STRUCTURAL BALANCE DRAWINGS AS ON

30.11.2016
TRIDENT:-
1.TOWER K ,L -RECEIVED ON RAFT UPPER FLOORS
REQUIRED
2.PODIUM ROOF
3.NON-TOWER ROOF
4.MUMTY, MACHINE ROOM & O.H TANK OF BLOCKS
FROM G

WHITE HOUSE:-
1.TOWER -5 BALANCE
2.TOWER 4 TERRACE FLOOR

GREEN VIEW:-
1.TOWER -2 BALANCE DRAWINGS
2.NONTOWER FOUNDATION /ROOF /SWIMMING
POOL

RUDRA:-
1.NON TOWER & COMMERCIAL
2.U.G. TANK

J.M.D.R.:-
1.NON TOWER
2.ALL THREE BLOCKS TERRACE
3.ALL 3 BLOCKS TANK,MUMTY/MACHINE ROOM
4. TOWER B BALANCE DRAWINGS ABOVE GROUND
FLOOR
5.U.G. TANK/S.T.P

VIHAAN:-
1.SWIMMING POOL
2.TOWER B & C MUMTY, MACHINE ROOM &O.H TANK
3.WATER TANK U.G & S.T.P

K.S.N. ( ATALCHAWK):-
1.TERRACE, MUMTY, MACHINE ROOM &O.H TANK
2.NON-TOWER RETAINING WALL PILE DETAILS &
NONTOWER ROOF DETAILS
3.U.G. TANK & S.T.P

EKDANT VASUNDHARA:-
1.NON-TOWER ROOF& FOUNDATION
2.U.G.TANK

CASAWOOD STOCK:-
1.CONNECTING BRIDGE