Numbering Procedure
Doc No: XXXX-XXX-PM-P-XXX
TOTAL OR PARTIAL REPRODUCTION AND / OR UTILISATION OF THIS DOCUMENTATION ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE TCL
Rev Date Pred Description Chkd Appd Client
Table of Content
1.0 SCOPE 3
1.1 Purpose 3
1.2 Definitions of Terms 3
1.3 Abbreviations 3
TOTAL OR PARTIAL REPRODUCTION AND / OR UTILISATION OF THIS DOCUMENTATION ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE TCL
1.0 SCOPE
1.1 Purpose
This document defines the minimum requirements to develop, control and maintain the
numbering procedure to be adopted during the execution of the project.
1.2 Definitions of Terms
The CLIENT / COMPANY / OWNER where used in this specification shall mean the
ultimate user / owner of the plant and facilities
The LSTK CONTRACTOR / PURCHASER where used in this specification shall mean the
party, who undertake LSTK / EPC contract for the above project.
The VENDOR / SUPPLIER where used in this specification shall mean the party, who
manufactures or supplies the equipment and services specified.
The INSPECTOR / TPIA / TPI where used in this specification shall mean the
PURCHASER / COMPANY or their authorized Third Party Agency for carrying out the
inspection.
The ENGINEER / DEC / PMC where used in this specification shall mean the party, who
perform Design Engineering Consultancy and Project Management for COMPANY
1.3 LSTK CONTRACTORAbbreviations
CTF Central Tank Farm
DEC Design Engineering Consultant
DIC Disciplinary Internal Check
LSTK Lump Sum Turn Key
IDR Inter Disciplinary Review
GGS Group Gathering Station
ISA Instrument Society of America
P&ID Piping & Instrumentation Diagram
UUU YY NNN
Serial Number
Equipment Designation
Unit Number
TOTAL OR PARTIAL REPRODUCTION AND / OR UTILISATION OF THIS DOCUMENTATION ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE TCL
Table 2.1 Unit Number
2.1.3 The new equipment designations are summarised in Table 2.2 covering the requirement of
basic engineering
Table 2.2 Equipment Designation
Equipment Equipment
Description Description
Designation Designation
E Exchanger MR Scraper Receiver
A Air Cooler PL Pipeline
F Fired Heater X Miscellaneous Items
J Ejector LZ Package Equipment
P Pump TA Turbo Alternator
Steam Turbine Driven
TP GD Emergency Generator
Pump
V Vessel G Steam Boiler
R Reactor ME Flare
C Column UB Crystallizer
K Compressor ST Filter / Strainer
Steam Turbine Driven
KT FA Flame Arrestor
Compressor
MX Mixer SP Specialty Item
T Storage Tank CT Cooling Tower
BH Bath Heater LS Flare Stack
ML Scraper Launcher HT Heater Treater
Serial Number
Instrument Designation
TOTAL OR PARTIAL REPRODUCTION AND / OR UTILISATION OF THIS DOCUMENTATION ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE TCL
Unit Number
Piping Material
Serial Number
Unit Number
Service Designation
TOTAL OR PARTIAL REPRODUCTION AND / OR UTILISATION OF THIS DOCUMENTATION ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE TCL
Table 2.3 Service Designation
Service Service
Description Description
Designation Designation
P Process CW Cooling Water
Process Lines
Drain Lines
TOTAL OR PARTIAL REPRODUCTION AND / OR UTILISATION OF THIS DOCUMENTATION ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE TCL
IG Instrument Gas 3201 - 3300
2.3.6 Piping Material Designation are summarised in Table 2.5 covering the requirement of Basic
Engineering
Table 2.5 Piping Material Designation
1st Digit 2nd Digit 3rd Digit
Pressure Rating Material Identification Corrosion Allowance
A # 150 A Carbon Steel 6 6 mm
Low Temperature
B # 300 B 3 3 mm
Carbon Steel
C # 400 C Stainless Steel 1 1.5 mm
D # 600 D CS - Galvanized 0 0 mm
E # 900
F # 1500
Insulation Description
Designation
IH Hot Insulation
TOTAL OR PARTIAL REPRODUCTION AND / OR UTILISATION OF THIS DOCUMENTATION ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE TCL
IC Cold Insulation
IS Safety Insulation
IT Steam Traced
IE Electrical Traced
IA Acoustic Insulation
Project Number
TOTAL OR PARTIAL REPRODUCTION AND / OR UTILISATION OF THIS DOCUMENTATION ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE TCL
Table 2.7 Department Code
Department Department
Description Description
Code Code
AR Architecture MT Material
CI Civil PC Procurement
EL Electrical PP Piping
ME Mechanical ST Structural
2.4.5 Document / Drawing type are summarised in Table 2.8 covering the requirement of
Engineering
Table 2.8 Document / Drawing Type
Doc. / Doc. /
Description Description
Draw. type Draw. type
C Calculations O Purchase Order
E Sketches Q Requisition
Report / Studies /
J Datasheets R
Summary
Line List / MTO (Material Specifications /
K S
Take-Off) / Schedule Standards / Systems
Design Basis / Hook-up
Work Instructions /
L Drawing / Document Control W
Operating Philosophy
Index
M Manual Z Miscellaneous
N Equipment List
TOTAL OR PARTIAL REPRODUCTION AND / OR UTILISATION OF THIS DOCUMENTATION ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE TCL
Revision
Drawings - Reason code Documents - Reason Code
Code
A Issued for DIC & IDR Issued for DIC & IDR
Datasheets /
Revision Drawings - Reason
Documents - Reason RFQ Reason Code
Code code
Code
A Issued for DIC & IDR Issued for DIC & IDR Issued for DIC & IDR
If the comments have conflict, or the document needs a second review, or more than one
issue of a document is required, then subsequent issues (between any two cycles) shall
be numbered as A1, A2; B1, B2; and so on.
Revisions to drawings subsequent to the IFC/IFA issue to client shall be identified by
exploded 'CLOUD' around the part of the drawing that has been changed.
A revision triangle inside the exploded 'CLOUD' shall contain the revision number
For subsequent revisions (e.g. 2, 3, etc) the earlier revision Cloud and revision triangle
shall be removed. New Cloud and revision triangle shall be added on the portion revised in
the said revision
Revisions to documents subsequent to the IFR/IFC issue to client shall be identified by a
vertical line (|) in the right of the amended text. In case of Excel generated document the
changes can be highlighted by shading if identification by vertical line is not possible or
clouding.