Program : Permit, License and Privilege For VSPP Project Development in Thailand
1 Energy International Co., Ltd. All
Copy Right2015 Excellent 2015 All Right Reserved.
Program : Permit, License and Privilege For VSPP Project Development in Thailand
2 2015 All Right Reserved.
Excellent Energy International Co., Ltd. (EEI)
A well-known ESCO (Energy Service Company) in The only ESCO in Thailand
Thailand established since 1999 with the registered whom was invited to
capital of 26 MB contribute a regional
An ESCO who offers guaranteed-payback on perspective as a Co-writer
EE/RE* projects for clients in various Industries and in two books of World- God
Commercial buildings Mother of ESCO, Dr. Shirley
Hansen!!! Namely ESCOs
*Energy Efficiency/ Renewable Energy Around The World:
Lessons Learned in 49
The first one, and only ESCO Countries(published in
in Thailand who successfully 2009) and World ESCO
implemented Thailand ESCO Outlook (Just released
Pilot Project with excellent and available now!!!)
base of support from the
Thai Government & the Awarded 4 consecutive years of ESCO Excellence
World Bank. Award 2009 - 2014, by The Federation of Thai
Industries, supported by the Ministry of Energy, to
the leading ESCO of Thailand.
An ESCO with Over 6,000 MB of on-going
projects distributed over Cogeneration system,
Renewable Energy, Energy Management
Information System (EMIS), Heat Recovery
projects, etc
Program : Permit, License and Privilege For VSPP Project Development in Thailand
3 2015 All Right Reserved.
EEIs Solution & Side Reference
ECMs for Industrial Facility
Cogeneration System
Coal Steam Turbine
EMIS Productivity
(Energy Management Improvement
Information System)
Refrigeration &
Boiler System HVAC
Gasification
Program : Permit, License and Privilege For VSPP Project Development in Thailand
4 2015 All Right Reserved.
EEIs Service
Engineering Design,
3 Permit & License Preparation and Application Service
Conceptual Design Contract
management
5
3 Investment & Financial Arrangement Construction and
Installation Supervision
6 Independent Engineering/Lender Engineer & Management
Program : Permit, License and Privilege For VSPP Project Development in Thailand
5 2015 All Right Reserved.
VS.
Program : Permit, License and Privilege For VSPP Project Development in Thailand
6 2015 All Right Reserved.
(Permit)
() ()
1 1
2
(Land Use Permit) 7
3 CoP (+PP 1 ) 90+120
4 IEE (+PP 1 ) 120+180
5 ESA (Optional = +PP 1 ) 90+120
6 EIA (+PP 2 ) 180+240
7 EHIA (+PP 3 ) 240+300
8 ./. ./. 30-60
9 PPA (Power Purchase Agreement) ERC/ EGAT/ MEA/ PEA N/A
Financial Close
Program : Permit, License and Privilege For VSPP Project Development in Thailand
7 2015 All Right Reserved.
Abbreviation
()
Website
Department of Public Works and Town & Country Planning DPT/. www.dpt.go.th
The Provincial Office of Public Works and Town & Country
Planning DPT Local
. .... Office of Public Works and Town & Country Planning
The Metropolitan Electricity Authority MEA/. www.mea.or.th
Provincial Electricity Authority PEA/. www.pea.co.th
Office of Natural Resources and Environmental Policy and ONEP/. www.onep.go.th
Planning
Program : Permit, License and Privilege For VSPP Project Development in Thailand
8 2015 All Right Reserved.
Project Master Plan
Project Project Bank Project Project
Identification Development Implementation Operation
PFS
Identification & FS Bidding & Bidding & Construction Operation &
(Preliminary Equip.
Consultant (Feasibility Procurement Procurement (CE, ME, Delivery
Installation Commissioning Maintenance
Feasibility
Engagement Study) Major Equipment BoP EE, C&IE) (O&M)
Study)
Program : Permit, License and Privilege For VSPP Project Development in Thailand
10 2015 All Right Reserved.
Integration of Feasibility Study
What, When, Where, Why, Who, How
Technical Legal
Shareholders Lenders Advisor Advisor
Insurance Environmental
Advisor Advisor
Government
Electricity Off-taker
EPC Contractor
Land Provider
R
Chilled Water Off-taker
Fuel Supply Provider
O
(Include Back up Fuel)
J Hot Water Off-taker
Raw Water Supplier
E Heat Off-taker
Utility Provider
O & M Contractor
C Contract No.
LTSA Provider
T Key Deliverable
PFS
Identification & FS Bidding & Bidding & Construction Operation &
(Preliminary Equip.
Consultant (Feasibility Procurement Procurement (CE, ME, Delivery
Installation Commissioning Maintenance
Feasibility
Engagement Study) Major Equipment BoP EE, C&IE) (O&M)
Study)
Content FS Report
(1) Project Development: (2) Financial Closure: (3) Project Implementation:
(Feasibility Study)
- - Project - Summary
Executive
-
Development
Introduction
-
Site Assessment
- Selected
( , - Project
Technology(s)
, ) Conceptual Design
- (
-
<--> Financial
Technical Closure
Feasibility Study
-
Financial Analysis
) - Down FinancialFeasibility
-
<-->
- ()
Payment Commissioning,
Legal Feasibility COD
(Commercial
Commercial Operation
Feasibility
- Date)
Risk Identification & Risk
- Project
Project Mitigation
Project Schedule
- Financial Closure Supplier List
-
Project
Appendix: Reference Material
Implementation
Appendix: Supporting Material
Program : Permit, License and Privilege For VSPP Project Development in Thailand
12 2015 All Right Reserved.
Integration into Project Master Plan
#1_VSPP Stand-alone Company
PEA 100%
Project Project Bank Project Project
Identification Development Implementation Operation
PFS
Identification & FS Bidding & Bidding & Construction Operation &
(Preliminary Equip.
Consultant (Feasibility Procurement Procurement (CE, ME, Delivery
Installation Commissioning Maintenance
Feasibility
Engagement Study) Major Equipment BoP EE, C&IE) (O&M)
Study)
Check ERC : ** ERC : ERC : PEA/ MEA : PEA/ MEA : PEA/ MEA : 60 COD
Feeder
App Submit Approve Sign PPA Sync Synch Test & COD
BG
< 30 days 7 days
1/ DBD 7 N/A N/A N/A 60 days (B/G 200
() PEA
Baht/1kW)
B/G Obj :
Sync Obj :
Land Use Land Use 200 Baht/1kW > 6 MW
(Web Search) Letter B/G B/G
30/ EGAT
0 / DPT 400 Baht/1 kVA
7 / DPT
CoP/IEE/ESA: CoP/IEE/ESA:
PP#1 Report
** 4 45 days 30 days < 45/ERC < 75/ERC
-
1,000 kVA
-
ESA 0.6 0.9 MB BOI: BOI: BOI: BOI: BOI: . BOI:
- IEE 0.8 1.4 MB
- Note : Apply Approve Issue Cert. IC Register Master List Opening
ESA : Electricity 5 MW 10 days 40-90 days 7+180 days < 30 days < 75 days 6
ESA : Boiler > 10 TPH
IEE : Electricity 0-10 MW
CoP : Electricity < 10 MW ( )
CoP : Solar > 1 MW Land Use - Land Digging
Boiler Test
CoP : MSW > 10 MW (Draft) Letter Notification
7/ SAODPT 7/ SAO > 30/ DIW 5++ / DIW
Construction Construction
Permit . 1 Permit . 6
45 /SAO and/or ERC 30 / SAO and/or ERC
Gas
(Sale /Mr.Naris) (
) )
(
0/ 60/ DOEB 90/ DOEB
Program : Permit, License and Privilege For VSPP Project Development in Thailand
13 2015 All Right Reserved.
Integration into Project Master Plan
#1_VSPP Stand-alone Company
PEA 100%
Project Project Bank Project Project
Identification Development Implementation Operation
PFS
Identification & FS Bidding & Bidding & Construction Operation &
(Preliminary Equip.
Consultant (Feasibility Procurement Procurement (CE, ME, Delivery
Installation Commissioning Maintenance
Feasibility
Engagement Study) Major Equipment BoP EE, C&IE) (O&M)
Study)
Check ERC : ** ERC : ERC : PEA/ MEA : PEA/ MEA : PEA/ MEA : 60 COD
Feeder
App Submit Approve Sign PPA Sync Synch Test & COD
BG
< 30 days 7 days
1/ DBD 7 N/A N/A N/A 60 days (B/G 200
() PEA
Baht/1kW)
B/G Obj :
Sync Obj :
Land Use Land Use 200 Baht/1kW > 6 MW
(Web Search) Letter B/G B/G
30/ EGAT
0 / DPT 400 Baht/1 kVA
7 / DPT
CoP/IEE/ESA: CoP/IEE/ESA:
PP#1 Report
** 4 45 days 30 days < 45/ERC < 75/ERC
-
1,000 kVA
-
ESA 0.6 0.9 MB BOI: BOI: BOI: BOI: BOI: . BOI:
- IEE 0.8 1.4 MB
- Note : Apply Approve Issue Cert. IC Register Master List Opening
ESA : Electricity 5 MW 10 days 40-90 days 7+180 days < 30 days < 75 days 6
ESA : Boiler > 10 TPH
IEE : Electricity 0-10 MW
CoP : Electricity < 10 MW ( )
CoP : Solar > 1 MW Land Use - Land Digging
Boiler Test
CoP : MSW > 10 MW (Draft) Letter Notification
7/ SAODPT 7/ SAO > 30/ DIW 5++ / DIW
Construction Construction
Permit . 1 Permit . 6
45 /SAO and/or ERC 30 / SAO and/or ERC
Gas
(Sale /Mr.Naris) (
) )
(
0/ 60/ DOEB 90/ DOEB
Program : Permit, License and Privilege For VSPP Project Development in Thailand
14 2015 All Right Reserved.
Integration into EEI Project Master Plan
#1_VSPP Stand-alone Company
PEA 100%
Project Project Bank Project Project
Identification Development Implementation Operation
PFS
Identification & FS Bidding & Bidding & Construction Operation &
(Preliminary Equip.
Consultant (Feasibility Procurement Procurement (CE, ME, Delivery
Installation Commissioning Maintenance
Feasibility
Engagement Study) Major Equipment BoP EE, C&IE) (O&M)
Study)
Check ERC : ** ERC : ERC : PEA/ MEA : PEA/ MEA : PEA/ MEA : 60 COD
Feeder
App Submit Approve Sign PPA Sync Synch Test & COD
BG
< 30 days 7 days
1/ DBD 7 N/A N/A N/A 60 days (B/G 200
() PEA
Baht/1kW)
B/G Obj :
Sync Obj :
Land Use Land Use 200 Baht/1kW > 6 MW
(Web Search) Letter B/G B/G
30/ EGAT
0 / DPT 400 Baht/1 kVA
7 / DPT
CoP/IEE/ESA: CoP/IEE/ESA:
PP#1 Report
** 4 45 days 30 days < 45/ERC < 75/ERC
-
1,000 kVA
-
ESA 0.6 0.9 MB BOI: BOI: BOI: BOI: BOI: . BOI:
- IEE 0.8 1.4 MB
- Note : Apply Approve Issue Cert. IC Register Master List Opening
ESA : Electricity 5 MW 10 days 40-90 days 7+180 days < 30 days < 75 days 6
ESA : Boiler > 10 TPH
IEE : Electricity 0-10 MW
CoP : Electricity < 10 MW ( )
CoP : Solar > 1 MW Land Use - Land Digging
Boiler Test
CoP : MSW > 10 MW (Draft) Letter Notification
7/ SAODPT 7/ SAO > 30/ DIW 5++ / DIW
Construction Construction
Permit . 1 Permit . 6
45 /SAO and/or ERC 30 / SAO and/or ERC
Gas
(Sale /Mr.Naris) (
) )
(
0/ 60/ DOEB 90/ DOEB
Program : Permit, License and Privilege For VSPP Project Development in Thailand
15 2015 All Right Reserved.
Integration into Project Master Plan
#1_VSPP Stand-alone Company
PEA 100%
Project Project Bank Project Project
Identification Development Implementation Operation
PFS
Identification & FS Bidding & Bidding & Construction Operation &
(Preliminary Equip.
Consultant (Feasibility Procurement Procurement (CE, ME, Delivery
Installation Commissioning Maintenance
Feasibility
Engagement Study) Major Equipment BoP EE, C&IE) (O&M)
Study)
Check ERC : ** ERC : ERC : PEA/ MEA : PEA/ MEA : PEA/ MEA : 60 COD
Feeder
App Submit Approve Sign PPA Sync Synch Test & COD
BG
< 30 days 7 days
1/ DBD 7 N/A N/A N/A 60 days (B/G 200
() PEA
Baht/1kW)
B/G Obj :
Sync Obj :
Land Use Land Use 200 Baht/1kW > 6 MW
(Web Search) Letter B/G B/G
30/ EGAT
0 / DPT 400 Baht/1 kVA
7 / DPT
CoP/IEE/ESA: CoP/IEE/ESA:
PP#1 Report
** 4 45 days 30 days < 45/ERC < 75/ERC
-
1,000 kVA
-
ESA 0.6 0.9 MB BOI: BOI: BOI: BOI: BOI: . BOI:
- IEE 0.8 1.4 MB
- Note : Apply Approve Issue Cert. IC Register Master List Opening
ESA : Electricity 5 MW 10 days 40-90 days 7+180 days < 30 days < 75 days 6
ESA : Boiler > 10 TPH
IEE : Electricity 0-10 MW
CoP : Electricity < 10 MW ( )
CoP : Solar > 1 MW Land Use - Land Digging
Boiler Test
CoP : MSW > 10 MW (Draft) Letter Notification
7/ SAODPT 7/ SAO > 30/ DIW 5++ / DIW
Construction Construction
Permit . 1 Permit . 6
45 /SAO and/or ERC 30 / SAO and/or ERC
Gas
(Sale /Mr.Naris) (
) )
(
0/ 60/ DOEB 90/ DOEB
Program : Permit, License and Privilege For VSPP Project Development in Thailand
16 2015 All Right Reserved.
Integration into Project Master Plan
#2_NG Cogen for Factory
Project Project Bank Project Project
Identification Development Implementation Operation
PFS
Identification & FS Bidding & Bidding & Construction Operation &
(Preliminary Equip.
Consultant (Feasibility Procurement Procurement (CE, ME, Delivery
Installation Commissioning Maintenance
Feasibility
Engagement Study) Major Equipment BoP EE, C&IE) (O&M)
Study)
Construction Construction
Permit . 1 Permit . 6
45 /SAO 30 / SAO
Gas
(Sale /Mr.Naris) (
) )
(
0/ 60/ DOEB 90/ DOEB
Program : Permit, License and Privilege For VSPP Project Development in Thailand
17 2015 All Right Reserved.
EEI 2-days Training
Permit, License, and Privilege
Just held: May-2015
Next Round: August-2015
Program : Permit, License and Privilege For VSPP Project Development in Thailand
19 2015 All Right Reserved.
Biomass VSPP Power Plant
Project Development
Cogeneration Power
Plant Feasibility
Study in Factory
Program : Permit, License and Privilege For VSPP Project Development in Thailand
20 2015 All Right Reserved.
Excellent Energy International Co.,Ltd
475 Sri Ayudhaya Rd., Rajthevee Bangkok 10400 Thailand
E-mail: training@eei.co.th
Phone: +66-2-201-3466-7
Fax: +66-2-201-3465
Program : Permit, License and Privilege For VSPP Project Development in Thailand
21 2015 All Right Reserved.