Sei sulla pagina 1di 4

PFD calculation program

=Fields to enter data into


=Result fields (Do not modify!)

Parameter Value Comment


DU 1.50E-06 (Failure rate of dangerous undetected failures (per hour))
M 2 (Minimum number of components DU failures causing system failure)
N 3 (Number of redundant "chanels" of subfunction)
0.02 (Common cause factor)
2190 (Test interval in hours)
PFDC #VALUE! (Probability of failure on demand, common cause failures)
PFDI #VALUE! (Probability of failure on demand, independent failures)
PFD() #VALUE! (Total probability of failure)
Component

Parameter Value =Fields to enter data into


PFDA 1.0E-03 =Result fields (Do not modify!)
DU,BE 1.0E-04
DU,CE 2.0E-04
M 2
N 3
2.00%
RF 90%
SD 1.0E-04
U1 10000
U2 1

Parameter P0(Init) P1 P2 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13


X-this period 0 1 0 0 1 1 0 1 2 1 0 4 2 2
t - this period 20000 20000 20000 20000 20000 20000 20000 20000 20000 20000 20000 20000 20000 20000
NFT this period
X 0 0 1 1 1 2 3 3 4 6 7 7 11 13 15
t 0 20000 40000 60000 80000 100000 120000 140000 160000 180000 200000 220000 240000 260000 280000
NFT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
U1 10000 29000 46100 61490 75341 87806.9 99026.21 109124 118211 126390 133751 140376 146338 151705 156534
U2 1.00 0.90 1.81 1.63 1.47 2.32 3.09 2.78 3.50 5.15 5.64 5.07 8.56 9.71 10.74
DU 2.0E-04 3.1E-05 3.9E-05 2.6E-05 1.9E-05 2.6E-05 3.1E-05 2.5E-05 3.0E-05 4.1E-05 4.2E-05 3.6E-05 5.9E-05 6.4E-05 6.9E-05
720
PFD #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Date 5/26/2017

Sign
X N Date Nelson Aalen
0 1 1/5/2004 0 Nelson Aalen
1 1 5/3/2004 1 16
0 1 8/31/2004 1
0 1 1/1/2005 1 14
1 1 5/5/2005 2 12
1 1 9/4/2005 3
0 1 2/5/2006 3 10
1 1 6/20/2006 4 8
2 1 10/1/2006 6
6
1 1 2/1/2007 7
0 1 6/1/2007 7 4
4 1 8/1/2007 11
2
2 1 1/1/2008 13
2 1 5/1/2008 15 0
9/1/2002 1/14/2004 5/28/2005 10/10/2006 2/22/2008
on Aalen

10/10/2006 2/22/2008 7/6/2009

Potrebbero piacerti anche