Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
General Instructions:
1) All columns are required to be filled up.
2) If the requirement is not applicable, then N/A should be written and signed by the approved person, with justification.
3) Completed schedule should be attached with the related work order.
I. REMOVAL OF ENGINE
A JOB SET UP
1. Comply with the general safety instructions for the electrical power supply system (AMM
24-00-00,3-1).
2. Comply with the general safety instructions for the mechanical assemblies (AMM 60-00-
Deccan Charters Private Limited Page 2 of 16
AS 350 B3 HELICOPTER Date: March 2017
Procedure Sheet For Engine Removal And Installation Rev No: 0
(Arriel 2B1) Form No: AS350/100
Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
b. Loosen the clamp (10) and disconnect the discharge duct (1) of the bleed valve at the
firewall.( PRE MOD 073227 (Figure 1 Sheet 1))
c.
Remove the attachment clamp (24),( POST MOD 073227 (Figure 1 Sheet 2, DETAIL E))
loosen and remove the clamp (25) and disconnect the discharge duct (1) of the bleed valve at
the firewall.
2. Loosen the clamp (13) and disconnect the ventilation duct of the starter-generator (12) at the
firewall.
3. Disconnect the fuel supply pipe (17) from the left side of the engine accessories unit
(DETAIL C):
a. cut and remove the lockwire,
b. Loosen and disconnect the fuel supply pipe (17) from the elbow union (18).
4. Disconnect the oil inlet pipe (16) and the oil discharge pipe (15) from the left side of the
engine accessories unit (DETAIL B):
a. cut and remove the lockwire,
b. loosen and disconnect the oil inlet pipe
c. loosen and discharge the oil discharge pipe (15).
5. Disconnect the P2 pipe (14) from the left side of the engine compressor casing (DETAIL A):
a. cut and remove the lockwire,
b. loosen and disconnect the P2 pipe (14) from the compressor casing.
6. Disconnect the fuel return pipe (19) from the right side of the engine accessories unit
(DETAIL D):
a. cut and remove the lockwire,
b. loosen and disconnect the fuel return pipe (19).
7. Disconnect the vent pipe (21) of the engine oil tank from the Tee union (23) on the right side of the engine (DETAIL
D):
a. loosen the two attachment clamps (20),
Deccan Charters Private Limited Page 3 of 16
AS 350 B3 HELICOPTER Date: March 2017
Procedure Sheet For Engine Removal And Installation Rev No: 0
(Arriel 2B1) Form No: AS350/100
Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
8.
Disconnect the electrical bonding braids (4), (8):
a.
remove the bolt that attaches the electrical bonding braid (8) to the firewall,
b.
remove the bolt that attaches the electrical bonding braid (4) to the transmission deck.
9.
Disconnect the power supply cables and the electrical bonding braid of the starter-generator
(AMM 24-31-00,4-1).
10.
Disconnect the electrical harness (6) from:
a.
the two connectors on the transmission deck,
b.
the two FADEC connectors in the cargo hold.
NOTE 1:REMOVE THE SEALANT BEAD FROM AROUND THE HATCH THAT GIVES ACCESS TO THE
FADEC CONNECTOR.
NOTE 2: LOOSEN AND REMOVE THE SCREWS FROM THE HATCH.
11.
Install the sling, ARRIEL engine [365A91-5400-02] on the hoisting points (2) on the engine.
Then attach the hoisting system used and adjust its tension.
12.
Disconnect the casing (9) of the engine-to-MGB coupling shaft from the engine (AMM 63-
11-00,4-1).
13.
Disconnect the forward element (3) of the tail rotor drive shaft (AMM 65-11-00,4-1).
14.
Remove the clamps from the engine mount (5):
Deccan Charters Private Limited Page 4 of 16
AS 350 B3 HELICOPTER Date: March 2017
Procedure Sheet For Engine Removal And Installation Rev No: 0
(Arriel 2B1) Form No: AS350/100
Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
b.
loosen and remove the clamps from the engine mount (5).
CAUTION: DISENGAGE THE CABLES AND THE PIPES YOU REMOVED TO MAKE IT EASIER TO MOVE
THE ENGINE. REMOVE ALL THE "TYRAPS" THAT CONNECT THE PIPES AND THE COMPONENTS OF
THE ELECTRICAL HARNESSES.
15.
Lift the engine and disengage it from the transmission deck.
NOTE: LIFT THE ENGINE A SMALL DISTANCE TO DISENGAGE THE MANIFOLD DRAIN (7) FROM THE
TRANSMISSION DECK. THEN MOVE THE ENGINE AFT TO DISCONNECT THE ENGINE-TO-MGB
COUPLING SHAFT.
16.
Install the engine on its support stand, ARRIEL engine [350A93-5400-00]. If necessary, use
the wheel assembly, engine base [365A91-5410-00] for the engine stand to make it easier to
move it on the ground.
17.
Remove the hoisting system and remove the sling, ARRIEL engine [365A91-5400-02] from
the engine.
18.
Inspect the firewall for crack, distortion, weld separation, loose rivets, etc...
19.
Inspect the transmission support platform for crack, distortion, corrosion, loose rivets, etc.
20.
Inspect the condition of the feedthrough seals at the firewall.
21.
Remove and discard the feedthrough seals if necessary
22.
Remove dampers (AMM 71-41-00,4-1) and inspect them for condition.
23.
Clean the removed items and the transmission support platform with white spirit CM 208.
Deccan Charters Private Limited Page 5 of 16
AS 350 B3 HELICOPTER Date: March 2017
Procedure Sheet For Engine Removal And Installation Rev No: 0
(Arriel 2B1) Form No: AS350/100
Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
1.
Remove if necessary, the portable crane.
2.
Make sure you put covers on the engine inlet and outlet:
a.
Install if necessary, the cover, ARRIEL engine tail pipe [350A92-5411-00].
b.
Put the cover, engine air intake [350A92-5481-00] if necessary on the engine air-intake.
3.
If you replace the engine, disassemble the engine you removed (AMM 71-11-00,4-3).
4.
If the engine is to be removed for a long time, put it under a cover away from all humidity.
Or, refer to the EMM TURBOMECA to do the external preservation procedure and put it in
the container, ARRIEL engine [881-4-400-000].
5.
Install the engine (AMM 71-11-00,4-2).
Deccan Charters Private Limited Page 6 of 16
AS 350 B3 HELICOPTER Date: March 2017
Procedure Sheet For Engine Removal And Installation Rev No: 0
(Arriel 2B1) Form No: AS350/100
Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
Using a pencil, make a mark between 20 and 25 mm (.79 - .98 in.) from the end of each
end fitting (23) and (25).
Install the bleed valve (1) discharge duct on end fittings (23) and (25), up to the marks.
Tighten the clamps securing the bleed valve (1) discharge duct on each end fitting (23) and
(25).
ii. Connect end fitting (25) at the firewall.
iii. Install clamp (26).
iv. Position end fittings (23) and (25) so that the bleed valve (1) discharge duct does not
interfere with the engine air intake and to
( )a = 20 mm (.79 in.) min.
( )b = 12 mm (.48 in.) min.
v. Tighten clamps (24) and (26).
NOTE:IT IS THE POSITION OF END FITTING (23) WHICH DETERMINES THE ROUTING OF THE BLEED
VALVE (1) DISCHARGE DUCT.
vi. Check that both ends of the bleed valve (1) discharge duct do not rotate at their attachment
to end fittings (23) and (25).
vii. Check that there is no displacement of the bleed valve (1) discharge duct by slightly
moving it.
c. POST MOD 073227 (Figure 2, DETAIL F)
i. Connect the discharge duct of bleed valve (1) at the firewall, then install and tighten clamp
(28).
ii. Install the attachment clamp (27).
19. Connect the vent pipe of engine oil tank (20) to tee union (22), on the right hand side of the
engine (DETAIL D):
a. Connect the vent pipe (20) of the engine oil tank with the sleeve (21) to the Tee union (22).
20. Connect the fuel return pipe (18) to the right side of the engine accessories unit (DETAIL
D):
a. Connect and tighten the fuel return pipe (18).
b. Safety the fuel return pipe (18) with the lockwire CM 776.
21. Connect the P2 pipe (13) to the left side of the engine compressor casing (DETAIL A):
a. Connect and tighten the P2 pipe (13) on the compressor casing.
22. Connect the oil inlet pipe (15) and the oil discharge pipe (14) to the right side of the engine
Deccan Charters Private Limited Page 11 of 16
AS 350 B3 HELICOPTER Date: March 2017
Procedure Sheet For Engine Removal And Installation Rev No: 0
(Arriel 2B1) Form No: AS350/100
Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
c. Safety the oil inlet pipe (15) and the oil discharge pipe (14) with the lockwire CM 776.
23. Connect the fuel supply pipe (16) to the left side of the engine accessories unit (DETAIL
C):
a. Connect and tighten the fuel supply pipe (16) on the elbow union (17).
b. Safety the fuel supply pipe (16) with the lockwire CM 776.
24. Connect the ventilation duct of the starter-generator (11) at the firewall, then install and
tighten the clamp (12).
25. Install all the TYRAPS that hold the pipes and the electrical harness elements in their
positions.
C. CLOSE-UP
1. Detach sling, ARRIEL engine [365A91-5400-02] from the hoisting system and then
remove sling from engine hoisting points (2).
2.
Install the main rotor blades (AMM 62-11-00,4-1)
6. Make sure the engine oil level is correct, add oil if necessary (AMM 79-00-00,3-1).
Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
Deccan Charters Private Limited Page 13 of 16
AS 350 B3 HELICOPTER Date: March 2017
Procedure Sheet For Engine Removal And Installation Rev No: 0
(Arriel 2B1) Form No: AS350/100
Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
Deccan Charters Private Limited Page 14 of 16
AS 350 B3 HELICOPTER Date: March 2017
Procedure Sheet For Engine Removal And Installation Rev No: 0
(Arriel 2B1) Form No: AS350/100
Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
Deccan Charters Private Limited Page 15 of 16
AS 350 B3 HELICOPTER Date: March 2017
Procedure Sheet For Engine Removal And Installation Rev No: 0
(Arriel 2B1) Form No: AS350/100
Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
FIGURE 2: Installation-Engine
Approved by CA Manager vide Approval No: DC/RW/248 Dated : 30th March 2017
I certify that the work specified except as otherwise stated was accomplished in accordance with CAR -145
and in respect of that work the aircraft / component is considered ready for release to service.
DATE: SIGNATURE :
CATEGORY :