PRELIMINARYGEOTECHNICALSTUDY
PROPOSEDCARBUNUPRIVERHAMLET
CARBUNUP,CITYOFBUSSELTON
Submittedto:
PalmerGroup
POBox699
DUNSBOROUGHWA6281
www.galtgeo.com.au
2/39FlynnSt,WEMBLEYWA6014
T:+61(8)62720200
J1401211001RRev1 F:+61(8)92858444 27March2015
J1401211001RRev1
27March2015
TABLEOFCONTENTS
1. Introduction................................................................................................................................................................1
2. SiteDescriptionandProposedDevelopment.............................................................................................................1
3. ProjectObjectives.......................................................................................................................................................1
4. Fieldwork.....................................................................................................................................................................2
5. LaboratoryTesting......................................................................................................................................................3
5.1 Geotechnical.......................................................................................................................................................3
5.2 PhosphorousRetentionIndex.............................................................................................................................3
6. SiteConditions............................................................................................................................................................4
6.1 Geology...............................................................................................................................................................4
6.2 SubsurfaceConditions.........................................................................................................................................4
6.3 Groundwater.......................................................................................................................................................5
7. GeotechnicalAssessment...........................................................................................................................................5
7.1 PreliminarySiteClassification.............................................................................................................................5
7.2 SitePreparation..................................................................................................................................................6
7.3 Compaction.........................................................................................................................................................6
7.4 ApprovedFill.......................................................................................................................................................7
7.5 EffluentDisposal.................................................................................................................................................7
7.6 PhosporousRetentionIndex(PRI)......................................................................................................................7
7.7 StormwaterDisposal...........................................................................................................................................8
7.8 PavementDesign................................................................................................................................................8
8. Closure........................................................................................................................................................................9
TABLES
Table1:SummaryofPermeameterTestResults................................................................................................................2
Table2:SummaryofLaboratoryTestResults....................................................................................................................3
Table3:SummaryofPRILaboratoryTestResults..............................................................................................................4
Table4:SummaryofSiteClassifications(AS28702011)...................................................................................................5
GaltGeotechnicsPtyLtd
J1401211001RRev1
27March2015
FIGURES
Figure1:SiteandLocationPlan
Figure2:SiteClassifications
APPENDICES
APPENDIXA: SITEPHOTOGRAPHS
APPENDIXB: TESTPITREPORTS
APPENDIXC: DYNAMICCONEPENETROMETERTESTRESULTS
APPENDIXD: GEOTECHNICALLABORATORYTESTRESULTS
APPENDIXE: PRILABORATORYTESTRESULTS
APPENDIXF: UNDERSTANDINGYOURGEOTECHNICALENGINEERINGREPORT
GaltGeotechnicsPtyLtd
J1401211001RRev1
27March2015
1. INTRODUCTION
This report presents the outcomes of Galt Geotechnics Pty Ltd (Galts) preliminary geotechnical study for the
proposed Carbunup River Hamlet located at Lots 1, 2 and 1490 Wildwood Road and Reserve 20554, south of
WildwoodRoadandeastofBussellHighway(thesite)atCarbunupRiverintheCityofBussellton.Thelocationof
thesiterelativetothesurroundingareaisshownonFigure1,SiteandLocationPlan.
TheinvestigationwasrequestedbyBenRoachofPalmerGroupandauthorisedbyStevePalmerofPalmerGroupina
signedClientAuthorisationFormdated3October2014.
2. SITEDESCRIPTIONANDPROPOSEDDEVELOPMENT
Thesiteisroughlyrectangularinplanandcoversapproximately65ha.Recentaerialphotographsindicatethatabout
threeresidentialbuildingarepresentintheeasternpartofthesite.Twocreeksrunfromsouthtonorththroughthe
site,oneinthewesternpartofLot1490(MaryBrook)andoneintheeasternpartofLot1.
Several horse paddocks are present across the site and a blue gum plantation is present across part of Lot 1.
Scatteredvegetationispresentacrossthesite,inparticularalongroadreservesandcreeklines.
AsmalldamispresentatthesoutheastcornerofLot2.
Fromtheinformationprovided,thesurfaceelevationrangesfromahighofaboutRL27mAHDonthesouthernpart
ofLot2,fallingtoaboutRL16mAHDinthevalleyonthenorthernpartofLot1490.
Totheeast,thesurfacefallstoaboutRL18mAHDalongtheeasternpartofLot1.
Based on a preliminary land use concept (namely Carbunup River Hamlet Concept) prepared by TME, the hamlet
developmentmaycomprise:
ahamletcoreforcommercialandmixedusepurposes;
aresidentialcomponent;
transitionalproductionlots;and
publicopenspaceincludingdrainageandareasofrevegetationaroundtheexistingwatercourses.
Atthispreliminaryconceptdesignstage,thelocation,functionandformoftheproposedbuildingsandservicesare
notdefined.
3. PROJECTOBJECTIVES
Basedonourunderstandingoftheproposeddevelopment,theobjectivesofthestudywereto:
broadlyassesssubsurfacesoilandgroundwaterconditionsacrossthesite;
providepreliminarysiteclassification(s)inaccordancewithAS28702011ResidentialSlabsandFootings;
recommendappropriatesitepreparationproceduresincludingcompactioncriteria;
broadlyidentifytheapproximateextentofareascontainingpoorroadsubgradeconditions;
provideapreliminaryCaliforniabearingratioforpavementthicknessdesignbyothers;
broadlyassessthecapacityoftheonsitesoilsforeffluentdisposal(bytestingaccordingtoDepartmentof
Healthstandards);and
assessthepermeabilityofthesoilsatthesiteforpotentialonsitedisposalofstormwaterinfiltration.
GaltGeotechnicsPtyLtd
4. FIELDWORK
Fieldworkwascarriedouton3December2014andcomprised:
awalkoversurveyofthesiteincludingtakingphotographs;
excavationoftestpitsatsixteenlocations(TP01toTP05,TP07toTP17)(approximatelyonetestpitper4ha),
extendingtodepthsofbetween0.7mand3.0m;
testingwithadynamicconepenetrometer(DCP)adjacenttoeachtestpit,extendingtodepthsofbetween
0.3mand0.9m;and
permeabilitytestingusingaGuelphpermeameterinaccordancewiththeHealthDepartmentRegulations,at
fourlocations(P1toP4),atdepthsofbetween0.4mand0.8m.
General
A geotechnical engineer from Galt located the test positions, observed the test pitting, logged the materials
encountered in the test pits, collected samples for inspection and possible laboratory testing, and performed the
permeabilitytestingandpenetrometertesting.
ThetestlocationsareshownonFigure1,SiteandLocationPlananddetailsaresummarisedinTableA1,Summaryof
Testslocatedattheendofthetext.PhotographsofthesitearepresentedinAppendixA,SitePhotographs.
TestPits
TestpitswereexcavatedusingaCAT313BSR13tonnetractormountedbackhoefittedwitha600mmwidetoothed
bucket.Theexcavatorwassuppliedbytheclientandoperatedbythepreviouslandowner.
Test pit reports are presented in Appendix B, Test Pit Reports, along with the method of soil description and
cementationclassification,andalistofexplanatorynotesandabbreviationsusedonthereports.Photographsofthe
testpitexcavationareincludedwiththetestpitreports.
DynamicConePenetrometerTesting
DCPtestswerecarriedoutadjacenttoeachtestpit.ResultsoftheDCPtestingarepresentedinAppendixD,Dynamic
ConePenetrometerTestResults.ThetestswereconductedinaccordancewithtestmethodAS12896.3.2.
PermeabilityTesting
Constanthead permeameter tests were carried out in accordance with Appendix G of AS1547 (2012), Onsite
domestic wastewater management using a Guelph permeameter. The results of the permeameter testing are
summarisedinTable1:SummaryofPermeameterTestResults.
Table1:SummaryofPermeameterTestResults
Permeability TestDepth HydraulicConductivity
SoilType
Test (m) Permeability,k(m/day)
GaltGeotechnicsPtyLtd
5. LABORATORYTESTING
5.1 Geotechnical
LaboratorytestingonsoilsampleswasundertakenbyMining&CivilGeotestintheirNATAaccreditedlaboratoryand
compriseddeterminationof:
particlesizedistributiononfoursamples;
Atterberglimitsandlinearshrinkageontwosamples;
organiccontentononesample;
drydensitymoisturecontentrelationshipusingModifiedcompactiveeffortontwosamples;and
soakedCaliforniabearingratio(CBR)ontworemouldedsamples.
LaboratorytestresultsalongwiththetestmethodsfollowedarepresentedinAppendixD,GeotechnicalLaboratory
TestResultsandaresummarisedinTable2,SummaryofLaboratoryTestResults.
Table2:SummaryofLaboratoryTestResults
UnifiedSoils Organic CBR
Test Depth % % % LL PI LS MMDD OMC
Classification Content @
Pit (m) Gravel Sand Fines (%) (%) (%) (t/m3) (%)
(%) 95%
TP02 1.11.3 SC 9 53 38 41 22 5.0
TP12 0.20.5 SM/SC 1 66 33 22 7 1.5 2.03 10.4 20
TP14 0.20.5 SP 0 96 4 1.83 11.9 16
TP16 0.20.4 SP/SM 2 92 6
TP17 0.00.1 SP/SM 6.9 7 84 9
LL: LiquidLimit PI: PlasticityIndex LS:LinearShrinkage
MC: MoistureContent MMDD:MaximumDryDensity(usingmodifiedcompactionenergy)
OMC: OptimumMoistureContent NO:NotObtainable NP: NonPlastic
CBR@95%: Californiabearingratio(soaked)ofsamplesremouldedtoadrydensityratioof95%MMDD,4.5kgsurcharge
5.2 PhosphorousRetentionIndex
Phosphorous Retention Index (PRI) testing was undertaken on 10 soil samples by CSBPs Soil and Plant Analysis
Laboratory in Bibra Lake. The results of the laboratory testing are presented in Appendix E, PRI Laboratory Test
ResultsandaresummarisedinTable3:SummaryofPRILaboratoryTestResults.
GaltGeotechnicsPtyLtd
6. SITECONDITIONS
6.1 Geology
The Yallingupsheet of the1:50,000 scaleEnvironmental Geology series map indicates that thearea is underlainby
either:
SiltySand:strongbrowntoreddishbrown,finetomediumgrainedquartz,variablesiltcontent;or
Sand: very light grey at surface, yellow at depth, fine to medium grained, subrounded quartz, moderately
wellsorted,localconcentrationsofheavyminerals,localdevelopmentofcoffeerock.
Thefindingsofourinvestigationindicatethatthesiteisgenerallyunderlainbysiltysandandsandoverlyingclayey
sand/sandyclay,aswellaslocalisedareasoflaterisedmaterial.
6.2 SubsurfaceConditions
Basedonthematerialsencounteredinthetestpitsandobservedduringthewalkoversurvey,thesitecanbroadlybe
separatedintotwotypicalareas,asshownonFigure2,SiteClassifications.Thetypicalsoilprofilesforthetwoareas
generallycomprise:
MajorityoftheSite(ClassS)
Silty/ClayeySAND(SM/SC),finetomediumgrained,with20%to30%nonplastictolowplasticityfines,grey
becomingpalebrown/paleyellowbrown,tracerootletsintop100mmto200mm,locallywithsomeorganic
fines,drytomoist,mediumdensetoverydense,presentfromthesurfacetodepthsofbetween0.5mand
1.9m;overlying
ClayeySAND/SandyCLAY(SC/CI),finetocoarsegrainedsand,40%to50%lowtomediumplasticityclayfines,
grey mottled yellowbrown, locally LATERISED, comprising weakly to moderately iron cemented fine to
coarsegrainedgravelandcobblesizednodules,mottledredbrown,drytomoist,stifftoverystiff,extending
tothemaximumdepthofinvestigationof3.0m.
WesternandSouthernCentralPortion(ClassA)
SAND/SiltySAND(SP/SM),finetomediumgrained,subangulartosubrounded,palegrey/paleyellow/white,
locally up to 20% nonplastic fines and rootlets, dry to moist, loose to dense, present from the surface, to
depthsofbetween0.1mand1.7m;overlying
GaltGeotechnicsPtyLtd
Note:AsmallamountoffillmaterialwasencounteredinthesoutherncentralportionofthesiteintestpitsTP08and
TP09. The fill is described as SAND/Gravelly SAND (SP), fine to coarse grained sand, fine to coarse grained gravel,
tracecobblesandbouldersupto800mm,tracenonplasticfines.
6.3 Groundwater
Nogroundwaterinformationisavailableforthesite.However,wewouldexpectthewatertabletobeclosetothe
levelofthewatercourses.
Groundwaterwasencounteredwithinfiveofthetestpitsatdepthsofbetween1.9mand2.7m.Thisisexpectedto
beperchedontopofthelaterite.
7. GEOTECHNICALASSESSMENT
7.1 PreliminarySiteClassification
The preliminary site classification is basedon AS 28702011 Residential Slabs and Footings whichdefines the site
classesasgiveninTable4,SummaryofSiteClassifications.
Table4:SummaryofSiteClassifications(AS28702011)
Class Description CharacteristicSurface
Movement(ys)
A Mostsandandrocksitewithlittleornogroundmovementfrommoisturechange NotDefined
(typically<5mm)
S Slightlyreactiveclaysiteswithonlyslightgroundmovementfrommoisturechanges 0 20mm
M Moderatelyreactiveclaysites,whichmayexperiencemoderategroundmovements 20 40mm
frommoisturechange
H1 Highlyreactivesites,whichmayexperiencehighgroundmovementsfrommoisture 40 60mm
change
H2 Highly reactive sites, which may experience very high ground movements from 60 75mm
moisturechange
E Extremely reactive sites, which may experience extreme ground movements from >75mm
moisturechange
P Siteswhichincludesoftsoils,suchassoftclayorsiltorloosesands;landslip;mine NotDefined
subsidence; collapsing soils; soils subject to erosion; reactive sites subject to
abnormalmoistureconditionsorsiteswhichcannotbeclassifiedotherwise
WeconsiderthatthesiteclassificationsshowninFigure2,SiteClassifications,areappropriateforthesite,provided
sitepreparationmeasuresoutlinedinSection7.2arefollowed.Siteclassificationsconsideredappropriateare:
ClassSforthemajorityofthesite;
ClassAforthewesternandsoutherncentralareaofthesitewherelateriteispresent;and
ImprovementofthewholesitetoClassAispossiblewithimportationandplacementofupto1.0mofinertsand(or
gravel)filltoproduceatotalthicknessofabout1.5m(insitusandandinertfill)overlyingclayeymaterial.
GaltGeotechnicsPtyLtd
7.2 SitePreparation
Thesitepreparationmeasuresoutlinedbelowareaimedatimprovementofthesiteinpreparationforconstructionof
structuresincludingongroundslabs,shallowfootings,retainingwallsandpavements.
Demolishandremoveallinfrastructureassociatedwithfarmingactivities.
Stripvegetationfromthesiteincludinggrubbingoutoftreeroots.
Strip and stockpile topsoil from the site for potential reuse in nonstructural applications or for possible
blendingwithcleansand(generallyonlyathinlayeroftopsoilwasnotedatthetimeofourinvestigationover
amajorityofthesite).Topsoilstripisonlynecessarytoremoveroots.Werecommenda100mmtopsoil
striporasotherwisenecessarytoremoveallrootsfromthesoil.Topsoilmayberetainedforscreeningand
reuseasstructuralfill.
CompactgroundsurfacetoachievethelevelofcompactionspecifiedinSection7.3toaminimumdepthof
0.9mbelowsurface.Note:Wherethereismorethan1mofbulkfilltobeplacedovertheinsitusand,the
depthofcompactioncanbereducedto0.45m.
Wherefillisrequiredtoraisesitesurfacelevels,approvedfillmustbeused(refertoSection7.4),placedand
compactedinlayersofnogreaterthan300mmloosethickness.
Theaboveareonlypreliminarysitepreparationproceduresbasedonlimitedgeotechnicalinformation.Thefinalsite
proceduresarealsolikelytodependtoalargeextentontheactualdevelopment.Additionalgeotechnicalstudiesare
requiredtoconfirmthenature,extentandthicknessoftheclayeysoilspresentacrossthesite.Thisinformationwill
enablemoredefinitivesitepreparationprocedurestobeprovided.
7.3 Compaction
If approved granular fill is used to build up the site, the material must be compacted using suitable compaction
equipmenttoachieveadrydensityratio(DDR)ofatleast95%MMDD(maximummodifieddrydensity)asdetermined
inaccordancewithAS12895.2.1.
Wheresandisusedasfill,aPerthsandpenetrometer(PSP)maybeusedforcompactioncontrol.
ThefollowingminimumPSPblowcountsmustbemet:
150mm450mm:8
450mm750mm:10
750mm900mm:6(or750mm1050mm:12)
Note:UseofthePSPisnotappropriateforgravellysoilsandwherethefinescontentofthesandexceedsabout5%.
In such cases, density testing must be done using a nuclear density gauge in accordance with AS1289.5.8.12007.
Clayey soils must be compacted to a target dry density ratio of 95% SMDD (standard maximum dry density,
AS1289.5.1.1).
Overexcavation and replacement of loose materials must be carried out where the minimum density cannot be
achieved.
Fillmustbeplacedinhorizontallayersofnotgreaterthan0.3mloosethickness.Eachlayermustbecompactedby
suitablecompactionequipment,andcarefullycontrolledtoensureevencompactionoverthefullareaanddepthof
eachlayer.
GaltGeotechnicsPtyLtd
Aftercompaction,verifythattherequiredlevelofcompactionhasbeenachievedbytestingwithinanyfillandtoa
minimumdepthof0.9mbelowfoundations:
oneachliftoffillattherateof1testper500m3;
ateachspreadfootinglocation(unlessfootingsareinclayeysoil);
at7.5mcentresbelowongroundslabs;and
at10mcentresonpavementsubgrades.
7.4 ApprovedFill
Imported granular fill must comply with the material requirements as stated in AS37982007, Guidelines on
EarthworksforCommercialandResidentialDevelopments.Sandfillmustcomprisecleansandthatisfreeoforganic
matterandhaveafinescontentoflessthan5%.
Theinsitucleansandandgravellymaterialisconsideredtobesuitableforreuseasinertstructuralfill.Theinsitu
clayeymaterialisnotconsideredtobesuitableforreuseasinertstructuralfill.Notwithstanding,theclayeymaterial
isconsideredsuitableforreuseasstructuralfillprovidedthatthematerialis:
placedinstockpile;
moistureconditionedtooraboveitsoptimummoisturecontent(OMC);
placedinmaximumlooselayersof0.2matorclosetoitsOMC;
compactedtoaachieveaminimumdrydensityratioof95%usingStandardcompactiveeffort.
Anyorganicrichsoilorsoilcontainingsignificantproportionsoffines(materiallessthan0.075mminsize)mustnot
beusedasstructuralfill.
Where doubt exists, a geotechnical engineer must be engaged to inspect and approve the use of potential fill
materials.
7.5 EffluentDisposal
Constantheadpermeametertestswerecarriedoutatfourlocationsacrossthesite.Theresultsofthepermeameter
testsarepresentedinSection4.Thepermeametertestingwasundertakenbetweendepthsof0.4mto0.8m.
ThesoilshavebeenclassifiedinaccordancewithTable5.1ofAS1547(2012).Ingeneral,thesandyandsiltysandsoils
inthetopofthesoilprofileacrossthesiteareclassedasSoilCategory1and2.Themoreclayeymaterialatdepth
acrossthesiteisclassedasSoilCategory5.Basedontheresultsofthepermeametertests,weconsiderthesandyand
siltysandsoilsatthetopofthesoilprofile(generallypresentfromsurfacetodepthsofbetween0.5mto1.9m)are
suitable for conventional effluent disposal systems. However, conventional effluent disposal is not recommended
within deeper soils due to the clayey nature of the soil. Additionally, conventional effluent disposal is not
recommendedinareasofshallowlaterite,generallylocatedtowardsthesouthwesternendofthesite.Intheseareas
itisrecommendedthatalternativeeffluentdisposalsystems(i.e.AerobicTreatmentUnits)beutilised.
7.6 PhosphorousRetentionIndex(PRI)
ThePRIsmeasuredinthelaboratoryon10samplesrangedfrom:
1.1mL/gto16.6mL/gforsoilsclassifiedasSAND;and
20.4mL/gto2,237.5mL/gforsoilsclassifiedasSiltySAND,Silty/ClayeySANDandClayeySAND.
GaltGeotechnicsPtyLtd
7.7 StormwaterDisposal
TheresultsofthepermeametertestscarriedoutatfourlocationsareshowninTable1:SummaryofPermeameter
TestResults.Theminimummeasuredpermeabilitiesrangebetween0.25m/day(P02inclayeysand)to26.5m/day
(P04incleansand).
WeconsiderthattheClassAareas(indicatedonFigure2)willbesuitableforonsitedisposalofstormwaterbythe
use of soak wells or soakage basins. This is applicable only where the ground surface is at least 1.2 m above the
maximumgroundwaterlevelandaboveaclayeyorlaterite(i.e.impermeable)layer.Apreliminarypermeabilityofno
greaterthan2m/daymaybeassumedfordesignofsoakagesystemsinnaturalsand.
Thepermeabilityofanystormwaterdisposalsystemmaybeexpectedtodecreaseovertimedueto:
densificationofsandduringsitepreparationworks;
naturalvariationinsands;and
cloggingofthesandaroundsoakwellsandsoakagebasinsovertimewithfines.
Where possible, soak wells should not be placed within 3 m of footings (subject to local council regulations).
Discharge from soak wells has been known to cause densification of loose sandy soils, leading to settlements of
footingsandslabs.Wheresoakwellsareplacedclosertofootings,theymustbecarefullywrappedwithgeotextileto
preventmigrationofsandandfinesintothesoakwell.
7.8 PavementDesign
Whereadequatesitepreparationmeasureshavebeencompleted(i.e.pavementsubgradescomprisecompactedin
situsandorsandbackfill),pavementthicknessdesignmaybeundertakenassumingapreliminarysubgradeCalifornia
bearingratio,CBR=12%.
Thesilty/clayeysandswhichcoverthemajorityofthesitecontainlowtomediumplasticityfines.Forsuchsubgrade,
weconsiderapreliminarysubgradeCaliforniabearingratio,CBR=8%canbeadoptedforpavementthicknessdesign.
This value assumes that appropriate subgrade preparation procedures are conducted. If the subgrade is kept at a
relativelyconstantmoisturecontentbyinstallationofsidedrainsorothersuitablemeasures,thedesignCBRcould
potentiallybeincreased.
GaltGeotechnicsPtyLtd
8. CLOSURE
We draw your attention to Appendix F of this report, Understanding Your Geotechnical Engineering Report. The
informationprovidedwithinisintendedtoinformyouastowhatyourrealisticexpectationsofthisreportshouldbe.
Guidanceisalsoprovidedonhowtominimiserisksassociatedwithgroundworksforthisproject.Thisinformationis
provided not to reduce the level of responsibility accepted by Galt, but to ensure that all parties who rely on this
reportareawareoftheresponsibilitieseachassumesinsodoing.
GALTGEOTECHNICSPTYLTD
FredDavenportCPEng JamesHarris
GeotechnicalEngineer GeotechnicalEngineer
O:\Jobs\2014\J1401211PalmerGroupSICarbunupRiver\03Correspondence\J1401211001RRev1.docx
GaltGeotechnicsPtyLtd
Tables
GaltGeotechnicsPtyLtd
www.galtgeo.com.au ABN:73292586155
2/39FlynnSt,WEMBLEYWA6014
J1401211001RRev1
27March2015
TableA1:SummaryofTests
Test Test Reasonfor Depthto Stratigraphy
Name Depth Termination Groundwater
(m) (m)
GaltGeotechnicsPtyLtd
www.galtgeo.com.au ABN:73292586155
2/39FlynnSt,WEMBLEYWA6014
Figures
GaltGeotechnicsPtyLtd
www.galtgeo.com.au ABN:73292586155
2/39FlynnSt,WEMBLEYWA6014
6,270,000 330,250 330,500 330,750 331,000
6,270,000
Hwy
sell
Bu s
Wildwood Rd
TP01 TP02
)
"
"
)
"
"
Legend
Site Boundary
6,269,750
"
/
" TP03
) " /
"
Permeability Test
P4 "
)
"
"
)"
" Test Pit
)"
" Test Pit (Not Completed)
TP11
)"
" P1
/
"
TP05
) "
"
Lennox Rd
TP10
)
"
"
LOT 2
LOT 1490 TP09 LOT 1
TP13
Lewis Rd
)
"
"
6,269,500
6,269,500
)"
"
P3 TP06
/
"
)
"
"
TP14 P2
/
"
)
"
" TP15
)
"
"
Meters
DRAWN DAC
Cape SITE
Clairault LOCATION DATE DRAWN 9/02/2015
TP08
TP07 CHECKED FAD
TP16
)
"
"
)
"
"
)"
"
DATE CHECKED 09/02/2015
6,269,250
6,269,250
TP17
PROJECTION
)
"
"
GDA 1994 MGA Zone 50
COPYRIGHT 2015 THIS FIGURE AND ITS CONTENTS REMAINS THE PROPERTY OF GALT
GEOTECHNICS PTY LTD AND MAY NOT BE REPRODUCED WITHOUT PRIOR APPROVAL.
THIS FIGURE SHOULD BE READ IN CONJUNCTION WITH THE ACCOMPANYING REPORT.
CLIENT
PALMER GROUP
PROJECT PROPOSED CARBUNUP RIVER HAMLET
LOCATION CARBUNUP
CITY OF BUSSELTON
TITLE SITE & LOCATION PLAN
330,250 330,500 330,750 331,000
Job No Fig No Rev
J1401211 FIGURE 1 A
O:\Jobs\2014\J1401211 - Palmer Group SI Carbunup River\09 GIS\04 MXD\J1401211-001.mxd (DamonClark) 9/02/2015 9:57:51 AM
6,270,000 330,250 330,500 330,750 331,000
6,270,000
Hwy
sell
Bu s
Wildwood Rd
TP01 TP02
CLASS S
Legend
)
"
" )"
"
Site Boundary
6,269,750
"
P4
/
" ) "
SAND overlying shallow LATERITE
LOT 2
"
)
"
"
SAND overlying LATERITE
Silty/Clayey SAND overlying Clayey SAND (locally laterised)
@ Testing Not Undertaken
TP11
P1 Test Locations
)"
"
/
" /
"
Permeability Test
TP05
)
"
" Test Pit
) "
"
)
"
" Test Pit (Not Completed)
CLASS A
Lennox Rd
TP10
)
"
"
TP13
LOT 1490 CLASS A LOT 1
TP09 )
Lewis Rd
"
"
6,269,500
6,269,500
)"
"
TP06
P3
/
"
)
"
"
TP14 P2
TP15
/
"
)"
"
)
"
"
Meters
DRAWN DAC
Cape SITE
Clairault LOCATION
TP08
DATE DRAWN 9/02/2015
TP07
TP16
CHECKED FAD
)
"
"
)
"
"
TP17
)"
"
DATE CHECKED 09/02/2015
6,269,250
6,269,250
PROJECTION
)
"
"
GDA 1994 MGA Zone 50
COPYRIGHT 2015 THIS FIGURE AND ITS CONTENTS REMAINS THE PROPERTY OF GALT
GEOTECHNICS PTY LTD AND MAY NOT BE REPRODUCED WITHOUT PRIOR APPROVAL.
THIS FIGURE SHOULD BE READ IN CONJUNCTION WITH THE ACCOMPANYING REPORT.
CLIENT
PALMER GROUP
PROJECT PROPOSED CARBUNUP RIVER HAMLET
LOCATION CARBUNUP
CITY OF BUSSELTON
TITLE PRELIMINARY SITE CLASSIFICATIONS (AS 2870)
330,250 330,500 330,750 331,000
A
Job No Fig No Rev
J1401211 FIGURE 2
O:\Jobs\2014\J1401211 - Palmer Group SI Carbunup River\09 GIS\04 MXD\J1401211-002.mxd (DamonClark) 9/02/2015 10:00:28 AM
AppendixA: SitePhotographs
GaltGeotechnicsPtyLtd
www.galtgeo.com.au ABN:73292586155
2/39FlynnSt,WEMBLEYWA6014
J1401211001RRev1
27March2015
Photograph1: ExcavatoratTP08location
Photograph2: LookingsouthacrosssitefromnearTP10
GaltGeotechnicsPtyLtd
J1401211001RRev1
27March2015
Photograph3: LookingsouthacrosssitefromnearTP04
Photograph4: DaminsoutheastcornerofLot2nearTP08
GaltGeotechnicsPtyLtd
J1401211001RRev1
27March2015
Photograph5: LookingeastfromnearTP12
Photograph6:LookingsouthacrosshorsepaddocknearTP02
GaltGeotechnicsPtyLtd
AppendixB: TestPitReports
GaltGeotechnicsPtyLtd
www.galtgeo.com.au ABN:73292586155
2/39FlynnSt,WEMBLEYWA6014
EXPLANATORYNOTESTOBEREADWITH
BOREHOLEANDTESTPITREPORTS
METHODOFDRILLINGOREXCAVATION
AC AirCore E Excavator PQ3 PQ3CoreBarrel
AD/T AugerDrillingwithTCBit EH ExcavatorwithHammer PT PushTube
AD/V AugerDrillingwithVBit HA HandAuger R Ripper
AT AirTrack HMLC HMLCCoreBarrel RR RockRoller
B BulldozerBlade HQ3 HQ3CoreBarrel SON SonicRig
BH BackhoeBucket N NaturalExposure SPT DrivenSPT
CT CableTool NMLC NMLCCoreBarrel WB Washbore
DT Diatube PP PushProbe X ExistingExcavation
SUPPORT
T Timbering
PENETRATIONEFFORT(RELATIVETOTHEEQUIPMENTUSED)
VE VeryEasy E Easy F Firm
H Hard VH VeryHard
WATER
WaterInflow WaterLevel
WaterLoss(complete)
WaterLoss(partial)
SAMPLINGANDTESTING
B BulkDisturbedSample P PistonSample
BLK BlockSample PBT PlateBearingTest
C CoreSample U UndisturbedPushinSample
CBR CBRMouldSample U50:50mmdiameter
D Small Disturbed Sample
SmallDisturbedSample SPT Standard Penetration Test
StandardPenetrationTest
ES EnvironmentalSoilSample Example:3,4,5N=9
EW EnvironmentalWaterSample 3,4,5:Blowsper150mm
G GasSample N=9:Blowsper300mmafter
HP HandPenetrometer 150mmseatinginterval
LB LargeBulkDisturbedSample VS VaneShear;P=Peak
M MazierTypeSample R=Remoulded(kPa)
MC MoistureContentSample W WaterSample
ROCKCORERECOVERY
CRL
TCR=TotalCoreRecovery(%) 100
TCL
CCR
SCR=SolidCoreRecovery(%) 100
TCL
ALC 100
RQD=RockQualityDesignation(%) 100
TCL
TCL LengthofCoreRun
CRL RecoveredLengthofCore
CCR TotalLengthofCylindricalPiecesofCoreRecovered
ALC>100 TotalLengthofAxialLengthsofCoreGreaterthan100mmLong
GaltFormPMP19
O:\Administration\StandardFormsandDocuments\PMP19ExplanatoryNotesRev1.xlsx RL1February2010
METHODOFSOILDESCRIPTION
BOREHOLEANDTESTPITREPORTS
GRAPHICLOG&UNIFIEDSOILCLASSIFICATIONSYSTEM(USCS)SYMBOLS
Graphic USCS SoilName Graphic USCS SoilName
FILL(varioustypes) SM SiltySAND
COBBLES ML SILT(lowliquidlimit)
BOULDERS MH SILT(highliquidlimit)
GP GRAVEL(poorlygraded) CL CLAY(lowplasticity)
GW GRAVEL(wellgraded) CI CLAY(mediumplasticity)
GC ClayeyGRAVEL CH CLAY(highplasticity)
SP SAND(poorlygraded) OL OrganicSILT(lowliquidlimit)
SW SAND(wellgraded) OH OrganicSILT(highliquidlimit)
SC ClayeySAND Pt PEAT
RESISTANCETOEXCAVATION
Symbol Term Description
VE Veryeasy
E Easy
F Firm Allresistancesarerelativetotheselectedmethodofexcavation
H Hard
VH Veryhard
SOILCLASSIFICATIONANDINFERREDSTRATIGRAPHY
SoildescriptionsarebasedonAS17261993,AppendixA.Materialpropertiesareassessedinthefieldbyvisual/tactilemethods
incombinationwithfieldtestingtechniques(whereused).
PARTICLESIZE PLASTICITYPROPERTIES
SoilName ParticleSize(mm) 40
BOULDERS >200 CH high
plasticityclay
COBBLES 63to200 CI medium
PlasticityIndex(%)
30 CL low
plasticityclay
Coarse 20to63 plasticityclay
GRAVEL Medium 6to20
Fine 2to6 20 OHorMH
highliquid
Coarse 0.6to2.0 limitsilt
OLorML
SAND Medium 0.2to0.6 10 lowliquid
limitsilt
Fine 0.075to0.2 CL/ML clay/silt
SILT 0.002to0.075 0
OLorML lowliquidlimit silt
FINES
CLAY <0.002 0 20 40 60 80
LiquidLimit(%)
MOISTURECONDITION AS17261993
Symbol Term Description
D Dry Sandsandgravelsarefreeflowing.Claysandsiltsmaybebrittleorfriableandpowdery.
M Moist Soilsaredarkerthaninthedryconditionandmayfeelcool.Sandsandgravelstendtocohere.
W Wet Soilsexudefreewater.Sandsandgravelstendtocohere.
CONSISTENCYANDDENSITY AS17261993andHB1602006
UndrainedShear DCPblows Density DCPblows PSPBlows
Symbol Term Strength(kPa) SPT"N" per100mm Symbol Term Index(%) SPT"N" per100mm per300mm
VS VerySoft 0to12 0to2 <1 VL VeryLoose <15 0to4 <1 0to2
S Soft 12to25 2to4 <1 L Loose 15to35 4to10 1to2 2to6
F Firm 25to50 4to8 1to2 MD MediumDense 35to65 10to30 2to3 6to8
St Stiff 50to100 8to15 3to4 D Dense 65to85 30to50 4to8 8to15
VSt VeryStiff 100to200 15to30 5to10 VD VeryDense >85 >50 >8 >15
H Hard >200 >30 >10 Note:PSPcorrelationsonlyvalidto450mmdepth
Consistencyanddensitymayalsobeinferredfromexcavationperformanceandmaterialbehaviour.
GaltFormPMP17
\\Galtsbs2011\data\Administration\StandardFormsandDocuments\PMP17MethodofSoilDescriptionRev3.xlsx RL2January2011
METHODOFCEMENTATIONCLASSIFICATION
BOREHOLEANDTESTPITREPORTS
CementationClassificationSystemForCementedGranularMaterials
CementationClassification Description
Uncemented Nocementationpresent
VeryweaklyCemented Nearuncementedsand
WeaklyCemented Verylowstrengthrock,fragmentscanbecrushedbetweenfingers
ModeratelyCemented Lowstrengthrock,easilyscratched,generallyfriable,rockcorecanbebrokenbyhand
Mediumstrengthrock,canbescratchedwiththumbnail,requiressubstantialhandeffortto
WellCemented
breakcore
Typicallyhighstrengthrock,cannotbescratchedeasily,corecanbebrokenwithblowfrom
Verywellcemented
hammer
GaltFormPMP23
\\GALTSBS2011\DATA\Administration\StandardFormsandDocuments\PMP23CementationClassification RL0March2010
TEST PIT: TP01
Sheet 1 OF 1
Job Number: J1401211 Easting: 330552 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269852 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0
Silty SAND/Clayey SAND: fine to medium grained, grey,
20-30% non-plastic to low plasticity fines, trace rootlets
D-(TP01-01) Below 0.1 m, pale brown, no rootlets
D
0.5 SM-
D
SC
1.0
2.0
SC St
2.5
Locally cemented cobble sized fragments up to 100 mm in
diameter
3.0
Hole terminated at 3.00 m
Target depth
Groundwater encountered at 2.7 m
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
TEST PIT: TP02
Sheet 1 OF 1
Job Number: J1401211 Easting: 330726 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269852 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0
Silty SAND/Clayey SAND: fine to medium grained, grey,
20-30% non-plastic to low plasticity fines, trace rootlets
Pale brown, no rootlets
SM- MD -
0.5 D
SC D
1.0
Clayey SAND: fine to medium grained, grey mottled
B(TP02-01) yellow-brown, 35-40% medium plasticity fines, trace quartz
F 1.5
E
St -
2.0 SC M
VSt
2.5
GALT LIB 1.01.GLB Log GG_EXCAVATION J1401211.GPJ <<DrawingFile>> 06/02/2015 15:47 8.30.003 Datgel DGD, CPT, Photo, Monitoring Tools | Lib: GALT 1.01 2013-02-21 Prj: GALT 1.01 2013-02-21
3.0
Hole terminated at 3.00 m
Target depth
Groundwater not encountered
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
TEST PIT: TP03
Sheet 1 OF 1
Job Number: J1401211 Easting: 330864 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269743 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0
Silty SAND/Clayey SAND: fine to medium grained, grey,
20-30% non-plastic to low plasticity fines, trace rootlets to MD
0.15 m
Below 0.15 m, pale brown, no rootlets
SM-
F
0.5 SC
D-
VD
H GC VD
1.5 D
E
CL- St -
F
2.5 CI VSt
GALT LIB 1.01.GLB Log GG_EXCAVATION J1401211.GPJ <<DrawingFile>> 06/02/2015 15:47 8.30.003 Datgel DGD, CPT, Photo, Monitoring Tools | Lib: GALT 1.01 2013-02-21 Prj: GALT 1.01 2013-02-21
3.0
Hole terminated at 3.00 m
Target depth
Groundwater not encountered
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
TEST PIT: TP04
Sheet 1 OF 1
Job Number: J1401211 Easting: 331063 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269756 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0
Silty SAND: fine to medium grained, grey, 20-30% non-plastic
D-(TP04-01) fines, trace rootlets to 0.1 m
Below 0.1 m, fine to coarse grained, yellow-brown, no rootlets
E SM D
0.5
LATERITE: Clayey Sandy GRAVEL, fine to medium grained,
rounded to sub-rounded, iron cemented, yellow-brown locally
mottled red-brown, low to medium plasticity fines, fine to
GC medium grained sand VD
1.0 D
1.5
E
D-(TP04-02)
2.0 CL-
St
CI
2.5 M
GALT LIB 1.01.GLB Log GG_EXCAVATION J1401211.GPJ <<DrawingFile>> 06/02/2015 15:47 8.30.003 Datgel DGD, CPT, Photo, Monitoring Tools | Lib: GALT 1.01 2013-02-21 Prj: GALT 1.01 2013-02-21
3.0
Hole terminated at 3.00 m
Target depth
Groundwater not encountered
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
TEST PIT: TP05
Sheet 1 OF 1
Job Number: J1401211 Easting: 331148 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269633 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0
SAND: fine to medium grained, sub-angular to sub-rounded,
B(TP05-01) SP brown, with some (5-8%) non-plastic fines, trace rootlets in MD
top 100 mm
Silty SAND/SAND: fine to medium grained, yellow-brown,
10-20% non-plastic fines D
0.5 D
1.0
E SP-
E
SM
MD
M
1.5
3.0
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
TEST PIT: TP07
Sheet 1 OF 1
Job Number: J1401211 Easting: 331144 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269280 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0
Silty SAND: fine to medium grained, grey, 20-30% non-plastic
fines, trace rootlets to 0.1 m
Below 0.1 m, brown, no rootlets
F SM D
B(TP07-01)
D
E
0.5
LATERITE: Clayey Sandy GRAVEL, fine to coarse grained
H GC cemented nodules, brown, locally red-brown, fine to medium M
grained sand, low to medium plasticity fines
Hole terminated at 0.70 m
Refusal on LATERITE
1.0 Groundwater not encountered
1.5
2.0
2.5
GALT LIB 1.01.GLB Log GG_EXCAVATION J1401211.GPJ <<DrawingFile>> 06/02/2015 15:47 8.30.003 Datgel DGD, CPT, Photo, Monitoring Tools | Lib: GALT 1.01 2013-02-21 Prj: GALT 1.01 2013-02-21
3.0
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
TEST PIT: TP08
Sheet 1 OF 1
Job Number: J1401211 Easting: 330855 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269287 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0
FILL: SAND, fine to coarse grained, pale grey, trace
non-plastic fines, trace rootlets in top 100 mm
E SP
FILL: Gravelly SAND, fine to coarse grained, brown, fine to Fill tapers off towards end of test pit
0.5 D-
coarse grained gravel, trace cobbles and boulders up to 800
mm in diameter, trace refuse (poly pipe 13 mm, upholstery VD
webbing)
E-F SP
D
1.0
E MD -
SP
D
1.5
3.0
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
TEST PIT: TP09
Sheet 1 OF 1
Job Number: J1401211 Easting: 330835 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269525 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0
SP FILL: SAND, fine to coarse grained, brown, with some fine
grained gravel MD
SP
SAND: fine to medium grained, grey, with some
B(TP09-01) (approximately 10%) non-plastic fines, trace rootlets
SAND: fine to medium grained, sub-angular to sub-rounded, Tree root at 0.4 m
0.5 white
SP
1.0
2.0
GC M
2.5
GALT LIB 1.01.GLB Log GG_EXCAVATION J1401211.GPJ <<DrawingFile>> 06/02/2015 15:47 8.30.003 Datgel DGD, CPT, Photo, Monitoring Tools | Lib: GALT 1.01 2013-02-21 Prj: GALT 1.01 2013-02-21
3.0
Hole terminated at 3.00 m
Target depth
Groundwater not encountered
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
TEST PIT: TP10
Sheet 1 OF 1
Job Number: J1401211 Easting: 330646 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269563 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0
SM Silty SAND: fine to medium grained, grey, with approximately
20% non-plastic fines, trace rootlets
Silty SAND/Clayey SAND: fine to medium grained, pale grey, D
B(TP10-01) 20-30% non-plastic to low plasticity fines, desiccated
E SM- D
0.5 SC
MD
1.5
E
E-F SC St
2.0
2.5
Rapid seepage of groundwater through test
pit walls
W
GALT LIB 1.01.GLB Log GG_EXCAVATION J1401211.GPJ <<DrawingFile>> 06/02/2015 15:47 8.30.003 Datgel DGD, CPT, Photo, Monitoring Tools | Lib: GALT 1.01 2013-02-21 Prj: GALT 1.01 2013-02-21
3.0
Hole terminated at 3.00 m
Target depth
Groundwater encountered at 2.5 m
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
TEST PIT: TP11
Sheet 1 OF 1
Job Number: J1401211 Easting: 330499 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269678 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0
Silty SAND/Clayey SAND: fine to medium grained, grey,
20-30% non-plastic to low plasticity fines, trace rootlets to
B(TP11-01) 0.1 m
Below 0.1 m, pale brown, no rootlets
SM D D
0.5
SC M St
F 1.5
E
SC W F
2.5
GALT LIB 1.01.GLB Log GG_EXCAVATION J1401211.GPJ <<DrawingFile>> 06/02/2015 15:47 8.30.003 Datgel DGD, CPT, Photo, Monitoring Tools | Lib: GALT 1.01 2013-02-21 Prj: GALT 1.01 2013-02-21
3.0
Hole terminated at 3.00 m
Target depth
Groundwater encountered at 1.9 m
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
TEST PIT: TP12
Sheet 1 OF 1
Job Number: J1401211 Easting: 330574 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269769 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0 B(TP12-01) Silty SAND/Clayey SAND: fine to medium grained, grey,
20-30% non-plastic to low plasticity fines, trace rootlets to
B(TP12-02) 0.1 m D
SM- Below 0.1 m, pale brown, no rootlets
SC D
0.5
F 1.0
E
1.5
M
SC St
2.0
Increase in laterisation, locally recovered as Clayey Sandy
GRAVEL: fine to coarse grained, trace cobbles
F-H
2.5
Becoming grey mottled red-brown, increase in cementation
Refusal on LATERITE
3.0 Groundwater not encountered
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
TEST PIT: TP13
Sheet 1 OF 1
Job Number: J1401211 Easting: 330132 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269514 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0
SM Silty SAND: fine to medium grained, grey, with approximately
E 20% non-plastic fines, trace rootlets
Sandy GRAVEL: fine to medium grained, rounded to D
B(TP13-01) sub-angular, lateritised, pale brown, fine to medium grained
sand, locally recovered as COBBLES up to 100 mm in
0.5 diameter, cemented, with some low to medium plasticity fines
VD
E
GP
H
M
1.0
2.0
2.5
GALT LIB 1.01.GLB Log GG_EXCAVATION J1401211.GPJ <<DrawingFile>> 06/02/2015 15:47 8.30.003 Datgel DGD, CPT, Photo, Monitoring Tools | Lib: GALT 1.01 2013-02-21 Prj: GALT 1.01 2013-02-21
3.0
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
TEST PIT: TP14
Sheet 1 OF 1
Job Number: J1401211 Easting: 330228 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269416 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0
SM Silty SAND: fine to medium grained, grey, with approximately
B(TP14-01) 20% non-plastic fines, trace rootlets
B(TP14-02) SAND: fine to medium grained, sub-angular to sub-rounded,
pale grey/pale yellow
0.5
L-
E D
SP MD
2.0
F-H GC M
2.5
GALT LIB 1.01.GLB Log GG_EXCAVATION J1401211.GPJ <<DrawingFile>> 06/02/2015 15:47 8.30.003 Datgel DGD, CPT, Photo, Monitoring Tools | Lib: GALT 1.01 2013-02-21 Prj: GALT 1.01 2013-02-21
3.0
Hole terminated at 3.00 m
Target depth
Groundwater not encountered
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
TEST PIT: TP15
Sheet 1 OF 1
Job Number: J1401211 Easting: 330517 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269401 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0
SM Silty SAND: fine to medium grained, grey, with approximately
20% non-plastic fines, trace rootlets
Silty SAND/Clayey SAND: fine to coarse grained, pale brown, D
20-30% non-plastic to low plasticity fines D
SM-
SC
0.5
M
F 1.5
E
SC VSt
2.0
As above, increase in fines content to 30-40%, generally pale Slow seepage through test pit walls
grey mottled red brown
2.5
W
GALT LIB 1.01.GLB Log GG_EXCAVATION J1401211.GPJ <<DrawingFile>> 06/02/2015 15:47 8.30.003 Datgel DGD, CPT, Photo, Monitoring Tools | Lib: GALT 1.01 2013-02-21 Prj: GALT 1.01 2013-02-21
3.0
Hole terminated at 3.00 m
Target depth
Groundwater encountered at 2.3 m
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
TEST PIT: TP16
Sheet 1 OF 1
Job Number: J1401211 Easting: 330621 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269271 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0
SM Silty SAND: fine to medium grained, grey, with approximately
20% non-plastic fines, trace rootlets
B(TP16-01) SAND: fine to medium grained, pale yellow-brown, trace to
with some non-plastic fines (approximately 6-10%), trace D
roots up to 40 mm
0.5
E SP- MD
SM
E
1.0
M
LATERITE: CEMENTED Gravelly SAND/Sandy GRAVEL: fine
F to coarse grained sand, fine to medium grained gravel, iron
SP-
GP cemented, pale brown, locally red-brown (recovered as
H MIXTURE of Sandy GRAVEL and cobble sized cemented
fragments)
1.5
Hole terminated at 1.50 m
Refusal on LATERITE
Groundwater not encountered
2.0
2.5
GALT LIB 1.01.GLB Log GG_EXCAVATION J1401211.GPJ <<DrawingFile>> 06/02/2015 15:47 8.30.003 Datgel DGD, CPT, Photo, Monitoring Tools | Lib: GALT 1.01 2013-02-21 Prj: GALT 1.01 2013-02-21
3.0
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
TEST PIT: TP17
Sheet 1 OF 1
Job Number: J1401211 Easting: 330138 m Contractor: Palmer Group Date: 03/12/2014
Client: Palmer Group Northing: 6269248 m Machine: CAT 313B SR Logged: JH
Project: Proposed Carbunup River Hamlet Datum: MGA94 Zone 50 Operator: Christian Checked Date: 02/02/2015
Location: Carbunup River Bucket: 600 mm toothed Checked By: FAD
Width: 1 m Length: 3 m
USCS SYMBOL
CONSISTENCY
ACID SULPHATE
RECOVERED
EXCAVATION
RESISTANCE
CONDITION
STRUCTURE AND
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION ADDITIONAL
(metres)
WATER
FIELD TEST
DEPTH
SAMPLE
OBSERVATIONS
LOG
DEPTH
RL
0.0 B(TP17-01) SP- SAND/Silty SAND: fine to medium grained, grey, with some
SM (10%) organic fines, trace rootlets
E MD
SP SAND: fine to medium grained, pale brown, trace/with some
non-plastic fines
Sandy GRAVEL/Gravelly SAND: fine to medium grained sand,
0.5 fine to medium grained, rounded to sub-angular gravel, pale
brown
GP-
F
SP
1.0 M
E
GP-
F-H 1.5
GC
2.0
Hole terminated at 2.00 m
Refusal on LATERITE
Groundwater not encountered
2.5
GALT LIB 1.01.GLB Log GG_EXCAVATION J1401211.GPJ <<DrawingFile>> 06/02/2015 15:48 8.30.003 Datgel DGD, CPT, Photo, Monitoring Tools | Lib: GALT 1.01 2013-02-21 Prj: GALT 1.01 2013-02-21
3.0
3.5
Sketch & Other Observations
Comments:
See Explanatory Notes and Method of Soil Description sheets for
details of abbreviations and basis of descriptions
AppendixC: DynamicConePenetrometer
TestResults
GaltGeotechnicsPtyLtd
www.galtgeo.com.au ABN:73292586155
2/39FlynnSt,WEMBLEYWA6014
DYNAMICCONEPENETROMETERRECORDSHEET
AS1298.6.3.2
Client: PALMERGROUP JobNo: J1401211
Project: PROPOSEDCARBUNUPRIVERHAMLET Date: 3Dec14
Location: CARBUNUPRIVER Engineer: JH
TestNo:
Location: TP01 TP02 TP03 TP04 TP05 TP07 TP08 TP09
o
Depth(mm) N ofPenetrometerBlowsper100mmDepthInterval
0100
100200 3 6 3 6 3 5 6 2
200300 7 10 3 5 5 6 10 2
300400 7 5 5 5 7 5 10R 3
400500 6 6 6 6 8 5 4
500600 5 6 8 10HB 6 11R 4
600700 7 5 6 6 5
700800 6 5 7 4 5
800900 5 5 7 4
9001000
TestNo:
Location: TP10 TP11 TP12 TP13 TP14 TP15 TP16 TP17
o
Depth(mm) N ofPenetrometerBlowsper100mmDepthInterval
0100
100200 5 6 3 4 2 3 2 3
200300 6 6 7 10 2 7 3 2
300400 7 7 10 15R 3 7 3 4
400500 5 6 7 3 7 2 10
500600 4 7 6 2 10 2 10HB
600700 3 7 5 2 10 2
700800 4 5 4 3 11 3
800900 4 5 4 2 2
9001000
TestNo:
Location:
o
Depth(mm) N ofPenetrometerBlowsper100mmDepthInterval
0100
100200
200300
300400
400500
500600
600700
700800
800900
9001000
DynamicConePenetrometertestsdoneinaccordancewithAS1289.6.3.2
R:Refusal
AppendixD: GeotechnicalLaboratoryTest
Results
GaltGeotechnicsPtyLtd
www.galtgeo.com.au ABN:73292586155
2/39FlynnSt,WEMBLEYWA6014
Sheet No: 1 of 1
100
90
80
70
% Passing
60
50
40
30
20
10
0
0.001 0.01 0.1 1 10 100
Client Address: 2/39 Flynn Street, Wembley WA Sampling Procedure: Tested as received
100
90
80
70
% Passing
60
50
40
30
20
10
0
0.001 0.01 0.1 1 10 100
Client Address: 2/39 Flynn Street, Wembley WA Sampling Procedure: Tested as received
Comments:
2.100
Dry Density (t/m3)
2.000
1.900
1.800
1.700
4 6 8 10 12 14
100
90
80
70
% Passing
60
50
40
30
20
10
0
0.001 0.01 0.1 1 10 100
Client Address: 2/39 Flynn Street, Wembley WA Sampling Procedure: Tested as received
Comments:
1.900
Dry Density (t/m3)
1.800
1.700
5 7 9 11 13 15
100
90
80
70
% Passing
60
50
40
30
20
10
0
0.001 0.01 0.1 1 10 100
Client Address: 2/39 Flynn Street, Wembley WA Sampling Procedure: Tested as received
100
90
80
70
% Passing
60
50
40
30
20
10
0
0.001 0.01 0.1 1 10 100
Client Address: 2/39 Flynn Street, Wembley WA Sampling Procedure: Tested as received
AppendixE: PRILaboratoryTestResults
GaltGeotechnicsPtyLtd
www.galtgeo.com.au ABN:73292586155
2/39FlynnSt,WEMBLEYWA6014
AppendixF: UnderstandingYour
GeotechnicalEngineeringReport
GaltGeotechnicsPtyLtd
www.galtgeo.com.au ABN:73292586155
2/39FlynnSt,WEMBLEYWA6014
This document has been prepared to clarify what is and is not provided in your geotechnical report. It is intended to inform you
of what your realistic expectations of this report should be and how to manage your risks associated with geotechnical
conditions.
Geotechnical engineering is a less exact science than other engineering disciplines. We include this information to help you
understand where our responsibilities as geotechnical engineers begin and end, to help the client recognise his responsibilities
and risks. You should read and understand this information. Please contact us if you do not understand the report or this
explanation. We have extensive experience in a wide variety of geotechnical problems and we can help you to manage your risk.
This report was developed for a unique set of project-specific conditions to meet the needs of the nominated client. It took into
account the following :
It should not be used for any purpose other than that indicated in the report. You should not rely on this geotechnical report if
any of the following conditions apply:
You should always inform us of changes in the proposed project (including minor changes) and request an assessment of their
impact.
Where we are not informed of developments relevant to your geotechnical engineering report, we cannot be held responsible
or liable for problems that may arise as a consequence.
Where design is to be carried out by others using information provided by us, we recommend that we be involved in the design
process by being engaged for consultation with other members of the design team and by being able to review work produced
by other members of the design team which relies on geotechnical information provided in our report.
Our reports often include logs of intrusive and non-intrusive geotechnical investigation techniques. These logs are based on our
interpretation of field data and laboratory results. The logs should only be read in conjunction with the report they were issued
with and should not be re-drawn for inclusion in other documents not prepared by us.
We have prepared this report for use by the client. This report must be regarded as confidential to the client and the clients
professional advisors. We do not accept any responsibility for contents of this document from any party other than the
nominated client. We take no responsibility for any damages suffered by a third party as a consequence of any decisions or
actions they may make based on this report. Any reliance or decisions made by a third party based on this report are the
responsibility of the third party and not of us.
The geotechnical recommendations in this report are based on the ground conditions that existed at the time when the study
was undertaken. Changes in ground conditions can occur in numerous ways including as a result of anthropogenic events (such
as construction on or adjacent to the site) or natural events (such as floods, groundwater fluctuations or earthquakes). We
should be consulted prior to use of this report so that we can comment on its reliability. It is important to note that where
ground conditions have changed, additional sampling, testing or analysis may be required to fully assess the changed conditions.
Practical constraints mean that we cannot know every minute detail about the subsurface conditions at a particular site. We use
engineering judgement to form an opinion about the subsurface conditions at the site. Some variation to our evaluated
conditions is likely and significant variation is possible. Accordingly, our report should not be considered as final as it is
developed from engineering judgement and opinion.
The most effective means of dealing with unanticipated ground conditions is to engage us for construction support. We can only
finalise our recommendations by observing actual subsurface conditions encountered during construction. We cannot accept
liability for a reports recommendations if we cannot observe construction.
7. ENVIRONMENTAL ISSUES
Unless specifically mentioned otherwise in our report, environmental considerations are not included. The investigation
techniques used by us in developing our report differ from those for an environmental investigation. Our report was not
prepared with environmental considerations in mind and it is the clients responsibility to satisfy himself that environmental