PROJECT PLTU LUAR JAWA & BALI

CRASH PROGRAM PLJB 20 LOKASI:


1. PLTU SUMUT 2X 200 MW, Medan Baru
PLTU 2 Sumatera Utara 2 x 200 MW is located at Tanjung Pasir Sungai Dua Kedaung
Village, Pangkalan Susu District, Langkat Regency, North Sumatera Province,
approximately 170 km due northwest of Medan the capital city of North Sumatera
Province. The altitude of the project area is about 4 m above MSL (Mean Sea Level), at
4 26.359 North Latitude and 98 21.850. East Longitude. The following map (Figure-1)
shows the relative position of such proposed location (see blue circle within the map

2. PLTU NAD 2 X 100 MW, Meulaboh


PLTU Nanggroe Aceh Darussalam 2 x (100-150) MW is located at Suak Puntong Village,
Kuala District, Nagan Raya Regency, Nanggroe Aceh Darussalam Province,
approximately 175 km due southeast of Banda Aceh the capital city of Nangroe Aceh
Darussalam Province. The altitude of the project area is about 4 m above MSL (Mean
Sea Level), at 04o 06.201 North Latitude and 96o 11.636 East Longitude. The following
map (Figure-1) shows the relative position of such proposed location (see blue circle
within the map).

3. PLTU 1 KALTENG 2 X 60 MW, Palangkaraya


The Plant is located at Buntoi Village, Kahayan Hilir Sub-District, Pulang Pisau Regency,
Central Kalimantan province approximately 90 km from Palangkaraya City or 95 km from
Banjarmasin City. The geographical coordinate at 02 O4952.9 South latitude and
114O1316.3 East longitude. The following map (Figure-1) shows the relative position of
such proposed location (see blue circle within the map).

4. PLTU SULSEL 2 X 50 MW, Barru


The Project Site is located at Burancie Village, Sopengriaja District, Barru Regency,
Sulawesi Selatan, along the South Coast of Makassar, approximately 160 km from
Makassar. The geographical coordinate is at 416544 South Latitude and 11936948
East Longitude..

5. PLTU 2 KALBAR 2 X 25 MW, Pontianak


The Project Site PLTU Kalimantan Barat, 2 x 25 MW is located at Karimunting Village,
Sungai Raya Kepulauan Sub District, Bengkayang Regency, West Kalimantan
Province, approximately 175 km from Pontianak due North. The altitude of the project
area is about 2 m above MSL (Mean Sea Level),The geographical coordinate is at
0049573 North Latitude and 10851212 East Longitude. The following map (Figure-
1) shows the relative position of such proposed location (see blue circle within the map)

6. PLTU SULUT 2 x 25 MW, Manado


The project is located at Moinit Village, Amorang Barat District, Minahasa Selatan
Regency, North Sulawesi Province, along the North Coast of Sulawesi,
approximately 76 km from Manado. The geographical coordinate is at N
111100 EL. and E 12428883 NL.

Catatan akhir 26 Des 2007


7. PLTU GORONTALO 2 X 25 MW, Gorontalo
The project is located at Ilangota Village, Anggrek District, Gorontalo Utara Regency,
Gorontalo Province, along the North Coast of Sulawesi, approximately 40 km from
Jalaluddin Air Port. The geographical coordinate is at 050648 North Longitude. and
12248042 East Longitude

8. PLTU 3 BABEL 2 X 25 MW, Bangka Baru


The project is located at Air Anyer Village, Merawang District, Bangka Regency, Bangka
Belitung Province, which located in left side Baturusa river 700 m from mouth of river,
approximately 6 km away from the Municipality of Pangkal Pinang. The geographical
coordinate is at S 020450.4 EL. and E 1060903.2 NL.

9. PLTU 4 BABEL 2 X 15 MW, Belitung Baru


The project is located at Pegantungan Village, Badau District, Belitung Induk
Regency, Bangka Belitung Province, along the Natuna Coast of Gaspar Bay. The
geographical coordinate is at S. 2.89.261 EL. and E. 107.55.870 NL.

10. PLTU MALUKU 2 X 15 MW, Ambon


The project is located at Emaleahari Village, Leitimur Selatan Sub District, Distric Ambon,
Maluku Province, 15 km from Ambon. The geographical coordinate is at S 3 o3846
South Latitude and 128o1512 East Longi

11. PLTU 2 NTT 2 X 15 MW, Kupang


The proposed plant will be located at Bolog Village, Alak District Kupang Sub-Province in
Nusa Tenggara Timur. The area is located at the east coast of Nusa Tenggara Timur,
Nusa Tenggara Island, approximately 16,3 km from old town, the capital of Nusa
Tenggara Timur Province. The geographical coordinate is at S 10.14.23 and E
123.29.360 The following map (Figure-1) shows the relative position of such proposed
location (see blue circle within the map).

12. PLTU 1 RIAU 2 X 10 MW, Bengkalis


PLTU 1 Riau is located at Pangkalan Batu Village, Bengkalis Sub-district, Bengkalis
Regency, Riau Province, approximately 4 km from Bengkalis City. The geographical
coordinate is at 01o 29 30 North Latitude and E 102o 04 68 East Longitude. The
following map (Figure-1) shows the relative position of such proposed location (see blue
circle within the map).

13. PLTU SULTRA 2 X 10 MW, Kendari


The project is located at Nii Tanasa Village, Soropia District, Kendari Regency, Southeast
Sulawesi Province, along the Nothern Coast of Lasolo Bay, approximately 9 km from
Kendari down town due to northeast. The geographical coordinate is at S 3.89.534 and E
122.53.764.

14. PLTU 1 NTB 2 X 10 MW, Bima


PLTU 1 NTB is located at located at Bonto Village, Asakota District Bima City Sub-
Province in Nusa Tenggara Barat. The area is located along the Senau Bay of Sumbawa
Island, approximately 10 km from Bima, the capital of Nusa Tenggara Barat. The
geographical coordinate is at 08o 24.611 Sorth Latitude and E 118o 41.998 East
Longitude. The following map (Figure-1) shows the relative position of such proposed
location (see blue circle within the map).

Catatan akhir 26 Des 2007


15. PLTU 2 PAPUA 2 X 10 MW, Jayapura
PLTU 2 Papua 2 x 10 MW The project is located at Holtekamp Village, Muaratami
District, Jayapura Regency, Papua Province, along the Youtefa Bay of north-east Papua
Island, approximately 60 km from Jayapura due east. The geographical coordinate is at S
262038 EL and E 14078732 NL.

16. PLTU 2 RIAU 2 X 7 MW, Selat Panjang


PLTU 2 Riau is located at Gogok Village, Tebing Tinggi District, Bengkalis Regency,
Kepulaun Riau Province, along the north coast of Rantau Island, approximately 1120 km
from Jakarta due southwest. The geographical coordinate is at 00 o 59 24 North Latitude
and 102o 38 39 East Longitude. The following map (Figure-1) shows the relative position
of such proposed location (see blue circle within the map).

17. PLTU KEPRI 2 X 7 MW, Tanjung Balai Karimun


The project is located at Tanjung Sebatak, Kecamatan Tebing, Kabupaten Tanjung Balai
Karimun, along the Northeast Coast of Karimun Island, Kepulauan Riau Province,
approximately 5 km from Tanjung Balai Karimun City due south. The geographical
coordinate is at N 01o 02 05 and E 103o 25 06.

18. PLTU MALUKU UTARA 2 X 7 MW, Ternate


PLTU Ternate (Coal Fired Steam Power Plant) 2 x 7 MW, is located at Tidore Island. The
Power Plant Site is located close to temporary harbor in the Rum Village, North Maluku
Province, approximately 10 km from Ternate City the capital of north Maluku Province.
The geographical coordinate is at 0o4453 North Latitude and 127o2449 East Longitude
The attached map (Figure-1) shows the relative position of such proposed location (see
blue circle within the map).

19. PLTU 1 NTT 2 X 7 MW, Ende


PLTU 1 Nusa Tenggara Timur, 2 x 7 MW is located at Keliwumbu Village, Marole District,
Ende Regency, Nusa Tenggara Timur Province, along the North beach of Flores Island,
approximately 30 km from Ende City due north east. The altitude of the project area is
about 2 m above MSL (Mean Sea Level), at 08 o30.332 South Latitude and 121 o42.300
East longitude. The following map (Figure-1) shows the relative position of such proposed
location (see blue circle within the map).

20. PLTU 1 PAPUA 2 X 7 MW, Timika


PLTU 1 Papua, 2 x 7 MW is located at Paumako Village, East Mimika District, Mimika
Regency, Irian Jaya Province, along the South Coast of Timika, approximately 60 km
from Timika. The geographical coordinate is at 479928 South Latitude and 13676960
East Longitude.

Catatan akhir 26 Des 2007


ADDENDUM BIDDING DOCUMENT LJB

ADDENDUM BIDDOC TAHAP 1 (10 LOKASI):


1. PLTU SUMUT 2 X 200 MW, Medan Baru ( 8 addendum)
2. PLTU NAD 2 X 100 MW, Meulaboh ( 8 addendum)
3. PLTU 3 BABEL 2 X 25 MW, Bangka Baru ( 9 addendum)
4. PLTU 4 BABEL 2 x 15 MW, Belitung Baru ( 8 addendum)
5. PLTU 1 KALTENG 2 X 60 MW, Palangkaraya ( 8 addendum)
6. PLTU 2 KALBAR 2 x 25 MW, Pontianak ( 8 addendum)
7. PLTU MALUKU 2 X 15 MW, Ambon ( 8 addendum)
8. PLTU MALUKU UTARA 2 x 7 MW, Ternate ( 9 addendum)
9. PLTU 1 NTB 2 x 10 MW, Bima ( 8 addendum)
10. PLTU 1 NTT 2 x 7 MW, Ende ( 9 addendum)
Note:_
Add. 1 Issued tgl. 07 April 2007
Add. 2 Issued tgl 13 April 2007
Add. 3 Issued tgl 17 April 2007
Add. 4 Issued tgl 17 April 2007
Add. 5 Issued tgl 20 April 2007
Add. 6 Issued tgl 30 April 2007
Add. 7 Issued tgl 07 May 2007
Add. 8 Issued tgl 10 May 2007
Add. 9 Issued tgl 21 May 2007

ADDENDUM BIDDOC TAHAP 2 (10 LOKASI):


1. PLTU KEPRI 2 X 7 MW, Tanjung Balai Karimun ( 3 addendum, latest add.as new
BIDDOC )
2. PLTU 1 RIAU 2 X 10 MW, Bengkalis ( 2 addendum, latest add.as new BIDDOC )
3. PLTU 2 RIAU 2 X 7 MW, Selat Panjang ( 3 addendum, latest add.as new BIDDOC )
4. PLTU SULUT 2 X 25 MW, Manado ( 2 addendum, latest add.as new BIDDOC )
5. PLTU GORONTALO 2 X 25 MW, Gorontalo ( 2 addendum, latest add.as new BIDDOC )
6. PLTU SULSEL 2 X 50 MW, Barru ( 2 addendum, latest add.as new BIDDOC )
7. PLTU SULTRA 2 X 10 MW, Kendari ( 2 addendum, latest add.as new BIDDOC )
8. PLTU 2 NTT 2 X 15 MW, Kupang ( 2 addendum, latest add.as new BIDDOC )
9. PLTU 1 PAPUA 2 X 7 MW, tImika ( 3 addendum, latest add.as new BIDDOC )
10. PLTU 2 PAPUA 2 X 10 MW, Jayapura ( 3 addendum, latest add.as new BIDDOC )
Note:_
Add. 1 Issued tgl. 07 May 2007
Add. 2 Issued tgl. 10 May 2007
Add. 3 Issued tgl. 21 May 2007

Catatan akhir 26 Des 2007


EVALUASI BID PROPOSAL LJB

EVALUASI UNTUK 11 LOKASI (yg lolos ke tahap evaluasi);


- BID OPENING TgL 29 MAY 2007 at PT. PLN (Persero) Head Office Annex Building
2nd floor

1. PLTU SUMUT 2 X 200 MW, Medan Baru


BIDDER : 1. CHINA HUADIAN DUTA GRAHA
2. NINCEC BAGUS KARYA
3. SINOHYDRO
THE WINNER IS : NINCEC BAGUS KARYA

2. PLTU 1 KALTENG 2 X 60 MW, Palangkaraya


BIDDER : 1. CHMC - SHANDONG
2 GXED - WASKITA
THE WINNER IS : CHMC - MPM

3. PLTU 2 SULUT 2 X 25 MW, Manado


BIDDER : 1. CAMCE JIANGXI - MPS
2 PT. WIJAYA KARYA
3 PT. INDONUSA JHBE - HEC
THE WINNER IS : PT. WIJAYA KARYA

4. PLTU GORONTALO 2 X 25 MW, Gorontalo


BIDDER : 1. CAMCE JIANGXI - MPS
2 ENERGI POWERINDO PT BMI
3 PT. INDONUSA JHBE HEC
4. META EPSI
THE WINNER IS : META EPSI

5. PLTU 4 BABEL 2 X 15 MW, Belitung Baru


BIDDER : 1. CAMCE JIANGXI - MPS
2 ENERGI POWERINDO PT BMI
3 PT. INDONUSA JHBE HEC
4. META EPSI
THE WINNER IS : SUBJECT TO REBIDDING LOCATION

6. PLTU MALUKU 2 X 15 MW, Ambon


BIDDER : 1. CNEEC DINAMIKARAYA
2 MBW - SEPCO
3 BOUSTEAD MAXITERM MODERN WIDYA TECHNICAL
THE WINNER IS : SUBJECT TO REBIDDING LOCATION

7. PLTU SULTRA 2 X 10 MW, Kendari


BIDDER : 1. DINAMIKARAYA - CNEEC
2 PT. INDONUSA JHBE HEC
3 MEGA POWER MANDIRI - CHMC
4. SHANDONG PT. REKADAYA ELEKTRIKA
THE WINNER IS : SHANDONG PT. REKADAYA ELEKTRIKA

Catatan akhir 26 Des 2007


8. PLTU 2 PAPUA 2 X 10 MW, Jayapura
BIDDER : 1. CNEEC DINAMIKARAYA CIPTA SELARAS
2 MBW - SEPCO
3 BOUSTEAD MAXITERM MODERN WIDYA TECHNICAL
THE WINNER IS : SUBJECT TO REBIDDING LOCATION

9. PLTU KEPRI 2 X 7 MW, Tanjung Balai Karimun


BIDDER : 1. BOUSTEAD MAXITERM INDUSTRIES
2 CIDAS HUBEI HUAGIAN
3 SHANDONG - REKADAYA
THE WINNER IS : SHANDONG REKADAYA

10. PLTU 1 NTT 2 X 7 MW, Ende


BIDDER : 1. SHANDONG - REKADAYA
2 WIJAYA KARYA PT. ADVANCE TECH. INDONESIA
THE WINNER IS : SHANDONG - REKADAYA

11. PLTU 1 PAPUA 2 X 7 MW, Timika


BIDDER : 1. CNEEC DCS
2 MBW - SEPCO
THE WINNER IS : SUBJECT TO REBIDDING LOCATION

REBIDDING LJB

9 LOKASI REBIDDIING Tahap1, (ADDENDUM 1 & 2 ):


1. PLTU NAD 2 X 100 MW, Meulaboh
2. PLTU SULSEL 2 X 50 MW, barru
3. PLTU 3 BABEL 2 X 25 MW, bangka baru
4. PLTU 2 KALBAR 2 X 25 MW, Singkawang
5. PLTU 2 NTT 2 X 15 MW, Kupang
6. PLTU 1 RIAU 2 X 10 MW, Bengkalis
7. PLTU 1 NTB 2 X 10 MW, ima
8. PLTU 2 RIAU 2 X 7 MW, Selat Panjang
9. PLTU MALUKU UTARA 2 X 7 MW, Ternate

Catatan akhir 26 Des 2007


4 LOKASI REBIDING Tahap 2 (ADDENDUM 1 ):
1. PLTU 4 BABEL 2 X 15 MW, Bangka baru
2. PLTU MALUKU 2 X 15 MW, Ambon
3. PLTU 2 PAPUA 2 X 10 MW, Jayapura
4. PLTU 1 PAPUA 2 X 7 MW, Timika

EVALUASI BID PROPOSAL FOR REBIDDING LJB

EVALUASI UNTUK 9 LOKASI REBIDDING PLJB:


- BID OPENING TgL 17 SEPTEMBER 2007 at PT. PLN (Persero) Head Office Annex
Building 2nd floor

1. PLTU NAD 2 X 100 MW, Meulaboh


BIDDER : 1. PT. ADHI KARYA - JEPDE
2 CNEEC - DCS
3 SFECO - HK
4. SINOHYDRO
THE WINNER IS :

2. PLTU SULSEL 2 X 50 MW, Barru


BIDDER : 1. HUBEI BAGUS KARYA
2 MENAMAS (WITHDRAW)
3 META EPSI (WITHDRAW)
4. PT. REKAYASA INDUSTRI
5. TAME CMC
6. PT. WIJAYA KARYA - CHENGDA
THE WINNER IS :

3. PLTU 3 BABEL 2 X 25 MW, Bangka Baru


BIDDER : 1. TAME - SFECO
2 PT. WIJAYA KARYA
3 INDONUSA JIANGSU HARBIN
4. PT. SUPRACO PT. KALTIMEX ENERGY
5. MENAMAS FEPEC (WITHDRAW)
THE WINNER IS :

4. PLTU 2 KALBAR 2 X 25 MW, Singkawang


BIDDER : 1. TAME QINGDAO
2 PT. WIJAYA KARYA
3 INPAR BARATA CONSORTIUM
4. PT. PAL INDONESIA
5. CNEEC DCS
6. PT. REKAYASA INDUSTRI (fail with no PG)
7. PT. MENAMAS FEPEC ( Fail with Boiler Stoker)
8. PT. INDOFUJI ENERGY

Catatan akhir 26 Des 2007


THE WINNER IS :

5. PLTU 2 NTT 2 X 15 MW, Kupang


BIDDER : 1. TAME QINGDAO (Fail with Boiler CFB)
2 PT. POESER SD MECO
3 PT. PAL INDONESIA
4. PT. MBW SEPCO (fail on PG)
THE WINNER IS :

6. PLTU 1 RIAU 2 X 10 MW, Bengkalis


BIDDER : 1. TAME QINGDAO (Fail with Boiler PC)
2 PT. BOUSTEAD MAXITERM
3 MOKA GMG CONSORTIUM
4. PT BUANA TEKNISINDO - SEPCO
5. PT.MENAMAS FEPEC (Fail with Boiler PC)
6. PT. POESER SHANDONG
THE WINNER IS :

7. PLTU 1 NTB 2 X 10 MW, Bima


BIDDER : 1. TAME SFECO (Fail with Boiler PC)
2 PT. REKADAYA SHANDONG JO
3 HK MAXITHERM JO
4. MOKA GMG CONSORTIUM
5. PT.MENAMAS FEPEC (Fail with Boiler PC)
THE WINNER IS :

8. PLTU 2 RIAU 2 X 7 MW, Selat Panjang


BIDDER : 1. TAME QINGDAO
2 PT. CIDAS HUBEI HUNG YUAN
3 PT. BOUSTEAD MAXITHERM INDUSTRIES
THE WINNER IS :

9. PLTU MALUKU UTARA 2 X 7 MW, Ternate


BIDDER : 1. TAME - SFECO
2 SHANDONG - REKADAYA
THE WINNER IS :

EVALUASI UNTUK 4 LOKASI REBIDDING PLJB:


- BID OPENING TgL 06 NOVEMBER 2007 at PT. PLN (Persero) Head Office Annex
Building 2nd floor

1. PLTU 4 BABEL 2 X 15 MW, Belitung Baru


BIDDER : 1. PT. POESER SD MECO SHANDONG

2. PLTU MALUKU 2 X 15 MW, Ambon


BIDDER : 1. INDONUSA JIANGSU HARBIN

3. PLTU 2 PAPUA 2 X 10 MW, Jayapura

Catatan akhir 26 Des 2007


BIDDER : 1. MODERN BOUSTEAD

4. PLTU 1 PAPUA 2 X 7 MW, Timika


BIDDER : 1. MBW SEPCO

PREBID CONFERENCE PLJB

PRE BID CONFERENCE 1ST TGL. 21 MARET 2007


at PLN Head Office Main Building 3rd Floor
KLASS 7 25 MW UNTUK LOKASI:
1. PLTU 1 NTT 2 X 7 MW, Ende
2. PLTU MALUKU UTARA 2 X 7 MW, Ternate
3. PLTU 1 NTB 2 X 10 MW, Bima
4. PLTU 4 BABEL 2 X 15 MW, Belitung baru

Catatan akhir 26 Des 2007


5. PLTU MALUKU 2 X 15 MW, Ambon
6. PLTU 3 BABEL 2 X 25 MW, Bangka Baru
7. PLTU 2 KALBAR 2 X 25 MW, Singkawang
8. PLTU 2 NTB 2 X 25 MW, Lombok

PRE BID CONFERENCE 2nd TGL. 22 MARET 2007


at PLN Head Office Main Building 3rd Floor
KLASS 50 65 & 100 200 MW UNTUK LOKASI:
1. PLTU SUMUT 2 X 200 MW, Medan Baru
2. PLTU NAD 2 X 100 MW, Meulaboh
3. PLTU 1 KALTENG 2 X 60 MW, Palangkaraya

PRE BID CONFERENCE 3rd TGL. 17 APRIL 2007


at PLN Head Office Main Building 3rd Floor
KLASS 7 25 & 50 65 MW UNTUK LOKASI:
1. PLTU KEPRI 2 X 7 MW, Tanjung Balai Karimun
2. PLTU 2 RIAU 2 X 7 MW, Selat Panjang
3. PLTU 1 PAPUA 2 X 10 MW, Timika
4. PLTU 1 RIAU 2 X 10 MW, Bengkalis
5. PLTU SULTRA 2 X 10 MW, Kendari
6. PLTU 2 PAPUA 2 X 10 MW, Jayapura
7. PLTU 2 NTT 2 X 15 MW, Kupang
8. PLTU 2 SULUT 2 X 25 MW, Manado
9. PLTU GORONTALO 2 X 25 MW, Gorontalo
10. PLTU SULSEL 2 x 100 MW, Barru

PRE BID CONFERENCE 4th U/REBIDDING TGL. 15 AGUSTUS 2007


at PLN Head Office Annex Building 2rd Floor
KLASS 7 25 & 50 -100 MW UNTUK LOKASI:
1. PLTU 2 RIAU 2 X 7 MW, Selat Panjang
2. PLTU MALUKU UTARA 2 X 7 MW, Ternate
3. PLTU 1 RIAU 2 X 10 MW, Bengkalis
4. PLTU 1 NTB 2 X 10 MW, Bima
5. PLTU 2 NTT 2 X 15 MW, Kupang
6. PLTU 3 BABEL 2 X 25 MW, Bangka baru
7. PLTU 2 KALBAR 2 X 25 MW, Singkawang
8. PLTU SULSEL 2 X 50 MW, Barru
9. PLTU KALSEL 2 X 65 MW,
10. PLTU NAD 2 X 100 MW, Meulaboh

PRE BID CONFERENCE 4th U/REBIDDING TGL. 5 OKTOBER 2007


at PLN Head Office Annex Building 2rd Floor
KLASS 7 15 MW UNTUK LOKASI:
1. PLTU 1 PAPUA 2 X 7 MW, Timika
2. PLTU 2 PAPUA 2 X 10 MW, Jayapura
3. PLTU 4 BABEL 2 X 15 MW, Belitung baru
4. PLTU MALUKU 2 X 15 MW, Ambon

Catatan akhir 26 Des 2007


CONTRACT DISCUSSION AGREEMENT

CDA 1st UNTUK 6 LOKASI Tahap 1:


1. PLTU KEPRI, Tb Karimun Start tgl 13 20 Agustus 2007
Kontraktor : Rekadaya Shandong

2. PLTU SUMUT, Medan baru tgl 13 20 Agustus 2007


Kontraktor : Guangdong (GPEC

3. PLTU KALTENG, Palangkaraya tgl 13 20 Agustus 2007


Kontraktor : CHMC - Shandong

4. PLTU 1 NTT, Ende tgl 21 28 Agustus 2007


Kontraktor ; Rekadaya Shandong

5. PLTU SULTRA, Kendari tgl 21 28 Agustus 2007


Kontraktor : Rekadaya Shandong

6. PLTU GORONTALO, Gorontalo tgl 21 28 Agustus 2007


Kontraktor : Meta Epsi

CONTRACT DOCUMENT

CONTRACT DOCUMENT 1st UNTUK 6 LOKASI Tahap 1:


1. PLTU KEPRI, Tb Karimun On the way
PIC: Mr. Triyanto Kontraktor : Rekadaya Shandong

2. PLTU SUMUT, Medan baru SIGNING


PIC: Mr. Wismanto Kontraktor : Guangdong (GPEC

3. PLTU KALTENG, Palangkaraya On the way


PIC: Mr. Jakfar Kontraktor : CHMC - Shandong

Catatan akhir 26 Des 2007


4. PLTU 1 NTT, Ende On the way
PIC: Mr. Triyanto Kontraktor ; Rekadaya Shandong

5. PLTU SULTRA, Kendari On the way


PIC: Mr. Jakfar Kontraktor : Rekadaya Shandong

6. PLTU GORONTALO, Gorontalo SIGNING


PIC: Mr. Sutiyo Kontraktor : Meta Epsi

7. PLTU SULAWESI UTARA, Manado SIGNING


PIC: Mr. Sutiyo Kontraktor : Wijaya Karya

Catatan akhir 26 Des 2007