AGENDA
1. Background
4. Next Steps
nyc.gov/dot 2
BACKGROUND
1
nyc.gov/dot 3
COMPREHENSIVE SAFETY PLAN
DOT hosted workshop
on comprehensive plan
on August 3, 2016
nyc.gov/dot 4
FLATBUSH AVE AND ATLANTIC AVE
Workshop feedback
on proposal used to
further develop
plans for the
intersection of
Flatbush Ave and
Atlantic Ave,
including Times
Plaza
AFTER
nyc.gov/dot 6
FLATBUSH AVE AND ATLANTIC AVE
2
nyc.gov/dot 7
FLATBUSH AVE AND ATLANTIC AVE
Major intersection of two two-way arterials
Multi-modal hub
New residential and commercial
development
Major entertainment and shopping
destination
Truck Routes
Bus Routes
Bike Routes
nyc.gov/dot 8
SAFETY
Flatbush Ave and Atlantic Ave:
VZ Intersection
Within a VZ Area
Are both VZ Corridors
nyc.gov/dot 9
EXISTING CONDITIONS
TIMES
130 PLAZA
ATLANTIC AVE
4TH AVE
nyc.gov/dot 10
EXISTING CONDITIONS
Heavy Turning Conflicts Between Pedestrians and Vehicles
nyc.gov/dot 11
EXISTING CONDITIONS
AM: 245
PM: 230
SUBWAY
ENTRANCE
nyc.gov/dot 12
EXISTING CONDITIONS
Lack of Bicycle Connections
nyc.gov/dot 13
PROPOSAL
ATLANTIC TERMINAL
TIMES
PLAZA
nyc.gov/dot 14
PROPOSAL
Four concrete pedestrian refuge
islands create shorter, two-part ATLANTIC TERMINAL
crossings
TIMES
PLAZA
nyc.gov/dot 15
PROPOSAL
Allow right-turns from center lane on
northbound 4th Ave
nyc.gov/dot 16
PROPOSAL
Removal of travel lanes EXISTING
necessary to accommodate
concrete pedestrian refuge
islands
Proposed Lane
Removals
Lane reductions in all directions
have minimal impact on overall
intersection level of service (LOS)
PROPOSED and delays
nyc.gov/dot 17
PROPOSAL
Traffic Flow Improvements
ATLANTIC TERMINAL
By increasing time for right-turn movement, even with lane reduction, westbound
Atlantic Ave level of service (LOS) is improved and delays are reduced
nyc.gov/dot 18
PROJECT BENEFITS
Safer, shorter pedestrian
crossings
nyc.gov/dot 19
PROJECT SUMMARY
Install four (4) concrete pedestrian refuge islands on
each leg of the intersection of Flatbush Ave and
Atlantic Ave
nyc.gov/dot 20
TIMES PLAZA
3
nyc.gov/dot 21
nyc.gov/dot 22
nyc.gov/dot 23
nyc.gov/dot 24
nyc.gov/dot 25
nyc.gov/dot 26
nyc.gov/dot 27
nyc.gov/dot 28
NEXT STEPS
4
nyc.gov/dot 29
NEXT STEPS
Fall 2017 implementation of
DOT Street Improvement
Project at Flatbush Ave and
Atlantic Ave
Questions?
nyc.gov/dot 31