Sei sulla pagina 1di 5

PETRONIO L.

POLINIO
. #

Position; 6-G pipe ( Tig -Arc-F-caw-G-maw


Welder)
A self motivated person responsible hard working welling to work under pressure
& over time I am Qualified as a Pressurized 6-G pipe welder(G-taw/Smaw/f-caw/G-
maw)Coded welder(057)Large & Small Bore Carbone steel-B-I & Stainless steel pipe
for the requirements of (ASTM-IX/ASTM A572 Gr-50/ASTM A53/ASTM A106 Gr.b/ASTM
A53 Gr.b)welding test procedure 100% x-ray PT-MT-UT, Proven experience Abroad &
Local. Hydro Power plant/Geothermal/Modular Power plant/petrochemical/Gas/oil
Refinery/Waste Heat Boiler/Coal & Gold Mining/High Rise Bldg. Project) (18) months
experience of DOHA QATAR AL- Arrab trading & contracting company. Involved fire
fighting & Chilled water Supply to HVAC as (G-taw Smaw welder) X-ray & 300 psi
hydro welding test .Also Performed Gas Cutting & MIG 6-GR, Gas welding for copper
Tube if needed.

EDUCATIONAL ATTAINNTME; High School Grad; 1990 Gender; male Age;38


Date of berth; Sept/06/1973 Civil Status; M Berth place; Ormoc City
Citizenship; Pilipino Provincial add; Linao Ormoc city Spouse; Renilda T.
Polinio No.of Children; 5 Passport #;EB5280269 Issue DFA;
May/03/2012 Expiry Date; May/03/2017.

TRADE TEST QUALIFICATION RECORD;

Year/ 2012 Philippine welding Tech, Skills & Services Center Inc, 2-G 3-G F-caw
. 2011 Enerthrust Inc. 6-G pipe Smaw
. 2011 Witco Inspection dev,corp 6-G pipe Smaw
.2007 to 2008 AL Arrab Doha Qatar 6-G pipe G-taw Smaw
.2009 to 2012 TESDA 6-G pipe Smaw
. 2008 Industrial Inspection Int,Inc 6-G pipe G-taw Smaw
. 2004 TESDA 6-G pipe Smaw
. 2003 Miescor 6-G pipe Smaw
. 2000 Executive 6-G pipe Smaw
PREVIOS COMPANY JOB DISCRIPTION

Enerthrust Inc. *Full welding of double ending joint


including fittings from/july/27/2011 to Aug/2012 pipe
Dia2420181614121086432 ,Gas position,6-G Smaw pipe welder
line, chilled water condenser chiller to cooling tower Gen, contractor Leighton
& pipe supply to EHU room Carbone Steel pipe .
Sch,40 w/t PT & 300 psi Hydro welding test, high .
Rise 34 history zuillig Bldg Makati.Using E6011 for .
Rooting E7018 for filling & cupping

Witco dev,corp *Full welding of double ending joint w/t


bucking plate from/oct/11/2010 to july/17/2011 of Carbone Shameless steel
pipe Dia 2.6 meters penstock position,6-G smaw pipe welder 1,2,3,
Sch251816mm Rehabilitation pipe laying SN Gen. contractor, McConnell
Dowell Aboitez Hydro electric power plant of Ambuklao&Binga .
Dum Buenget, w/t PT,MT,UT & X-ray welding test Also .
pipe laying for fire hydrant, Dia6 inch,Sch40,Using .
E6011 & E7016 f0r rooting E7018 for filling & cupping

AGA Dev.Corp. *Full welding of Stainless steel Pipe 304-


308-309 for Air From/april/27/2010 to Aug/10/2010 & Water Line Pipe
Dia1210864to , Sch20 Position;6-G Pipe welder G-taw Smaw w/t
100% x-ray welding test Using 316L filler metal.for Gen, contractor
Carbone Steel water line Pipe Dia864 Sch40 w/t .
300 Psi hydro welding test G-taw for Rooting Using .
ER70-2 Filler metal Smaw Filling & cupping Using E .
7018. AIR Liquid Pinagbuhatan Pasig Phil.

Good Wrench Tech, *Full welding of Stainless steel pipe 309


Dia6432 From/jan/16/2010 to April/20/2010. 1.Sch40.Pipe line from
Boiler to Condensate tank Position; TIG welder pipe line
supply to hydraulic machine using 316L filler Gen .Contractor
metal w/t 100% X-ray welding test, Nidic Precision .
Phil, Corp. binan laguna,

Witco Dev.Corp * Full Welding of double ending joint


Carbone steel From/Jan/27/2009 to July/25/2009. Pipe
Dia,865432.Sch 40.Pipe line Tank Farm Position;6-G Smaw Pipe welder
to Fuel loading Area 200 meter liner w/t PT.& Hyd Gen. Contractor Leighton
ro Welding test,Full welding of CIL.FUEL.BANKER .
CYANIDE. & WATER TANK.Using E6011 for Root .
ing E7018 for filling & Cupping. Felmenera Gold .
Mining Processing & Refining Corp.Aroroy Masbate

AL- arrab Trade & contracting Company, *The new Discovery Island The Pearl
of Qatar From, Feb/25/2007 to July/25/2008. Involved Carbone
Steel, Full welding of water line position; 6-G pipe G-taw Smaw
Supply to Riser pump Room to Cooling tower General Contractor
From Riser to EHU room Supply to HVAC, pipe .
Dia,322420181612108654321 .
welding procedure G-taw for rooting Using ER70S .
-5 Filler metal, smaw for filling & Cupping Using .
E7018,w/t X-ray & 300 psi hydro test, Full Welding .
Main & Branch line for fire fighting. Including Fittings.

Fabmik Cons & Equipment Co, Inc *34 Megawatts Modular power plant Full
Welding of From,july/6/2006 to oct/1/2006. Carbone steel pipe Line Fuel tank
Supply to Genset, pipe position; 6-G pipe welder Smaw Dia 6423,
w/t 300 psi Hydro test, Including fittings General Contractor
Like Reducer, Tee, elbow, Flange. Masbate Project Phil.

IPI *Pipe Production of Spiral pipe 32


inch Sch80 Repair From/Oct/3/2005 to Jan/17/2006. Spiral Joint of Defective
SAW Welding Also Full welding Position; 6-G pipe welder Smaw of Ring Bond,
Pipe to Flange & Lifting I, w/t PT & UT Supply For Hanjin Subic
Welding test, Using E6011 for rooting E7018 for Filling & .
Cupping Bagong Ilog Pasig Phil.

ICPWI *Full Welding of Main Line & Cross Main


for Fire Fight From,Marc/3/2005 to Aug/12/2005 ting Double ending joint of
Carbone Steel Dia6432 Position; 6-G pipe welder Smaw Sch
40.Using E6011 for Rooting E7018 for Filling & Gen, Contractor Hilmacs
Cupping w/t 300 psi Hydro Test.Full welding of Storage .
Tank w/t Pt. Lee Tower Binondo Manila Project.

ROBLEET *Full welding of Double ending joint


Pressurized Steam From; April/8/2004 to Dec/5/2004. & Gas Line From Boiler to
Condensate Tank to Refilling Position; 6-G pipe Welder Gtaw-Smaw Area Carbone
Steel pipe Dia;8643.w/t X-ray Gen. Contractor
Welding Test, Using Tig ER70S-2 for Rooting N7018 for .
Filling & Cupping Air Liquid Balamban Cebu & Pasig

SUMMARY:
* FULL WELDING PRESSURIZED, PIPE TO FITTINGS LIKE,ELBOW,TEE, Y
REDUCER,TRADE DOLET, WELDOLET,& STOB-IN,*FULL WELDING ECCENTRIC RED,
DIA42 TO 36 INCH, W/T 100% X-RAY JOB FALLOWING FROM ASME PROCCEDURE.
*FULL WELDING; PRESSURIZED ELEVATED TANK, REFFILING WATER TANK, ANY
WELDING TEST REQUIRED.
*FULL WELDING; I-BEAM, TRUSSES, GERDERS, JOINT COLUMN BOX, SHEEL PLATES,
BULK HEAD, SHEDDER, STEFFINER, & BUTTOM PLATES. UT, WELDING TEST.

SHILO *Full Welding of double ending joint including


pipe fittings From;March,2002 to feb,10,2002 of Stainless Steel 309 & Carbone
Steel pipe Dia24201816 Position; TIG Welder
1412108643213/4,of Steam line Using 316L&319L Gen. Contractor
Filler Metal, ER70S-5 for Rotting of Carbon Steel E7018 for
filling & Cupping, w/t 100% X-ray Welding test, Quezon .
Power Plant Mauban ,& PASAR Isabel Leyte Project Phil.

DREVA CONS *Full Welding of Elevated Water Tank Including


Pipe Line From,April,3,2001 to Sept,16,2001. Water Tank to Refilling Room
Station Supply to Sunny Position; 6-G pipe Welder Smaw Villas Housing pipe
Dia of Carbone Steel64532, Sch Gen. Contractor 40,
Using E6011 for Rooting & E6013 for Filling& Cupping .
w/t 300 psi Hydro Welding Test. Fairview Q,C Project.

U-con BUILDERS Inc. *Full Welding of Pressurized Carbone Steel


Pipe From,Feb,16,2000 to oct,19,2000. Dia65432sch,40 for Fire Hydrant
Supply to Fire Hose Position; 6-G pipe welder Smaw Cabinet Using E6011 for
Rooting E6013 for Filling & General Contractor Cupping w/t 300
psi Hydro Test SSS main BLDG. Q.C

PENTA PLANNERS *Full Welding of Carbone Steel Pipe For 100%


Alcohol From,March,12,1998 to May,5,1999 Dia10864, Sch 40,Storage tank
to Boiler Using E6011 Position; 6-G pipe Welder Smaw for rooting E7018 for
Filling& cupping Pipe Line Boiler to General Contractor,
Chimney32 Inch Dia of & pipe to Flange Full Welding .
of Chimney. Condis Distilleria Lian Batangas.

MIESCOR *Full Welding Pressurized Steam Line


Carbone Steel From,Jan,28,98 to Aug,19,1998 Pipe
Dia242028181614121086,Using E6011 Position; 6-G pipe Welder
for Rooting E7018 for Filling & Cupping w/t X-ray Gen. Contractor
welding Test Leyte Geothermal plant Ormoc City Phil.

TICC *Upper Mahiao 128 Geothermal Plant


Kananga Leyte From, April,4,1996 to Oct,22,1996 As a 6-G pipe Welder
Smaw.
JHON HOLLAND *Cebu Light House Project Cebu City
From, April,12,1995 to Nov, 22,1996 As a Plate Welder Smaw.

DIAMANT BOART *PNOC, Philippine Steel Project Limery


Batangas From, Nov, 20, 1993 to Jan, 31, 1995 As a 6-G Pipe
Welder Smaw.

SIGNATURE

Potrebbero piacerti anche