Sei sulla pagina 1di 1

TENDER DRAWINGS

1/- GENERAL REFERENCES SYMBOLS 2/- MATERIAL HATCH AND SYMBOLS 5/- MATERIAL HATCH AND SYMBOLS
REFERENCES - WALL TYPES REFERENCES - FLOOR FINISHING

1
LOCATION PLAN - BLOCK A,B,C 1/1000

A001

1/100

EXTENSION BUILDING - B

RENOVATION BUILDING - A

3/- MATERIAL HATCH AND SYMBOLS


REFERENCES - GLASS

FFL + 0.450
TOC + 0.350

ENTRANCE WAY
P.B
REV DATE AMENDMENT CHECK

LEVEL REFERENCE CLIENT

+2.450 HEIGHTS OF CEILING FROM FINISHED FLOOR LEVEL


4/- MATERIAL HATCH AND SYMBOLS L'HOPITAL FRANCAIS DE HANOI
No 1 Phuong Mai, Dong Da,

REFERENCES - CEILING FINISHING Ha Noi, Vietnam, 100000


Tel:+84 4 3577 1100,
Fax:+84 4 3576 4443
contact@hfh.com.vn
NOTE www.hfh.com.vn

General Director Philippe Hovette


INTERIOR DESIGN
GYPSUM FALSE CEILING
CTY TNHH ADRIEN DESPORT
Adrien Desport Architecture Design Ltd.
657 Street 34, An Phu Ward , District 2
Ho Chi Minh, Vietnam
Tel:+84 8 6281 8340
GYPSUM TILE FALSE CEILING WITH Fax:+84 8 6281 8003
admin@desport-architects.com
CONCEALED GRID LINE www.desport-architects.com ISSUED BY

LAMINATE FALSE CEILING


General Director Adrien Desport
PROJECT NAME

HFH RENOVATION & EXTENSION


DECORATIVE CEILING
ADDRESS: NO. 1, PHUONG MAI, DONG DA DISTRICT, HANOI

DISCIPLINE

INTERIOR DESIGN

DRAWING TITLE
ANTIBACTERIAN TILE FALSE CEILING

-
WOOD PANEL CEILING
GENERAL NOTES & SYMBOLIST

WATER PROOFING GYPSUM FALSE CEILING PROJECT No. DRAWING No. REVISION No.

ID\GN\01
DESIGN HEAD CHECKED BY

NOTE: - THE REPRESENTATION OF STRUCTURE AND M&E ITEMS ARE HERE FOR REFERENCE ONLY. - ALL DIMENSIONS MUST BE CHECKED ON SITE. ADRIEN DESPORT

- THE DIMENSIONS FOR WALLS INCLUDE THE BRICKS AND PLASTERING MORTAR - MINIMUM SCREEDING MORTAR IS 25mm. DATE SIZE SCALE
EXCLUDE THE ADDITIONAL FINISHING LAYERS. 3/16/2017 A1

Potrebbero piacerti anche