Sei sulla pagina 1di 1

SULE SQUARE

QINGJIAN INTERNATIONAL (SOUTH PACIFIC) GROUP DEVELOPMENT CO.,PTE.LTD

SHOP DRAWING SUBMISSION STATUS FOR MOCK UP

1st SUBMISSION 2nd SUBMISSION STATUS REMARK


S/N SFA REFERENCE No. DRAWING TITLE
DATE SUBMITTED DATE COMMENTED WILL BE SUBMITTED DATE COMMENT

Shop drawing submission for


1 QJI-SS-SFA-AR-032B 2-Oct-15 9-Oct-15 16-Oct-15 Proceed with comments Details to be finalized
Level 9 toilet details
Shop drawing submission for
2 QJI-SS-SFA-AR-051 2-Oct-15 Pending
Level 2 lift lobby details
Shop drawing submission for
3 QJI-SS-SFA-AR-052 2-Oct-15 7-Oct-15 14-Oct-15 Proceed with comments Details to be finalized
Level 9 lift lobby details
Shop drawing submission for
4 QJI-SS-SFA-AR-053 2-Oct-15 Pending
Column details
Shop drawing submission for Ceiling height discrepency
5 QJI-SS-SFA-AR-057 2-Oct-15 12-Oct-15 19-Oct-15 Proceed with comments
Level 1 reflected ceiling with RFI-ID-017-1
Shop drawing submission for
6 QJI-SS-SFA-AR-058 2-Oct-15 13-Oct-15 20-Oct-15 Revised & resubmit
Level 2 reflected ceiling

Potrebbero piacerti anche