Sei sulla pagina 1di 20

VSPP

--

Mr. Ruamlarp Anantasanta


Jun 5, 2015
Renewable Energy Asia 2015
Bitec Bangna,
Permit & Regulation Integration Bangkok
into EEI
Project Master Plan

by CoP-Permit & Regulation

Program : Permit, License and Privilege For VSPP Project Development in Thailand
1 Energy International Co., Ltd. All
Copy Right2015 Excellent 2015 All Right Reserved.
Program : Permit, License and Privilege For VSPP Project Development in Thailand
2 2015 All Right Reserved.
Excellent Energy International Co., Ltd. (EEI)
A well-known ESCO (Energy Service Company) in The only ESCO in Thailand
Thailand established since 1999 with the registered whom was invited to
capital of 26 MB contribute a regional
An ESCO who offers guaranteed-payback on perspective as a Co-writer
EE/RE* projects for clients in various Industries and in two books of World- God
Commercial buildings Mother of ESCO, Dr. Shirley
Hansen!!! Namely ESCOs
*Energy Efficiency/ Renewable Energy Around The World:
Lessons Learned in 49
The first one, and only ESCO Countries(published in
in Thailand who successfully 2009) and World ESCO
implemented Thailand ESCO Outlook (Just released
Pilot Project with excellent and available now!!!)
base of support from the
Thai Government & the Awarded 4 consecutive years of ESCO Excellence
World Bank. Award 2009 - 2014, by The Federation of Thai
Industries, supported by the Ministry of Energy, to
the leading ESCO of Thailand.
An ESCO with Over 6,000 MB of on-going
projects distributed over Cogeneration system,
Renewable Energy, Energy Management
Information System (EMIS), Heat Recovery
projects, etc

Some of EEI Clients

Program : Permit, License and Privilege For VSPP Project Development in Thailand
3 2015 All Right Reserved.
EEIs Solution & Side Reference
ECMs for Industrial Facility
Cogeneration System
Coal Steam Turbine

Biomass Gas Turbine

Natural Gas Gas Engine

Biogas Absorption Chiller

Waste Heat Recovery / ORC

EMIS Productivity
(Energy Management Improvement
Information System)
Refrigeration &
Boiler System HVAC

Heat Pump Motor Optimization

Lighting Ozone for Laundry

ECMs for Commercial Building

Power Generation Renewable Energy

Solar Power Plant Plant Simple Cycle

Biomass Power Waste to Energy

Gasification

Program : Permit, License and Privilege For VSPP Project Development in Thailand
4 2015 All Right Reserved.
EEIs Service

1 ESCO Performance Guarantee Investment Potential


Study, Feasibility Study Permit, BOI and
Regulation
2 ESCO Performance Base
management

Engineering Design,
3 Permit & License Preparation and Application Service
Conceptual Design Contract
management

4 Project Management Consultancy & System Integration Bidding & Procurement


Management

5
3 Investment & Financial Arrangement Construction and
Installation Supervision
6 Independent Engineering/Lender Engineer & Management

7 O&M Management Service


Commissioning
8 Plant Monitoring System
Operation &
9 Training (Public and In-House) Maintenance
Supervision

Program : Permit, License and Privilege For VSPP Project Development in Thailand
5 2015 All Right Reserved.

VS.

Program : Permit, License and Privilege For VSPP Project Development in Thailand
6 2015 All Right Reserved.
(Permit)
() ()

1 1
2

(Land Use Permit) 7
3 CoP (+PP 1 ) 90+120
4 IEE (+PP 1 ) 120+180
5 ESA (Optional = +PP 1 ) 90+120
6 EIA (+PP 2 ) 180+240
7 EHIA (+PP 3 ) 240+300

8 ./. ./. 30-60
9 PPA (Power Purchase Agreement) ERC/ EGAT/ MEA/ PEA N/A

Financial Close

10 *BOI* (*This is a Promotion. Not Permit.) 50-100 + 3m-8m


11 (Land Digging) (.2) ./ 7
12 (Construction Permit) (.1) / ./ 45 95/ 45 - 135
13 (. 4) / 60/ 30
14 (-- (ERC) 75
)
15 (. 2) (ERC) 45

16 Boiler 30
17 3 90
18
5++

Program : Permit, License and Privilege For VSPP Project Development in Thailand
7 2015 All Right Reserved.
Abbreviation
()
Website
Department of Public Works and Town & Country Planning DPT/. www.dpt.go.th
The Provincial Office of Public Works and Town & Country
Planning DPT Local
. .... Office of Public Works and Town & Country Planning
The Metropolitan Electricity Authority MEA/. www.mea.or.th

Provincial Electricity Authority PEA/. www.pea.co.th
Office of Natural Resources and Environmental Policy and ONEP/. www.onep.go.th
Planning

Department of Industrial Works DIW/ . www.diw.go.th


Board of Investment BOI www.boi.go.th
Subdistrict Administrative Organization SAO/.
City Municipality .
Energy Regulatory Commission ERC/. www.erc.or.th
Office of the Energy Regulatory Commission of Thailand OERC/. www.erc.or.th
Department of Energy Business, Ministry of Energy DoEB/ . www.doeb.go.th

Program : Permit, License and Privilege For VSPP Project Development in Thailand
8 2015 All Right Reserved.
Project Master Plan
Project Project Bank Project Project
Identification Development Implementation Operation

PFS
Identification & FS Bidding & Bidding & Construction Operation &
(Preliminary Equip.
Consultant (Feasibility Procurement Procurement (CE, ME, Delivery
Installation Commissioning Maintenance
Feasibility
Engagement Study) Major Equipment BoP EE, C&IE) (O&M)
Study)

(1) Project Development: (2) Financial Closure: (3) Project Implementation:


- - Project -

-
Development

-
-
( , -
, ) - Financial Closure
- (

-
) - Down -
- ()
Payment Commissioning, COD

(Commercial Operation
- Date)
- Project
Project

- Financial Closure
-
Project
Implementation
Program : Permit, License and Privilege For VSPP Project Development in Thailand
9 2015 All Right Reserved.
Integration of Project Feasibility Study

A measure of how well Project can be implemented


Legal within existing legal/contractual obligations.
A MUST Compliance

First systematic investigation of Project Design Viability.


Technical Foundation of all other Feasibility Study
Question is How can it be built? .

Analysis of costs- and- benefits, together with


Commercial appropriate terms and conditions
Question is How to : How much
To produce and sell
Legal Technical

Capability to raise fund for Projects implementation.


Financial Project MUST
Financial Commercial Repay the debt in full
Generate attractive returns to owner

Program : Permit, License and Privilege For VSPP Project Development in Thailand
10 2015 All Right Reserved.
Integration of Feasibility Study
What, When, Where, Why, Who, How

Technical Legal
Shareholders Lenders Advisor Advisor

Insurance Environmental
Advisor Advisor

Government

Electricity Off-taker
EPC Contractor

Core Equipment Supplier


P Steam Off-taker

Land Provider
R
Chilled Water Off-taker
Fuel Supply Provider
O
(Include Back up Fuel)
J Hot Water Off-taker
Raw Water Supplier
E Heat Off-taker
Utility Provider

O & M Contractor
C Contract No.

LTSA Provider
T Key Deliverable

Integrate right and obligation of each


relevant counterpart into overall
Insurance
contractual framework for risk
assessment
Program : Permit, License and Privilege For VSPP Project Development in Thailand
11 2015 All Right Reserved.
Feasibility Study: in supporting
Project Development, Financial Closure
Project Project Bank Project Project
Identification Development Implementation Operation

PFS
Identification & FS Bidding & Bidding & Construction Operation &
(Preliminary Equip.
Consultant (Feasibility Procurement Procurement (CE, ME, Delivery
Installation Commissioning Maintenance
Feasibility
Engagement Study) Major Equipment BoP EE, C&IE) (O&M)
Study)

Content FS Report
(1) Project Development: (2) Financial Closure: (3) Project Implementation:
(Feasibility Study)
- - Project - Summary
Executive

-
Development
Introduction

-
Site Assessment
- Selected
( , - Project
Technology(s)

, ) Conceptual Design
- (
-
<--> Financial
Technical Closure
Feasibility Study
-
Financial Analysis
) - Down FinancialFeasibility
-
<-->
- ()
Payment Commissioning,
Legal Feasibility COD

(Commercial
Commercial Operation
Feasibility
- Date)
Risk Identification & Risk
- Project
Project Mitigation

Project Schedule
- Financial Closure Supplier List
-
Project
Appendix: Reference Material
Implementation
Appendix: Supporting Material
Program : Permit, License and Privilege For VSPP Project Development in Thailand
12 2015 All Right Reserved.
Integration into Project Master Plan
#1_VSPP Stand-alone Company
PEA 100%
Project Project Bank Project Project
Identification Development Implementation Operation

PFS
Identification & FS Bidding & Bidding & Construction Operation &
(Preliminary Equip.
Consultant (Feasibility Procurement Procurement (CE, ME, Delivery
Installation Commissioning Maintenance
Feasibility
Engagement Study) Major Equipment BoP EE, C&IE) (O&M)
Study)

Check ERC : ** ERC : ERC : PEA/ MEA : PEA/ MEA : PEA/ MEA : 60 COD
Feeder
App Submit Approve Sign PPA Sync Synch Test & COD
BG
< 30 days 7 days
1/ DBD 7 N/A N/A N/A 60 days (B/G 200
() PEA
Baht/1kW)
B/G Obj :
Sync Obj :


Land Use Land Use 200 Baht/1kW > 6 MW

(Web Search) Letter B/G B/G
30/ EGAT
0 / DPT 400 Baht/1 kVA

7 / DPT
CoP/IEE/ESA: CoP/IEE/ESA:
PP#1 Report
** 4 45 days 30 days < 45/ERC < 75/ERC
-
1,000 kVA
-

ESA 0.6 0.9 MB BOI: BOI: BOI: BOI: BOI: . BOI:
- IEE 0.8 1.4 MB
- Note : Apply Approve Issue Cert. IC Register Master List Opening
ESA : Electricity 5 MW 10 days 40-90 days 7+180 days < 30 days < 75 days 6
ESA : Boiler > 10 TPH
IEE : Electricity 0-10 MW
CoP : Electricity < 10 MW ( )

CoP : Solar > 1 MW Land Use - Land Digging

Boiler Test
CoP : MSW > 10 MW (Draft) Letter Notification
7/ SAODPT 7/ SAO > 30/ DIW 5++ / DIW

Construction Construction
Permit . 1 Permit . 6
45 /SAO and/or ERC 30 / SAO and/or ERC

Factory License Factory License


4 4

90++/ DIW and/or DIW 15 / DIW and/or ERC

Gas
(Sale /Mr.Naris) (
) )
(
0/ 60/ DOEB 90/ DOEB
Program : Permit, License and Privilege For VSPP Project Development in Thailand
13 2015 All Right Reserved.
Integration into Project Master Plan
#1_VSPP Stand-alone Company
PEA 100%
Project Project Bank Project Project
Identification Development Implementation Operation

PFS
Identification & FS Bidding & Bidding & Construction Operation &
(Preliminary Equip.
Consultant (Feasibility Procurement Procurement (CE, ME, Delivery
Installation Commissioning Maintenance
Feasibility
Engagement Study) Major Equipment BoP EE, C&IE) (O&M)
Study)

Check ERC : ** ERC : ERC : PEA/ MEA : PEA/ MEA : PEA/ MEA : 60 COD
Feeder
App Submit Approve Sign PPA Sync Synch Test & COD
BG
< 30 days 7 days
1/ DBD 7 N/A N/A N/A 60 days (B/G 200
() PEA
Baht/1kW)
B/G Obj :
Sync Obj :


Land Use Land Use 200 Baht/1kW > 6 MW

(Web Search) Letter B/G B/G
30/ EGAT
0 / DPT 400 Baht/1 kVA

7 / DPT
CoP/IEE/ESA: CoP/IEE/ESA:
PP#1 Report
** 4 45 days 30 days < 45/ERC < 75/ERC
-
1,000 kVA
-

ESA 0.6 0.9 MB BOI: BOI: BOI: BOI: BOI: . BOI:
- IEE 0.8 1.4 MB
- Note : Apply Approve Issue Cert. IC Register Master List Opening
ESA : Electricity 5 MW 10 days 40-90 days 7+180 days < 30 days < 75 days 6
ESA : Boiler > 10 TPH
IEE : Electricity 0-10 MW
CoP : Electricity < 10 MW ( )

CoP : Solar > 1 MW Land Use - Land Digging

Boiler Test
CoP : MSW > 10 MW (Draft) Letter Notification
7/ SAODPT 7/ SAO > 30/ DIW 5++ / DIW

Construction Construction
Permit . 1 Permit . 6
45 /SAO and/or ERC 30 / SAO and/or ERC

Factory License Factory License


4 4

90++/ DIW and/or DIW 15 / DIW and/or ERC

Gas
(Sale /Mr.Naris) (
) )
(
0/ 60/ DOEB 90/ DOEB
Program : Permit, License and Privilege For VSPP Project Development in Thailand
14 2015 All Right Reserved.
Integration into EEI Project Master Plan
#1_VSPP Stand-alone Company
PEA 100%
Project Project Bank Project Project
Identification Development Implementation Operation

PFS
Identification & FS Bidding & Bidding & Construction Operation &
(Preliminary Equip.
Consultant (Feasibility Procurement Procurement (CE, ME, Delivery
Installation Commissioning Maintenance
Feasibility
Engagement Study) Major Equipment BoP EE, C&IE) (O&M)
Study)

Check ERC : ** ERC : ERC : PEA/ MEA : PEA/ MEA : PEA/ MEA : 60 COD
Feeder
App Submit Approve Sign PPA Sync Synch Test & COD
BG
< 30 days 7 days
1/ DBD 7 N/A N/A N/A 60 days (B/G 200
() PEA
Baht/1kW)
B/G Obj :
Sync Obj :


Land Use Land Use 200 Baht/1kW > 6 MW

(Web Search) Letter B/G B/G
30/ EGAT
0 / DPT 400 Baht/1 kVA

7 / DPT
CoP/IEE/ESA: CoP/IEE/ESA:
PP#1 Report
** 4 45 days 30 days < 45/ERC < 75/ERC
-
1,000 kVA
-

ESA 0.6 0.9 MB BOI: BOI: BOI: BOI: BOI: . BOI:
- IEE 0.8 1.4 MB
- Note : Apply Approve Issue Cert. IC Register Master List Opening
ESA : Electricity 5 MW 10 days 40-90 days 7+180 days < 30 days < 75 days 6
ESA : Boiler > 10 TPH
IEE : Electricity 0-10 MW
CoP : Electricity < 10 MW ( )

CoP : Solar > 1 MW Land Use - Land Digging

Boiler Test
CoP : MSW > 10 MW (Draft) Letter Notification
7/ SAODPT 7/ SAO > 30/ DIW 5++ / DIW

Construction Construction
Permit . 1 Permit . 6
45 /SAO and/or ERC 30 / SAO and/or ERC

Factory License Factory License


4 4

90++/ DIW and/or DIW 15 / DIW and/or ERC

Gas
(Sale /Mr.Naris) (
) )
(
0/ 60/ DOEB 90/ DOEB
Program : Permit, License and Privilege For VSPP Project Development in Thailand
15 2015 All Right Reserved.
Integration into Project Master Plan
#1_VSPP Stand-alone Company
PEA 100%
Project Project Bank Project Project
Identification Development Implementation Operation

PFS
Identification & FS Bidding & Bidding & Construction Operation &
(Preliminary Equip.
Consultant (Feasibility Procurement Procurement (CE, ME, Delivery
Installation Commissioning Maintenance
Feasibility
Engagement Study) Major Equipment BoP EE, C&IE) (O&M)
Study)

Check ERC : ** ERC : ERC : PEA/ MEA : PEA/ MEA : PEA/ MEA : 60 COD
Feeder
App Submit Approve Sign PPA Sync Synch Test & COD
BG
< 30 days 7 days
1/ DBD 7 N/A N/A N/A 60 days (B/G 200
() PEA
Baht/1kW)
B/G Obj :
Sync Obj :


Land Use Land Use 200 Baht/1kW > 6 MW

(Web Search) Letter B/G B/G
30/ EGAT
0 / DPT 400 Baht/1 kVA

7 / DPT
CoP/IEE/ESA: CoP/IEE/ESA:
PP#1 Report
** 4 45 days 30 days < 45/ERC < 75/ERC
-
1,000 kVA
-

ESA 0.6 0.9 MB BOI: BOI: BOI: BOI: BOI: . BOI:
- IEE 0.8 1.4 MB
- Note : Apply Approve Issue Cert. IC Register Master List Opening
ESA : Electricity 5 MW 10 days 40-90 days 7+180 days < 30 days < 75 days 6
ESA : Boiler > 10 TPH
IEE : Electricity 0-10 MW
CoP : Electricity < 10 MW ( )

CoP : Solar > 1 MW Land Use - Land Digging

Boiler Test
CoP : MSW > 10 MW (Draft) Letter Notification
7/ SAODPT 7/ SAO > 30/ DIW 5++ / DIW

Construction Construction
Permit . 1 Permit . 6
45 /SAO and/or ERC 30 / SAO and/or ERC

Factory License Factory License


4 4

90++/ DIW and/or DIW 15 / DIW and/or ERC

Gas
(Sale /Mr.Naris) (
) )
(
0/ 60/ DOEB 90/ DOEB
Program : Permit, License and Privilege For VSPP Project Development in Thailand
16 2015 All Right Reserved.
Integration into Project Master Plan
#2_NG Cogen for Factory

Project Project Bank Project Project
Identification Development Implementation Operation

PFS
Identification & FS Bidding & Bidding & Construction Operation &
(Preliminary Equip.
Consultant (Feasibility Procurement Procurement (CE, ME, Delivery
Installation Commissioning Maintenance
Feasibility
Engagement Study) Major Equipment BoP EE, C&IE) (O&M)
Study)

Check PEA PEA/ MEA : PEA/ MEA : 60 COD


Feeder Apply Sync Synch Test & COD
BG
< 30 days 7 days
1/ DBD 7 120 days (B/G 200
() PEA
Baht/1kW)
Obj :
Sync Obj :


Land Use Land Use > 20 MW

(Web Search) Letter B/G B/G
30/ EGAT
0 / DPT 400 Baht/1 kVA

7 / DPT
CoP/IEE/ESA: CoP/IEE/ESA:
PP#1 Report
45 days 30 days < 45/ERC < 75/ERC
1,000 kVA
ESA 0.6 0.9 MB BOI: BOI: BOI: BOI: BOI: . BOI:
IEE 0.8 1.4 MB Apply Approve Issue Cert. IC Register Master List Opening
Note :
ESA : Electricity 5 MW 10 days 40-90 days 7+180 days < 30 days < 75 days 6
ESA : Boiler > 10 TPH
IEE : Electricity 0-10 MW
CoP : Electricity < 10 MW ( )

CoP : Solar > 1 MW Land Use - Land Digging

Boiler Test
CoP : MSW > 10 MW (Draft) Letter Notification
7/ SAODPT 7/ SAO > 30/ DIW 5++ / DIW

Construction Construction
Permit . 1 Permit . 6
45 /SAO 30 / SAO

Factory License Factory License


4 4

/ DIW / DIW

Gas
(Sale /Mr.Naris) (
) )
(
0/ 60/ DOEB 90/ DOEB
Program : Permit, License and Privilege For VSPP Project Development in Thailand
17 2015 All Right Reserved.
EEI 2-days Training
Permit, License, and Privilege
Just held: May-2015
Next Round: August-2015

Program : Permit, License and Privilege For VSPP Project Development in Thailand
19 2015 All Right Reserved.
Biomass VSPP Power Plant
Project Development

VSPPSPP Power Plant


Project Feasibility Study
for Bank & Investor Financing

Cogeneration Power
Plant Feasibility
Study in Factory

Program : Permit, License and Privilege For VSPP Project Development in Thailand
20 2015 All Right Reserved.
Excellent Energy International Co.,Ltd
475 Sri Ayudhaya Rd., Rajthevee Bangkok 10400 Thailand
E-mail: training@eei.co.th
Phone: +66-2-201-3466-7
Fax: +66-2-201-3465

Program : Permit, License and Privilege For VSPP Project Development in Thailand
21 2015 All Right Reserved.

Potrebbero piacerti anche