Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
POLINIO
. #
Year/ 2012 Philippine welding Tech, Skills & Services Center Inc, 2-G 3-G F-caw
. 2011 Enerthrust Inc. 6-G pipe Smaw
. 2011 Witco Inspection dev,corp 6-G pipe Smaw
.2007 to 2008 AL Arrab Doha Qatar 6-G pipe G-taw Smaw
.2009 to 2012 TESDA 6-G pipe Smaw
. 2008 Industrial Inspection Int,Inc 6-G pipe G-taw Smaw
. 2004 TESDA 6-G pipe Smaw
. 2003 Miescor 6-G pipe Smaw
. 2000 Executive 6-G pipe Smaw
PREVIOS COMPANY JOB DISCRIPTION
AL- arrab Trade & contracting Company, *The new Discovery Island The Pearl
of Qatar From, Feb/25/2007 to July/25/2008. Involved Carbone
Steel, Full welding of water line position; 6-G pipe G-taw Smaw
Supply to Riser pump Room to Cooling tower General Contractor
From Riser to EHU room Supply to HVAC, pipe .
Dia,322420181612108654321 .
welding procedure G-taw for rooting Using ER70S .
-5 Filler metal, smaw for filling & Cupping Using .
E7018,w/t X-ray & 300 psi hydro test, Full Welding .
Main & Branch line for fire fighting. Including Fittings.
Fabmik Cons & Equipment Co, Inc *34 Megawatts Modular power plant Full
Welding of From,july/6/2006 to oct/1/2006. Carbone steel pipe Line Fuel tank
Supply to Genset, pipe position; 6-G pipe welder Smaw Dia 6423,
w/t 300 psi Hydro test, Including fittings General Contractor
Like Reducer, Tee, elbow, Flange. Masbate Project Phil.
SUMMARY:
* FULL WELDING PRESSURIZED, PIPE TO FITTINGS LIKE,ELBOW,TEE, Y
REDUCER,TRADE DOLET, WELDOLET,& STOB-IN,*FULL WELDING ECCENTRIC RED,
DIA42 TO 36 INCH, W/T 100% X-RAY JOB FALLOWING FROM ASME PROCCEDURE.
*FULL WELDING; PRESSURIZED ELEVATED TANK, REFFILING WATER TANK, ANY
WELDING TEST REQUIRED.
*FULL WELDING; I-BEAM, TRUSSES, GERDERS, JOINT COLUMN BOX, SHEEL PLATES,
BULK HEAD, SHEDDER, STEFFINER, & BUTTOM PLATES. UT, WELDING TEST.
SIGNATURE