.03 DESBROCE
TOTAL LINEA DE CONDUCCION 1.00 252.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (<=2")
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 176.40
03.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A=0.50m H=0.70m (< 2'')
TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 75.60
03.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL LINEA DE CONDUC. TERRENO COMPACTO 1.00 176.40

03.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M


TOTAL LINEA DE CONDUC. ROCA SUELTA 1.00 75.60
03.02.05 CAMA DE APOYO P/TUB. H= 0.10 M (HASTA 2")
TOTAL LINEA DE CONDUCCCION 1.00 252.00
03.02.06 RELLENO CON MATERIAL PROPIO SELECCIONADO A=0.5, H=0.70
TOTAL LINEA DE CONDUCCION 1.00 252.00
03.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
0.00 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA NTP 399.002 DE 26.5mm C-10 (3/4") 1.00 252.00
03.03.05 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE CONDUCCION CHALLCHA 1.00
CODO SP NTP 399.002 DE 26.5 mm(3/4") x 45 4.00
03.03.06 COLOCACION DE ACCESORIOS PVC EN LINEA DE CONDUCCION
TOTAL DE ACCESORIOS 1.00 4.00
3.04 PRUEBA HIDRAULICA Y DESINFECCION
03.04.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA NTP 399.002 DE 26.5mm C-10 (3/4") 1.00 252.00
ORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

5,236.00
5,236.00
5,236.00

3,665.20
1,570.80
3,665.20
1,570.80
5,236.00
5,236.00

401.00
335.00
3,835.00
413.00
5.00
44.00

401.00
587.00
3,835.00
413.00
ORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

ML

1,153.00 ml
1,153.00
1,153.00 ml
1,153.00
1,153.00 ml
1,153.00

807.10 ml
807.10
345.90 ml
345.90
807.10 ml
807.10

345.90 ml
345.90
1,153.00 ml
1,153.00
1,153.00 ml
1,153.00 ml

1,047.00 ml
1,047.00
106.00 ml
106.00
1.00 glb

11.00 und
11.00

1,047.00 ml
1,047.00
106.00 ml
106.00

ORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

ML

46.00 ml
46.00
46.00 ml
46.00
46.00 ml
46.00

32.20 ml
32.20
13.80 ml
13.80
32.20 ml
32.20
13.80 ml
13.80
46.00 ml
46.00
46.00 ml
46.00 ml

46.00 ml
46.00
46.00 ml
46.00

ORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

ML

56.00 ml
56.00
56.00 ml
56.00
56.00 ml
56.00

39.20 ml
39.20
16.80 ml
16.80
39.20 ml
39.20

16.80 ml
16.80
56.00 ml
56.00
56.00 ml
56.00 ml

56.00 ml
56.00

56.00 ml
56.00

ORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

ML

2,850.00 ml
2,850.00
2,850.00 ml
2,850.00
2,850.00 ml
2,850.00

1,995.00 ml
1,995.00
855.00 ml
855.00
1,995.00 ml
1,995.00

855.00 ml
855.00
2,850.00 ml
2,850.00
2,850.00 ml
2,850.00 ml

401.00 ml
401.00
2,449.00 ml
2,449.00
1.00 glb

25.00 und
25.00

401.00 ml
401.00
2,449.00 ml
2,449.00

ORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

ML

98.00 ml
98.00
98.00 ml
98.00
98.00 ml
98.00

68.60 ml
68.60
29.40 ml
29.40
68.60 ml
68.60

29.40 ml
29.40
98.00 ml
98.00
98.00 ml
98.00 ml

98.00 ml
98.00
1.00 glb

1.00 und
1.00

98.00 ml
98.00

ORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

ML

153.00 ml
153.00
153.00 ml
153.00
153.00 ml
153.00

107.10 ml
107.10
45.90 ml
45.90
107.10 ml
107.10

45.90 ml
45.90
153.00 ml
153.00
153.00 ml
153.00 ml
153.00 ml
153.00

153.00 ml
153.00

ORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

ML

168.00 ml
168.00
168.00 ml
168.00
168.00 ml
168.00

117.60 ml
117.60
50.40 ml
50.40
117.60 ml
117.60

50.40 ml
50.40
168.00 ml
168.00
168.00 ml
168.00 ml

168.00 ml
168.00

168.00 ml
168.00

ORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

ML

125.00 ml
125.00
125.00 ml
125.00
125.00 ml
125.00

87.50 ml
87.50
37.50 ml
37.50
87.50 ml
87.50

37.50 ml
37.50
125.00 ml
125.00
125.00 ml
125.00 ml

125.00 ml
125.00
125.00 ml
125.00

ORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

ML

335.00 ml
335.00
335.00 ml
335.00
335.00 ml
335.00

234.50 ml
234.50
100.50 ml
100.50
234.50 ml
234.50

100.50 ml
100.50
335.00 ml
335.00
335.00 ml
335.00 ml

335.00 ml
335.00
1.00 glb

3.00 und
3.00

335.00 ml
335.00

ORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

ML

252.00 ml
252.00
252.00 ml
252.00
252.00 ml
252.00

176.40 ml
176.40
75.60 ml
75.60
176.40 ml
176.40

75.60 ml
75.60
252.00 ml
252.00
252.00 ml
252.00 ml

252.00 ml
252.00
1.00 glb

4.00 und
4.00

252.00 ml
252.00
HOJA RESUMEN DE METRADOS DE CAMARA DISTRIBUIDORA DE CAUDALES

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR
Provincia : ESPINAR

04 CAMARA DISTRIBUIDORA DE CAUDALES


4.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL M2
04.01.02 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE M2
4.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE) M3
04.02.02 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (< 2'') ML
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS. M3
4.03 OBRAS DE CONCRETO SIMPLE
04.03.01 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON M3
4.04 OBRAS DE CONCRETO ARMADO
04.04.01 CONCRETO f 'c=210 kg/cm2 PARA OBRAS DE ARTE CON HORMIGON M3
04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE) M2
04.04.03 ACERO CORRUGADO = 1/4", FY= 4,200 KG/CM2 GRADO 60 KG
04.04.04 ACERO CORRUGADO = 3/8", FY= 4,200 KG/CM2 GRADO 60 KG
4.05 REVESTIMIENTOS
04.05.01 TARRAJEO CON IMPERMEABILIZANTES M2
04.05.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA M2
4.06 VALVULAS, ACCESORIOS Y TUBERIA
04.06.01 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CDC-01, 02 y 03 ENT=1", SAL1=1" Y SAL2=1" UND
04.06.02 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CDC-04 ENT=1", SAL1=1", SAL2=1" Y SAL3=1" UND
04.06.03 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CDC-05 ENT=3/4", SAL1=3/4" Y SAL2=3/4" UND
4.07 TAPAS SANITARIAS
04.07.01 TAPA SANITARIA METALICA 0.60 x 0.60 mts, UND
4.08 LIMPIEZA Y DESINFECCION
04.08.01 LIMPIEZA Y DESINFECCION CDC UND
4.09 PINTURA
04.09.01 PINTURA CON LATEX EN MUROS EXTERIORES M2
04.09.02 PINTURA ANTICORROSIVA PARA TAPAS M2
HOJA DE METRADOS DE CAMARA DISTRIBUIDORA DE CAUDALES: 01, 02, 03 y 05

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

04 CAMARA DISTRIBUIDORA DE CAUDALES 1.00 UNID


4.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL
BASE CAMARA HUMEDA 1.00 1.80 1.80
DADO DE CONCRETO 1.00 0.30 0.30
04.01.02 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
BASE CAMARA HUMEDA 1.00 1.80 1.80
DADO DE CONCRETO 1.00 0.30 0.30
4.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
BASE CAMARA HUMEDA 1.00 1.80 1.80 0.80
DADO DE CONCRETO 1.00 0.30 0.30 0.30
04.02.02 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (< 2'')
ZANJAS PARA TUBERIA 2.00 2.50
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
1.30 2.62
4.03 OBRAS DE CONCRETO SIMPLE
04.03.01 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO DE CONCRETO 1.00 0.30 0.30
4.04 OBRAS DE CONCRETO ARMADO
04.04.01 CONCRETO f 'c=210 kg/cm2 PARA OBRAS DE ARTE CON HORMIGON
BASE CAMARA HUMEDA 1.00 1.80 1.80 0.15
MUROS EXTERIORES 4.00 1.45 0.15 1.00
MURO DIVICION 01 1.00 1.30 0.10 0.55
MURO DIVICION 02 1.00 0.60 0.10 0.55
LOSA DE TECHO 1 1.00 1.80 1.80 0.08
PESTAA PARA TAPA 3.00 0.70 0.10 0.08
04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MUROS EXTERIORES 4.00 1.60 1.00
MUROS INTERIORES 4.00 1.30 1.00
MURO DIVICION 01 2.00 1.30 0.55
MURO DIVICION 02 2.00 0.60 0.55
LOSA DE TECHO 1.00 1.80 1.80
LOSA DE TECHO -1.00 0.60 0.60
04.04.03 ACERO CORRUGADO = 1/4", FY= 4,200 KG/CM2 GRADO 60
DE PLANILLA DE ARMADURA 1.00 63.97
04.04.04 ACERO CORRUGADO = 3/8", FY= 4,200 KG/CM2 GRADO 60
1.00 4.14
4.05 REVESTIMIENTOS
04.05.01 TARRAJEO CON IMPERMEABILIZANTES
MUROS INTERIORES 4.00 1.30 1.00
MURO DIVICION 01 2.00 1.30 0.55
1.00 1.30 0.10
MURO DIVICION 02 2.00 0.60 0.55
1.00 0.60 0.10
PISO 1.00 1.30 1.30
04.05.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA
MUROS EXTERIORES 4.00 1.60 1.00
LOSA DE TECHO 1.00 1.80 1.80
LOSA DE TECHO -1.00 0.60 0.60
BORDE LOSA DE TECHO 4.00 1.80 0.08
PESTAAS 8.00 1.55 0.10
4.06 VALVULAS, ACCESORIOS Y TUBERIA
04.06.01 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CDC-01, 02 y 03 ENT=1", SAL1=1" Y SAL2=1"
CANASTILLA NTP 399.019 60 mm X 33 mm (2"X1") 2.00
TUBERIA NTP 399.002 60.2 mm (1") 3.50
TUBERIA NTP 399.002 60.2 mm (2") 6.00
REDUCCION SP NTP 399.019 DE 114 mm (4") X 60 mm (4" a 2") 3.00
CODO SP NTP 399.019 X 45 60.3 mm (2") 4.00
TEE SP NTP 399.019 60.3 mm (2") 2.00
ADAPTADOR UPR NTP 399.019 33 mm (1") 1.00
UNION SP NTP399.019 33 mm (1") 2.00
CODO SP NTP 399.019 X 90 33.2 mm (1") 3.00
UNION SP NTP399.019 60.3 mm (2") 3.00
TUBERIA DE VENTILACION DE F G DE 2" 1.00
04.06.03 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CDC-05 ENT=3/4", SAL1=3/4" Y SAL2=3/4"
CODO SP NTP 399.019 X 90 26.7 mm (3/4") 3.00
TUBERIA NTP 399.002 60.2 mm (2") 6.00
TUBERIA NTP 399.002 DE 26.5 mm (3/4") 3.50
ADAPTADOR UPR NTP 399.019 DE 36.7 mm (3/4") 1.00
REDUCCION SP NTP399.019 114 mm (4") X 60 mm (2") 3.00
CODO SP NTP 399.019 X 45 60.3 mm (2") 4.00
TEE SP NTP 399.019 60.3 mm (2") 2.00
UNION SP NTP399.019 60.3 mm (2") 3.00
CANASTILLA NTP 399.019 48 mm X 26.5 mm (1 1/2"X3/4") 2.00
UNION SP NTP399.019 26.7 mm (3/4") 2.00
TUBERIA DE VENTILACION DE F G DE 2" 1.00
4.07 TAPAS SANITARIAS
04.07.01 TAPA SANITARIA METALICA 0.60 x 0.60 mts,
TAPA SANITARIA METALICA 0.60 x 0.60 mts 1.00
4.08 LIMPIEZA Y DESINFECCION
04.08.01 LIMPIEZA Y DESINFECCION CDC
LIMPIEZA Y DESINFECCION EN CDC 1.00 1.00
4.09 PINTURA
04.09.01 PINTURA CON LATEX EN MUROS EXTERIORES
MUROS EXTERIORES 4.00 1.60 1.00
LOSA DE TECHO 1.00 1.80 1.80
LOSA DE TECHO -1.00 0.60 0.60
BORDE LOSA DE TECHO 4.00 1.80 0.08
PESTAAS 8.00 1.55 0.10
04.09.02 PINTURA ANTICORROSIVA PARA TAPAS
TAPA SANITARIA METALICA DE 0.60 x 0.60 mts 2.00 0.60 0.60
TAPA SANITARIA METALICA DE 0.40 x 0.40 mts 2.00 0.40 0.40

HOJA DE METRADOS DE CAMARA DISTRIBUIDORA DE CAUDALES 04

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

04 CAMARA DISTRIBUIDORA DE CAUDALES 1.00 UNID


4.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL
BASE CAMARA HUMEDA 1.00 1.80 2.50
DADO DE CONCRETO 1.00 0.30 0.30
04.01.02 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
BASE CAMARA HUMEDA 1.00 1.80 2.50
DADO DE CONCRETO 1.00 0.30 0.30
4.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
BASE CAMARA HUMEDA 1.00 1.80 2.50 0.80
DADO DE CONCRETO 1.00 0.30 0.30 0.30
04.02.02 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (< 2'')
ZANJAS PARA TUBERIA 3.00 2.50
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
1.30 3.63
4.03 OBRAS DE CONCRETO SIMPLE
04.03.01 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO DE CONCRETO 1.00 0.30 0.30
4.04 OBRAS DE CONCRETO ARMADO
04.04.01 CONCRETO f 'c=210 kg/cm2 PARA OBRAS DE ARTE CON HORMIGON
BASE CAMARA HUMEDA 1.00 1.80 2.50 0.15
MUROS EXTERIORES 2.00 1.60 0.15 1.00
MUROS EXTERIORES 2.00 2.30 0.15 1.00
MURO DIVICION 01 1.00 2.00 0.10 0.55
MURO DIVICION 02 2.00 0.60 0.10 0.55
LOSA DE TECHO 1 1.00 1.80 2.50 0.08
PESTAA PARA TAPA 4.00 0.70 0.10 0.08
04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MUROS EXTERIORES 2.00 1.60 1.00
MUROS EXTERIORES 2.00 2.30 1.00
MUROS INTERIORES 2.00 1.30 1.00
MUROS INTERIORES 2.00 2.00 1.00
MURO DIVICION 01 2.00 2.00 0.55
MURO DIVICION 02 4.00 0.60 0.55
LOSA DE TECHO 1.00 1.80 2.50
LOSA DE TECHO -1.00 0.60 0.60
04.04.03 ACERO CORRUGADO = 1/4", FY= 4,200 KG/CM2 GRADO 60
DE PLANILLA DE ARMADURA 1.00 90.74
04.04.04 ACERO CORRUGADO = 3/8", FY= 4,200 KG/CM2 GRADO 60
1.00 4.90
4.05 REVESTIMIENTOS
04.05.01 TARRAJEO CON IMPERMEABILIZANTES
MUROS INTERIORES 2.00 1.30 1.00
MUROS INTERIORES 2.00 2.00 1.00
MURO DIVICION 01 2.00 2.00 0.55
1.00 2.00 0.10
MURO DIVICION 02 4.00 0.60 0.55
2.00 0.60 0.10
PISO 1.00 1.30 2.00
04.05.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA
MUROS EXTERIORES 2.00 1.60 1.00
MUROS EXTERIORES 2.00 2.30 1.00
LOSA DE TECHO 1.00 1.80 2.50
LOSA DE TECHO -1.00 0.60 0.60
BORDE LOSA DE TECHO 2.00 1.80 0.08
BORDE LOSA DE TECHO 2.00 2.50 0.08
PESTAAS 4.00 1.80 0.10
PESTAAS 4.00 2.30 0.10
4.06 VALVULAS, ACCESORIOS Y TUBERIA
04.06.02 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CDC-04 ENT=1", SAL1=1", SAL2=1" Y SAL3=1"
CANASTILLA NTP 399.019 DE 60 mm X 33 mm (2"X1") 3.00
TUBERIA NTP 399.002 DE 60.2 mm (1") 3.50
TUBERIA NTP 399.002 60.2 mm (2") 7.00
REDUCCION SP NTP399.019 DE 114 mm (4") X 60 mm (2") 4.00
CODO SP NTP 399.019 X 45 60.3 mm (2") 4.00
CODO SP NTP 399.019 X 90 DE 33.2 mm (1") 3.00
TEE SP NTP 399.019 DE 60.3 mm (2") 3.00
ADAPTADOR UPR NTP 399.019 DE 33.2 mm (1") 1.00
UNION SP NTP399.019 33 mm (1") 3.00
UNION SP NTP399.019 DE 60.3 mm (2") 4.00
TUBERIA DE VENTILACION DE F G DE 2" 1.00
4.07 TAPAS SANITARIAS
04.07.01 TAPA SANITARIA METALICA 0.60 x 0.60 mts,
TAPA SANITARIA METALICA 0.60 x 0.60 mts 2.00
4.08 LIMPIEZA Y DESINFECCION
04.08.01 LIMPIEZA Y DESINFECCION CDC
LIMPIEZA Y DESINFECCION EN CDC 1.00 1.00
4.09 PINTURA
04.09.01 PINTURA CON LATEX EN MUROS EXTERIORES
MUROS EXTERIORES 2.00 1.60 1.00
MUROS EXTERIORES 2.00 2.30 1.00
LOSA DE TECHO 1.00 1.80 2.50
LOSA DE TECHO -1.00 0.60 0.60
BORDE LOSA DE TECHO 2.00 1.80 0.08
BORDE LOSA DE TECHO 2.00 2.50 0.08
PESTAAS 4.00 1.80 0.10
PESTAAS 4.00 2.30 0.10
04.09.02 PINTURA ANTICORROSIVA PARA TAPAS
TAPA SANITARIA METALICA DE 0.60 x 0.60 mts 2.00 0.60 0.60
TAPA SANITARIA METALICA DE 0.40 x 0.40 mts 2.00 0.40 0.40
RO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

7.92
7.92

6.25
12.50
8.12

0.18

4.10
38.63
154.71
9.04

19.61
25.36

3.00
1.00
1.00

3.00

2.00

23.32
2.08
5

RO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

3.33 m2
3.24
0.09
3.33 m2
3.24
0.09

2.62 m3
2.59
0.03
5.00 ml
5.00
3.40 m3
3.40

0.09 m3
0.09

1.72 m3
0.49
0.87
0.07
0.03
0.24
0.02
16.57 m2
6.40
5.20
1.43
0.66
3.24
-0.36
63.97 kg
63.97
4.14 kg
4.14

9.17 m2
5.20
1.43
0.13
0.66
0.06
1.69
11.10 m2
6.40
3.24
-0.36
0.58
1.24

3.00 3.00 und


2.00 6.00 und
3.50 10.50 ml
6.00 18.00 ml
3.00 9.00 und
4.00 12.00 und
2.00 6.00 und
1.00 3.00 und
2.00 6.00 und
3.00 9.00 und
3.00 9.00 und
1.00 3.00 und
1.00 1.00 und
3.00 und
6.00 ml
3.50 ml
1.00 und
3.00 und
4.00 und
2.00 und
3.00 und
2.00 und
2.00 und
1.00 und

1.00 und
1.00

1.00 und
1.00

11.10 m2
6.40
3.24
-0.36
0.58
1.24
1.04 m2
0.72
0.32

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

4.59 m2
4.50
0.09
4.59 m2
4.50
0.09

3.63 m3
3.60
0.03
7.50 ml
7.50
4.72 m3
4.72

0.09 m3
0.09

2.38 m3
0.68
0.48
0.69
0.11
0.07
0.34
0.02
22.06 m2
3.20
4.60
2.60
4.00
2.20
1.32
4.50
-0.36
90.74 kg
90.74
4.90 kg
4.90

10.44 m2
2.60
4.00
2.20
0.20
1.32
0.12
2.60
14.27 m2
3.20
4.60
4.50
-0.36
0.29
0.40
0.72
0.92

1.00 1.00 und


3.00 3.00 und
3.50 3.50 und
7.00 7.00 und
4.00 4.00 und
4.00 4.00 und
3.00 3.00 und
3.00 3.00 und
1.00 1.00 und
3.00 3.00 und
4.00 4.00 und
1.00 1.00 und

2.00 und
2.00

1.00 und
1.00

12.23 m2
3.20
4.60
4.50
-0.36
0.29
0.40
0.72
0.92
1.04 m2
0.72
0.32
PLANILLA DE ARMADURA DE CAMARA DISTRIBUIDORA DE CAUDALES

ARMADURA LOSA DE TECHO LONGITUD VECES LONG. POR EN ML


1/4"
0.88
0.05 0.05 1/4 0.98 13.00 12.74

0.56
0.05 0.10 1/4 0.71 26.00 18.46

1.76
0.05 0.05 1/4 1.86 8.00 14.88

1.81
0.05 0.05 1/4 1.91 8.00 15.28

1.81 3/8 1.81 2.00

1.76 3/8 1.76 2.00

0.10 0.18 0.05 1/4 0.33 13.00 4.29

0.10
0.70 0.10
1/4 3.00 1.00 3.00
0.70
0.70

0.70

LONGITUD VECES
ARMADURA DE MURO Y LOSA DE FONDO
1/4"

1.10

0.20 0.15 1/4 1.45 35.00 50.75

0.20 1.10
1/4 1.45 12.00 17.40
0.15

0.58 1/4 0.73 16.00 11.68


0.15

0.10

1.55 0.10
1/4 6.30 9.00 56.70
1.50
1.50
1.50
1.50

1.55

1.40 1/4 1.40 5.00 7.00

0.70 1/4 0.70 5.00 3.50

1.65 1/4 1.65 12.00 19.80

1.70 1/4 1.70 12.00 20.40

PESO POR / ML. 0.25

LONG. TOTAL POR 255.88


RESUMEN GENERAL
PESO TOTAL POR 63.97
PESO TOTAL 68.11 Kg

PLANILLA DE ARMADURA DE CAMARA DISTRIBUIDORA DE CAUDALES


ARMADURA LOSA DE TECHO LONGITUD VECES
1/4"
0.88
0.05 0.05 1/4 0.98 17.00 16.66

1.76
0.05 0.05 1/4 1.86 12.00 22.32

2.46
0.05 0.05 1/4 2.56 7.00 17.92

0.88
1.00 0.05 1/4 1.93 26.00 50.18

2.46 3/8 2.46 2.00

1.76 3/8 1.76 2.00

0.10 0.18 0.05 1/4 0.33 17.00 5.61

0.10
0.70 0.10
1/4 3.00 1.00 3.00
0.70
0.70

0.70

LONGITUD VECES
ARMADURA DE MURO Y LOSA DE FONDO
1/4"

1.10

0.20 0.15 1/4 1.45 41.00 59.45


0.20 1.10
1/4 1.45 17.00 24.65
0.15

0.58 1/4 0.73 29.00 21.17


0.15

0.10

2.20 0.10
1/4 7.60 9.00 68.40
1.50
1.50

2.20

2.30 1/4 2.30 5.00 11.50

0.75 1/4 0.75 10.00 7.50

1.65 1/4 1.65 16.00 26.40

2.35 1/4 2.35 12.00 28.20

PESO POR / ML. 0.25

LONG. TOTAL POR 362.96


RESUMEN GENERAL
PESO TOTAL POR 90.74
PESO TOTAL 95.64 Kg
RA DE CAUDALES

LONG. POR EN ML.


3/8" 1/2" 5/8"

3.62

3.52

LONG. POR EN ML.


3/8" 1/2" 5/8"
0.58 1.02 1.55
7.14 0.00 0.00
4.14 0.00 0.00

68.11 Kg

RA DE CAUDALES
LONG. POR EN ML.
3/8" 1/2" 5/8"

4.92

3.52

LONG. POR EN ML.


3/8" 1/2" 5/8"
0.58 1.02 1.55
8.44 0.00 0.00
4.90 0.00 0.00

95.64 Kg
ARMADO CAMARA ROMPE PRESION TIPO VI

ARMADURA LOSA DE TECHO LONGITUD VECES


1/4"

0.75

1.03 1.03 1/4 2.87 20.00 57.40

0.03 0.03

0.10
0.75 0.10
1/4 3.20 8.00 25.60
0.75
0.75

0.75

PESO POR / ML. 0.25

LONG. TOTAL POR 83.00


RESUMEN GENERAL
PESO TOTAL POR 20.75
PESO TOTAL 20.75 Kg
LONG. POR EN ML.
3/8" 1/2" 5/8"

0.58 1.02 1.55


0.00 0.00 0.00
0.00 0.00 0.00
20.75 Kg
HOJA RESUMEN DE METRADOS DE RESERVORIOS

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESP

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION
07 RESERVORIOS

07.01 RESERVORIO APOYADO: 04 UND DE 1.0 M3.


07.01.01 TRABAJOS PRELIMINARES
07.01.01.01 LIMPIEZA DE TERRENO MANUAL M2
07.01.01.02 TRAZO NIVELES Y REPLANTEO M2
07.01.02 MOVIMIENTO DE TIERRAS
07.01.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE) M3
07.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS. M3
07.01.03 OBRAS DE CONCRETO SIMPLE
07.01.03.01 EMPEDRADO PARA SOLADOS h=20 cm. CON P.G. 8" M3
07.01.03.02 SOLADOS CONCRETO f'c=100 kg/cm2 h=2", SOBRE EMPEDRADO M2
07.01.03.03 CONCRETO f'c=140 kg/cm2 PARA ANCLAJES Y/O DADOS CON HORMIGON M3
07.01.04 OBRAS DE CONCRETO ARMADO
07.01.04.01 CONCRETO f 'c=210 kg/cm2 PARA OBRAS DE ARTE CON HORMIGON M3
07.01.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE) M2
07.01.04.03 ACERO CORRUGADO = 3/8", FY= 4,200 KG/CM2 GRADO 60 KG
07.01.05 REVESTIMIENTOS
07.01.05.01 TARRAJEO CON IMPERMEABILIZANTES M2
07.01.05.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA M2
07.01.06 SUMINISTRO E INSTALACION DE ACCESORIOS PARA RESERVORIO
07.01.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIOS: 01, 04, 05, 06, 07, 09, 11, 12, 14, 15, 16; VOL=0.5 m3 UND
07.01.06.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIOS: 03, 04, 05, 08; VOL=1.0 m3 UND
07.01.06.03 SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIO: 08; VOL=1.5 m3 UND
07.01.07 TAPAS SANITARIAS
07.01.07.01 TAPA SANITARIA METALICA 0.60 x 0.60 mts, UND
07.01.08 LIMPIEZA Y DESINFECCION
07.01.08.01 LIMPIEZA Y DESINFECCION EN RESERVORIO UND
07.01.09 PINTURA
07.01.09.01 PINTURA CON LATEX EN MUROS EXTERIORES M2
07.01.09.02 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS M2
07.01.10 PROTECCION DE RESERVORIO
07.01.10.01 TRAZO Y REPLANTEO (PROTECCION) M2
07.01.10.02 EXCAVACION MASIVA EN TERRENO COMPACTADO (PROTECCION) M3
07.01.10.03 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS. M3
07.01.10.04 CONCRETO F'C= 140 KG/CM2 + 40%P.G. EN CIMIENTOS (PROTECCION) CON HORMIGON M3
07.01.10.05 POSTES DE CONCRETO PARA CERCO DE PROTECCION und
07.01.10.06 ALAMBRE DE PUAS m
07.01.10.07 PUERTA: BASTIDOR DE MADERA CON ALAMBRE DE PUAS UND
HOJA DE METRADOS DE RESERVORIOS: 03, 04, 05, 08; DE 1.00 M3

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESP

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

07.01 RESERVORIO APOYADO 4.00 unid


07.01.01 TRABAJOS PRELIMINARES
07.01.01.01 LIMPIEZA DE TERRENO MANUAL
1.00 1.60 1.60
07.01.01.02 TRAZO NIVELES Y REPLANTEO
1.00 1.60 1.60
07.01.02 MOVIMIENTO DE TIERRAS
07.01.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
1.00 1.60 1.60 1.20
07.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
1.30 1.60 1.60 1.20
07.01.03 OBRAS DE CONCRETO SIMPLE
07.01.03.01 EMPEDRADO PARA SOLADOS h=20 cm. CON P.G. 8"
1.00 1.60 1.60 0.20
07.01.03.02 SOLADOS CONCRETO f'c=100 kg/cm2 h=2", SOBRE EMPEDRADO
1.00 1.70 1.70
07.01.03.03 CONCRETO f'c=140 kg/cm2 PARA ANCLAJES Y/O DADOS CON HORMIGON
1.00 0.40 0.40 0.40
07.01.04 OBRAS DE CONCRETO ARMADO
07.01.04.01 CONCRETO f 'c=210 kg/cm2 PARA OBRAS DE ARTE CON HORMIGON
MUROS 2.00 1.30 0.15 0.95
2.00 1.60 0.15 0.95
TECHO 1.00 1.60 1.60 0.10
-1.00 0.60 0.60 0.10
FONDO 1.00 1.70 1.70 0.15

TAPA 1.00 2.40 0.05 0.05


07.01.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MUROS INTERIORES 4.00 1.30 0.95
MUROS EXTERIORES 4.00 1.60 0.10
TECHO 1.00 1.30 1.30
-1.00 0.60 0.60
4.00 1.60 0.10
FONDO 4.00 1.70 0.15

07.01.04.03 ACERO CORRUGADO = 3/8", FY= 4,200 KG/CM2 GRADO 60


78.71
07.01.05 REVESTIMIENTOS
07.01.05.01 TARRAJEO CON IMPERMEABILIZANTES
MUROS INTERIORES 4.00 1.30 0.95
TECHO 1.00 1.30 1.30
-1.00 0.60 0.60
FONDO 1.00 1.30 1.30
07.01.05.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA
MUROS EXTERIORES 4.00 1.60 1.05
07.01.06 SUMINISTRO E INSTALACION DE ACCESORIOS PARA RESERVORIO
07.01.06.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIOS: 03, 04, 05, 08; VOL=1.0 m3
TUBERIA DE VENTILACION DE FG DE 2" 1.00
HIPOCLORADOR DE 4" 1.00
07.01.07 TAPAS SANITARIAS
07.01.07.01 TAPA SANITARIA METALICA 0.60 x 0.60 mts,
1.00
07.01.08 LIMPIEZA Y DESINFECCION
07.01.08.01 LIMPIEZA Y DESINFECCION EN RESERVORIO
1.00
07.01.09 PINTURA
07.01.09.01 PINTURA CON LATEX EN MUROS EXTERIORES
MUROS EXTERIORES 4.00 1.60 1.05
TECHO 1.00 1.60 1.60
-1.00 0.60 0.60
07.01.09.02 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
1.00 0.60 0.60
07.01.10 PROTECCION DE RESERVORIO
07.01.10.01 TRAZO Y REPLANTEO (PROTECCION)
1.00 6.40 4.85
07.01.10.02 EXCAVACION MASIVA EN TERRENO COMPACTADO (PROTECCION)
9.00 0.40 0.40 0.70
07.01.10.03 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
1.30 4.03
07.01.10.04 CONCRETO F'C= 140 KG/CM2 + 40%P.G. EN CIMIENTOS (PROTECCION) CON HORMIGON
9.00 0.40 0.40 0.80
07.01.10.05 POSTES DE CONCRETO PARA CERCO DE PROTECCION
9.00 1.00
07.01.10.06 ALAMBRE DE PUAS
8.00 20.90
07.01.10.07 PUERTA: BASTIDOR DE MADERA CON ALAMBRE DE PUAS
1.00 1.00
E OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

TOTAL

10.24
10.24

12.29
15.97

2.05
11.56
0.26

5.94
34.28
314.84

31.84
26.88

0.00
4.00
0.00

4.00

4.00

35.68
1.44

124.16
4.03
5.24
4.61
36.00
668.80
4.00
E OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

10.24 m2
2.56
10.24 m2
2.56

12.29 m3
3.07
15.97 m3
3.99

2.05 m3
0.51
11.56 m2
2.89
0.26 m3
0.06

5.94 m3
0.37
0.46
0.26
-0.04
0.43

0.01
34.28 m2
4.94
0.64
1.69
-0.36
0.64
1.02

314.84 kg
78.71

31.84 m2
4.94
1.69
-0.36
1.69
26.88 m2
6.72

4.00 und
1.00
1.00

4.00 und
1.00

4.00 und
1.00

35.68 m2
6.72
2.56
-0.36
1.44 m2
0.36

124.16 m2
31.04
4.03 m3
1.01
5.24 m3
5.24
4.61 m3
1.15
36.00 und
9.00
668.80 ml
167.20
4.00 und
1.00
RESERVORIO DE 1.0 M3

LONGITUD VECES LONG. POR EN ML.


ARMADURA DE MURO Y LOSA DE FONDO
1/4" 3/8" 1/2" 5/8"
0.05

1.08 3/8 1.43 7.00 10.01

0.30

0.10

1.08 3/8 1.48 25.00 37.00

0.30

1.60 3/8 1.60 18.00 28.80

1.50 3/8 1.50 8.00 12.00

0.75 3/8 0.75 6.00 4.50

0.10

1.50 0.10

3/8 6.20 7.00 43.40


1.50
1.50

1.50

PESO POR / ML. 0.25 0.58 1.02 1.55

LONG. TOTAL POR 0.00 135.71 0.00 0.00


RESUMEN GENERAL
PESO TOTAL POR 0.00 78.71 0.00 0.00
PESO TOTAL 78.71 Kg
MUNICIPALIDAD DISTRITAL DE OCORURO
HOJA DE METRADOS

ITEM DESCRIPCION VECES LONGITUD ANCHO ALTURA

07 RESERVORIO DE 5 m3 -
07.01
07.01.01 LIMPIEZA DE TERRENO MANUAL 1.00 4.00 4.00
07.01.02 TRAZO Y REPLANTEO 1.00 4.00 4.00
07.02 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION MANUAL
Explanacion 1.00 4.00 4.00 0.50
Cimentacion 1.00 3.00 3.00 0.20
07.02.02 REFINE Y NIVELACION Y COMPACTADO 1.00 4.00 4.00
07.02.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE 1.25 9.80
07.03 CONCCRETO SIMPLE
07.03.01 SOLADO E = 3" MEZCLA 1:12 CEMENTO-HORMIGON 1.00 3.00 3.00
07.04 OBRAS DE CONCRETO ARMADO
07.04.01 ENCOFRADO Y DESENCOFRADO
Cimentacion 1.00 12.00 0.20
Interior muros 4.00 2.30 1.35
Exterior muros 4.00 2.60 1.35
Losa 1.00 2.30 2.30
4.00 2.40 0.10
4.00 2.40 0.15
(-) Tapa -1.00 0.60 0.60
1.00 2.40 0.15
07.04.02 CONCRETO Fc = 210 Kg/cm2
Cimentacion 1.00 3.00 3.00 0.20
Muros 1.00 9.80 0.15 1.35
Losa 1.00 2.80 2.90 0.15
(-) Tapa -1.00 0.60 0.60 0.15
07.04.03 ACERO Fy = 4200 Kg/cm2 1.00 313.31
07.05 REVOQUES, ENLUCIDOS Y MOLDURAS
07.05.01 TARRAJEO EXTERIOR
Exterior muros 4.00 2.60 1.35
Losa 1.00 2.70 2.70
4.00 2.70 0.25
07.05.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE
Muros 4.00 2.30 1.35
Piso 1.00 2.30 2.30

07.06 SUMINISTRO Y COLOCACION VALV. - ACCESORIOS


07.06.01 MARCO Y TAPA METALICOS DE INSPECCION 0.60X0.60M 1.00
07.06.02 SUMINISTRO Y COLOC. DE HIPOCLORADOR 1.00
07.06.03 TUBERIA DE VENTILACION FG 2" 4.00 2.45
07.07 PINTURA 1.00
07.07.01 PINTURA ESMALTE EN EXTERIORES
Exterior muros 4.00 2.60 1.35
Losa 1.00 2.70 2.70
07.08 CERCO PERIMETRICO
07.08.01 CERCO PERIMETRICO C/MALLA GALVANIZADA 1.00 4.00 4.00 0.25
MUNICIPALIDAD DISTRITAL DE OCORURO
HOJA DE METRADOS

ITEM DESCRIPCION VECES LONGITUD ANCHO ALTURA


SUB TOTAL TOTAL UND

16.00 16.00 m1
16.00 16.00 m2

9.80 m3
8.00
1.80
16.00 16.00 m2
12.25 12.25 m3

9.00 9.00 m2

36.55 m2
2.40
12.42
14.04
5.29
0.96
1.44
-0.36
0.36
4.95 m3
1.80
1.98
1.22
-0.05
313.31 313.31 Kg.

24.03 m2
14.04
7.29
2.70
17.71 m2
12.42
5.29

1.00 1.00 Und


1.00 1.00 Und
9.80 9.80 m
1.00 1.00 Glb
37.33 m2
14.04
7.29

16.00 16.00 ML
SUB TOTAL TOTAL UND
INFRAESTRUCTURA PARA LA ELIMINACION DE EXCRETAS DE LAS FAMILIAS
DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL
18 CASETA DE LETRINA UND

02.01 UBS DE ARRASTRE HIDRAULICO 39.00 UND


18.01.01 TRABAJOS PRELIMINARES
18.01.01.01 LIMPIEZA DE TERRENO MANUAL
1.00 2.40 1.60 3.84
18.01.01.02 TRAZO Y REPLANTEO
1.00 2.40 1.60 3.84
18.01.02 MOVIMIENTO DE TIERRAS
18.01.02.01 EXCAVACION MANUAL EN TERRENO NATURAL
PISO UBS 1.00 2.40 1.60 0.10 0.38
CIMIENTOS UBS 1 2.00 2.40 0.35 0.40 0.67
CIMIENTOS UBS 2 2.00 0.90 0.35 0.40 0.25
CIMIENTOS UBS 3 -1.00 0.80 0.35 0.40 -0.11
18.01.02.02 ELIMINACION MATERIAL EXCEDENTE d= 30 MTS
TOTAL EXCAVACION 1.25 46.64 1.00 1.00 58.31
18.01.03 OBRAS DE CONCRETO SIMPLE
18.01.03.01.01 CIMIENTOS CORRIDOS DE CONCRETO 1:10 + 30% P.G.
CIMIENTOS UBS 1 2.00 2.40 0.35 0.40 0.67
CIMIENTOS UBS 2 2.00 0.90 0.35 0.40 0.25
18.01.03.02 SOBRE CIMIENTOS
18.01.03.02.01 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS
SOBRE CIMIENTOS UBS 1 2.00 2.20 0.30 1.32
SOBRE CIMIENTOS UBS 2 2.00 1.10 0.30 0.66
18.01.03.02.02 CONCRETO FC=175 KG/CM2 EN TAPA DE POZO SEPTICO
SOBRE CIMIENTOS UBS 1 2.00 2.20 0.15 0.30 0.20
SOBRE CIMIENTOS UBS 2 2.00 1.10 0.15 0.30 0.10
18.01.04 OBRAS DE CONCRETO ARMADO
18.01.04.01 COLUMNAS
18.01.04.01.01 ACERO CORRUGADO F'Y=4200 KG/CM2 GRADO 60
VIGAS DELANTE Y POSTERIORES 1/4" 4.00 2.35 0.25 2.35
ESTRIBOS 1/4" 24.00 0.25 0.25 1.50
VIGAS LATERALES 1/4" 4.00 1.55 0.25 1.55
ESTRIBOS 1/4" 16.00 0.25 0.25 1.00
18.01.04.01.02 ENCOFRADO Y DESENCOFRADO DE VIGAS
VIGAS LATERALES 4.00 1.60 0.15 0.96
PUERTA , VENTANA Y POSTERIOR 4.00 1.90 0.15 1.14
18.01.04.01.03 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS
VIGAS LATERALES 2.00 1.60 0.15 0.15 0.07
PUERTA , VENTANA Y POSTERIOR 2.00 1.90 0.15 0.15 0.09
18.01.04.02 COBERTURAS
02.01.05.03 COBERTURAS DE CALAMINA GALVANIZADA (INC. CUMBRERA) P/ 2.40 X 0.83 N30
CALAMINA GALVANIZADA 2.40 X 0.83 N 30 1.00 2.60 2.00 5.20
18.01.04.02.01 LARGERO DE MADERA ROLLIZO
PARES DE MADERA CORRIENTE 3" X 2" 3.00 2.00 6.00
18.01.04.02.02 CORREAS DE MADERA TORNILLO 2*3*5'
CORREAS DE MADERA EUCALIPTO 3" X 2" 4.00 2.60 10.40
18.01.05 MUROS Y TABIQUES DE ALBAILERIA
18.01.05.01 MUROS DE LADRILLO KK 10X14X24
UBS MURO 1 1.00 2.20 2.25 4.95
UBS MURO 2 2.00 1.10 2.25 4.95
UBS MURO 3 1.00 2.20 1.70 3.74
MURO TRIANGULAR -2.00 1.10 0.55 -1.21
UBS 5 PUERTA -1.00 0.80 1.70 -1.36
UBS 6 VENTANA -1.00 0.90 0.40 -0.36
18.01.06 REVOQUES, ENLUCIDO Y MOLDURAS
18.01.06.01 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO - ARENA
UBS MURO 1 1.00 1.90 1.20 2.28
UBS MURO 2 2.00 1.10 1.20 2.64
UBS MURO 3 1.00 1.90 0.72 1.37
MURO TRIANGULAR -2.00 1.10 0.49 -1.08
UBS 5 PUERTA -1.00 0.80 1.90 -1.52
UBS 6 VENTANA -1.00 0.90 0.40 -0.36
18.01.06.02 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
UBS MURO 1 2.00 2.20 2.05 9.02
UBS MURO 2 2.00 1.40 2.05 5.74
UBS MURO 3 2.00 0.55 0.60 0.66
UBS MURO 4 2.00 1.90 0.60 2.28
UBS 5 PUERTA -1.00 0.80 2.05 -1.64
UBS 6 VENTANA -1.00 0.90 0.40 -0.36
18.01.06.03 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS.
VENTANA 1.00 2.60 2.60
PUERTA 1.00 4.60 4.60
18.01.07 PISOS Y PAVIMENTOS
18.01.07.01 PISO DE 4" CONCRETO F'C 140 KG/CM2 X 9 CM.+ PULIDO 1:2 X 1CM
BASE DE PIEDRA UBS
PISO UBS 1 1.00 1.90 1.10 2.09
VEREDA FRONTAL 1.00 2.60 0.70 1.82
VEREDA LATERAL 2.00 1.40 0.20 0.56
PISO DE CONCRETO SOBRE EMPEDRADO UBS
PISO UBS 1 1.00 2.10 1.00 2.10
PISO DE CONCRETO SOBRE EMPEDRADO VEREDA
VEREDA FRONTAL 1.00 2.60 0.70 1.82
VEREDA LATERAL 2.00 1.40 0.20 0.56
PISO DE CEMENTO PULIDO E=4"
PERIMETRO UBS PISO 1.00 2.10 1.00 2.10
18.01.08 PINTURA
18.01.08.01 PINTURA LATEX INTERIORES Y EXTERIORES
UBS MURO 1 2.00 2.20 2.05 9.02
UBS MURO 2 2.00 1.40 2.05 5.74
UBS MURO 3 2.00 0.55 0.60 0.66
UBS MURO 4 2.00 2.20 0.60 2.64
UBS 5 PUERTA -1.00 0.80 2.05 -1.64
UBS 6 VENTANA -1.00 0.90 0.60 -0.54
18.01.09 CARPINTERIA METALICA
18.01.09.01 PUERTA DE METALICA DE 0.75 X 2.10 M.
18.01.09.02 VENTANA METALICA DE 0.80 X 0.50 M.
18.01.10 VIDRIOS CRISTALES Y SIMILARES
02.01.10.01 VIDRIO SIMPLE. PROVISION Y COLOCACION EN VENTANAS DE FIERRO
VENTANA UBS 1.00 1.00 1.00
02.01.12 INSTALACIONES SANITARIAS
18.01.11.01 INSTALACION SANITARIAS
TUBERIA DE DESAGUE EN INTERIORES 1.00 3.50 3.50
TUBERIA DE DESAGUE DE UBS A CAJA REGISTRO 01 1.00 0.80 0.80
TUBERIA DE DESAGUE DE UBS A CAJA REGISTRO 02 1.00 0.85 0.85
TUBERIA DE DESAGUE DE CAJA REGISTRO 01 A POZO PERCOLADOR 1.00 23.00 23.00
TUBERIA DE DESAGUE DE CAJA REGISTRO 02 A BIODIGESTOR 1.00 10.00 10.00

TUBERIA DE DESAGUE EN INTERIORES 1.00 3.50 3.50


TUBERIA DE DESAGUE DE UBS A POZO 1.00 0.80 0.80
TUBERIA DE DESAGUE DE UBS A CAJA REGISTRO 02 1.00 0.85 0.85
TUBERIA DE DESAGUE DE CAJA REGISTRO 01 A POZO PERCOLADOR 1.00 23.00 23.00
TUBERIA DE DESAGUE DE CAJA REGISTRO 02 A BIODIGESTOR 1.00 10.00 10.00
02.01.12.03 SUMINISTRO TUBERIA DE PVC SAL D= 4"
TUBERIA DE 4" 1.00 11.78 11.78
02.01.12.04 SUMINISTRO TUBERIA DE PVC SAL D= 2"
TUBERIA DE 2" 1.00 43.29 43.29
TUBERIA DE VENTILAC ION D= 2" 1.00 3.00 3.00
02.01.12.05 SUMINISTRO DE INODORO DE LOSA BLANCA TANQUE BAJO
INODORO INC ACCESORIOS 1.00 1.00 1.00
02.01.12.06 SUMINISTRO DE LAVATORIO DE LOSA BLANCA
LAVATORIO INC/ACCESORIOS 1.00 1.00 1.00
02.01.12.07 SUMINISTRO DE ACCESORIOS PVC SAL
CODOS PVC SAL D= 2" x 90 10.00 1.00 10.00
CODOS PVC SAL D= 2" x 45 2.00 1.00 2.00
YEE PVC SAL D= 2" 1.00 1.00 1.00
TRAMPAS PVC SAL D= 2" 1.00 1.00 1.00
SOMBRERO DE VENTILACION D= 2" 1.00 1.00 1.00
CODOS PVC SAL D= 4" x 90 1.00 1.00 1.00
SUMIDERO DE BRONCE CON REJILLA D= 2" 1.00 2.00 2.00
SOMBRERO DE VENTILACION D= 2" 1.00 1.00 1.00
02.01.12.08 INSTALACION TUBERIA DE PVC SAL D= 4"
TUBERIA DE 4" 1.00 11.78 11.78
02.01.12.09 INSTALACION TUBERIA DE PVC SAL D= 2"
TUBERIA DE 2" 1.00 43.29 43.29
TUBERIA DE VENTILAC ION D= 2" 1.00 3.00 3.00
02.01.12.10 COLOCACION DE ACCESORIOS DE DESAGUE
TOTAL ACCESORIOS 1.00 19.00 19.00
02.01.12.11 COLOCACION DE APARATOS SANITARIOS CORRIENTES
APARATOS SANITARIOS 2.00 1.00 2.00
02.01.12.12 SUMINISTRO Y COLOCACION DE CAJA REGISTRO 24" X 12"
CAJA REGISTRO INCLUYE TAPA DE CA 1.00 2.00 2.00
02.01.12.13 SUMINISTRO DE TUBERIA DE PVC SAP D= 1/2"
TUBERIA DE 1/2" 1.00 5.00 5.00
1.00 3.00 3.00
02.01.12.14 SUMINISTRO DE ACCESORIOS DE AGUA POTABLE
CODOS PVC SAP D= 1/2" x 90 1.00 2.00 2.00
TEE PVC SAP D= 1/2" 1.00 2.00 2.00
DUCHA DE PVC 1.00 1.00 1.00
02.01.12.15 INSTALACION DE TUBERIA DE PVC NTP 399.002 C-10, D= 1/2"
TUBERIA DE 1/2" 1.00 5.00 5.00
1.00 3.00 3.00
02.01.12.16 COLOCACION DE ACCESORIOS PVC NTP
TOTAL ACCESORIOS 1.00 5.00 5.00
02.01.12.17 SUMINISTRO Y COLOCACION DE VAVULA COMPUERTA DE BRONCE D= 1/2"
VALVULA DE BRONCE D= 1/2" 1.00 1.00 1.00
02.01.12.18 SUMINISTRO Y COLOCACION DE LLAVE DE DUCHA DE BRONCE D= 1/2"
LLAVE DE DUCHA BRONCE D= 1/2" 1.00 1.00 1.00
02.01.13 INSTALACIONES ELECTRICAS
02.01.13.01 SALIDA PARA CENTROS DE LUZ CON INTERRUPTOR SIMPLE
MODULO 01 1.00 1.00 1.00
02.01.13.02 CONDUCTORES Y CABLES ELECTRICOS
EXTERIOR 1.00 5.00 5.00
INTERIOR 1.00 2.50 2.50
18.02 INSTALACION DE TANQUE BIODIGESTOR 1.00 1.00
18.02.01 TRABAJOS PRELIMINARES
18.02.01.01 LIMPIEZA DE TERRENO MANUAL
18.02.01.02 TRAZO, NIVELACION Y REPLANTEO
1.00 1.45 1.14 1.65
18.02.02 MOVIMIENTO DE TIERRAS
18.02.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO
BASE TANQUE BIODIGESTOR 1.00 1.45 1.14 1.54 2.54
18.02.02.02 RELLENO Y COMPACTADO CON MATERIAL DE PROPIO
BASE TANQUE BIODIGESTOR 1.00 1.45 1.14 1.54 2.54
-1.00 0.85 0.67 1.54 -0.87
18.02.02.03 ELIMINACION MATERIAL EXCEDENTE d= 30 MTS
TOTAL EXCAVACION 1.25 99.18 1.00 1.00 123.97
BIODIGESTOR DE POLIETILENO
18.02.03 BIODIGESTOR DE POLIETILENO
18.02.03.01 SUMINISTRO E INSTALACION DE BIODIGESTOR C/ACCESORIOS 1.00 1.00 1.00
18.02.04 CAJAS DE INSPECCION
18.02.04.01 TRAZO, NIVELACION Y REPLANTEO 1 0.4 0.25 0.1
18.02.04.02 EXCAVACION PARA CIMIENTOS TERRENO NORMAL 1 0.4 0.25 0.4 0.04
18.02.04.03 RELLENO Y COMPACTADO CON MATERIAL DE PROPIO 1 0.4 0.25 0.1 0.01

18.02.04.04 ACARREO DE MATERIAL EXCEDENTE C/CARRETILLA HASTA D=50M 1 1.17

18.02.04.05 CONCRETO FC=210 KG/CM3


BASE 1 0.6 0.45 0.1 0.027
LATERALES 2 0.6 0.6 0.1 0.072
POSTERIORES 2 0.25 0.25 0.1 0.0125
TAPA 1 0.6 0.45 0.5 0.135

18.02.04.06 ENCOFRADO Y DESENCOFRADO


BASE 1 0.6 0.45 0.27
PAREDES EXTERIORES 1 2.1 0.45 0.945
TAPA 1 2.1 0.1 0.21

18.02.04.07 ACERO ESTRUCTURAL GRADO 60 0.9

18.03 CAJA DE REGISTRO DE LODOS


18.03.01 TRAZO, NIVELACION Y REPLANTEO 1 0.5 0.5 0.25
18.03.02 EXCAVACION PARA CIMIENTOS TERRENO NORMAL 1 0.6 0.6 0.4 0.144
18.03.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO 1 0.6 0.6 0.05 0.018

18.03.04 ACARREO DE MATERIAL EXCEDENTE C/CARRETILLA HASTA D=50M 1 0.126

18.03.05 CONCRETO FC=210 KG/CM3


BASE 1 0.6 0.6 0.1 0.036
LATERALES 2 0.6 0.1 0.4 0.048
POSTERIORES 2 0.5 0.1 0.4 0.04
TAPA 1 0.6 0.6 0.1 0.036
SOBRE CAJA 4 0.2 0.1 0.1 0.008

18.03.06 ENCOFRADO Y DESENCOFRADO


BASE 1 0.6 0.6 0.36
PAREDES EXTERIORES 1 8.4 0.55 4.62
PAREDES INTERIORES 1 2 0.45 0.9
TAPA 1 2.4 0.15 0.36

18.03.07 ACERO ESTRUCTURAL GRADO 60 0.9


18.04 ZANJA DE PERCOLACION 1.00 1.00
18.04.01 TRAZO Y REPLANTEO
ZANJA DE PERCOLACION 2.00 7.00 0.90 12.60
18.04.02 EXCAVACION EN TERRENO NORMAL
ZANJA DE PERCOLACION 2.00 7.00 0.90 0.60 7.56
18.04.03 ELIMINACION DE MATERIAL EXCEDENTE D= 30 MTS
ZANJAS DE PERCOLACION 1.25 294.84 1.00 1.00 368.55
18.04.04 CONCRETO CEMENTO HORMIGON 1:12
ZANJAS DE PERCOLACION 1.00 0.80 0.80 0.50 0.32
1.00 0.60 0.60 0.40 0.14
18.04.05 RELLENO DE PIEDRA MEDIANA E= 0.10
ZANJAS DE PERCOLACION 1.00 0.80 0.80 0.60 0.38
18.04.06 SUMINISTRO DE ACCESORIOS EN ZANJA DE PERCOLACION
CODOS PVC SAL D= 4" x 90 1.00 1.00 1.00
RA LA ELIMINACION DE EXCRETAS DE LAS FAMILIAS
TOTAL UNID.

149.76 m2
m2
149.76 m2
m2

46.64 m3
m3
m3
m3
m3
58.31 m3
m3

36.04 m3
m3
m3

77.22 m2
m2
m2
11.58 m3
m3
m3

249.60 Kg

81.90 m2

6.14 m3

202.80 m2
m2
234.00 ml
ml
405.60 ml
ml

417.69 m2
m2
m2
m2
m2
m2
m2

129.87 m2
m2
m2
m2
m2
m2
m2
612.30 m2
m2
m2
m2
m2
m2
m2
280.80 m
m
m

430.95 M2
174.33 m2
m2
m2
m2
81.90 m2
m2
92.82 m2
m2
m2
81.90 m2
m2
619.32 m2
m2
m2
m2
m2
m2
m2

39.00 und
39.00 und

39.00 und
und

1,487.85 m
m
m
m
m
m
1,487.85 m
m
m
m
m
m
459.42 m
m
1,805.31 m
m
m
39.00 unid
unid
39.00 unid
unid
39.00 glb
unid
unid
unid
unid
unid
unid
unid

459.42 m
m
1,805.31 m
m
m
741.00 unid
unid
78.00 unid
unid
78.00 unid
unid
312.00 m
m
m
195.00 glb
unid
unid
unid
312.00 m
m
m
195.00 unid
unid
39.00 unid
unid
39.00 unid
unid

39.00 Pto

292.50 m

64.40 m2
64.40 m2
m2

99.18 m3
m3
65.10 m3
m3
m3
123.97 m3
m3

39.00 unid
unid

3.9 M2
1.56 M3
0.39 M3

45.63 m3

9.6135 M3

55.575 M2

35.1 KG

9.75 M2
5.616 m3
0.702 M3

4.914 m3

30.576 M3

31.2 M2

35.1 KG

491.40 m2
m2
294.84 m3
m3
368.55 m3
m3
6.86 m3
m3

14.98 m3
m3
39.00 unid
unid
MEMORIA DE METRADO

CAJA VALVULAS DE CONTROL


13.01 TRABAJOS PRELIMINARES N CAJA =
13.01.01 Limpieza de terreno
0.80 * 0.80 = 0.64 m2 *

13.01.02 Trazo y replanteo preliminar


0.80 * 0.80 = 0.64 m2 *

13.02 MOVIMIENTO DE TIERRAS


13.02.01 Excavacin de material suelto en terreno seco
0.800 * 0.800 * 0.800 = 0.512 m3 *

13.02.02 Refine y Nivelacion y Compactado


0.80 * 0.80 = 0.64 m2 *

13.02.03 Eliminacion de material excedente D = 30 M.


Excavacin 0.512
Relleno 0.000
0.512 * 1.3 = 0.666 m3 *

13.03 OBRAS DE CONCRETO SIMPLE


13.03.01 Solado e=2" 0.800 * 0.800 = 0.640 m2 *

0.1
0.1

TUBERIA PVC LINEA


DE CONDUCCION 0.4
TEE PVC SAP

TUBERIA PVC DE PURGA

0.1
0.1
TAPON PVC MACHO 3/4"
TUBERIA PVC
DE PURGA tuberia pvc 1/2
0.4 0.1 0.1

13.04 OBRAS DE CONCRETO ARMADO


13.04.01 Concreto F'c=175 kg/cm2 (losa fondo y muros)
muros 0.60 * 0.70 * 0.10 * 2.00 = 0.08 m3
0.40 + 0.70 * 0.10 * 2.00 = 0.06 m3
Losa fondo 0.80 * 0.80 * 0.10 * 1.00 = 0.06 m3
0.20 m3 *

13.04.02 Encofrado y desencofrado (losa fondo y muros)


exteriores 0.600 * 0.700 * 4.000 = 1.680 m2
interiores 0.400 * 0.700 * 4.000 = 1.120 m2
2.800 m2 *
13.04.03 Acero F'y=4200 kg/cm2 (losa fondo y muros)

1 2
0.75 0.75 0.55
3/8a 0.20 m . 3
3/8a 0.20 m .

0.55 0.55 3/8a 0.20m . 0.55

1) 1/4" 2.05 * 4 = 8.20 * 0.25 kg/cm2 = 2.05 2.050


2) 1/4" 2.05 * 3 = 6.15 * 0.25 kg/cm3 = 1.5375 1.538
3) 1/4" 2.40 * 4 = 9.60 * 0.25 kg/cm4 = 2.4 2.400
23.95 m 5.9875 *

13.05 TARRAJEOS ENLUCIDOS Y MOLDURAS


13.05.01 Tarrajeos interior y exterior
Interior 0.400 * 0.700 * 4.000 = 1.120 m2 *

13.06 VALVULAS Y ACCESORIOS


13.06.01 VALVULA DE COMPUERTA 1/2" CONTROL
Adaptador PVC - FG 1/2" 2.0 *
Niples FG 1 1/2" 4.0 *
Unin universal FG 1/2" 2.0 *
Valvula de compuerta de Bronce 1/2" 1.0 *
13.06.02 TAPA METALICA 0.40 X 0.40m. 1 *
39

39 = 24.96 m2

39 = 24.96 m2

39 = 19.97 m3

39 = 24.96 m2

39 = 25.96 m3

39 = 24.96 m2

0.05

0.70
TEE PVC SAP

0.10

39 = 7.96 m3

39 = 109.20 m2
39 = 233.51 kg

39 = 43.68 m2

39 = 78.00 und.
39 = 156.00 und.
39 = 78.00 und.
39 = 39.00 und.
39 = 39.00 und.
MEMORIA DE METRADO

PILETA PUBLICA

16.01 TRABAJOS PRELIMINARES N PILETA = 39


16.01.01 Limpieza de terreno
1.50 * 1.50 = 2.25 m2 * 39

16.01.02 Trazo y replanteo preliminar


1.50 * 1.50 = 2.25 m2 * 39

16.02 MOVIMIENTO DE TIERRAS


16.02.01 Excavacin de material suerlto
* caja 1.500 * 1.500 * 0.250 = 0.563
* Zanja para desague 2.500 * 0.400 * 0.400 = 0.400
0.963 m3 * 39
16.02.02 Cama de apoyo para tuberia de desague
1.00 * 2.50 = 2.500 m * 39
16.02.03 Eliminacion de material excedente D = 30 M.
Excavacin 0.963 * 1.30 = 1.251 m3
Relleno 1.500 * 0.100 * 4.000 = 0.600 m3
Relleno zanja 2.500 * 0.400 * 0.400 = 0.400 m3
0.251 m3 * 39
16.03 OBRAS DE CONCRETO SIMPLE
16.03.01 Solado e=2"
caja 1.30 * 1.30 = 1.690 m2 * 39

16.04 OBRAS DE CONCRETO ARMADO


PLANTA

GRA VA CLAS IFICA DA Grifo


0 .5 0 GRAVA CLAS IFICA DA a 1 a
0
0 .2 0
0 .1 5 0 .6 0 0 .7 0
00 0 0

0 .6 0 0 .6 0
0
0 .1 0 GRA VA CLAS IFICA DA
1 a
0 .1 5 0 .1 0
0 .2 0 0 .2 0
0
0 .5 0 0 .6 0
0 0
0 .2 0 0 .6 0 0 .2 0 0 .5 0 0 .8 0
0 0 .1 5 0 .1 50

0 .5 0 0 .6 0

16.04.01 Concreto F'c=140 kg/cm2 (losa y pedestal)


Losa fondo 1.600 * 1.300 * 0.100 = 0.208 m3
0.500 * 1.300 * 0.100 = 0.065 m3
0.100 * 1.300 * 0.100 * 3.000 = 0.039 m3
batea 0.900 * 0.900 * 0.100 * 1.000 = 0.081 m3
0.900 * 0.900 * 0.150 * 2.000 = 0.243 m3
0.600 * 0.600 * 0.150 * 2.000 = 0.108 m3
Pedestal 0.330 + 0.200 * 0.700 * 0.150 = 0.028 m3
2.000 0.772 m3 * 39

16.04.02 Encofrado y desencofrado (muros)


Losa Fondo 1.600 * 0.100 * 2.000 = 0.320m2
1.300 * 0.100 * 2.000 = 0.260m2
batea 0.900 * 0.200 * 4.000 = 0.720m2
Pedestal 1.300 * 0.900 * 1.000 = 1.170m2
0.330 + 0.200 * 0.700 * 2.000 = 0.371 m2
2
0.700 * 0.150 * 2.000 0.210 m2
3.051 m2 * 39
16.04.03 Acero de refuerzo F'y=4200 kg/cm2

0.90

1 / 4" .15 m.
0.90

1 / 4" .15 m.

1.30 * 4.00 = 5.20 m


1.30 * 2.00 = 2.60 m
0.85 * 2.00 = 1.70 m
1.30 * 7.00 = 9.10 m
18.60 m
18.60 * 0.25 kg/m = 4.65 kg * 39
16.05 TARRAJEOS ENLUCIDOS Y MOLDURAS
16.05.01 TARRAJEO INTERIOR Y EXTERIOR ACABADO CON CEMENTO-ARENA
batea interior 0.60 * 0.60 * 1.00 = 0.360 m2
0.60 * 0.10 * 4.00 = 0.240 m2
exterior 0.90 * 0.10 * 4.00 = 0.360 m2
0.90 * 0.15 * 4.00 = 0.540 m2
pedestal 0.33 + 0.20 * 0.70 * 2.00 = 0.371 m2
2.00
0.70 * 0.15 * 2.00 = 0.210 m2
losa exterior 0.35 * 1.30 * 2.00 = 0.910 m2
0.20 * 0.90 * 2.00 = 0.360 m2
3.35 m2 * 39

16.06 POZA PERCOLADOR


16.06.01 Grava clasificada 1 1/2" a 1/4"
0.30 * 0.30 * 3.14 * 0.90 = 0.25 m3
0.25 m3 * 39
16.07 VALVULAS Y ACCESORIOS
16.07.01 Vlvula de bronce + accesorios en pileta familiare
Tuberia PVC SAP 1/2" 5.0 ml * 39
Tuberia PVC SAL 2" 6.0 ml * 39
Grifo 1/2" 1.0 und. * 39
Valvula de bronce de 1/2" 1.0 und. * 39
Codo PVC SAL 2 " * 45 1.0 und. * 39
Unin universal FG 1/2" 2.0 und. * 39
Sumidero de Bronce 2" 1.0 und. * 39
Adaptadores PVC SAP 1/2" 2.0 und. * 39
Unin roscada FG 1/2" 1.0 und. * 39
Niple FG 1/2" 2.0 und. * 39
Codo FG 1/2" * 90 2.0 und. * 39
= 87.75 m2

= 87.75 m2

= 37.54 m3

= 97.50 m

= 9.80 m3

= 65.91 m2

= 30.10 m3

= 118.99 m2
= 181.35 kg

= 130.69 m2

= 9.92 m3

= 195.00 und.
= 234.00 und.
= 39.00 und.
= 39.00 und.
= 39.00 und.
= 78.00 und.
= 39.00 und.
= 78.00 und.
= 39.00 und.
= 78.00 und.
= 78.00 und.
PARTIDAS COMPLEMENTARIAS
DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL TOTAL UNID.
19 PARTIDAS COMPLEMENTARIAS GLB
19.01 PRUEBAS DE LABORATORIO
19.01.01 DISEO DE MEZCLAS DE CONCRETO 1 1.00 GLB
19.01.02 PRUEBA DE COMPRESION DEL CONCRETO 1.00 45.00 GLB
19.02 TRANSPORTE
19.02.01 FLETE DE TRANSPORTE DE MATERIALES 1 _ 1.00 GLB
19.02.02 FLETE RURAL (ASCEMILA) 1.00 1.00 GLB
19.03 PLACA RECORDATORIA DE OBRA 1.00
19.03.01 PLACA RECORDATORIA INC./PEDESTAL 1 1.00 und
19.04 MANEJO AMBIENTAL
19.04.01 LIMPIEZA FINAL DE TERRENO 1.00 6,420.00 m2
19.04.02 LIMPIEZA MANUAL DE CURSOS NATURALES DE AGUA 1 150.00 m3
19.05 CAPACITACION
19.05.01 CAPACITACION TECNICA EN SANEAMIENTO 1.00 24.00 SESION
19.05.02 CAPACITACION SOCIAL 1 36.00 SESION
19.05.03 MODULO DE CAPACITACION 1.00 1.00 GLB
19.05.04 MONITOREO ARQUEOLOGICO 1.00 1.00 GLB
19.05.05 MONITOREO DE DESASTRES NATURALES 1 5.00 GLB
CALCULO ESTRUCTURAL DE RESERVORIO APOYADO PARA AGUA POTABLE
PROYECTO

SECTOR :

DATOS
CARACTERISTICAS GEOMETRICAS
VOLUMEN RESERVORIO V=
ALTURA UTIL RESERVORIO H=
LADO UTIL RESERVORIO L=
ESPECIFICACIONES
CONCRETO f'c f'c =
SOBRECARGA EN LOSA WL =
FLUENCIA DEL ACERO fy =
RESISTENCIA DEL SUELO
COEF. SISMICO Cs =
RECUBRIMIENTO MUROS Rm =
RECUBRIMIENTO LOSA SUPERIOR Rl =
RECUBRIMIENTO LOSA DE FONDO Rl =
ft ft =
fs (SEGN NORMAS SANITARIAS) fs =
fs PARA LOSAS fsl =
fc fc =
ACERO
DIAMETRO ACERO VERTICAL (MUROS) Vm =
DIAMETRO ACERO HORIZONTAL (MUROS) Hm =
DIAMETRO ACERO HORIZONTAL (LOSA TECHO) Lt =
DIAMETRO ACERO HORIZONTAL (LOSA FONDO) Lf =

CALCULO DE MUROS DE RESERVORIO


RELACION ANCHO - ALTURA R=b/h R=
ASUMIMOS R=

VALORES DE LOS COEF. (K) PARA EL CALCULO DE MOMENTOS - TAPA LIBRE Y FONDO EMPOTRADO
y=0 y = b/4
b/h x/h
Mx My Mx My
2.50 0 0.000 0.027 0.000 0.013
1/4 0.012 0.022 0.007 0.013
1/2 0.011 0.014 0.008 0.010
3/4 -0.021 -0.001 -0.010 0.001
1 -0.108 -0.022 -0.077 -0.015

CALCULO DE MOMENTOS POR EMPUJE DE AGUA M = K * Pa * h3 M=

MOMENTOS (Kg-m) DEBIDO AL EMPUJE DEL AGUA


y=0 y = b/4
b/h x/h
Mx My Mx My
2.50 0 0.000 31.256 0.000 15.049
1/4 13.892 25.468 8.103 15.049
1/2 12.734 16.207 9.261 11.576
3/4 -24.310 -1.158 -11.576 1.158
1 -125.024 -25.468 -89.137 -17.364
DIAGRAMAS DE MOMENTOS VERTICALES (MURO)

0 1 0 1
0

1/4 2 1/4 2 1/4 2

1/2 3 1/2 3 1/2 3

3/4 4 3/4 4 3/4

1 5 1
1 5
-16.000 -14.000 -12.000 -10.000 -8.000 -
-150.000 -100.000
PARA Y = 0
-50.000 0.000 50.000 -100.000 -80.000 -60.000 -40.000 -20.000 0.000 20.000 PARA Y = 1/2
PARA Y = 1/4

DIAGRAMAS DE MOMENTOS HORIZONTALES (MURO)

100 100 100


82.312875
67.06975
50 39.632125 39.632125 50 39.632125 39.632125 50 42.6
30.48625
0 0 0
-50 -50 -50
-100 -100 -100
-150 -150 -150 -161.577125
-200 -200 -201.20925 -201.20925 -200
-225.59825 -225.59825
-250 -250 -250
-0.5 -0.25 X= 0 0 0.25 0.5 -0.5 -0.25 0 0.25 0.5 -0.5 -0.25 0
X= h/4 X= h /2

100 100
50 50
0 3.048625 -3.048625 3.048625 0 0 0
-50 -50 -45.729375 -45.729375
-67.06975
-82.312875 -82.312875
-100 -100

-150 -150

-200 -200

-250 -250

-0.5 -0.25 0 0.25 0.5 -0.5 -0.25 0 0.25 0.5


X =3h / 4 X= h

CALCULO DEL AREA DE ACERO DE MUROS

ESPESOR DEL MURO (Em = 6M / ft b )1/2 Em =


PERALTE EFECTIVO De = Em * 100 - r - Da/2 De =
n=
K= 1 / (1+fs/(n*fs)) K=
J= 1-(K/3) J=
ACERO VERTICAL As = (100*M) / ( fs*J*d) As=
CUANTIA P = As / t1 x b P=
CUANTIA MINIMA Pm=
ACERO VERTICAL ASUMIDO As=

CALCULADO : 1 1/2 @

USAR : 1 1/2 @

ACERO HORIZONTAL As = (100*M) / ( fs*J*d) As=


CUANTIA P = As / t1xb P=
CUANTIA MINIMA Pm=
ACERO HORIZONTAL ASUMIDO As=

CALCULADO : 1 1/2 @

USAR : 1 1/2 @
CALCULO DE LOSA DE TECHO
LUZ DE CALCULO DE LA LOSA L= Li+2*Em/2 L=
ESPESOR DE LA LOSA El = L/36 El=
ESPESOR DE LA LOSA ASUMIDA El = L/36 El=
COEFICIENTE PARA LOSAS CUADRADAS C=
PP=
WL=
W=

CALCULO DE MOMENTOS MA = MB = CWL2 MA=


n = Es / Ec n=
k= 1 / (1+fs/(nfc)) k=
j= 1- k/3 j=
R=0.5*fc*j*k R=

CALCULO DEL AREA DE ACERO DE LA LOSA DE TECHO


PERALTE EFECTIVO CALCULADO (De = M / R b )1/2 De=
PERALTE EFECTIVO REAL Der = El*100-r-Da/2 Der=
ACERO As = (100*M) / ( fs*J*d) As=
CUANTIA P = As / t1 x b P=
CUANTIA MINIMA Pm=
ACERO ASUMIDO As=

CALCULADO : 1 3/8 @

USAR : 1 3/8 @

CALCULO DE LOSA DE FONDO


LUZ DE CALCULO DE LA LOSA L= Li+2*Em/2 L=
ESPESOR DE LA LOSA El = L/36 El=
C1=

PPagua=
PPconcr=
W=

MOMENTO DE EMPOTRAMIENTO EN EL EXTREMO MEE= - WL2 / 192 MEE=


MOMENTO EN EL CENTRO MC= WL3 / 384 MC=
MOMENTO FINAL EN EL EXTREMO MFE= 0.529*MEE MFE=
MOMENTO FINAL EN EL CENTRO MFC= 0.0513*MC MFC=

CALCULO DEL AREA DE ACERO DE LA LOSA DE FONDO


PERALTE EFECTIVO CALCULADO De =( 6*M / ft*b )1/2 De=
PERALTE EFECTIVO REAL Der = El*100-r-Da/2 Der=
n=
K= 1 / (1+fs/(n*fs)) K=
J= 1-(K/3) J=
ACERO As = (100*M) / ( fs*J*d) As=
CUANTIA P = As / t1 x b P=
CUANTIA MINIMA Pm=
ACERO ASUMIDO As=

CALCULADO : 1 3/8 @

USAR : 1 3/8 @
URAL DE RESERVORIO APOYADO PARA AGUA POTABLE

5.00 m3
1.05 mts.
2.30 mts.

210 Kg/cm2
200 Kg/cm2
4,200 Kg/cm2
1.25 Kg/cm2
0.12
5.00 cm
3.00 cm
7.50 cm
12.32 Kg/cm2
900 Kg/cm2
1,400 Kg/cm2
95.0 Kg/cm2

1/2 pulg
1/2 pulg
3/8 pulg
3/8 pulg

2.19
2.50

) PARA EL CALCULO DE MOMENTOS - TAPA LIBRE Y FONDO EMPOTRADO


y = b/2
Mx My
0.000 -0.074
-0.013 -0.066
-0.011 -0.053
-0.005 -0.027
0.000 0.000

1,157.63 * K Kg-m

OMENTOS (Kg-m) DEBIDO AL EMPUJE DEL AGUA


y = b/2
Mx My
0.000 -85.664
-15.049 -76.403
-12.734 -61.354
-5.788 -31.256
0.000 0.000
IAGRAMAS DE MOMENTOS VERTICALES (MURO)

0 1

1/4 2

1/2 3

3/4 4

1 5
-16.000 -14.000 -12.000 -10.000 -8.000 -6.000 -4.000 -2.000 0.000
PARA Y = 1/2

GRAMAS DE MOMENTOS HORIZONTALES (MURO)

100

50 42.68075
30.48625 30.48625
0

-50

-100

-150 -161.577125 -161.577125


-200

-250

-0.5 -0.25 0 0.25 0.5


X= h /2

CALCULO DEL AREA DE ACERO DE MUROS

0.15 mts
9.37 cm
9.00
0.49
0.84
1.77 cm2
0.0012
0.0015
2.25 cm2

0.573 mts.

0.20 mts.

1.21 cm2
0.0008
0.0015
2.25 cm2

0.57 mts.

0.30 mts.
2.45 mts
0.075 mts
0.150 mts
0.036
360.00 Kg/m2
150.00 Kg/m2
510.00 Kg/m2

110.206 Kg-m
9
0.379
0.87
15.73

2.65 cm
11.524 cm
0.78 cm2
0.0005
0.0017
2.55 cm2

0.28 mts.

0.25 mts.

2.45 mts
0.200 mts
0.036

1,050.00 Kg/m2
480.00 Kg/m2
1,530.00 Kg/m2

-47.83 Kg-m
23.92 Kg-m
-25.303 Kg-m
1.23 Kg-m

3.51 cm
12.024 cm
9.00
0.49
0.84
0.28 cm2
0.0001
0.0017
3.40 cm2

0.21 mts.

0.20 mts.
GEOMETRIA DEL RESERVORIO VALORES DE LOS COEFICIENTES (K) PARA EL CALCULO DE MOMENTOS - TAPA LIBRE Y FONDO EMPOT
VOLUMEN ALTURA LADO R=b/h y=0 y = b/4
b/h x/h
5.00 m3 1.05 2.30 2.19 Mx My Mx
VOLUMEN ALTURA INTER LADO INTER R=b/h 0 0.000 0.025 0.000
1.00 0.60 1.45 2.42 1/4 0.010 0.019 0.007
2.00 0.75 1.75 2.33 3.00 1/2 0.005 0.010 0.008
3.00 0.90 1.95 2.17 3/4 -0.033 -0.004 -0.018
4.00 1.00 2.15 2.15 1 -0.126 -0.025 -0.092
5.00 1.05 2.30 2.19 0 0.000 0.027 0.000
6.00 1.10 2.45 2.23 1/4 0.012 0.022 0.007
7.00 1.20 2.55 2.13 2.50 1/2 0.011 0.014 0.008
8.00 1.20 2.70 2.25 3/4 -0.021 -0.001 -0.010
9.00 1.25 2.80 2.24 1 -0.108 -0.022 -0.077
10.00 1.30 2.90 2.23 0 0.000 0.027 0.000
11.00 1.35 3.00 2.22 1/4 0.013 0.023 0.006
12.00 1.35 3.10 2.30 2.00 1/2 0.015 0.016 0.010
13.00 1.45 3.15 2.17 3/4 -0.008 0.003 -0.002
14.00 1.45 3.25 2.24 1 -0.086 -0.017 -0.059
15.00 1.50 3.30 2.20 0 0.000 0.025 0.000
16.00 1.50 3.40 2.27 1/4 0.012 0.022 0.005
17.00 1.55 3.45 2.23 1.75 1/2 0.016 0.016 0.010
18.00 1.55 3.55 2.29 3/4 -0.002 0.005 0.001
19.00 1.60 3.60 2.25 1 -0.074 -0.015 -0.050
20.00 1.65 3.60 2.18 0 0.000 0.021 0.000
21.00 1.65 3.70 2.24 1/4 0.008 0.020 0.004
22.00 1.65 3.80 2.30 1.50 1/2 0.016 0.016 0.010
23.00 1.70 3.80 2.24 3/4 0.003 0.006 0.003
24.00 1.70 3.90 2.29 1 -0.060 -0.012 -0.041
25.00 1.75 3.90 2.23 0 0.000 0.021 0.000
26.00 1.75 4.00 2.29 1/4 0.008 0.020 0.004
27.00 1.75 4.05 2.31 1.25 1/2 0.016 0.016 0.010
28.00 1.75 4.15 2.37 3/4 0.003 0.006 0.003
29.00 1.80 4.15 2.31 1 -0.060 -0.012 -0.041
30.00 1.80 4.25 2.36 0 0.000 0.009 0.000
31.00 1.80 4.30 2.39 1/4 0.002 0.011 0.000
32.00 1.85 4.30 2.32 1.00 1/2 0.009 0.013 0.005
33.00 1.85 4.35 2.35 3/4 0.008 0.008 0.005
34.00 1.90 4.35 2.29 1 -0.035 -0.007 -0.022
35.00 1.95 4.35 2.23 0 0.000 0.004 0.000
36.00 1.95 4.45 2.28 1/4 0.001 0.008 0.000
37.00 1.95 4.50 2.31 0.75 1/2 0.005 0.010 0.002
38.00 1.95 4.55 2.33 3/4 0.007 0.007 0.003
39.00 1.95 4.60 2.36 1 -0.024 -0.005 -0.015
40.00 2.00 4.60 2.30 0 0.000 0.001 0.000
41.00 2.00 4.65 2.33 1/4 0.000 0.005 0.000
42.00 2.05 4.65 2.27 0.50 1/2 0.002 0.006 0.001
43.00 2.05 4.70 2.29 3/4 0.004 0.006 0.001
44.00 2.05 4.75 2.32 1 -0.015 -0.003 -0.008
45.00 2.10 4.75 2.26
46.00 2.10 4.80 2.29
47.00 2.10 4.85 2.31 CARACTERISTICAS DEL ACERO DE CONSTRUCCION
48.00 2.10 4.90 2.33 DIAMETRO DIAM. (Cms) AREA (Cms2) PESO (Kg/ml)
49.00 2.10 4.95 2.36 1/4 0.635 0.320 0.250
50.00 2.10 5.00 2.38 3/8 0.953 0.713 0.580
51.00 2.15 5.00 2.33 1/2 1.270 1.290 1.020
52.00 2.15 5.05 2.35 5/8 1.588 2.000 1.600
53.00 2.15 5.10 2.37 3/4 1.905 2.840 2.260
54.00 2.15 5.15 2.40 1 2.540 5.100 4.040
55.00 2.15 5.20 2.42
56.00 2.15 5.25 2.44 VALORES PARA EL CALCULO DE MOMENTOS - TAPA LIBRE Y FONDO EMPOTRADO
57.00 2.25 5.15 2.29 Y 0 1/4 1/2 3/4
58.00 2.25 5.20 2.31 0 31.256 25.468 16.207 -1.158
59.00 2.25 5.25 2.33 1/4 15.049 15.049 11.576 1.158
60.00 2.25 5.30 2.36 1/2 -85.664 -76.403 -61.354 -31.256
0 31.256 25.468 16.207 -1.158
- 1/4 15.049 15.049 11.576 1.158
- 1/2 -85.664 -76.403 -61.354 -31.256

VALORES ABSOLUTOS DE LOS MOMENTOS-TAPA LIBRE Y FONDO EMPOTRADO


y=0 y = b/4
b/h x/h
Mx My Mx
2.50 0 0.000 31.256 0.000
1/4 13.892 25.468 8.103
1/2 12.734 16.207 9.261
3/4 24.310 1.158 11.576
1 125.024 25.468 89.137
O DE MOMENTOS - TAPA LIBRE Y FONDO EMPOTRADO

y = b/4 y = b/2
My Mx My
0.014 0.000 -0.082
0.013 -0.014 -0.071
0.010 -0.011 -0.055
0.000 -0.006 -0.028
-0.018 0.000 0.000
0.013 0.000 -0.074
0.013 -0.013 -0.066
0.010 -0.011 -0.053
0.001 -0.005 -0.027
0.015 0.000 0.000
0.009 0.000 -0.060
0.010 0.012 -0.059
0.010 0.010 -0.049
0.003 -0.005 -0.027
-0.012 0.000 0.000
0.007 0.000 -0.050
0.008 -0.010 -0.052
0.009 -0.009 -0.046
0.004 -0.005 -0.027
-0.010 0.000 0.000
0.005 0.000 -0.040
0.007 -0.009 -0.044
0.008 -0.008 -0.042
0.004 -0.005 -0.026
-0.008 0.000 0.000
0.005 0.000 -0.040
0.007 -0.009 -0.044
0.008 -0.008 -0.042
0.004 -0.005 -0.026
-0.008 0.000 0.000
0.002 0.000 -0.018
0.003 -0.005 -0.023
0.005 -0.006 -0.029
0.004 -0.004 -0.020
-0.005 0.000 0.000
0.001 0.000 -0.007
0.002 -0.002 -0.011
0.003 -0.003 -0.017
0.003 -0.003 -0.013
-0.003 0.000 0.000
0.000 0.000 -0.002
0.001 -0.001 -0.004
0.001 -0.002 -0.009
0.001 -0.001 -0.007
-0.002 0.000 0.000

Y FONDO EMPOTRADO
1
-25.468
-17.364
0.000
-25.468
-17.364
0.000

TOS-TAPA LIBRE Y FONDO EMPOTRADO


y = b/4 y = b/2
My Mx My
15.049 0.000 85.664
15.049 15.049 76.403
11.576 12.734 61.354
1.158 5.788 31.256
17.364 0.000 0.000
3.00

0.15

0.15
0.20

0.15

1.35

0.10

2.30

ESCALINES FG
VER DETALLE
DETALLE DE ESCALINES

BUZON 0,60 x 0,60 Mts.


TAPA SANITARIA METALICA

ESPECIFICACI
RESISTENCIA DEL CONCRETO
0.15
FLUENCIA DEL ACERO

TRASLAPE MINIMO DE VARILLAS


0.20

0.20 0.15 2.30 0.15 0.20


0.30

TUB. FG 3/4"
@ 0,30 Mts.

UNIONES
ELECTROSOLDADAS

DETALLE DE ESCALINES

ESPECIFICACIONES TECNICAS
f'c = 210 Kg/cm2

fy = 4200 Kg/cm2

TRASLAPE MINIMO DE VARILLAS = 30 cm

RESERVORIO APOYADO 5 M3
PLANTA
May-17
TAPA SANITARIA METALICA 3/8 @ 0.25 TUBERIA DE VENTILACION FG 2"
0,60 x 0,80 mts.

0.150


0.300

NIVEL DE AGUA

1/2 @ 0.20

1/2 @ 0.30 TARRAJEO C / IMPERMEABILIZANTE


1.050


3/8 @ 0.20 PENDIENTE DE FONDO 1%



0.200

0.050

0.77 SOLADO DE CONCRETO

0.20 0.15 0.15 0.20


2.30

3.00

RESERVOR
TUBERIA DE VENTILACION FG 2"

1.35

0.20

3.00

RESERVORIO APOYADO 5 M3
CORTE A-A
May-17
3/8 @ 0.25

2.80

2 3/8

ESPECIFICACIONE
RESISTENCIA DEL CONCRETO

FLUENCIA DEL ACERO

TRASLAPE MINIMO DE VARILLAS

2 3/8

2.80
ESPECIFICACIONES TECNICAS
RESISTENCIA DEL CONCRETO f'c = 210 Kg/cm2

fy = 4200 Kg/cm2

TRASLAPE MINIMO DE VARILLAS = 30 cm

RESERVORIO APOYADO 5 M3
ARMADURA DE LOSA DE TECHO
May-17
PLANILLA DE ARMADURA DE RESERVORIO DE M3

ARMADURA LOSA DE TECHO LONGITUD VECES LONG. POR EN ML.


1/4" 3/8" 1/2"
2.74

0.12 3/8 2.98 25.00 74.50

2.74

3/8 2.74 4.00 10.96

1.20

3/8 1.20 4.00 4.80

0.10 3/8 3.00 1.00 3.00


0.7

0.7
0.075

0.15 3/8 0.43 8.00 3.40

0.2

ARMADURA LOSA DE FONDO LONGITUD VECES 1/4" 3/8" 1/2"


2.94

3/8 3.28 32.00 104.96


0.17

ARMADURA DE MURO LONGITUD VECES 1/4" 3/8" 1/2"


0.09

1.47
1/2 2.39 56.00 133.67

0.82

0.15
2.45 1/2 5.35 11.00 58.85

1.30

PESO POR / ML. 0.25 0.58 1.02

LONG. TOTAL POR 0.00 201.62 192.52

RESUMEN GENERAL PESO TOTAL POR 0.00 116.94 196.37

NUMERO VARILLAS POR 0.00 22.00 21.00


RESUMEN GENERAL

PESO TOTAL 313.31 Kg


RMADURA DE RESERVORIO DE M3

LONG. POR EN ML.


5/8"

5/8"

5/8"

1.55

0.00

0.00

0.00
313.31 Kg
HOJA RESUMEN DE METRADOS DE VALVULA DE RESERVORIOS

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION
7.02 CAMARA DE VALVULAS PARA RESERVORIO 1 M3
07.02.01 TRABAJOS PRELIMINARES
07.02.01.01 LIMPIEZA DE TERRENO MANUAL
07.02.01.02 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
07.02.02 MOVIMIENTO DE TIERRAS
07.02.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
07.02.02.02 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (< 2'')
07.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
07.02.03 OBRAS DE CONCRETO ARMADO
07.02.03.01 CONCRETO f 'c=210 kg/cm2 PARA OBRAS DE ARTE CON HORMIGON
07.02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
07.02.04 REVESTIMIENTOS
07.02.04.01 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA
07.02.05 SUMINISTRO E INSTALACION DE ACCESORIOS PARA RESERVORIO
07.02.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CASETA DE VALVULAS DE RESERVORIOS: 01, 04, 05, 06, 07, 09, 11, 12, 14, 15, 16; VOL=0.5 m3
07.02.05.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN CASETA DE VALVULAS EN RESERVORIOS: 02, 03, 10, 13; VOL=1.0 m3
07.02.05.03 SUMINISTRO E INSTALACION DE ACCESORIOS EN CASETA DE VALVULAS EN RESERVORIO: 08; VOL=1.5 m3
07.02.06 TAPAS SANITARIAS
07.02.06.01 TAPA SANITARIA METALICA 0.60 x 0.60 mts,
07.02.07 PINTURA
07.02.07.01 PINTURA CON LATEX EN MUROS EXTERIORES
07.02.07.02 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
HOJA DE METRADOS DE CAMARA DE VALVULAS PARA RESERVORIO DE 1.0 M3

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR -

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO


7.02 CAMARA DE VALVULAS PARA RESERVORIO 4.00
07.02.01 TRABAJOS PRELIMINARES
07.02.01.01 LIMPIEZA DE TERRENO MANUAL
1.00 0.75 0.80
07.02.01.02 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
1.00 0.75 0.80
07.02.02 MOVIMIENTO DE TIERRAS
07.02.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
1.00 0.75 0.80
07.02.02.02 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (< 2'')
ENTRADA 1.00 1.00
SALIDA 1.00 1.00
REBOSE 1.00 5.00
AGUS PLUVIALES 1.00 1.00
07.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
CAJA DE VALVULAS 1.30 0.75 0.80
ENTRADA 1.30 1.00 0.50
SALIDA 1.30 1.00 0.50
REBOSE 1.30 5.00 0.50
AGUS PLUVIALES 1.30 1.00 0.50
07.02.03 OBRAS DE CONCRETO ARMADO
07.02.03.01 CONCRETO f 'c=210 kg/cm2 PARA OBRAS DE ARTE CON HORMIGON
MUROS 2.00 0.75 0.10
1.00 0.10 0.60
1.00 0.05 0.60
FONDO 1.00 0.80 0.90
07.02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MUROS INTERIORES 4.00 0.60 0.50
MUROS EXTERIORES 2.00 0.75 0.50
1.00 0.80 0.50
07.02.04 REVESTIMIENTOS
07.02.04.01 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA
MUROS INTERIORES 4.00 0.60 0.50
MUROS EXTERIORES 2.00 0.75 0.50
1.00 0.80 0.50
07.02.05 SUMINISTRO E INSTALACION DE ACCESORIOS PARA RESERVORIO
07.02.05.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN CASETA DE VALVULAS EN RESERVORIOS: 02, 03, 10, 13; VOL=1.0 m3
RESERVORIOS: 02, 13; VOL= 1.00 m3, ENT=1", SAL=3/4" 2.00
ENTRADA
CODO SP NTP399.019 X 90 33.2 mm (1") 3.00
ADAPTADOR UPR NTP399.019 33.2 mm (1") 2.00
UNION UNIVERSAL DE F G DE 1" 2.00
NIPLE DE F G DE 1" 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 1" 1.00
TUBERIA NTP399.002 DE 33.0 mm (1") 2.00
SALIDA
CANASTILLA NTP399.019 48.0 mm (1 1/2") X 26.5 mm (3/4") 1.00
UNION SP NTP399.019 26.7 mm (3/4") 1.00
ADAPTADOR UPR NTP 399.019 26.7 mm (3/4") 2.00
UNION UNIVERSAL DE F G (3/4") 2.00
NIPLE DE F G DE 50 mm (3/4") 2.00
VALVULA ESFERICA DE BRONCE PESADA (3/4") 1.00
TUBERIA NTP399.002 26.7 mm (3/4") 2.00
LIMPIA Y REBOSE
REDUCCION NTP399.019 114.0 mm (4") X 60.0 mm (2") 1.00
UNION SP NTP399.019 60.2 mm (2") 1.00
CODO SP NTP399.019 X 45 60.2 mm (2") 2.00
TUBERIA NTP399.002 60.2 mm (2") 7.00
DRENAJE DE AGUAS PLUVIALES
CODO NTP399.003 X 45 DE 54.0 mm (2)" 2.00
TUBERIA NTP399.003 DE 54.0 mm (2)" 1.00
RESERVORIOS: 03, 10; VOL= 1.00 m3, ENT=2", SAL=3/4" 2.00
ENTRADA
CODO SP NTP399.019 X 90 60.2 mm (2") 3.00
ADAPTADOR UPR NTP399.A19 60.2 mm (2") 2.00
UNION UNIVERSAL DE F G 2" 2.00
NIPLE DE F G DE 50 mm 2" 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 2" 1.00
TUBERIA NTP399.002 DE 60.0 mm 2" 2.00
SALIDA
CANASTILLA NTP399.019 48.0 mm (1 1/2") X 26.5 mm (3/4") 1.00
UNION SP NTP399.019 26.7 mm (3/4") 1.00
ADAPTADOR UPR NTP 399.019 26.7 mm (3/4") 2.00
UNION UNIVERSAL DE F G (3/4") 2.00
NIPLE DE F G DE 50 mm (3/4") 2.00
VALVULA ESFERICA DE BRONCE PESADA (3/4") 1.00
TUBERIA NTP399.002 26.7 mm (3/4") 2.00
LIMPIA Y REBOSE
REDUCCION NTP399.019 114.0 mm (4") X 60.0 mm (2") 1.00
UNION SP NTP399.019 60.2 mm (2") 1.00
CODO SP NTP399.019 X 45 60.2 mm (2") 2.00
TUBERIA NTP399.002 60.2 mm (2") 7.00
DRENAJE DE AGUAS PLUVIALES
CODO NTP399.003 X 45 DE 54.0 mm (2)" 2.00
TUBERIA NTP399.003 DE 54.0 mm (2)" 1.00
07.02.06 TAPAS SANITARIAS
07.02.06.01 TAPA SANITARIA METALICA 0.60 x 0.60 mts,
1.00
07.02.07 PINTURA
07.02.07.01 PINTURA CON LATEX EN MUROS EXTERIORES m2
MUROS EXTERIORES 2.00 0.75 0.50
1.00 0.80 0.50
07.02.07.02 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
1.00 0.60 0.60
ORIOS

DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

TOTAL UNID.

3.00 M2
3.00 M2

2.50 M3
40.00 ML
20.15 M3

1.14 M3
11.75 m2

11.75 M2

11.00 UND
4.00 UND
1.00 UND

5.00 UND

5.75 M2
1.80 M2
RIO DE 1.0 M3

DE OCORURO, PROVINCIA DE ESPINAR -

Distrito : OCORURO
Departamento : CUSCO

ALTURA SUB-TOTAL TOTAL UNID.

2.40 m2
0.60
2.40 m2
0.60

2.00 m3
0.50 0.50
32.00 ml
1.00
1.00
5.00
1.00
16.12 m3
0.50 0.39
0.70 0.46
0.70 0.46
0.70 2.28
0.70 0.46

0.91 m3
0.50 0.08
0.50 0.03
0.50 0.02
0.15 0.11
9.40 m2
1.20
0.75
0.40
m3
9.40 m2
1.20
0.75
0.40

4.00 UND

6.00 UND
4.00 UND
4.00 UND
4.00 UND
2.00 UND
4.00 ML

2.00 UND
2.00 UND
4.00 UND
4.00 UND
4.00 UND
2.00 UND
4.00 ML

2.00 UND
2.00 UND
4.00 UND
14.00 ML

4.00 UND
2.00 ML

6.00 UND
4.00 UND
4.00 UND
4.00 UND
2.00 UND
4.00 ML

2.00 UND
2.00 UND
4.00 UND
4.00 UND
4.00 UND
2.00 UND
4.00 ML

2.00 UND
2.00 UND
4.00 UND
14.00 ML

4.00 UND
2.00 ML

4.00 UND
1.00

4.60 m2
0.75
0.40
1.44 m2
0.36
HOJA RESUMEN DE METRADOS RED DE DISTRIBUCION

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVI

Localidad : HUISAPATA
Provincia : ESPINAR

RED DE DISTRIBUCION
08 RED DE DISTRIBUCION
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts. ML
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML
08.01.03 DESBROCE ML
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m ML
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70 ML
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M ML
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M ML
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M ML
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M ML
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21.0 mm ( 1/2") ML
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4") ML
08.03.03 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 1 GLB
08.03.04 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 2 GLB
08.03.05 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 3 GLB
08.03.06 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 4 GLB
08.03.07 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 5 GLB
08.03.08 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 6 GLB
08.03.09 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 7 GLB
08.03.10 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 8 GLB
08.03.11 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 9 GLB
08.03.12 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 10 GLB
08.03.13 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 12 GLB
08.03.14 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 13 GLB
08.03.15 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 14 GLB
08.03.16 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 15 GLB
08.03.17 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 16 GLB
08.03.18 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 17 GLB
08.03.19 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 18 GLB
08.03.20 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 19 GLB
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION UND
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE M2
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE) M3
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE) M2
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON M3
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON M3
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA M2
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8" UND
08.04.08 SUMINISTRO E INST. VALVULA DE PURGA DE 1/2" UND
08.04.09 SUMINISTRO E INST. VALVULA DE PURGA DE 3/4" UND
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS M2
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.05.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1/2" ML
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4" ML
HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 1

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 170.80
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 170.80
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 170.80
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 145.18
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 25.62
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 145.18
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 25.62
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 170.80
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 170.80
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 170.80
08.03.03 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 1 1.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 2.00
REDUCCION SP NTP 399.019 DE 26.7 mm A 21.2 mm (3/4" A 1/2") 2.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 4.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 1.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.09 SUMINISTRO E INST. VALVULA DE PURGA DE 3/4" 1.00
TUBERIA SP NTP 399.002 DE 26.5mm (3/4") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 26.7mm (3/4") 1.00 2.00
UNION UNIVERSAL DE F G DE 3/4" 1.00 2.00
NIPLE FG DE 3/4" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 3/4" 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 2.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 1.00 1.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 170.80
HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 2

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 1,186.55
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 1,186.55
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 1,186.55
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 1,008.57
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 177.98
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 1,008.57
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 177.98
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 1,186.55
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 1,186.55
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21.0 mm ( 1/2")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 367.33
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 819.22
08.03.04 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 2 1.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 3.00
REDUCCION SP NTP 399.019 DE 26.7 mm A 21.2 mm (3/4" A 1/2") 3.00
CODO SP NTP 399.019 DE 26.7mm (3/4") X 45 15.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 21.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 1.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.08 SUMINISTRO E INST. VALVULA DE PURGA DE 1/2" 1.00
TUBERIA SP NTP 399.002 DE 21.0mm (1/2") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 21.2mm (1/2") 1.00 2.00
UNION UNIVERSAL NTP 399.019 DE 21.0mm (1/2") 1.00 2.00
NIPLE FG DE 1/2" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 21.0mm (1/2.") 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 3.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.05.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1/2"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 367.33
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 819.22

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 3

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 706.54
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 706.54
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 706.54
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 600.56
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 105.98
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 600.56
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 105.98
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 706.54
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 706.54
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21.0 mm ( 1/2")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 160.75
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 545.79
08.03.05 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 3 1.00
TEE SP NTP 399.019 DE 21.2 mm (1/2" ) 1.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 4.00
REDUCCION SP NTP 399.019 DE 26.7 mm A 21.2 mm (3/4" A 1/2") 4.00
CODO SP NTP 399.019 DE 26.7mm (3/4") X 45 3.00
CODO SP NTP 399.019 DE 21.2mm (1/2") X 45 1.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 13.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 2.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.08 SUMINISTRO E INST. VALVULA DE PURGA DE 1/2" 1.00
TUBERIA SP NTP 399.002 DE 21.0mm (1/2") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 21.2mm (1/2") 1.00 2.00
UNION UNIVERSAL NTP 399.019 DE 21.0mm (1/2") 1.00 2.00
NIPLE FG DE 1/2" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 21.0mm (1/2.") 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 3.00
08.04.09 SUMINISTRO E INST. VALVULA DE PURGA DE 3/4" 1.00
TUBERIA SP NTP 399.002 DE 26.5mm (3/4") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 26.7mm (3/4") 1.00 2.00
UNION UNIVERSAL DE F G DE 3/4" 1.00 2.00
NIPLE FG DE 3/4" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 3/4" 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 2.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 1.00 1.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.05.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1/2"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 160.75
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 545.79

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 4

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 456.50
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 456.50
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 456.50
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 388.03
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 68.48
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 388.03
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 68.48
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 456.50
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 456.50
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21.0 mm ( 1/2")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 174.92
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 281.58
08.03.06 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 4 1.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 2.00
REDUCCION SP NTP 399.019 DE 26.7 mm A 21.2 mm (3/4" A 1/2") 2.00
CODO SP NTP 399.019 DE 21.2mm (1/2") X 45 2.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 6.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 2.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.08 SUMINISTRO E INST. VALVULA DE PURGA DE 1/2" 1.00
TUBERIA SP NTP 399.002 DE 21.0mm (1/2") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 21.2mm (1/2") 1.00 2.00
UNION UNIVERSAL NTP 399.019 DE 21.0mm (1/2") 1.00 2.00
NIPLE FG DE 1/2" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 21.0mm (1/2.") 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 3.00
08.04.09 SUMINISTRO E INST. VALVULA DE PURGA DE 3/4" 1.00
TUBERIA SP NTP 399.002 DE 26.5mm (3/4") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 26.7mm (3/4") 1.00 2.00
UNION UNIVERSAL DE F G DE 3/4" 1.00 2.00
NIPLE FG DE 3/4" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 3/4" 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 2.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 1.00 1.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.05.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1/2"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 174.92
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 281.58

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 5

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 669.14
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 669.14
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 669.14
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 568.77
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 100.37
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 568.77
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 100.37
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 669.14
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 669.14
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 669.14
08.03.07 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 5 1.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 3.00
REDUCCION SP NTP 399.019 DE 26.7 mm A 21.2 mm (3/4" A 1/2") 3.00
CODO SP NTP 399.019 DE 26.7mm (3/4") X 45 4.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 10.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 1.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.09 SUMINISTRO E INST. VALVULA DE PURGA DE 3/4" 1.00
TUBERIA SP NTP 399.002 DE 26.5mm (3/4") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 26.7mm (3/4") 1.00 2.00
UNION UNIVERSAL DE F G DE 3/4" 1.00 2.00
NIPLE FG DE 3/4" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 3/4" 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 2.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 1.00 1.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 669.14

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 6

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 1,068.73
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 1,068.73
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 1,068.73
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 908.42
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 160.31
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 908.42
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 160.31
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 1,068.73
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 1,068.73
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21.0 mm ( 1/2")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 598.50
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 470.23
08.03.08 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 6 1.00
TEE SP NTP 399.019 DE 21.2 mm (1/2" ) 1.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 2.00
REDUCCION SP NTP 399.019 DE 26.7 mm A 21.2 mm (3/4" A 1/2") 1.00
CODO SP NTP 399.019 DE 26.7mm (3/4") X 45 8.00
CODO SP NTP 399.019 DE 21.2mm (1/2") X 45 2.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 14.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 1.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.08 SUMINISTRO E INST. VALVULA DE PURGA DE 1/2" 1.00
TUBERIA SP NTP 399.002 DE 21.0mm (1/2") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 21.2mm (1/2") 1.00 2.00
UNION UNIVERSAL NTP 399.019 DE 21.0mm (1/2") 1.00 2.00
NIPLE FG DE 1/2" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 21.0mm (1/2.") 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 3.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.05.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1/2"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 598.50
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 25.7 mm (3/4") 1.00 470.23

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 7

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 554.14
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 554.14
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 554.14
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 471.02
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 83.12
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 471.02
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 83.12
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 554.14
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 554.14
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21.0 mm ( 1/2")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 498.49
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 55.65
08.03.09 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 7 1.00
TEE SP NTP 399.019 DE 21.2 mm (1/2" ) 1.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 3.00
REDUCCION SP NTP 399.019 DE 26.7 mm A 21.2 mm (3/4" A 1/2") 4.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 8.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 1.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.08 SUMINISTRO E INST. VALVULA DE PURGA DE 1/2" 1.00
TUBERIA SP NTP 399.002 DE 21.0mm (1/2") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 21.2mm (1/2") 1.00 2.00
UNION UNIVERSAL NTP 399.019 DE 21.0mm (1/2") 1.00 2.00
NIPLE FG DE 1/2" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 21.0mm (1/2.") 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 3.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.05.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1/2"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 498.49
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 25.7 mm (3/4") 1.00 55.65

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 8

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 815.43
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 815.43
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 815.43
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 693.12
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 122.31
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 693.12
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 122.31
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 815.43
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 815.43
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21.0 mm ( 1/2")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 76.94
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 738.49
08.03.10 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 8 1.00
CODO SP NTP 399.019 DE 26.7mm (3/4") X 45 6.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 8.00
REDUCCION SP NTP 399.019 DE 26.7 mm A 21.2 mm (3/4" A 1/2") 8.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 16.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 2.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.09 SUMINISTRO E INST. VALVULA DE PURGA DE 3/4" 1.00
TUBERIA SP NTP 399.002 DE 26.5mm (3/4") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 26.7mm (3/4") 1.00 2.00
UNION UNIVERSAL DE F G DE 3/4" 1.00 2.00
NIPLE FG DE 3/4" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 3/4" 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 2.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 1.00 1.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.05.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1/2"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 76.94
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 738.49

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 9

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 1,072.79
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 1,072.79
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 1,072.79
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 911.87
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 160.92
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 911.87
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 160.92
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 1,072.79
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 1,072.79
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21.0 mm ( 1/2")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 781.20
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 291.59
08.03.11 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 9 1.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 3.00
REDUCCION SP NTP 399.019 DE 26.7 mm A 21.2 mm (3/4" A 1/2") 3.00
CODO SP NTP 399.019 DE 26.7mm (3/4") X 45 3.00
CODO SP NTP 399.019 DE 21.2mm (1/2") X 45 3.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 6.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 1.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.08 SUMINISTRO E INST. VALVULA DE PURGA DE 1/2" 1.00
TUBERIA SP NTP 399.002 DE 21.0mm (1/2") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 21.2mm (1/2") 1.00 2.00
UNION UNIVERSAL NTP 399.019 DE 21.0mm (1/2") 1.00 2.00
NIPLE FG DE 1/2" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 21.0mm (1/2.") 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 3.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.05.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1/2"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 781.20
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 291.59

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 10

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 1,289.82
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 1,289.82
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 1,289.82
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 1,096.35
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 193.47
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 1,096.35
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 193.47
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 1,289.82
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 1,289.82
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21.0 mm ( 1/2")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 1,289.82
08.03.12 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 10 1.00
CODO SP NTP 399.019 DE 21.2mm (1/2") X 45 13.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 13.00
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.05.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1/2"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 1,289.82

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 11

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 84.20
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 84.20
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 84.20
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 71.57
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 12.63
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 71.57
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 12.63
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 84.20
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 84.20
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 84.20
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.05.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1/2"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 84.20

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 12

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 575.31
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 575.31
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 575.31
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 489.01
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 86.30
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 489.01
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 86.30
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 575.31
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 575.31
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21.0 mm ( 1/2")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 69.84
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 505.47
08.03.13 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 12 1.00
TEE SP NTP 399.019 DE 21.2 mm (1/2" ) 3.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 5.00
REDUCCION SP NTP 399.019 DE 26.7 mm A 21.2 mm (3/4" A 1/2") 5.00
CODO SP NTP 399.019 DE 26.7mm (3/4") X 45 5.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 18.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 1.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.09 SUMINISTRO E INST. VALVULA DE PURGA DE 3/4" 1.00
TUBERIA SP NTP 399.002 DE 26.5mm (3/4") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 26.7mm (3/4") 1.00 2.00
UNION UNIVERSAL DE F G DE 3/4" 1.00 2.00
NIPLE FG DE 3/4" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 3/4" 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 2.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 1.00 1.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.05.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1/2"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 69.84
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 505.47

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 13

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 371.01
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 371.01
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 371.01
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 315.36
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 55.65
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 315.36
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 55.65
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 371.01
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 371.01
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21.0 mm ( 1/2")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 338.75
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 32.26
08.03.14 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 13 1.00
TEE SP NTP 399.019 DE 21.2 mm (1/2" ) 1.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 2.00
REDUCCION SP NTP 399.019 DE 26.7 mm A 21.2 mm (3/4" A 1/2") 3.00
CODO SP NTP 399.019 DE 26.7mm (3/4") X 45 2.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 5.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 1.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.08 SUMINISTRO E INST. VALVULA DE PURGA DE 1/2" 1.00
TUBERIA SP NTP 399.002 DE 21.0mm (1/2") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 21.2mm (1/2") 1.00 2.00
UNION UNIVERSAL NTP 399.019 DE 21.0mm (1/2") 1.00 2.00
NIPLE FG DE 1/2" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 21.0mm (1/2.") 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 3.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.05.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1/2"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 338.75
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 32.26

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 14

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN
Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 437.85
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 437.85
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 437.85
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 372.17
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 65.68
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 372.17
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 65.68
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 437.85
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 437.85
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 437.85
08.03.15 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 14 1.00
CODO SP NTP 399.019 DE 26.7mm (3/4") X 45 2.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 2.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 1.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.09 SUMINISTRO E INST. VALVULA DE PURGA DE 3/4" 1.00
TUBERIA SP NTP 399.002 DE 26.5mm (3/4") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 26.7mm (3/4") 1.00 2.00
UNION UNIVERSAL DE F G DE 3/4" 1.00 2.00
NIPLE FG DE 3/4" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 3/4" 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 2.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 1.00 1.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 437.85

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 15

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN
Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 359.48
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 359.48
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 359.48
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 305.56
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 53.92
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 305.56
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 53.92
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 359.48
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 359.48
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 359.48
08.03.16 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 15 1.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 2.00
CODO SP NTP 399.019 DE 26.7mm (3/4") X 45 2.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 4.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 1.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.09 SUMINISTRO E INST. VALVULA DE PURGA DE 3/4" 1.00
TUBERIA SP NTP 399.002 DE 26.5mm (3/4") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 26.7mm (3/4") 1.00 2.00
UNION UNIVERSAL DE F G DE 3/4" 1.00 2.00
NIPLE FG DE 3/4" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 3/4" 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 2.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 1.00 1.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 359.48

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 16

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN
Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 588.29
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 588.29
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 588.29
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 500.05
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 88.24
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 500.05
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 88.24
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 588.29
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 588.29
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 588.29
08.03.17 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 16 1.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 5.00
REDUCCION SP NTP 399.019 DE 26.7 mm A 21.2 mm (3/4" A 1/2") 4.00
CODO SP NTP 399.019 DE 26.7mm (3/4") X 45 3.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 12.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 2.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.09 SUMINISTRO E INST. VALVULA DE PURGA DE 3/4" 1.00
TUBERIA SP NTP 399.002 DE 26.5mm (3/4") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 26.7mm (3/4") 1.00 2.00
UNION UNIVERSAL DE F G DE 3/4" 1.00 2.00
NIPLE FG DE 3/4" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 3/4" 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 2.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 1.00 1.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 588.29

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 17


Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 582.17
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 582.17
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 582.17
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 494.84
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 87.33
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 494.84
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 87.33
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 582.17
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 582.17
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21.0 mm ( 1/2")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 564.71
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 17.46
08.03.18 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 17 1.00
TEE SP NTP 399.019 DE 21.2 mm (1/2" ) 1.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 1.00
REDUCCION SP NTP 399.019 DE 26.7 mm A 21.2 mm (3/4" A 1/2") 2.00
CODO SP NTP 399.019 DE 21.2 mm (1/2") X 45 5.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 9.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 1.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.08 SUMINISTRO E INST. VALVULA DE PURGA DE 1/2" 1.00
TUBERIA SP NTP 399.002 DE 21.0mm (1/2") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 21.2mm (1/2") 1.00 2.00
UNION UNIVERSAL NTP 399.019 DE 21.0mm (1/2") 1.00 2.00
NIPLE FG DE 1/2" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 21.0mm (1/2.") 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 3.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.05.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 1/2"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 21.0 mm (1/2") 1.00 564.71
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 17.46

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 18

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 357.99
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 357.99
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 357.99
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 304.29
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 53.70
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 304.29
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 53.70
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 357.99
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 357.99
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 357.99
08.03.19 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 18 1.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 2.00
REDUCCION SP NTP 399.019 DE 26.7 mm A 21.2 mm (3/4" A 1/2") 2.00
CODO SP NTP 399.019 DE 26.7mm (3/4") X 45 5.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 9.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 1.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.09 SUMINISTRO E INST. VALVULA DE PURGA DE 3/4" 1.00
TUBERIA SP NTP 399.002 DE 26.5mm (3/4") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 26.7mm (3/4") 1.00 2.00
UNION UNIVERSAL DE F G DE 3/4" 1.00 2.00
NIPLE FG DE 3/4" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 3/4" 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 2.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 1.00 1.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 357.99

HOJA DE METRADOS DE RED DE DISTRIBUCION SISTEMA 19

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPIN

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

08 RED DE DISTRIBUCION ML
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts.
TOTAL RED DE DISTRIBUCION 1.00 398.29
08.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
TOTAL RED DE DISTRIBUCION 1.00 398.29
08.01.03 DESBROCE
TOTAL RED DE DISTRIBUCION 1.00 398.29
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 338.55
08.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 59.74
08.02.03 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M
TOTAL RED DISTRIBUCION TERRENO COMPACTO 1.00 338.55
08.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION ROCA SUELTA 1.00 59.74
08.02.05 CAMA DE APOYO P/TUB. H= 0.10 M
TOTAL RED DE DISTRIBUCION 1.00 398.29
08.02.06 RELLENO COMPACTADO P/TUB. H= 0.70 M
TOTAL RED DISTRIBUCION 1.00 398.29
8.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
08.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 26.5 mm ( 3/4")
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 398.29
08.03.20 SUMINISTRO DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION SISTEMA 19 1.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 2.00
REDUCCION SP NTP 399.019 DE 26.7 mm A 21.2 mm (3/4" A 1/2") 2.00
CODO SP NTP 399.019 DE 26.7mm (3/4") X 45 3.00
08.03.21 COLOCACION DE ACCESORIOS PVC EN LINEA DE DISTRIBUCION
COLOCACION DE ACCESORIOS 1.00 7.00
08.04 SUMINISTRO E INST. DE VALVULAS DE PURGA 1.00 unid
08.04.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
CAJA 1.00 1.00 0.80
DADO 1.00 0.30 0.30
08.04.02 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CAJA 1.00 1.00 0.80 0.70
DADO 1.00 0.30 0.30 0.30
TUBERIA 1.00 6.00 0.60 0.70
08.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURO EXT 2.00 0.60 0.85
2.00 0.80 0.85
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.05 CONCRETO F'C= 175 KG/CM2 EN CAJA DE VALVULA CON HORMIGON
MUROS 2.00 0.60 0.10 0.85
2.00 0.80 0.10 0.85
PISO 1.00 1.00 0.80 0.10
08.04.04 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 CON HORMIGON
DADO 1.00 0.30 0.30 0.30
08.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA
MURO EXT 2.00 0.60 0.35
2.00 0.80 0.35
MURO INT. 2.00 0.40 0.85
2.00 0.60 0.85
08.04.07 TAPA SANITARIA METALICA 0.50 x 0.50 mts. E = 1/8"
1.00
08.04.09 SUMINISTRO E INST. VALVULA DE PURGA DE 3/4" 1.00
TUBERIA SP NTP 399.002 DE 26.5mm (3/4") 1.00 6.00
ADAPTADOR UPR NTP 399.019 DE 26.7mm (3/4") 1.00 2.00
UNION UNIVERSAL DE F G DE 3/4" 1.00 2.00
NIPLE FG DE 3/4" 1.00 2.00
VALVULA ESFERICA DE BRONCE PESADA DE 3/4" 1.00 1.00
CODO NTP 399.003 DE 54.0mm X 45 (2") 1.00 2.00
TUBERIA NTP 399.003 DE 54.0mm (2") 1.00 2.00
TEE SP NTP 399.019 DE 26.7 mm (3/4" ) 1.00 1.00
08.04.10 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METLICAS
2.00 0.50 0.50
08.05 PRUEBA HIDRAULICA Y DESINFECCION
08.06.02 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA DE 3/4"
TOTAL TUBERIA PVC NTP 399.002 C-10 DE 26.5 mm (3/4") 1.00 398.29
Distrito : OCORURO
Departamento : CUSCO

11,745.03
11,745.03
11,745.03

9,983.28
1,761.76
9,983.28
1,761.76
11,745.03
11,745.03

4,921.25
6,823.78
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
177.00

18.69
65.25
85.68
0.57
6.68
56.28
21.00
8.00
13.00
10.50

5,005.45
6,739.58
ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

170.80 ml
170.80
170.80 ml
170.80
170.80 ml
170.80

145.18 ml
145.18
25.62 ml
25.62
145.18 ml
145.18
25.62 ml
25.62
170.80 ml
170.80
170.80 ml
170.80

170.80 ml
170.80
1.00 1.00 glb
2.00 unid
2.00 unid
4.00 unid
4.00

0.89 m2
0.80
0.09
3.11 m3
0.56
0.03
2.52
4.08 m2
1.02
1.36
0.68
1.02
0.32 m3
0.10
0.14
0.08
0.03 m3
0.03
2.68 m2
0.42
0.56
0.68
1.02
1.00 und
1.00
1.00 und
6.00 ml
1.00 und
1.00 und
1.00 und
1.00 und
1.00 und
1.00 ml
1.00 ml
0.50 m2
0.50

170.80 ml
170.80
ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

1,186.55 ml
1,186.55
1,186.55 ml
1,186.55
1,186.55 ml
1,186.55

1,008.57 ml
1,008.57
177.98 ml
177.98
1,008.57 ml
1,008.57
177.98 ml
177.98
1,186.55 ml
1,186.55
1,186.55 ml
1,186.55

367.33 ml
367.33
819.22 ml
819.22
1.00 1.00 glb
3.00 unid
3.00 unid
15.00 unid
21.00 unid
21.00

0.89 m2
0.80
0.09
3.11 m3
0.56
0.03
2.52
4.08 m2
1.02
1.36
0.68
1.02
0.32 m3
0.10
0.14
0.08
0.03 m3
0.03
2.68 m2
0.42
0.56
0.68
1.02
1.00 und
1.00
1.00 und
6.00 ml
1.00 und
1.00 und
1.00 und
1.00 und
1.00 und
1.00 ml
0.50 m2
0.50

367.33 ml
367.33
819.22 ml
819.22

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

706.54 ml
706.54
706.54 ml
706.54
706.54 ml
706.54

600.56 ml
600.56
105.98 ml
105.98
600.56 ml
600.56
105.98 ml
105.98
706.54 ml
706.54
706.54 ml
706.54

160.75 ml
160.75
545.79 ml
545.79
1.00 1.00 glb
1.00 unid
4.00 unid
4.00 unid
3.00 unid
1.00 unid
13.00 unid
13.00

1.78 m2
0.80
0.09
6.21 m3
0.56
0.03
2.52
8.16 m2
1.02
1.36
0.68
1.02
0.64 m3
0.10
0.14
0.08
0.05 m3
0.03
5.36 m2
0.42
0.56
0.68
1.02
2.00 und
1.00
1.00 und
6.00 ml
1.00 und
1.00 und
1.00 und
1.00 und
1.00 und
1.00 ml
1.00 und
6.00 ml
1.00 und
1.00 und
1.00 und
1.00 und
1.00 und
1.00 ml
1.00 ml
1.00 m2
0.50

160.75 ml
160.75
545.79 ml
545.79

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

456.50 ml
456.50
456.50 ml
456.50
456.50 ml
456.50

388.03 ml
388.03
68.48 ml
68.48
388.03 ml
388.03
68.48 ml
68.48
456.50 ml
456.50
456.50 ml
456.50

174.92 ml
174.92
281.58 ml
281.58
1.00 1.00 glb
2.00 unid
2.00 unid
2.00 unid
6.00 unid
6.00

1.78 m2
0.80
0.09
6.21 m3
0.56
0.03
2.52
8.16 m2
1.02
1.36
0.68
1.02
0.64 m3
0.10
0.14
0.08
0.05 m3
0.03
5.36 m2
0.42
0.56
0.68
1.02
2.00 und
1.00
1.00 und
6.00 ml
1.00 und
1.00 und
1.00 und
1.00 und
1.00 und
1.00 ml
1.00 und
6.00 ml
1.00 und
1.00 und
1.00 und
1.00 und
1.00 und
1.00 ml
1.00 ml
1.00 m2
0.50

174.92 ml
174.92
281.58 ml
281.58

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

669.14 ml
669.14
669.14 ml
669.14
669.14 ml
669.14

568.77 ml
568.77
100.37 ml
100.37
568.77 ml
568.77
100.37 ml
100.37
669.14 ml
669.14
669.14 ml
669.14

669.14 ml
669.14
1.00 1.00 glb
3.00 unid
3.00 unid
4.00 unid
10.00 unid
10.00

0.89 m2
0.80
0.09
3.11 m3
0.56
0.03
2.52
4.08 m2
1.02
1.36
0.68
1.02
0.32 m3
0.10
0.14
0.08
0.03 m3
0.03
2.68 m2
0.42
0.56
0.68
1.02
1.00 und
1.00
1.00 und
6.00 ml
1.00 und
1.00 und
1.00 und
1.00 und
1.00 und
1.00 ml
1.00 ml
0.50 m2
0.50

669.14 ml
669.14

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

1,068.73 ml
1,068.73
1,068.73 ml
1,068.73
1,068.73 ml
1,068.73

908.42 ml
908.42
160.31 ml
160.31
908.42 ml
908.42
160.31 ml
160.31
1,068.73 ml
1,068.73
1,068.73 ml
1,068.73

598.50 ml
598.50
470.23 ml
470.23
1.00 1.00 glb
1.00 unid
2.00 unid
1.00 unid
8.00 unid
2.00 unid
14.00 unid
14.00
0.89 m2
0.80
0.09
3.11 m3
0.56
0.03
2.52
4.08 m2
1.02
1.36
0.68
1.02
0.32 m3
0.10
0.14
0.08
0.03 m3
0.03
2.68 m2
0.42
0.56
0.68
1.02
1.00 und
1.00
1.00 und
6.00 ml
1.00 und
1.00 und
1.00 und
1.00 und
1.00 und
1.00 ml
0.50 m2
0.50

598.50 ml
598.50
470.23 ml
470.23

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

554.14 ml
554.14
554.14 ml
554.14
554.14 ml
554.14

471.02 ml
471.02
83.12 ml
83.12
471.02 ml
471.02
83.12 ml
83.12
554.14 ml
554.14
554.14 ml
554.14

498.49 ml
498.49
55.65 ml
55.65
1.00 1.00 glb
1.00 unid
3.00 unid
4.00 unid
8.00 unid
8.00

0.89 m2
0.80
0.09
3.11 m3
0.56
0.03
2.52
4.08 m2
1.02
1.36
0.68
1.02
0.32 m3
0.10
0.14
0.08
0.03 m3
0.03
2.68 m2
0.42
0.56
0.68
1.02
1.00 und
1.00
1.00 und
6.00 ml
1.00 und
1.00 und
1.00 und
1.00 und
1.00 und
1.00 ml
0.50 m2
0.50

498.49 ml
498.49
55.65 ml
55.65

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

815.43 ml
815.43
815.43 ml
815.43
815.43 ml
815.43

693.12 ml
693.12
122.31 ml
122.31
693.12 ml
693.12
122.31 ml
122.31
815.43 ml
815.43
815.43 ml
815.43
76.94 ml
76.94
738.49 ml
738.49
1.00 1.00 glb
6.00 unid
8.00 unid
8.00 unid
16.00 unid
16.00

1.78 m2
0.80
0.09
6.21 m3
0.56
0.03
2.52
8.16 m2
1.02
1.36
0.68
1.02
0.64 m3
0.10
0.14
0.08
0.05 m3
0.03
5.36 m2
0.42
0.56
0.68
1.02
2.00 und
1.00
2.00 und
12.00 ml
4.00 und
4.00 und
4.00 und
2.00 und
4.00 und
4.00 ml
2.00 ml
1.00 m2
0.50

76.94 ml
76.94
738.49 ml
738.49

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

1,072.79 ml
1,072.79
1,072.79 ml
1,072.79
1,072.79 ml
1,072.79

911.87 ml
911.87
160.92 ml
160.92
911.87 ml
911.87
160.92 ml
160.92
1,072.79 ml
1,072.79
1,072.79 ml
1,072.79

781.20 ml
781.20
291.59 ml
291.59
1.00 1.00 glb
3.00 unid
3.00 unid
3.00 unid
3.00 unid
6.00 unid
6.00

0.89 m2
0.80
0.09
3.11 m3
0.56
0.03
2.52
4.08 m2
1.02
1.36
0.68
1.02
0.32 m3
0.10
0.14
0.08
0.03 m3
0.03
2.68 m2
0.42
0.56
0.68
1.02
1.00 und
1.00
1.00 und
6.00 ml
1.00 und
1.00 und
1.00 und
1.00 und
1.00 und
1.00 ml
0.50 m2
0.50

781.20 ml
781.20
291.59 ml
291.59

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

1,289.82 ml
1,289.82
1,289.82 ml
1,289.82
1,289.82 ml
1,289.82

1,096.35 ml
1,096.35
193.47 ml
193.47
1,096.35 ml
1,096.35
193.47 ml
193.47
1,289.82 ml
1,289.82
1,289.82 ml
1,289.82

1,289.82 ml
1,289.82
1.00 1.00 glb
13.00 unid
13.00 unid
13.00

1,289.82 ml
1,289.82

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

84.20 ml
84.20
84.20 ml
84.20
84.20 ml
84.20

71.57 ml
71.57
12.63 ml
12.63
71.57 ml
71.57
12.63 ml
12.63
84.20 ml
84.20
84.20 ml
84.20

84.20 ml
84.20

84.20 ml
84.20

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

575.31 ml
575.31
575.31 ml
575.31
575.31 ml
575.31
489.01 ml
489.01
86.30 ml
86.30
489.01 ml
489.01
86.30 ml
86.30
575.31 ml
575.31
575.31 ml
575.31

69.84 ml
69.84
505.47 ml
505.47
1.00 1.00 glb
3.00 unid
5.00 unid
5.00 unid
5.00 unid
18.00 unid
18.00

0.89 m2
0.80
0.09
3.11 m3
0.56
0.03
2.52
4.08 m2
1.02
1.36
0.68
1.02
0.32 m3
0.10
0.14
0.08
0.03 m3
0.03
2.68 m2
0.42
0.56
0.68
1.02
1.00 und
1.00
1.00 und
6.00 ml
2.00 und
2.00 und
2.00 und
1.00 und
2.00 und
2.00 ml
1.00 ml
0.50 m2
0.50

69.84 ml
69.84
505.47 ml
505.47

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.


371.01 ml
371.01
371.01 ml
371.01
371.01 ml
371.01

315.36 ml
315.36
55.65 ml
55.65
315.36 ml
315.36
55.65 ml
55.65
371.01 ml
371.01
371.01 ml
371.01

338.75 ml
338.75
32.26 ml
32.26
1.00 1.00 glb
1.00 unid
2.00 unid
3.00 unid
2.00 unid
5.00 unid
5.00

0.89 m2
0.80
0.09
3.11 m3
0.56
0.03
2.52
4.08 m2
1.02
1.36
0.68
1.02
0.32 m3
0.10
0.14
0.08
0.03 m3
0.03
2.68 m2
0.42
0.56
0.68
1.02
1.00 und
1.00
1.00 und
6.00 ml
2.00 und
2.00 und
2.00 und
1.00 und
2.00 und
3.00 ml
0.50 m2
0.50

338.75 ml
338.75
32.26 ml
32.26

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO


Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

437.85 ml
437.85
437.85 ml
437.85
437.85 ml
437.85

372.17 ml
372.17
65.68 ml
65.68
372.17 ml
372.17
65.68 ml
65.68
437.85 ml
437.85
437.85 ml
437.85

437.85 ml
437.85
1.00 1.00 glb
2.00 unid
2.00 unid
2.00

0.89 m2
0.80
0.09
3.11 m3
0.56
0.03
2.52
4.08 m2
1.02
1.36
0.68
1.02
0.32 m3
0.10
0.14
0.08
0.03 m3
0.03
2.68 m2
0.42
0.56
0.68
1.02
1.00 und
1.00
1.00 und
6.00 ml
2.00 und
2.00 und
2.00 und
1.00 und
2.00 und
2.00 ml
1.00 ml
0.50 m2
0.50

437.85 ml
437.85

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO


Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

359.48 ml
359.48
359.48 ml
359.48
359.48 ml
359.48

305.56 ml
305.56
53.92 ml
53.92
305.56 ml
305.56
53.92 ml
53.92
359.48 ml
359.48
359.48 ml
359.48

359.48 ml
359.48
1.00 1.00 glb
2.00 unid
2.00 unid
4.00 unid
4.00

0.89 m2
0.80
0.09
3.11 m3
0.56
0.03
2.52
4.08 m2
1.02
1.36
0.68
1.02
0.32 m3
0.10
0.14
0.08
0.03 m3
0.03
2.68 m2
0.42
0.56
0.68
1.02
1.00 und
1.00
1.00 und
6.00 ml
2.00 und
2.00 und
2.00 und
1.00 und
2.00 und
2.00 ml
1.00 ml
0.50 m2
0.50

359.48 ml
359.48

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO


Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

588.29 ml
588.29
588.29 ml
588.29
588.29 ml
588.29

500.05 ml
500.05
88.24 ml
88.24
500.05 ml
500.05
88.24 ml
88.24
588.29 ml
588.29
588.29 ml
588.29

588.29 ml
588.29
1.00 1.00 glb
5.00 unid
4.00 unid
3.00 unid
12.00 unid
12.00

1.78 m2
0.80
0.09
6.21 m3
0.56
0.03
2.52
8.16 m2
1.02
1.36
0.68
1.02
0.64 m3
0.10
0.14
0.08
0.05 m3
0.03
5.36 m2
0.42
0.56
0.68
1.02
2.00 und
1.00
2.00 und
12.00 ml
4.00 und
4.00 und
4.00 und
2.00 und
4.00 und
4.00 ml
2.00 ml
1.00 m2
0.50

588.29 ml
588.29
ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

582.17 ml
582.17
582.17 ml
582.17
582.17 ml
582.17

494.84 ml
494.84
87.33 ml
87.33
494.84 ml
494.84
87.33 ml
87.33
582.17 ml
582.17
582.17 ml
582.17

564.71 ml
564.71
17.46 ml
17.46
1.00 1.00 glb
1.00 unid
1.00 unid
2.00 unid
5.00 unid
9.00 unid
9.00

0.89 m2
0.80
0.09
3.11 m3
0.56
0.03
2.52
4.08 m2
1.02
1.36
0.68
1.02
0.32 m3
0.10
0.14
0.08
0.03 m3
0.03
2.68 m2
0.42
0.56
0.68
1.02
1.00 und
1.00
1.00 und
6.00 ml
2.00 und
2.00 und
2.00 und
1.00 und
2.00 und
3.00 ml
0.50 m2
0.50
564.71 ml
564.71
17.46 ml
17.46

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

357.99 ml
357.99
357.99 ml
357.99
357.99 ml
357.99

304.29 ml
304.29
53.70 ml
53.70
304.29 ml
304.29
53.70 ml
53.70
357.99 ml
357.99
357.99 ml
357.99

357.99 ml
357.99
1.00 1.00 glb
2.00 unid
2.00 unid
5.00 unid
9.00 unid
9.00

0.89 m2
0.80
0.09
3.11 m3
0.56
0.03
2.52
4.08 m2
1.02
1.36
0.68
1.02
0.32 m3
0.10
0.14
0.08
0.03 m3
0.03
2.68 m2
0.42
0.56
0.68
1.02
1.00 und
1.00
1.00 und
6.00 ml
2.00 und
2.00 und
2.00 und
1.00 und
2.00 und
2.00 ml
1.00 ml
0.50 m2
0.50

357.99 ml
357.99

ISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

398.29 ml
398.29
398.29 ml
398.29
398.29 ml
398.29

338.55 ml
338.55
59.74 ml
59.74
338.55 ml
338.55
59.74 ml
59.74
398.29 ml
398.29
398.29 ml
398.29

398.29 ml
398.29
1.00 1.00 glb
2.00 unid
2.00 unid
3.00 unid
7.00 unid
7.00

0.89 m2
0.80
0.09
3.11 m3
0.56
0.03
2.52
4.08 m2
1.02
1.36
0.68
1.02
0.32 m3
0.10
0.14
0.08
0.03 m3
0.03
2.68 m2
0.42
0.56
0.68
1.02
1.00 und
1.00
1.00 und
6.00 ml
2.00 und
2.00 und
2.00 und
1.00 und
2.00 und
2.00 ml
1.00 ml
0.50 m2
0.50

398.29 ml
398.29
PASE AEREO

tem Descripcin Largo (m) Ancho (m) Altura (m) Sub Total
01.07 PASE AEREO 5.00 und
01.07.01 TRABAJOS PRELIMINARES
01.07.01.01 LIMPIEZA DEL TERRENO MANUAL
8.00 1.00 8.00
01.07.01.02 TRAZO Y REPLANTEO
BASE ZAPATA 2.00 2.00 4.00
01.07.02 MOVIMIENTO DE TIERRAS
01.07.02.01 EXCAVACION MANUAL
BASE ZAPATA 2.00 2.00 1.00 4.00
01.07.02.02 RELLENO Y APISONADO DE ZANJAS
BASE ZAPATA 2.00 2.00 0.10 0.40
COLUMNA 0.25 0.25 0.10 0.01
01.07.02.03 ELIMINACION DE MATERIAL EXCEDENTE D= 30 mts
14.43 1.00 1.00 14.43
01.07.03 OBRAS DE CONCRETO SIMPLE
01.07.03.01 CONCRETO F'C= 100 KG/CM2 PARA SOLADO
BASE ZAPATA 2.00 2.00 0.10 0.40
DADO DE ANCLAJE 0.80 0.80 0.80 0.51
01.07.04 OBRAS DE CONCRETO ARMADO
01.07.04.01 CONCRETO F'C= 210 KG/CM2
ZAPATA COLUMNA 2.00 2.00 0.40 1.60
COLUMNA 0.25 0.25 1.50 0.09
01.07.04.02 ENCOFRADO Y DESENCOFRADO
COLUMNA 0.25 1.50 0.38
DADO DE ANCLAJE 0.80 0.80 0.64
01.07.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
DE PLANILLA DE ARMADURA 99.67 99.67
01.07.05 REVOQUES, ENLUCIDOS Y MOLDURAS
01.07.05.01 TARRAJEO EXTERIOR MEZCLA 1:5
COLUMNA 0.25 1.50 0.38
01.07.06 ACCESORIOS Y TUBERIAS
01.07.06.01 SUMINISTRO DE ACCESORIOS EN PASE AEREO CON ESTRUCTUR
TAPA DE SEGURIDAD 0.40 X 0.40 1.00 1.00
01.07.07 ESTRUCTURA METALICA
01.07.07.01 ESTRUCTURA METALICA 15.00 15.00
01.07.07.02 APOYO FIJO EN COLUMNETA
APOYO FIJO 1.00 1.00
01.07.07.03 APOYO MOVIL EN COLUMNETA
APOYO MOVIL 1.00 1.00
01.07.08 PINTURAS
01.07.08.01 PINTADO DE ESTRUCTURA METALICA
ESTRUCTURAS 15.00 15.00
PASE AEREO

N Veces Total Unidad

40.00 m2
1.00
40.00 m2
2.00

40.00 m3
2.00
3.94 m3
2.00 4.00
-2.00 -0.06
90.16 m3
1.25

6.56 m3
2.00 4.00
1.00 2.56

16.94 m3
2.00 16.00
2.00 0.94
31.00 m2
8.00 15.00
5.00 16.00
498.35 kg
1.00

15.00 m2
8.00

2.00 2.00 glb


2.00 2.00 und

1.00 75.00 m
5.00 und
1.00
5.00 und
1.00

75.00 m
1.00
HOJA RESUMEN DE METRADOS INSTALACIONES DOMICILIARIAS

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORUR

Localidad : HUISAPATA
Provincia : ESPINAR

09 INSTALACIONES DOMICILIARIA
09.01 TRABAJOS PRELIMINARES
09.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAV. ZANJA EN TIERRA COMPACTA P/TUB. A= 0.50 m H= 0.70
09.02.02 CAMA DE APOYO P/TUB. H= 0.10 M
09.02.03 RELLENO COMPACTADO P/TUB. H= 0.70 M
09.03 SUMINISTRO E INSTALACION DE ACCESORIOS
09.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21 mm ( 1/2")
09.03.02 SUMINISTRO E INST. VALVULA DE PASO EN CONEXION DOMICILIARIA
10 PILETAS DOMICILIARIAS
10.01 TRABAJOS PRELIMINARES
10.01.01 LIMPIEZA DE TERRENO MANUAL
10.01.02 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
10.02 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
10.02.02 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (< 2'')
10.03 OBRAS DE CONCRETO SIMPLE
10.03.01 EMPEDRADO PARA SOLADOS h=20 cm. CON P.G. 8"
10.03.02 SOLADOS CONCRETO f'c=100 kg/cm2 h=2", SOBRE EMPEDRADO
10.03.03 CONCRETO F'C= 140 KG/CM2 + 30 % P.M CON HORMIGON
10.04 OBRAS DE CONCRETO ARMADO
10.04.01 CONCRETO F'C= 175 KG/CM2 EN OBRAS DE ARTE CON HORMIGON
10.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
10.04.03 ACERO CORRUGADO = 1/4", FY= 4,200 KG/CM2 GRADO 60
10.05 REVESTIMIENTOS
10.05.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
10.05.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA
10.06 ACCESORIOS
10.06.01 SUMINISTRO DE ACCESORIOS
10.06.02 COLOCACION DE ACCESORIOS
10.07 POZO DE ABSORCION
10.07.01 EXCAVACION HASTA 1.50 M
10.07.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
10.07.03 MATERIAL FILTRANTE
HOJA DE METRADOS DE CONEXIONES DOMICILIARIAS Y BATEAS EN EL SISTEMA GENERAL

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORUR

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

9.00 INSTALACION DOMICILIARIA 89.00 unid


09.01 TRABAJOS PRELIMINARES
09.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
CONEXIN DOMICILIARIA 1.00 890.00
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAV. ZANJA EN TIERRA COMPACTA P/TUB. A= 0.50 m H= 0.70
CONEXIN DOMICILIARIA 1.00 890.00
09.02.02 CAMA DE APOYO P/TUB. H= 0.10 M
PARA TUBERIA 1.00 890.00
09.02.03 RELLENO COMPACTADO P/TUB. H= 0.70 M
1.00 890.00
09.03 SUMINISTRO E INSTALACION DE ACCESORIOS
09.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.002, C-10 DE 21 mm ( 1/2")
TUBERIA PVC CLASE 10 D= 1/2" 1.00 890.00
09.03.02 SUMINISTRO E INST. VALVULA DE PASO EN CONEXION DOMICILIARIA 1.00
CAJA DE CONCRETO PARA VALVULA DE PASO DE 1/2" 1.00 1.00
VALVULA DE PASO PVC DE 1/2" TIPO PESADO 1.00 1.00
MARCO Y TAPA DE ACERO GALVANIZADO NTN 350.085 1.00 1.00
ADAPTADOR UPR NTP 399.019 DE 21.2 mm (1/2") 1.00 2.00
UNION UNIVERSAL NTP 399.019 DE 21.0 mm (1/2") 1.00 2.00
NIPLE CON ROSCA NTP 399.019 DE 18.4 mm (1/2") 1.00 2.00
10 PILETAS DOMICILIARIAS 89.00 UNID
10.01 TRABAJOS PRELIMINARES
10.01.01 LIMPIEZA DE TERRENO MANUAL
1.00 2.00 0.90
10.01.02 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
BASE 1.00 1.70 0.65
10.02 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
BASE 3.00 0.65 0.30 0.10
10.02.02 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A=0.50m H=0.70m (< 2'')
EXCAVACION PARA TUBERIA 1.00 2.00
10.03 OBRAS DE CONCRETO SIMPLE
10.03.01 EMPEDRADO PARA SOLADOS h=20 cm. CON P.G. 8"
1.00 2.00 0.90 0.30
10.03.02 SOLADOS CONCRETO f'c=100 kg/cm2 h=2", SOBRE EMPEDRADO
1.00 2.00 0.90
10.03.03 CONCRETO F'C= 140 KG/CM2 + 30 % P.M CON HORMIGON
CIMENTACION 1 3.00 0.65 0.30 0.10
MURETE 1 1.00 0.65 0.25 0.75
MURETE 2 2.00 0.65 0.30 0.35
10.04 OBRAS DE CONCRETO ARMADO
10.04.01 CONCRETO F'C= 175 KG/CM2 EN OBRAS DE ARTE CON HORMIGON
LOSA 1 1.00 0.80 0.65 0.10
PARED 1 2.00 0.65 0.10 0.40
PARED 2 2.00 0.80 0.10 0.40
PARED 3 1.00 0.25 0.10 0.35
PARED 4 0.00 0.90 0.05 0.35
10.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
MURETE 1 2.00 0.65 0.85
MURETE 1-2 2.00 0.65 0.75
MURETE 2-1 1.00 1.70 0.85
MURETE 2-2 -1.00 0.50 0.75
MURETE 2-3 -1.00 0.40 0.35
MURETE 2-4 1.00 0.65 0.10
BASE LOSA 1 1.00 0.65 0.50
INTERIOR POZA 1 2.00 0.45 0.40
INTERIOR POZA 2 2.00 0.80 0.40
CARA INFERIOR LOSA DE POZA 1.00 0.50 0.65
PEDESTAL TRAPEZOIDAL 1.00 0.40 0.35
PEDESTAL TRAPEZOIDAL 2.00 0.10 0.35
10.04.03 ACERO CORRUGADO = 1/4", FY= 4,200 KG/CM2 GRADO 60
F DE 1/4" ARMADURA LOGITUDINAL 3 2.5 0.25
F DE 1/4" ARMADURA PERIMETRAL BATEA 2 3 0.25
F DE 1/4" ARMADURA TRANSVERSAL POZA 2 1.2 0.25
F DE 1/4" ARM. TRANSV. POZA Y PEDESTAL 2 1.5 0.25
F DE 1/4" ARMADURA TRANSV. LOSA 3 0.57 0.25
10.05 REVESTIMIENTOS
10.05.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
LARGO DE LA POZA 2.00 0.80 0.40
ANCHO DE LA POZA 2.00 0.45 0.40
PEDESTAL TRAPEZOIDAL 1.00 0.40 0.35
LATERALES DEL PEDESTAL TRAPEZOIDAL 2.00 0.35 0.10
CARA SUPERIOR LOSA 1.00 0.80 0.65
10.05.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA
CARAS LATERALES 2.00 0.65 0.85
CARA FRONTAL 1.00 1.70 0.85
CARA FRONTAL -1.00 0.75 0.50
CARA FRONTAL -1.00 0.40 0.35
10.06 ACCESORIOS
10.06.01 SUMINISTRO DE ACCESORIOS 1.00
SUMIDERO DE BRONCE DE 2" PARA BATEA 1.00
CODO NTP 399.003 DE 54.0 mm x 90 (2"X90) 4.00
CODO NTP 399.003 DE 54.0 mm x 45 (2"X45) 2.00
TUBERIA NTP 399.003 DE 54.0 mm (2") 6.00
TUBERIA NTP 399.002 DE 21.0 mm (1/2") 3.00
CODO SP NTP 399.002 DE 21.2 mm x 90 (1/2"X90) 1.00
CODO FG DE 1/2"X90 1.00
NIPLE FG DE 2"X1/2" 2.00
UNION SIMPLE FG DE 1/2" 1.00
GRIFO ESFERICO PESADO TIPO JARDINERO DE 1/2" 1.00
10.06.02 COLOCACION DE ACCESORIOS
COLOCACION DE ACCESORIOS 1.00 22.00
10.07 POZO DE ABSORCION
10.07.01 EXCAVACION HASTA 1.50 M
POZO DE ABSORCION (VOLUMEN TOTAL) 1.00 0.80 0.80 0.90
10.07.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
DE EXCAVACION 1.30 0.80 0.80 0.90
10.07.03 MATERIAL FILTRANTE
PIEDRA MEDIANA Dmx. 6" PARA POZO DE ABSORCION 1.00 0.80 0.80 0.90
ARIAS

DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

ML 890.00

ML 890.00
ML 890.00
ML 890.00

ML 890.00
UND 89.00

M2 160.20
M2 98.35

M3 5.21
ML 178.00

M3 48.06
M2 160.20
M3 28.20

M3 15.73
M2 439.22
KG 440.55

M2 153.97
M2 181.12

GLB 89.00
UND 1,958.00

M3 51.26
M3 66.64
M3 51.26
SISTEMA GENERAL

DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

SUB-TOTAL TOTAL UNID.

890.00 ml
890.00

890.00 ml
890.00
890.00 ml
890.00
890.00 ml
890.00

890.00 ml
890.00

1.00 89.00 und

160.20 m2
1.80
98.35 m2
1.11

5.21 m3
0.06
178.00 ml
2.00

48.06 m3
0.54
160.20 m2
1.80
28.20 m3
0.06
0.12
0.14

15.73 m3
0.05
0.05
0.06
0.01
0.00
439.22 m2
1.11
0.98
1.45
-0.38
-0.14
0.07
0.33
0.36
0.64
0.33
0.14
0.07
440.55 kg

1.725
1.5
0.6
0.75
0.375

153.97 m2
0.64
0.36
0.14
0.07
0.52
181.12 m2
1.11
1.45
-0.38
-0.14

89.00 glb
1.00 und
4.00 und
2.00 und
6.00 ml
3.00 ml
1.00 und
1.00 und
2.00 und
1.00 und
1.00 und
1,958.00 und
22.00

51.26 m3
0.58 m3
66.64 m3
0.75 m3
51.26 m3
0.58 m3
HOJA RESUMEN DE METRADOS CASETA DE UBS CON ARRASTRE HIDRAULICO

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA

Localidad : HUISAPATA
Provincia : ESPINAR

11 UNIDAD BASICA DE SANEAMIENTO TIPO ARRASTRE HIDRAULICO ( 52 UND )


CASETAS DE UBS CON ARRASTRE HIDRAULICO
11.01
11.01.01 TRABAJOS PRELIMINARES
11.01.01.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
11.01.02 MOVIMIENTO DE TIERRAS
11.01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS EN TERRENO COMPACTO
11.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
11.01.03 OBRAS DE CONCRETO SIMPLE
11.01.03.01 CIMIENTOS CORRIDOS MEZCLA CEMENTO:HORMIGON 1:10 +30% P.G. MAX. 8" C/MEZCLADORA
11.01.03.02 SOBRECIMIENTO CONCRETO 1:8+25% PM CON HORMIGON
11.01.03.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS
11.01.04 MUROS
11.01.04.01 MUROS DE ADOBE DE 0.4 X 0.25 X 0.15 mts
11.01.05 COBERTURAS
11.01.05.01 ESTRUCTURA DE COBERTURA P/UBS C/A. HIDRAULICO
11.01.06 REVOQUES ENLUCIDOS Y MOLDURAS
11.01.06.01 ZOCALO EN INTERIOR EN MUROS DE ADOBE UBS
11.01.06.02 ZOCALO EN EXTERIOR EN MUROS DE ADOBE UBS
11.01.07 PISOS
11.01.07.01 BASE DE PIEDRA UBS
11.01.07.02 PISO DE CONCRETO E=2" f'c 140 kg/cm2 C/HORMIGON, ACABADO PULIDO
11.01.08 CARPINTERIA DE MADERA
11.01.08.01 PUERTA MAD. CORRIENTE (MISA ALCANFOR) 0.70 x 1.80m, T. REBAJADO C/PERSIANA
11.02 INSTALACIONES DE DESAGUE
11.02.01 TRABAJOS PRELIMINARES
11.02.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS P/DESAGE
11.02.02 MOVIMIENTO DE TIERRAS
11.02.02.01 EXCAVACION DE ZANJAS PARA TUBERIA
11.02.02.02 REFINE Y NIVELACION EN TERRENO NORMAL
11.02.02.03 RELLENO COMPACTADO P/TUB. H= 0.45 M
11.02.03 TUBERIAS, ACCESORIOS Y VALVULAS
11.02.03.01 SUMINISTRO Y COLOCACION DE ACCESORIOS EN UBS CON ARRASTRE HIDRAULICO
11.02.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.003 C-7.5 DE 105mm (4")
11.02.03.03 CAJA DE REGISTRO DE DESAGUE 0.25x0.30 m, e=0.1
11.03 POZO SEPARADOR DE LODOS
11.03.01 TRABAJOS PRELIMINARES
11.03.01.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
11.03.02 MOVIMIENTO DE TIERRAS
11.03.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
11.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
11.03.03 OBRAS DE CONCRETO SIMPLE
11.03.03.01 CONCRETO F'C= 140 KG/CM2 + 40 % PG CON HORMIGON
11.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
11.03.04 OBRAS DE CONCRETO ARMADO
11.03.04.01 CONCRETO Fc = 175 kg/cm2 EN LOSA Y TAPA CON HORMIGON
11.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
11.03.04.03 ACERO CORRUGADO = 1/4", FY= 4,200 KG/CM2 GRADO 60
11.03.04.04 ACERO CORRUGADO = 3/8", FY= 4,200 KG/CM2 GRADO 60
11.03.05 REVESTIMIENTOS
11.03.05.01 TARRAJEO CON IMPERMEABILIZANTES
11.03.06 ACCESORIOS DE POZO SEPARADOR DE LODOS
11.03.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS PARA POZO SEPARADOR DE LODOS
11.03.06.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.003 C-7.5 DE 54mm (2")
11.04 POZAS DE PERCOLACION
11.04.01 TRABAJOS PRELIMINARES
11.04.01.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
11.04.02 MOVIMIENTO DE TIERRAS
11.04.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS EN TERRENO COMPACTO
11.04.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
11.04.02.03 RELLENO DE PIEDRA MEDIANA
11.04.03 ACCESORIOS EN POZA DE PERCOLACION
11.04.03.01 SUMINISTRO E INSTALACION DE ACCESORIOS PARA POZO PERCOLADOR
11.05 POZO DE SECADO
11.05.01 TRABAJOS PRELIMINARES
11.05.01.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
11.05.02 MOVIMIENTO DE TIERRAS
11.05.02.01 EXCAVACION EN TERRENO COMPACTO
11.05.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
11.05.02.03 RECUBRIMIENTO DE PIEDRA MEDIANA E= 0.15
11.05.02.04 MADERA ROLLIZO DE EUCALIPTO D= 4"
METRADOS UBS CON ARRASTE HIDRAULICO Y POZO SEPARADOR DE LODOS
Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO, PROVINCIA

Localidad : HUISAPATA
Provincia : ESPINAR

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA


11 UNIDAD BASICA DE SANEAMIENTO TIPO ARRASTRE HIDRAULICO ( 52 UND )
11.01.01 TRABAJOS PRELIMINARES
11.01.01.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
UBS 1.00 1.88 1.77
11.01.02 MOVIMIENTO DE TIERRAS
11.01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS EN TERRENO COMPACTO
CIMIENTOS UBS 1 2.00 1.88 0.35 0.40
CIMIENTOS UBS 2 2.00 1.07 0.35 0.40
11.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
TOTAL EXCAVACION 0.03 42.95
11.01.03 OBRAS DE CONCRETO SIMPLE
11.01.03.01 CIMIENTOS CORRIDOS MEZCLA CEMENTO:HORMIGON 1:10 +30% P.G. MAX. 8" C/MEZCLADORA
CIMIENTOS UBS 1 2.00 1.88 0.35 0.40
CIMIENTOS UBS 2 2.00 1.07 0.35 0.40
11.01.03.02 SOBRECIMIENTO CONCRETO 1:8+25% PM CON HORMIGON
SOBRE CIMIENTOS UBS 1 2.00 1.78 0.25 0.20
SOBRE CIMIENTOS UBS 2 2.00 1.16 0.25 0.20
SOBRE CIMIENTOS UBS 3 -1.00 0.70 0.25 0.20
11.01.03.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS
SOBRE CIMIENTOS UBS EXTER.1 2.00 1.78 0.20
SOBRE CIMIENTOS UBS EXTER. 2 2.00 1.66 0.20
SOBRE CIMIENTOS UBS INTER. 1 2.00 1.28 0.20
SOBRE CIMIENTOS UBS INTER. 2 2.00 1.16 0.20
SOBRE CIMIENTOS UBS 3 -2.00 0.70 0.20
SOBRE CIMIENTOS UBS 4 2.00 0.25 0.20
11.01.04 MUROS
11.01.04.01 MUROS DE ADOBE DE 0.4 X 0.25 X 0.15 mts
UBS 1 2.00 1.78 2.27
UBS 2 1.00 1.16 2.48
UBS 3 1.00 1.16 2.05
PUERTA -1.00 0.70 1.65
11.01.05 COBERTURAS
11.01.05.01 ESTRUCTURA DE COBERTURA P/UBS C/A. HIDRAULICO 1.00 1.00
11.01.06 REVOQUES, ENLUCIDO Y MOLDURAS
11.01.06.01 ZOCALO EN INTERIOR EN MUROS DE ADOBE UBS
ZOCALO INTERIOR SOBRECIMIENTOS DE CONCRETO 1 2.00 1.28 0.20
ZOCALO INTERIOR SOBRECIMIENTOS DE CONCRETO 2 2.00 1.16 0.20
PUERTA -1.00 0.70 0.20
TARRAJEO EN INTERIORES EN MUROS DE ADOBE.
ZOCALO INTERIOR EN MURO ADOBE 1 2.00 1.28 0.30
ZOCALO INTERIOR EN MURO ADOBE 2 2.00 1.16 0.30
PUERTA -1.00 0.70 0.30
PUERTA 2.00 0.15 0.50
11.01.06.02 ZOCALO EN EXTERIOR EN MUROS DE ADOBE UBS
ZOCALO EXTERIORES EN MURO ADOBE 1 2.00 0.40 0.50
PUERTA 2.00 0.10 0.50
11.01.07 PISOS
11.01.07.01 BASE DE PIEDRA UBS
BASE DE PIEDRA UBS 1.00 1.16 1.28
11.01.07.02 PISO DE CONCRETO E=2" f'c 140 kg/cm2 C/HORMIGON, ACABADO PULIDO
PISO UBS 1 1.00 1.16 1.28
11.01.08 CARPINTERIA DE MADERA
11.01.08.01 PUERTA MAD. CORRIENTE (MISA ALCANFOR) 0.70 x 1.80m, T. REBAJADO C/PERSIANA
UBS 1.00
11.02 INSTALACIONES DE DESAGUE
11.02.01 TRABAJOS PRELIMINARES
11.02.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS P/DESAGE
TRAZO NIVELACION Y REPLANTEO 1.00 9.00
11.02.02 MOVIMIENTO DE TIERRAS
11.02.02.01 EXCAVACION DE ZANJAS PARA TUBERIA
TUBERIA DE DESAGUE DE UBS A POZO 1.00 6.00
TUBERIA DE DESAGUE DE POZO A PERCOLADOR 1.00 3.00
11.02.02.02 REFINE Y NIVELACION EN TERRENO NORMAL
REFINE DE ZANJA DE UBS A POZO 1.00 6.00 0.45
REFINE DE ZANJA DE POZO A PERCOLADOR 1.00 3.00 0.45
11.02.02.03 RELLENO COMPACTADO P/TUB. H= 0.45 M
TUBERIA DE DESAGUE DE UBS A POZO 1.00 6.00
TUBERIA DE DESAGUE DE POZO A PERCOLADOR 1.00 3.00
11.02.03 TUBERIAS, ACCESORIOS Y VALVULAS
11.02.03.01 SUMINISTRO Y COLOCACION DE ACCESORIOS EN UBS CON ARRASTRE HIDRAULICO 1.00
YEE NTP 399.003 DE 54.0 mm (2") 1.00 1.00
TUBERIA NTP 399.003 DE 54.0 mm (2") 1.00 3.00
CODO NTP 399.003 DE 64.0 mm x 90 (2" x 90) 1.00 1.00
SOMBRERO DE VENTILACION NTP 399.003 DE 54.0 mm (2") 1.00 1.00
11.02.03.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.003 C-7.5 DE 105mm (4")
TUBO NTP 399.003 DE 54.0 mm (4") 1.00 1.00
11.02.03.03 CAJA DE REGISTRO DE DESAGUE 0.25x0.30 m, e=0.1
CAJA DE REGISTRO DE DESAGUE 1.00 1.00
11.03 TANQUE SEPTICO 52.00 und
11.03.01 TRABAJOS PRELIMINARES
11.03.01.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
TANQUE SEPTICO 1.00 1.90 1.10
11.03.02 MOVIMIENTO DE TIERRAS
11.03.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
BASE TANQUE SEPTICO 1.00 1.90 1.10 1.35
11.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
TOTAL EXCAVACION 1.30 146.72
11.03.03 OBRAS DE CONCRETO SIMPLE
11.03.03.01 CONCRETO F'C= 140 KG/CM2 + 40 % PG CON HORMIGON
LOSA DE FONDO 1.00 1.90 1.10 0.15
MUROS 1 2.00 1.90 0.15 1.10
MUROS 2 2.00 0.80 0.15 1.10
11.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
PERIMETRO MUROS INTERIOR 1 2.00 1.60 1.10
PERIMETRO MUROS INTERIOR 2 2.00 0.80 1.10
11.03.04 OBRAS DE CONCRETO ARMADO
11.03.04.01 CONCRETO Fc = 175 kg/cm2 EN LOSA Y TAPA CON HORMIGON
LOSA DE TECHO 1.00 1.90 1.10 0.10
TAPAS DE INSPECCION -2.00 0.50 0.50 0.10
TAPA DE LOSA+PESTAAS 2.00 0.90 0.90 0.10
PESTAAS DE LOSA 8.00 0.73 0.05 0.05
11.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
LOSA DE TECHO 1.00 1.60 0.80
TAPAS DE INSPECCION BASE -2.00 0.50 0.50
TAPAS DE INSPECCION LATERALES 2.00 2.00 0.15
PESTAAS DE TAPAS DE INSPECCION 2.00 2.60 0.05
TAPA DE LOSA EXTERIOR 2.00 3.20 0.10
TAPA DE LOSA INTERIOR 2.00 2.60 0.05
FRISOS DE LA TAPA DE LOSA 1.00 6.00 0.10
11.03.04.03 ACERO CORRUGADO = 1/4", FY= 4,200 KG/CM2 GRADO 60
FIERRO PARA LOSA DE TAPA CAMARAS VERTICALES Y HORIZONTALES 24.00 0.85 0.25
FIERRO PARA LOSA DE TAPA CAMARAS CORONA 2.00 2.80 0.25
11.03.04.04 ACERO CORRUGADO = 3/8", FY= 4,200 KG/CM2 GRADO 60
LOSA 1 FIERRO DE 3/8" 8.00 1.50 0.58
LOSA 2 FIERRO DE 3/8" 3.00 0.50 0.58
LOSA 3 FIERRO DE 3/8" 6.00 0.15 0.58
LOSA 4 FIERRO DE 3/8" 11.00 1.00 0.58
LOSA 5 FIERRO DE 3/8" 12.00 0.30 0.58
11.03.05 REVESTIMIENTOS
11.03.05.01 TARRAJEO CON IMPERMEABILIZANTES
FONDO 1 1.00 1.60 0.80
PERIMETRO MUROS 1 2.00 1.60 1.10
PERIMETRO MUROS 2 2.00 0.80 1.10
11.03.06 ACCESORIOS DE POZO SEPARADOR DE LODOS
11.03.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS PARA POZO SEPARADOR DE LODOS 1.00
TEE SANITARIA C/REDUCCION NTP 399.003 DE 105.3 A 54.2 mm (4"A 2") 2.00 1.00
TUBERIA NTP 399.002 DE 88.5 mm (D=3") 5.00 1.00
CODO SP NTP 399.019 DE 84.0 mm x 45 (3" ) 2.00 1.00
TUBERIA NTP 399.002 DE 105.0 mm (4") 2.00 1.00
11.03.06.02 SUMINISTRO E INSTALACION TUBERIA NTP 399.003 C-7.5 DE 54mm (2")
TUBO NTP 399.003 DE 54.0 mm (2") 1.00 1.00
11.04 POZOS DE PERCOLACION
11.04.01 TRABAJOS PRELIMINARES
11.04.01.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
POZO DE PERCOLACION 1.00 0.38 1.00
11.04.02 MOVIMIENTO DE TIERRAS
11.04.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS EN TERRENO COMPACTO
POZOS DE PERCOLACION 1.00 0.38 1.00 1.00
11.04.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
POZOS DE PERCOLACION 1.30 20.01
11.04.02.03 RELLENO DE PIEDRA MEDIANA
PIEDRA MEDIANA DIAMETRO MXIMO 6" 1.00 20.01
11.04.03 ACCESORIOS EN POZA DE PERCOLACION
11.04.03.01 SUMINISTRO E INSTALACION DE ACCESORIOS PARA POZO PERCOLADOR
CODO SP NTP 399.003 DE 64.0 mm x 90 (2" x 90) 1.00 1.00
TUBO NTP 399.003 DE 54 mm (2") 1.00 1.00
11.05 POZOS DE SECADO 52.00 UND
11.05.01 TRABAJOS PRELIMINARES
11.05.01.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
POZO DE SECADO 1.00 1.85 1.60
11.05.02 MOVIMIENTO DE TIERRAS
11.05.02.01 EXCAVACION EN TERRENO COMPACTO
POZOS DE SECADO 1.00 1.85 1.60 0.80
11.05.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
POZOS DE SECADO 1.30 2.37
11.05.02.03 RECUBRIMIENTO DE PIEDRA MEDIANA E= 0.15
POZOS DE SECADO 1.00 1.45 1.20
11.05.02.04 MADERA ROLLIZO DE EUCALIPTO D= 4"
MADERA ROLLIZO DE EUCALIPTO D= 4" x 1.50 1.00 10.00
E HIDRAULICO

ISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

M2 173.04

M3 42.95
M3 55.84

M3 42.95
M3 13.47
M2 112.94

M2 632.49

UND 52.00

M2 116.48
M2 26.00

M2 77.21
M2 77.21

UND 52.00

M2 468.00

ML 468.00
M2 210.60
ML 468.00

GLB 52.00
GLB 52.00
GLB 52.00

M2 108.68

M3 146.72
M3 190.73

M3 62.63
m2 274.56

M3 17.45
m2 163.28
KG 338.00
KG 874.64

M2 341.12

UND 52.00
UND 52.00

M2 20.01

M3 20.01
M3 26.02
M3 20.01

UND 52.00

M2 153.92

M3 123.14
M3 160.08
M2 90.48
UND 520.00
DE LODOS
ISAPATA, DISTRITO DE OCORURO, PROVINCIA DE ESPINAR - CUSCO

Distrito : OCORURO
Departamento : CUSCO

PARCIAL TOTAL UNID.


52.00 und

173.04 m2
3.33

42.95 m3
0.53
0.30
55.84 m3
1.07

42.95 m3
0.53
0.30
13.47 m3
0.18
0.12
-0.04
112.94 m2
0.71
0.66
0.51
0.46
-0.28
0.10

632.49 m2
8.06
2.88
2.38
-1.16

1.00 52.00 und

116.48 m2
0.51
0.46
-0.14

0.77
0.70
-0.21
0.15
26.00 m2
0.40
0.10

77.21 m2
1.48
77.21 m2
1.48

52.00 und
1.00

468.00 ml
9.00

468.00 ml
6.00
3.00
210.60 m2
2.70
1.35
468.00 ml
6.00
3.00

52.00 und
1.00 und
3.00 ml
1.00 und
1.00 und
52.00 und
1.00
52.00 und
1.00

108.68 m2
2.09

146.72 m3
2.82
190.73 m3
190.73

62.63 m3
0.31
0.63
0.26
274.56 m2
3.52
1.76

17.45 m3
0.21
-0.05
0.16
0.01
163.28 m2
1.28
-0.50
0.60
0.26
0.64
0.26
0.60
338.00
5.10
1.40
874.64 kg
6.96
0.87
0.52
6.38
2.09

341.12 m2
1.28
3.52
1.76

52.00 gbl
2.00 und
5.00 und
2.00 und
2.00 und
52.00 und
1.00

20.01 m2
0.38

20.01 m3
0.38
26.02 m3
26.02
20.01 m3
20.01
52.00 und
1.00 und
1.00 ml

153.92 m2
2.96

123.14 m3
2.37
160.08 m3
3.08
90.48 m2
1.74
520.00 und
10.00
HOJA RESUMEN DE METRADOS CASETA DE UBS CON ABONERAS

Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO DE OCORURO

Localidad : HUISAPATA Distrito : OCORURO


Provincia : ESPINAR Departamento : CUSCO

12 UNIDAD BASICA DE SANEAMIENTO TIPO ABONERA DE DOBLE CAMARA (04 UND.)


12.01 CAMARAS ABONERAS
12.01.01 TRABAJOS PRELIMINARES
12.01.01.01 TRAZO Y REPLANTEO DE UBS
12.01.02 MOVIMIENTO DE TIERRAS
12.01.02.01 EXCAVACION EN TERRENO COMPACTO
12.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
12.01.03 OBRAS DE CONCRETO SIMPLE
12.01.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE, CON MEZCLADORA
12.01.03.02 CONCRETO F'C= 140 KG/CM2 + 40 % PG CON HORMIGON
12.01.03.03 ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS
12.01.04 OBRAS DE CONCRETO ARMADO
12.01.04.01 CONCRETO F'C= 175 KG/CM2 EN VIGAS P/CAMARA UBS ABONERA CON HORMIGON
12.01.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
12.01.04.03 ACERO CORRUGADO = 3/8", FY= 4,200 KG/CM2 GRADO 60
12.01.04.04 ACERO CORRUGADO = 1/4", FY= 4,200 KG/CM2 GRADO 60
12.01.04.05 TAPAS DE CONCRETO ARMADO EN CAMARA ABONERA DE 0.85 X 0.45 mts
12.02 CASETAS ABONERAS
12.02.01 OBRAS DE CONCRETO SIMPLE
12.02.01.01 CONCRETO F'C= 100 KG/CM2 + 60% PG MAX 6" CON HORMIGON
12.02.01.02 ENCOFRADO Y DESENCOFRADO EN GRADAS
12.02.02 MUROS
12.02.02.01 MUROS DE BLOQUETA DE CONCRETO DE 0.1 X 0.20 X 0.40 mts
12.02.02.02 MUROS DE ADOBE DE 0.4 X 0.25 X 0.15 mts
12.02.03 COBERTURAS
12.02.03.01 ESTRUCTURA DE COBERTURA P/UBS ABONERO
12.02.04 REVOQUES ENLUCIDOS Y MOLDURAS
12.02.04.01 TARRAJEO INTERIOR CAMARA UBS ABONERA, E=1.50 cm, MEZCLA 1:5
12.02.05 CARPINTERIA DE MADERA
12.02.05.01 PUERTA MAD. CORRIENTE (MISA ALCANFOR) 0.70 x 1.80m, T. REBAJADO C/PERSIANA
12.02.06 INSTALACIONES SANITARIAS
12.02.06.01 SUMINISTRO Y COLOCACION DE ACCESORIOS EN CASETA ABONERAS
12.02.06.02 SUMINISTRO Y COLOCACION DE INODORO EN CASETA ABONERA
12.02.06.03 SUMINISTRO Y COLOCACION DE URINARIO EN ABONERA
12.03 POZO DE PERCOLACION
12.03.01 TRABAJOS PRELIMINARES
12.03.01.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
12.03.02 MOVIMIENTO DE TIERRAS
12.03.02.01 EXCAVACION EN TERRENO COMPACTO
12.03.02.03 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
12.03.02.04 MATERIAL FILTRANTE EN UBS
HOJA DE METRADOS UBS ABONERAS
Obra : MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DISPOSICION DE EXCRETAS EN LA COMUNIDAD DE HUISAPATA, DISTRITO Fecha :

Localidad : HUISAPATA Distrito : OCORURO


Provincia : ESPINAR Departamento : CUSCO

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA


12 ABONERAS 4.00 und
12.01 CAMARAS DE CONCRETO CICLOPEO
12.01.01 TRABAJOS PRELIMINARES
12.01.01.01 TRAZO Y REPLANTEO DE UBS
TRAZO Y REPLANTEO PARA CAMARAS 1.00 2.62 1.66
TRAZO Y REPLANTEO PARA GRADAS 1.00 1.97 0.60
12.01.02 MOVIMIENTO DE TIERRAS
12.01.02.01 EXCAVACION EN TERRENO COMPACTO
CIMENTACION 1 2.00 1.16 0.40 0.40
CIMENTACION 2 2.00 2.62 0.40 0.40
12.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
TOTAL EXCAVACION 0.33 4.84
12.01.03 OBRAS DE CONCRETO SIMPLE
12.01.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE, CON MEZCLADORA
CIMENTACION 1 2.00 1.16 0.40 0.40
CIMENTACION 2 2.00 2.62 0.40 0.40
LOSA CIMENTACION DE LAS CAMARAS 2.00 1.16 1.01 0.10
12.01.03.02 CONCRETO F'C= 140 KG/CM2 + 40 % PG CON HORMIGON
MURO 1 2.00 1.16 0.25 1.20
MURO 2 1.00 2.62 0.25 1.08
MURO 3 2.00 0.38 0.25 1.08
MURO 4 1.00 0.36 0.25 1.08
SOBRE CIMENTACION PARA MUROS DE ADOBE 0.25 x 0.15 (1) 2.00 1.16 0.25 0.15
SOBRE CIMENTACION PARA MUROS DE ADOBE 0.25 x 0.15 (2) 2.00 2.62 0.25 0.15
SOBRE CIMENTACION PARA MUROS DE ADOBE 0.25 x 0.15 (1) -1.00 0.70 0.25 0.15
12.01.03.03 ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS
MUROS 1 2.00 1.66 1.20
MUROS 2 2.00 1.16 1.20
MUROS 3 2.00 2.62 1.20
MUROS 4 -2.00 0.70 1.20
MUROS 5 4.00 1.01 1.20
SOBRE CIMENTACION PARA MUROS DE ADOBE 0.25 x 0.15 (1) 2.00 1.66 0.15
SOBRE CIMENTACION PARA MUROS DE ADOBE 0.25 x 0.15 (2) 2.00 1.16 0.15
SOBRE CIMENTACION PARA MUROS DE ADOBE 0.25 x 0.15 (3) 2.00 2.62 0.15
SOBRE CIMENTACION PARA MUROS DE ADOBE 0.25 x 0.15 (4) 2.00 1.80 0.15
SOBRE CIMENTACION PARA MUROS DE ADOBE 0.25 x 0.15 (5) -2.00 0.70 0.15
SOBRE CIMENTACION PARA MUROS DE ADOBE 0.25 x 0.15 (5) 2.00 0.25 0.15
12.01.04 OBRAS DE CONCRETO ARMADO
12.01.04.01 CONCRETO F'C= 175 KG/CM2 EN VIGAS P/CAMARA UBS ABONERA CON HORMIGON
LOSA DE TECHO 1.00 2.62 1.66 0.08
VIGA EN ABONERAS 1.00 2.62 0.25 0.12
TAPA DE CA EN ABONERA 2.00 0.80 1.05 0.05
PISO ACABADO DE LAS CAMARAS 2.00 1.16 1.01 0.08
AREA ADJACENTE A LA TAPA 2.00 0.20 0.70 0.08
12.01.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (O. DE ARTE)
LOSA DE TECHO 2.00 1.16 1.01
FRISO DE LOSA DE TECHO 1.00 5.94 0.08
VIGA EN ABONERAS 2.00 1.01 0.12
VIGA EN ABONERAS 1.00 2.62 0.20
12.01.04.03 ACERO CORRUGADO = 3/8", FY= 4,200 KG/CM2 GRADO 60
LOSA DE TECHO 1 13.00 1.58 0.58
LOSA DE TECHO 2 8.00 2.54 0.58
VIGA EN ABONERAS 4.00 2.64 0.58
12.01.04.04 ACERO CORRUGADO = 1/4", FY= 4,200 KG/CM2 GRADO 60 26.00 0.68 0.25
EN TAPAS DE ABONERAS (1) 1/4 15.00 0.97 0.25
EN TAPAS DE ABONERAS (2) 1/4 20.00 0.72 0.25
12.01.04.05 TAPAS DE CONCRETO ARMADO EN CAMARA ABONERA DE 0.85 X 0.45 mts
TAPAS DE CONCRETO 1.00 4.00
12.02 CASETAS ABONERAS
12.02.01 OBRAS DE CONCRETO SIMPLE
12.02.01.01 CONCRETO F'C= 100 KG/CM2 + 60% PG MAX 6" CON HORMIGON
GRADAS 1.00 0.97 0.60 1.00
PASOS 1.00 0.25 0.60 0.80
PASOS 1.00 0.25 0.60 0.60
PASOS 1.00 0.25 0.60 0.40
PASOS 1.00 0.25 0.60 0.20
12.02.01.02 ENCOFRADO Y DESENCOFRADO EN GRADAS
GRADAS 1 1.00 0.97 1.00
FONDO 1.00 0.60 1.00
PASOS 1.00 0.25 0.80
PASOS 1.00 0.25 0.60
PASOS 1.00 0.25 0.40
PASOS 1.00 0.25 0.20
CONTRAPASO 5.00 0.60 0.20
12.02.02 MUROS
12.02.02.01 MUROS DE BLOQUETA DE CONCRETO DE 0.1 X 0.20 X 0.40 mts
MURO DE BLOQUETA DE CONCRETO 1.00 1.16 1.12
12.02.02.02 MUROS DE ADOBE DE 0.4 X 0.25 X 0.15 mts
MUROS 1 1.00 2.30 2.09
MUROS 2 1.00 2.30 1.75
MUROS 3 -1.00 0.70 1.95
MUROS 6 2.00 1.16 1.92
12.02.03 COBERTURAS
12.02.03.01 ESTRUCTURA DE COBERTURA P/UBS ABONERO
ESTRUCTURA DE TECHA Y COBERTURAS 1.00 1.00
12.02.04 REVOQUES ENLUCIDOS Y MOLDURAS
12.02.04.01 TARRAJEO INTERIOR CAMARA UBS ABONERA, E=1.50 cm, MEZCLA 1:5
TARRAJEO INTERIOR UBS 1 1.00 1.00 1.00
12.02.05 CARPINTERIA DE MADERA
12.02.05.01 PUERTA MAD. CORRIENTE (MISA ALCANFOR) 0.70 x 1.80m, T. REBAJADO C/PERSIANA
UBS 1.00
12.02.06 INSTALACIONES SANITARIAS
12.02.06.01 SUMINISTRO Y COLOCACION DE ACCESORIOS EN CASETA ABONERAS 1.00
CODOS SP NTP 399.03 DE 54.0 mm x 45 (2" x 45) 1.00 8.00
TEE SANITARIO SIMPLE NTP 399.003 DE 54.0 mm (D= 2" x 2") 1.00 1.00
YEE SP NTP 399.003 DE 54.0 mm (2" x 2") 1.00 1.00
TUBERIA PVC SAL D= 2" 1.00 15.00
CODOS SP NTP 399.003 DE 54.0 mm x 90 (2" x 90) 1.00 2.00
SOMBRERO DE VENTILACION NTP 399.003 DE 54.0 mm (D= 2") 1.00 2.00
12.02.06.02 SUMINISTRO Y COLOCACION DE INODORO EN CASETA ABONERA
INODORO SEGN DISEO INCLUYE TAPAS 1.00 1.00
12.02.06.03 SUMINISTRO Y COLOCACION DE URINARIO EN ABONERA
URINARIO 1.00 1.00
12.03 POZOS DE PERCOLACION
12.03.01 TRABAJOS PRELIMINARES
12.03.01.01 TRAZO, NIVEL Y REPLANTEO EN OBRAS DE ARTE
POZO DE PERCOLACION 1.00 0.50 0.50
12.03.02 MOVIMIENTO DE TIERRAS
12.03.02.01 EXCAVACION EN TERRENO COMPACTO
POZOS DE PERCOLACION 1.00 0.50 0.50 0.61
12.03.02.03 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
POZOS DE PERCOLACION 0.33 0.61 1.00 1.00
12.03.02.04 MATERIAL FILTRANTE EN UBS
POZOS DE PERCOLACION 1.00 0.50 0.50 0.55
S

Distrito : OCORURO
Departamento : CUSCO

M2 22.12

M3 4.84
M3 6.29

M3 5.78
M3 7.85
M2 73.04

M3 2.75
M2 14.34
KG 119.29
KG 46.26
UND 16.00

M3 3.53
M2 10.68

M2 5.20
M2 47.69

UND 4.00

M2 4.00

UND 4.00

GLB 4.00
UND 4.00
UND 4.00

M2 1.00

M3 0.61
M3 0.79
M3 0.55
Distrito : OCORURO
Departamento : CUSCO

PARCIAL TOTAL UNID.

22.12 m2
4.35
1.18

4.84 m3
0.37
0.84
6.29 m3
1.57

5.78 m3
0.37
0.84
0.23
7.85 m3
0.70
0.71
0.21
0.10
0.09
0.20
-0.03
73.04 m2
3.98
2.78
6.29
-1.68
4.85
0.50
0.35
0.79
0.54
-0.21
0.08

2.75 m3
0.33
0.08
0.08
0.18
0.02
14.34 m2
2.34
0.48
0.24
0.52
119.29 kg
11.91
11.79
6.12
4.38 46.26 kg
3.61
3.57
16.00 und
4.00

3.53 m3
0.58
0.12
0.09
0.06
0.03
10.68 m2
0.97
0.60
0.20
0.15
0.10
0.05
0.60

5.20 m2
1.30
47.69 m2
4.81
4.03
-1.37
4.45

4.00 und
1.00

4.00 m2
1.00

4.00 und
1.00

4.00 glb
8.00 unid
1.00 unid
1.00 unid
15.00 ml
2.00 unid
2.00 unid
4.00 und
1.00
4.00 und
1.00

1.00 m2
0.25

0.61 m3
0.15
0.79 m3
0.20
0.55 m3
0.14