UB PERTAMINA EP TANJUNG

13 3/8" Casing Cementing Program

Well Name : T-162


October 21, 2009

what you get out from your well


depends on .
what you put in it, so .

FIRST

Presented to:
Mr.Hipni

Prepared by:
Yohanes Budi Hend(+62 8125426665)

PT. BJ SERVICES INDONESIA


Jl. Mulawarman KM 17.5 Batakan Besar Balikpapan 76117, Telp. +62 542 747637, Fax. +62 542 747642
PT. BJ SERVICES INDONESIA
CEMENT RECOMMENDATION AND CALCULATION
UB PERTAMINA EP TANJUNG
Well Name : T-162
October 21, 2009
Objectiv13-3/8" Casing will be cemented up to surface. Job time is 15 minute. Thickening time approximately

### WELL DATA :


EXISTING CASING 13 3/8 INCH WEIGHT 54.5 PPF I.D 12.615 INCH
0.00 Ft OPEN HOLE 17 1/2 INCH TOC 0 FEET T.O.T FEET
0m DRILL PIPE 3 1/2 INCH WEIGHT 9.5 PPF I.D 2.992 INCH

VOLUME CALCULATION : 100 %EXCESS OPEN HOLE


CSG - OH 0.6946 CUFT/FT x 98 FEET = 137 CUFT
SHOE TRACK 0.8679 CUFT/FT x 0 FEET = 0 CUFT
TOTAL VOLUME : 137 CUFT

CEMENT CALCULATION :
MAIN SLURRY 137 CUFT YIELD 1.150 CUFT/SX VOLUME 119 SACKS

MIXING FLUID VOLUME : TOTAL SLURRY:


MAIN SLURRY 5.04 GPS 14 BBL MAIN SLURR 24 BBLS

MATERIAL REQUIREMENT :
ADDITIVES/ MAIN 15.85 PPG
PRODUCTS CONCENTRATION
CEMENT 119 SACKS
GEL 0.000 % bwoc 0 LBS
CACL2 1.000 % bwoc 112 LBS
R-21LS 0.000 GPS 0 GALS
FL-45LS 0.000 GPS 0 GALS
CD-31L 0.000 GPS 0 GALS
BA-58L 0.000 GPS 0 GALS
FP-9LS 0.030 GPS 3 GALS
A-300L 0.000 GPS 0 GALS

PREFLUSH WATER AHEAD 20 BBL

DISPLACEMENT 3.5" DRILL PIPE 1 BBL

TOTAL MATERIAL REQUIREMENT ESTIMATED JOB TIME :


P R O D U C T SM A I N TOTAL U N I T Fluid Type Rate(BPM) Time
CEMENT 119 119 SACKS PREFLUSH 7 3 MIN
GEL 0 0 LBS SWITCH 10 MIN
CACL2 112 112 LBS MAIN SLURR 5 5 MIN
R-21LS 0 0 GALS PLUGS 10 MIN
FL-45LS 0 0 GALS DISP. 5 0 MIN
o CD-31L 0 0 GALS TOTAL 28 MIN
BA-58L 0 0 GALS NET FROM MIXING :
Casing Shoe @ FP-9LS 3 3 GALS LEAD 15 MIN
98.43 Ft A-300L 0 0 GALS
30 m ###
SLURRY PROPERTIES DETAILS
Specification Main
Thickening time @70Bc (Hr:Min 3:13
Fluid Loss (cc/30min/1000psi) N/A
Free Water (%) 0.00
Compressive Strength (psi aft 1800
This report is the property of
SERVICES, and is intended for pr
information of the named party.
report nor any part thereof may no
PT BJ SERVICES INDONESIA published or disclosed to a third
without the written approval of P
LABORATORY REPORT SERVICES INDONESIA

REPORT NO. TNJ-0126/KPT/2009 LOCATION BALIKPAPAN DATED October 20, 2009

SUBJECT : SLURRY TESTING FOR 13-3/8" CASING CEMENTATION

CLIENT : UB PERTAMINA EP TANJUNG

WELL NAME : T-162

Depth : 30 Meter (MD) CONFIRMATION TEST


Depth : 30 Meter (TVD)
B.H.S.T : 98 deg. F
B.H.C.T : 97 deg. F (Pertamina - API Casing Schedule)
T.G. : 1.75 deg. F/100 Feet

SLURRY SYSTEM :
Class "G" cement + 1.00 % (db-bwoc) CaCl2, Accelerator
+ 0.030 GPS FP-9LS, Foam Preventer

Slurry Density : 1.90 SG or 15.85 ppg


Slurry Yield : 1.154 Cuft/sack
Mixing water : 5.037 gal/sack (Fresh Water)
Total Fluid : 14.300 gal/sack

TEST RESULTS
Thickening Time at 97 deg.F. : 2 : 36 (40 BC), 3 : 13 (70 BC), 3 : 53 (100 BC)
Fluid Loss at 97 deg.F. : N/A
Free water at 97 deg.F. : 0% by volume
Fann 35 readings (R1,B1,F=1) : 300 200 100 6 3 Pv Yp
@ after Mixing : 67 53 39 22 15 42 25
@ BHCT : 124 110 88 44 34 54 70

API Mixing Time : 10 Seconds

Compressive Strength at BHST : 1800 psi after 24 hours

Cement/Additives/Water : Holcim "G" & Water from Location

REQUESTED BY PERTAMINA EP (TANJUNG)

ANALYZED BY BJ BALIKPAPAN LAB SIGNED BY

DISTRIBUTED TO PERTAMINA - BJ

NOTICE : This report is the property of PT BJ SERVICES INDONESIA, Any user of the rep
This report is the property of BJ
SERVICES, and is intended for private
information of the named party. This
report nor any part thereof may not be
published or disclosed to a third party
without the written approval of PT.BJ
SERVICES INDONESIA

October 20, 2009

s the property of PT BJ SERVICES INDONESIA, Any user of the report agrees that PT BJ
UB PERTAMINA EP TANJUNG
CEMENTING PROGRAM AND PROCEDURE
Well Name : T-162
October 21, 2009

13-3/8" CASING JOB PROCEDURE


Note:- Carry out pre-job safety meeting prior to each treatment. Treatment must be performed according to
BJ Services' and Pertamina EP Tanjung procedures for mixing and pumping cement slurry

. RUN CENTRALIZER PROGRAM AS PER PERTAMINA PROGRAM. BJ SERVICES RECOMMEND TO RUN 1EA
CENTRALIZER PER 2 JOINT OF CASING.
. RUN CASING AS PER PERTAMINA PROGRAM.
. PRESSURE TEST CEMENT LINE TO 2500 PSI FOR 5 MINITES.
. PUMP THE FOLLOWING PREFLUSH
TYPE OF FLUID VOLUME DENSITY RATE (BPM)
WATER AHEAD 20 BBL 8.34 PPG .
. MIX AND PUMP CEMENT SLURRY AS FOLLOW
TYPE OF SLURRY VOLUME DENSITY RATE (BPM)
TAIL 24 BBL 15.80 PPG .

. DISPLACE WITH THE FOLLOWING SCHEDULE


STAGE VOLUME RATE (BPM)
FRESH WATER . BBL .

. END JOB
PT. BJ SERVICES INDONESIA
CEMENT RECOMMENDATION AND CALCULATION
UB PERTAMINA EP TANJUNG
Well Name : T-162
October 21, 2009
Objectiv9-5/8" Casing will be cemented up to surface. Job time is 54 minute. Thickening time approximately 3

7-7/ 8 inch Casing Diagram WELL DATA :


PREVIOUS CASING 13.375 INCH WEIGHT 54.5 PPF I.D 12.615 INCH
Top of Cement EXISTING CASING 9.625 INCH WEIGHT 36.0 PPF I.D 8.921 INCH
0 ft OPEN HOLE 12.250 INCH T.O.C 0 FEET T.O.T 493 FEET

VOLUME CALCULATION : 100 % EXCESS LEAD 100 % EXCESS TAIL


CSG - CSG (Lead) 0.363 CUFT/FT x 98 FEET = 36 CUFT
CSG - OH (Lead) 0.313 CUFT/FT x 395 FEET = 247 CUFT
CSG - OH (Tail)) 0.313 CUFT/FT x 344 FEET = 215 CUFT
SHOE TRACK (Tail) 0.434 CUFT/FT x 41 FEET = 18 CUFT
10-7/8 in Casing Shoe @ TOTAL VOLUME : 516 CUFT
98 Ft
30 m CEMENT CALCULATION :
LEAD 283 CUFT YIELD 1.620 CUFT/SX VOLUME 175 SACKS
TAIL 233 CUFT YIELD 1.152 CUFT/SX VOLUME 202 SACKS

MIXING FLUID VOLUME : TOTAL SLURRY:


LEAD 8.235 GPS 34 BBL LEAD 50 BBLS
TAIL 5.015 GPS 24 BBL TAIL 42 BBLS
12.25 in Open Hole
MATERIAL REQUIREMENT :
ADDITIVES/ LEAD 13.76 PPG TAIL 15.85 PPG
PRODUCTS CONCENTRATION TOTAL CONCENTRATION TOTAL
CEMENT 175 SACKS 202 SACKS
GEL 0.500 % bwoc 82 LBS 0.000 % bwoc 0 LBS
CACL2 0.500 % bwoc 82 LBS 0.600 % bwoc 114 LBS
R-21LS 0.000 GPS 0 GALS 0.000 GPS 0 GALS
FL-45LS 0.000 GPS 0 GALS 0.000 GPS 0 GALS
CD-31L 0.000 GPS 0 GALS 0.000 GPS 0 GALS
BA-58L 0.000 GPS 0 GALS 0.000 GPS 0 GALS
FP-9LS 0.030 GPS 5 GALS 0.030 GPS 6 GALS
A-300L 0.300 GPS 53 GALS 0.000 GPS 0 GALS
Top of Tail Slurry
493 ft PREFLUSH Chemical Wash 20 BBL Consist of 1 gal/bbl MCS-A and 1 gal/bbl CD-31L
150 m SPACER MCS-Spacer 60 BBL

DISPLACEMENT 9-5/8" CSG VOL 62 BBL

TOTAL MATERIAL REQUIREMENT ESTIMATED JOB TIME:


PRODUCTS LEAD TAIL TOTAL U N I T Fluid Type Rate(BPM) Time
CEMENT 175 202 377 SACKS SPACER 7 3 MIN
GEL 82 0 82 LBS SWITCH 10 MIN
CACL2 82 114 196 LBS LEAD 5 10 MIN
R-21LS 0 0 0 GALS TAIL 5 8 MIN
FL-45LS 0 0 0 GALS PLUGS 10 MIN
CD-31L 0 0 0 GALS DISP. 6 14 MIN
BA-58L 0 0 0 GALS TOTAL JOB TIME : 55 MIN
FP-9LS 5 6 11 GALS NET FROM MIXING :
A-300L 53 0 53 GALS LEAD 42 MIN
MCS SPACER 60 BBLS TAIL 32 MIN

SLURRY PROPERTIES DETAILS Displacement Rate :


o 7-7/8 in Casing Shoe @ Specification Measurement Unit Tail Lead 2 Bpm - Last 10 BBls
837 Ft TT @ 70 BC Hr:Min 3:12 3:21
255 m FLUID LOSS cc/30min/1000psi N/C N/C
FREE WATER % 0.9 0.9
COMPRESSIVE STR. psi aft 24 hrs 2475 1350
This report is the property of
SERVICES, and is intended for pr
information of the named party.
report nor any part thereof may no
PT BJ SERVICES INDONESIA published or disclosed to a third
without the written approval of P
LABORATORY REPORT SERVICES INDONESIA

REPORT NO. TNJ-079/KPT/2009 LOCATION BALIKPAPAN DATED August 12, 2009

SUBJECT : SLURRY TESTING FOR 9-5/8" CASING CEMENTATION

CLIENT : PERTAMINA EP (TANJUNG)

WELL NAME : T-160

Depth : 249 Meter (MD) CONFIRMATION TEST


Depth : 249 Meter (TVD)
B.H.S.T : 106 deg. F
B.H.C.T : 100 deg. F (Pertamina - API Casing Schedule)
T.G. : 1.75 deg. F/100 Feet

LEAD SLURRY :
Class "G" cement + 1.00 % (ph-bwoc) Gel, Extender
+ 1.00 % (ph-bwoc) CaCl2, Accelerator
+ 0.300 GPS A-300L, Strength Enhancer
+ 0.010 GPS FP-9LS, Defoamer

Slurry Density : 1.65 SG or 13.76 ppg


Slurry Yield : 1.629 Cuft/sack
Mixing water : 8.235 gal/sack (Fresh Water)
Total Fluid : 8.645 gal/sack

TEST RESULTS
Thickening Time at 100 deg.F. : 3 : 21 (70 BC)
Fluid Loss at 100 deg.F. : N/A
Free water at 100 deg.F. : 0.85% by volume
Fann 35 readings (R1,B1,F=1) : 300 200 100 6 3 Pv Yp
@ after Mixing : 54 40 26 10 8 42 12
@ BHCT : 62 47 31 14 12 46.5 15.5

API Mixing Time : 15 Seconds

Compressive Strength at BHST : 1350 psi after 24 hours

Cement/Additives/Water : Holcim "G" & Water from Location - Additives from Lab Stock

REQUESTED BY UB PERTAMINA EP TANJUNG

ANALYZED BY BJ BALIKPAPAN LAB SIGNED BY

DISTRIBUTED TO UB PERTAMINA EP TANJUNG - BJ

NOTICE : This report is the property of PT BJ SERVICES INDONESIA, Any user of the rep
NOTICE : This report is the property of PT BJ SERVICES INDONESIA, Any user of the rep

LABORATORY REPORT NO. TNJ-079/KPT/2009 DATED 12-Aug-09 PAGE 2 OF

Continuation from page 1.

TAIL SLURRY :
Class "G" cement + 0.75 % (ph-bwoc) CaCl2, Accelerator
+ 0.030 GPS FP-9LS, Defoamer

Slurry Density : 15.85 ppg


Slurry Yield : 1.152 Cuft/sack
Mixing water : 5.015 gal/sack (Fresh Water)
Total Fluid : 5.079 gal/sack

TEST RESULTS
Thickening Time at 100 deg.F. : 3 : 12 (70 BC)
Fluid Loss at 100 deg.F. : N/C
Free water at 100 deg.F. : 0.9% by volume
Fann 35 readings (R1,B1,F=1) : 300 200 100 6 3 Pv Yp
@ after Mixing : 73 54 36 16 14 56 18

API Mixing Time : 15 Seconds

Compressive Strength at BHST : 2475 psi after 24 hours

PT BJ SERVICES INDONESIA BJ BALIKPAPAN LABORATORY


This report is the property of BJ
SERVICES, and is intended for private
information of the named party. This
report nor any part thereof may not be
published or disclosed to a third party
without the written approval of PT.BJ
SERVICES INDONESIA

August 12, 2009

the property of PT BJ SERVICES INDONESIA, Any user of the report agrees that PT BJ
the property of PT BJ SERVICES INDONESIA, Any user of the report agrees that PT BJ

2
UB PERTAMINA EP TANJUNG
CEMENTING PROGRAM AND PROCEDURE
Well Name : T-162
October 21, 2009

9-5/8" CASING JOB PROCEDURE


Note:- Carry out pre-job safety meeting prior to each treatment. Treatment must be performed according to
BJ Services' and Pertamina EP Tanjung procedures for mixing and pumping cement slurry

. RUN CENTRALIZER PROGRAM AS PER PERTAMINA PROGRAM. BJ SERVICES RECOMMEND TO RUN 1EA
CENTRALIZER PER 2 JOINT OF CASING.
. RUN CASING AS PER PERTAMINA PROGRAM. PERFORM MUD CIRCULATION WHEN THE CASING REACH
PREVIOUS CASING SHOE.
3 WHEN THE CASING AT BOTTOM HOLE, PERFORM MUD CONDITIONING BY REDUCING YP OF THE DRILLING
MUD AS LOW AS APPLICABLE. RECIPROCATE CASING WHILE MUD CONDITIONING. THREE BOTTOM-UP
VOLUME IS RECOMMENDED TO HELP MUD REMOVAL. MAKE SURE NO LOSS IN THE WELL.
. RIG UP CEMENTING HEAD AND MANIFOLD. USE "Y" AND TWO HAMER VALVES ON THE RIG FLOOR TO
EASILY SWITCH FROM CEMENT LINE TO MUD LINE

. PRESSURE TEST CEMENT LINE TO 2500 PSI FOR 5 MINUTES.


. PUMP THE FOLLOWING PREFLUSH AND SPACER
TYPE OF FLUID VOLUME DENSITY RATE (BPM)
MCS - SPACER 60 BBL PPG .
MUD WASH 20 BBL 8.43 PPG .
MCS - SPACER 60 BBL 9.50 PPG
NOTE : SPACER SHOULD BE 1/2 PG AND 1 PPG OVER MUD WEIGHT .
. DROP BOTTTOM PLUG
. MIX AND PUMP CEMENT SLURRY AS FOLLOW
TYPE OF SLURRY VOLUME DENSITY RATE (BPM)
LEAD . BBL 13.76 PPG .
TAIL 42 BBL 15.85 PPG .
. DROP TOP PLUG
. DISPLACE WITH THE FOLLOWING SCHEDULE
STAGE VOLUME RATE
MUD . BBL . BPM
. THE PLUG AT 500 PSI ABOVE FINAL PUMPING PRESSURE, HOLD FOR 5 MINUTES
BUMP
. BLEED OFF PRESSURE AND FLOW IT BACK TO DISPLACEMENT TANK. MONITOR THE RETURNS TO CHECK
FLOAT SHOE AND FLOAT COLLAR

. IF THE FLOATS IS LEAKING THEN PUMP THE RETURNED VOLUME BACK TO THE WELL AND CLOSE THE
VALVE ON THE CEMENTING HEAD AND HOLD FOR 6 HRS.
. IF THE FLOAT WORKING PROPERLY, OPEN CEMENT HEAD MANIFOLD VALVE DURING WOC
. WAIT ON CEMENT
15 END OF JOB
PT. BJ SERVICES INDONESIA
CEMENT RECOMMENDATION AND CALCULATION
UB PERTAMINA EP TANJUNG
Well Name : T-162
October 21, 2009
Objectiv The 1st stage will cement 7" casing from TD to DSCC (740.7 meter). Estimate job time is 91
minute. Thickening time approximately 3 - 3.5 hours.

-7/ 1 inch Casing Diagram WELL DATA :


PREVIOUS CASING 9.625 INCH WEIGHT 36.0 PPF I.D 8.921 INCH
Top of Cement EXISTING CASING 7.000 INCH WEIGHT 23.0 PPF I.D #N/A INCH
0 Ft OPEN HOLE 8.500 INCH T.O.C 0 FEET T.O.T FEET
0m
VOLUME CALCULATION : 160 % EXCESS OPEN HOLE
CSG - OH 0.127 CUFT/FT x 2,222 FEET = 733 CUFT
SHOE TRACK #N/A CUFT/FT x 83 FEET = #N/A CUFT
TOTAL VOLUME : #N/A CUFT
OH Size from Caliper = 9.66 "
Volume Cement = Caliper Volume + 40% Excess = 134 BBls Cement
Volume cement equivalent with 160 % Excess with 8.5" OH Size

CEMENT CALCULATION :
7-7/8 in Casing Shoe @ MAIN SLURRY #N/A CUFT YIELD 1.179 CUFT/SX VOLUME #N/A SACKS
830 Ft
253 m
MIXING WATER 3.807 GPS #N/A BBL TOTAL SLURRY:
MIXING FLUID 5.277 GPS #N/A BBL MAIN SLURR #N/A BBLS

MATERIAL REQUIREMENT : ESTIMATED JOB TIME 1ST STAGE:


ADDITIVES/ MAIN SLURRY 15.85 PPG Fluid Type Rate(BPM) Time
PRODUCTS CONCENTRATION TOTAL SPACER 5 16 MIN
8.50 in Open Hole CEMENT #N/A SACKS CHEM.WASH 5 6 MIN
GEL % bwoc #N/A LBS BOTTOM PLUG 10 MIN
CACL2 % bwoc #N/A LBS MAIN SLURR 6 #N/A
FL-45LS 0.900 GPS #N/A GALS TOP PLUG 10 MIN
CD-31L 0.080 GPS #N/A GALS DISPLACE 8 #N/A
R-21LS 0.060 GPS #N/A GALS TOTAL JOB TIME : #N/A
BA-58L 0.400 GPS #N/A GALS NET FROM MIXING :
FP-9LS 0.030 GPS #N/A GALS MAIN SLURR #N/A MIN
MCS SPACER 80 BBLS Displacement Rate :
CHEMICAL WASH 30 BBLS 2 Bpm - Last 10 BBls

CHEMICAL WASH MCS-A 30 BBL


SPACER (10 PPG) MCS SPACER 80 BBL
DSCC/Top of Tail Slurry
2,430 Ft DISPLACEMENT 1ST STAGE #N/A BBL
740.68 m

Float Collar
o 4,570 Ft
1392.80 m
-7/1 in Casing Shoe @
4,652 Ft
1418.0 m
PT. BJ SERVICES INDONESIA
CEMENT RECOMMENDATION AND CALCULATION
UB PERTAMINA EP TANJUNG
Well Name : T-162
October 21, 2009
Objectiv The 2nd stage will cement 7" casing from DSCC to SURFACE mTVD. Estimate job time is 75
minute. Thickening time approximately 3.5 hours.

-7/ 1 inch Casing Diagram WELL DATA :


PREVIOUS CASING 9.625 INCH WEIGHT 36.0 PPF I.D 8.921 INCH
Top of Cement EXISTING CASING 7.000 INCH WEIGHT 23.0 PPF I.D #N/A INCH
0 Ft OPEN HOLE 8.500 INCH T.O.C 0 FEET T.O.T FEET
0m
VOLUME CALCULATION : 210 % EXCESS OPEN HOLE
CSG - CSG 0.167 CUFT/FT x 830 FEET = 138 CUFT
CSG - OH 0.127 CUFT/FT x 1,600 FEET = 629 CUFT
SHOE TRACK #N/A CUFT/FT x 3 FEET = #N/A CUFT
TOTAL VOLUME : #N/A CUFT
OH Size from Caliper = 10.03 "
Volume Cement = Caliper Volume + 40% Excess + Volume Annulus Casing = 137 BBls Cement
Volume cement in Open Hole equivalent with 210 % Excess with 8.5" OH Size

CEMENT CALCULATION :
7-7/8 in Casing Shoe @ MAIN SLURRY #N/A CUFT YIELD 1.652 CUFT/SX VOLUME #N/A SACKS
830 Ft
253 m
MIXING WATER 7.509 GPS #N/A BBL TOTAL SLURRY:
MIXING FLUID 8.821 GPS #N/A BBL MAIN SLURR #N/A BBLS

MATERIAL REQUIREMENT : ESTIMATED JOB TIME 1ST STAGE:


ADDITIVES/ MAIN SLURRY 13.76 PPG Fluid Type Rate(BPM) Time
PRODUCTS CONCENTRATION TOTAL SPACER 5 12 MIN
8.50 in Open Hole CEMENT #N/A SACKS CHEM.WASH 5 4 MIN
GEL 1 % bwoc #N/A LBS BOTTOM PLUG 10 MIN
CACL2 0 % bwoc #N/A LBS MAIN SLURR 6 #N/A
FL-45LS 0.700 GPS #N/A GALS TOP PLUG 10 MIN
CD-31L 0.050 GPS #N/A GALS DISPLACE 8 #N/A
R-21LS 0.010 GPS #N/A GALS TOTAL JOB TIME #N/A
BA-58L 0.500 GPS #N/A GALS NET FROM MIXING :
FP-9LS 0.010 GPS #N/A GALS MAIN SLURR #N/A MIN
MCS SPACER 60 BBLS Displacement Rate :
CHEMICAL WASH 20 BBLS 2 Bpm - Last 10 BBls

CHEMICAL WASH MCS-A 20 BBL


SPACER (10 PPG) MCS SPACER 60 BBL
DSCC/Top of Tail Slurry
2,430 Ft DISPLACEMENT 2ND STAGE #N/A BBL
740.68 m

Float Collar
o 4,570 Ft
1392.80 m
-7/1 in Casing Shoe @
4,652 Ft
1418 m
This report is property of BJ SE
and is intended for private inform
the below named party. This re
any part thereof may be publ
PT BJ SERVICES INDONESIA disclosed to a third party wit
written approval of PT.BJ SE
LABORATORY REPORT INDONESIA

REPORT NO. TNJ-0201-KPT-2009 LOCATION BALIKPAPAN LABORATORY DATED 11-Oct-09

SUBJECT : SLURRY TESTING FOR 7" CASING CEMENTATION

CLIENTS : PERTAMINA EP (TANJUNG)

Well Name : T-161 CONFIRMATION TEST

FIRST STAGE :
Depth : 1418 Meters (MD)
Depth : 1400 Meters (TVD)
B.H.S.T : 160 deg. F
B.H.C.T : 122 deg. F (Pertamina - API Casing Schedule)
T.G. : 1.75 deg. F/100 feet

SLURRY SYSTEM
Class "G" cement + 0.900 gps FL-45LS, Fluidloss Additive
+ 0.080 gps CD-31L, Dispersant
+ 0.060 gps R-21LS, Retarder
+ 0.400 gps BA-58L, Bonding Agent
+ 0.030 gps FP-9LS, Foam preventer

Slurry Density : 15.85 ppg or 1.9 SG


Slurry Yield : 1.179 Cuft/sack
Mixing water : 3.807 gal/sack (Fresh water)
Total Fluid : 5.277 gal/sack

TEST RESULTS
Thickening Time at 122 deg. F. : 3 : 16 (40 Bc) _ 3 : 28 (70 Bc) _ 3 : 40 (100 Bc)
Fluid Loss at 122 deg. F. : 48 cc/30 min./1000 psi
Free Water at 122 deg. F. : 0 % by volume (with 45% inclination)
Fann 35 readings (R1,B1,F=1) : 300 200 100 6 3 Pv Yp
@ after Mixing : 147 101 54 9 7 139.5 7.5
@ BHCT : 162 114 63 8 7 148.5 13.5

API Mixing Time : 20 seconds

Compressive Strength @ BHST : 2450 psi after 12 hrs


2950 psi after 24 hrs

Cement/Additives/Water : Holcim "G" from Location/LabStock/Fresh Water from Location

REQUESTED BY PERTAMINA EP (TANJUNG)

ANALYZED BY BJ BALIKPAPAN LAB SIGNED BY

DISTRIBUTED TO PERTAMINA - BJ Continue to page 2..

NOTICE : This report is the property of PT BJ SERVICES INDONESIA, Any user of the report
agrees that PT BJ SERVICES INDONESIA. Shall not be liable for any loss or damage which result
from the use of the information in the report PT BJ SERVICES INDONESIA make no warranties in
NOTICE : This report is the property of PT BJ SERVICES INDONESIA, Any user of the report
agrees that PT BJ SERVICES INDONESIA. Shall not be liable for any loss or damage which result
from the use of the information in the report PT BJ SERVICES INDONESIA make no warranties in

LABORATORY REPORT NO. TNJ-0201-KPT-2009 DATED 11-Oct-09 PAGE 2 OF

Continuation from page 1.

SECOND STAGE :
Depth : 740.7 Meters (MD)
Depth : 725 Meters (TVD)
B.H.S.T : 122 deg. F
B.H.C.T : 96 deg. F (Pertamina - API Casing Schedule)
T.G. : 1.75 deg. F/100 feet

SLURRY SYSTEM
Class "G" cement + 1.00 % (ph-bwoc) GEL, Extender
+ 0.700 gps FL-45LS, Fluid Loss Additive
+ 0.050 gps CD-31LS, Dispersant
+ 0.010 gps R-21LS, Retarder
+ 0.500 gps BA-58L, Bonding Agent
+ 0.010 gps FP-9LS, Defoamer

Slurry Density : 13.76 ppg or 1.65 SG


Slurry Yield : 1.652 Cuft/sack
Mixing water : 7.509 gal/sack (Fresh water)
Total Fluid : 8.821 gal/sack

TEST RESULTS
Thickening Time at 96 deg. F. : 3 : 39 (40 Bc) _ 4 : 12 (70 Bc) _ 4 : 38 (100 Bc)
Fluid Loss at 96 deg. F. : 287 cc/30 min./1000 psi
Free Water at 96 deg. F. : 0.1 % by volume
Fann 35 readings (R1,B1,F=1) : 300 200 100 6 3 Pv Yp
@ after Mixing : 22 17 11 6 5 16.5 5.5
@ BHCT 60 48 37 24 23 34.5 25.5

API Mixing Time : 19 seconds

Compressive Strength @ BHST : 1054 psi after 12 hrs


1798 psi after 24

PT BJ SERVICES INDONESIA BJ BALIKPAPAN LABORATORY


rt is property of BJ SERVICES
ended for private information of
named party. This report not
thereof may be published or
to a third party without the
pproval of PT.BJ SERVICES
IA

11-Oct-09
2
UB PERTAMINA EP TANJUNG
CEMENTING PROGRAM AND PROCEDURE
Well Name : T-162
October 21, 2009

7" CSG JOB PROCEDURE (FIRST STAGE)


Note:- Carry out pre-job safety meeting prior to each treatment. Treatment must be performed according to
BJ Services' and Pertamina EP Tanjung procedures for mixing and pumping cement slurry.

. RUN CENTRALIZER PROGRAM AS PER PERTAMINA PROGRAM.


. RUN CASING AS PER PERTAMINA PROGRAM. PERFORM MUD CIRCULATION WHEN THE CASING REACH
PREVIOUS CASING SHOE.
3 WHEN THE CASING AT BOTTOM HOLE, PERFORM MUD CONDITIONING BY REDUCING YP OF THE DRILLING
MUD AS LOW AS APPLICABLE. RECIPROCATE CASING WHILE MUD CONDITIONING. THREE BOTTOM-UP
VOLUME IS RECOMMENDED TO HELP MUD REMOVAL. MAKE SURE THERE IS NO LOSS CONDITION.

4 PERFORM FLUID CALLIPER. MAKE SURE THE MUD VOLUME IN AND OUT THE WELLBORE IS THE SAME

. RIG UP CEMENTING HEAD AND MANIFOLD. USE "Y" AND TWO HAMER VALVES ON THE RIG FLOOR TO
EASILY SWITCH FROM CEMENT LINE TO MUD LINE
. PRESSURE TEST CEMENT LINE TO 3000 PSI FOR 5 MINUTES.
. PUMP THE FOLLOWING PREFLUSH (ALWAYS RECIPROCATE THE CASING DURING THE PUMPING UNTILL
THE PLUG IS BUMPED)
TYPE OF FLUID VOLUME DENSITY RATE (BPM)
MCS SPACER 80 BBL 10.04 PPG .
MUD WASH 30 BBL 8.34 PPG .
NOTE : SPACER SHOULD 1 PPG OVER MUD WEIGHT

. MIX AND PUMP CEMENT SLURRY AS FOLLOW


TYPE OF SLURRY VOLUME DENSITY RATE (BPM)

1st STAGE #N/A BBL 15.80 PPG .


. DROP PLUG
. DISPLACE WITH THE FOLLOWING SCHEDULE
STAGE VOLUME RATE
MUD #N/A BBL . BPM
Note : Reduce the rate in the last 10 bbls to 2 bpm
. BLEED OFF PRESSURE AND FLOW IT BACK TO DISPLACEMENT TANK. MONITOR THE RETURNS TO CHECK
FLOAT SHOE AND FLOAT COLLAR.
. DROP BALL TO OPEN DSCC (DV), PRESSURIZED AS SOP FOR OPENING DSCC.
. CIRCULATE EXCESS CEMENT ABOVE DSCC IN ANNULAR
. ESTABLISH REVERSE CIRCULATION AND CHECK THE RETURN ( PREFLUSH , SPACER , SCAVENGER )
. WOC 12 HRS
UB PERTAMINA EP TANJUNG
CEMENTING PROGRAM AND PROCEDURE
Well Name : T-162
October 21, 2009

7" CSG JOB PROCEDURE (SECOND STAGE)


Note:- Carry out pre-job safety meeting prior to each treatment. Treatment must be performed according to
BJ Services' and Pertamina UBEP Tanjung procedures for mixing and pumping cement slurry.

. PRESSURE TEST CEMENT LINE TO 3000 PSI FOR 5 MINUTES.


. PUMP THE FOLLOWING PREFLUSH
TYPE OF FLUID VOLUME DENSITY RATE (BPM)

MCS SPACER 60 BBL 10.04 PPG .


MUD WASH 20 BBL 8.34 PPG .
NOTE : SPACER SHOULD BE 1 PPG OVER MUD WEIGHT

. MIX AND PUMP CEMENT SLURRY AS FOLLOW


TYPE OF SLURRY VOLUME DENSITY RATE (BPM)

2ND STAGE #N/A BBL 13.76 PPG .

. DROP TOP PLUG


. DISPLACE WITH THE FOLLOWING SCHEDULE
STAGE VOLUME RATE
MUD #N/A BBL . BPM
Note : Drop the rate the last 10 bbls to 2 bpm
. WOC
MCS Spacer
7" CASING CEMENTING
T-160

Mud
Weight : 9.42 PPG

MCS Spacer

Weight : 1.204 = 10.04 ppg

Field quantities for 1 bbl of spacer

Additive Amount FOR 80 BBLS

Drill water 35.4 gal/bbl 2833.475 gals 67.5 BBL Drill water
FP-9LS 1 gal/bbl 80 gals 1.9 BBL FP-9LS
GW-23 1 lb/bbl 80 lbs 80.0 Lbs GW-23
Barite 90 lb/bbl 7200 lbs 7,200.0 Lbs Barite
MCS-A 1 gal/bbl 80 gals 1.9 BBL MCS-A
CD-31L 2 gal/bbl 160 gals 3.8 BBL CD-31L

Sub-total 6.58
Total

Laboratory quantities for 100 cc of Spacer 500 cc 500 cc

Drill water 84.30 cc/100 cc 421.48 cc 421.5 gr


FP-9LS 2.38 cc/100 cc 11.90 cc 10.7 gr
GW-23 0.29 gr/100 cc 1.43 gr 1.43 gr
Barite 25.74 gr/100 cc 128.70 gr 128.7 gr
MCS-A 2.38 cc/100 cc 11.90 cc 12.1 gr
CD-31L 4.76 cc/100 cc 23.80 cc 28.084 gr
Volume Weight

35.42 295.39
1 6.92
0.07 1.00
2.51 90.00
1 8.84
2 19.52

42.00 421.7
PRODUCT DISCUSSION

Safe and environmentally friendly cement additive, designed to provide ease of use,
in terms of field mixing and handling, while meeting rigorous standards of
environmental compliance. A-300L, acts primarily as a slurry strength enhancer but
also exhibits some accelerating effects, in terms of shortening thickening time. When
A-300L used alone or combined with other additives, A-300L substantially increase both
early and late compressive strength of all cement slurries. In addition, A-300L acts to
stabilise lower density slurries and, exhibits synergistic effects when combined with
dispersants and fluid-loss control additives. A-300L can be used in fresh or seawater
for slurries ranging from 11.0 ppg to 16.0 ppg.
A liquid fluid loss additive, designed to prevent the problems associated with filtrate
loss of cement slurry for bottomhole circulating temperatures, ranging from 80F to
300F. A highly versatile product, FL-45LN/FL-45LS is an anionic blend of high
FL-45LS molecular weight synthetic copolymer and surfactant that will control fluid loss in
cement slurries by absorption and conformation of macro molecules at the
solid/solution interface, in other words, it will attach to the cement particles and
thicken the interstitial water.
Dispersant, a dark brown liquid, composed primary of a highly polymerized
naphthalene sullonate. It is used to thin cement slurries so that turbulent flow can be
CD-31L achieved at a reasonable low pump rate, it is also use to densify slurries up to 17.5
ppg, resulting in heavier, stronger cement.
An anionic blend of organic acid salts. When mixed with cement it will absorb into
the cement particles and chelate the calcium ions retarding formation on CSH gels.
R-21LS has a slight dispersive action with most cements, which results in some
R-21LS thinning of cement slurry. Due to this, better fluid loss control is generally obtained.
It can be use as a retarder with slurries prepared with either fresh water or
sea`water. It used at temperature range of 120 F to 350 F.
Gas block additive, a water suspension of tiny silica particles with average size of 0.8
microns it effectively reduce the internal permeability of the cement by chemically
BA-58L and physically blocking the slurries matrix. These include fluid loss materials and the
slurries' ability to prevent gas migration. The material is very versatile and can be
used with equal effectiveness in fresh or sea water.
Liquid defoamer, light yellow fluid, defoamer for cement slurries. It is very effective
FP-9LS and long lasting defoamer for cement slurries. It prevent the formation of foam or
destroys the foam immediately if added when foaming has commenced
SERVICES OPERATION REPORT
1. CLIENT: PERTAMINA 9. PROJECT: 9-5/8" CSG CMT 16. DATE: 25-Aug-09 SOR # 825673
2. CITY: TANJUNG 10. WELL #: T-160 17. DIST/LOC CODE: KPT 21. MAX DEPTH: 0 FT

3. COUNTRY: INDONESIA 11. FIELD: TANJUNG 18. JOB W/EVENT: Y N 22. KM (ONE WAY):

4. CLIENT #: 12. WELL: NEW OLD 19. WELL TYPE: EXP DEV W/O R/L

5. PURCHASE ORDER #: 13. OFFSHORE ONSHORE 20. OIL GAS OTHERS 23. MMP: Y N

6. EQT USED: BJ 3RD PARTY 14. SERVICES PERF 1 (SEE BELOW FOR CODE) 24. MAX PRESS.: PSI

7. MAT USED: BJ 3RD PARTY 15. APPLICABLE PRICE LIST: 82 89 90 25. ENGINEER: SAROSO
8. # OF BJ PERSONNEL ON JOB: SUP SE HEL MECH EO TECH MANAGER 26. PERSONNEL CODE:

27. CASING SIZE: 28. SURFACE INTERMEDIATE PRODUCTION REMEDIAL

CONTRACT CONDITIONS: (This agreement must be signed before work is commenced)


The undersigned, as autorized client representative, agees and acknowledges that services, materials, products
and supplies provided for in this order shall be subject to the terms and conditions appearing on the front and reverse
sides of the customer copy hereof and no additional terms and conditions shall apply to this oreder without the consent
of and authorized BJ representative. SIGNED:

REFERENCE CODE QUANTITY DESCRIPTION UNIT UNIT PRICE AMOUNT

SERVICE COST 1.00 Set up Charge JOB 2,500.00 2,500.00


2.00 Pumping Charge Hr 500.00 1,000.00

A. SUB TOTAL = 3,500.00

TOOL COST 0.00 Set up Charge for Tools JOB 990.00 0.00
0.00 RBP Rental Charges Hr 49.50 0.00
0.00 Packer Rental Charges Hr 49.50 0.00

B. SUB TOTAL = 0.00

PRODUCT COST

0.00 A-7 (CaCl2) LBS 0.290 0.00


0.00 A-300 L GALL 18.240 0.00
556.00 FL-45 L GALL 9.730 5,409.88
314.00 CD-31 L GALL 17.200 5,400.80
32.00 R-21LS GALL 13.250 424.00
309.00 BA-58 L GALL 12.280 3,794.52
154.00 FP-9 LS GALL 39.180 6,033.72
50.00 MCS-A GALL 30.175 1,508.75
5,880.00 MCS SPACER GALL 1.600 9,408.00

C. SUB TOTAL = 31,979.67

GRAND TOTAL COST 35,479.67

BASE TO LOCATION JOB FINISHED


29. EQT Hrs 33. TIME 37. OPER Hrs 38. LOST TIME Hrs
30. PER Hrs 34. DATE August 25, 2009 BJ REPRESENTATIVE

JOB STARTED LOCATION TO BASE NATHANAEL NAINGGOLAN


31. TIME 35. EQT Hrs COMPANY REPRESENTATIVE

32. DATE August 25, 2009 36. PER Hrs ASSISTEN MANAGER OPERASI
SERVICE CODE:
CEMENT PRIMARY 01 HANDLING 05 MATRIX ACIDIZING 09 SAND CONTROL 13 WELL KILL 17
CEMENT REMEDIAL 02 CEMENT MATERIAL 06 STIM. MATERIAL 10 GRAVEL PACK 14 DST 18
CEMENT PLUG 03 DOWNHOLE TOOLS 07 STIMULATION TOOLS 11 SAND CONTROL MAT'L 15 NITROGEN 19
GROUTING 04 FRACTURING 08 COILED TUBING 12 MISC PUMPING 16 RENTAL/OTHERS 20
CUSTOMER (ORG) REGION (PINK) / DISTRICT (YELLOW) / STATION (GREEN) / INVOICE (BLUE) FILTRATION 21
DELIVERY TICKET
P.T. BJ. SEVICES INDONESIA DT- 712767
Jl. Ampera Raya No. 9 - 10
Jakarta 12550, Indonesia

LOCATION CODE : TANJUNG

CUSTOMER : Pertamina DATE : 25-Aug-09

FIELD : TANJUNG PROJECT NO. :

CONTRACT NO. : JOB TYPE : CEMENTING

WELL NAME : T-160 SHIPPED VIA : BJ SUPPLIER

ITEM PRODUCT DESCRIPTION QUANTITY


NO CODE DELIVERED

1 A-7 (CaCl2) ACCELERATOR 0.00 LBS


2 A-300 L MULTI PURPOSE ADDITIVE 0.00 GALL
3 FL-45 L FLUID LOSS CONTROL 556.00 GALL
4 CD-31 L DISPERSANT 314.00 GALL
5 R-21LS RETARDER 32.00 GALL
6 BA-58 L BONDING AGENT 309.00 GALL
7 FP-9 LS FOAM PREVENTER 154.00 GALL
8 MCS-A CHEMICAL WASH 50.00 GALL
9 MCS SPACER SPACER 5,880.00 GALL

PREPARED BY : NATHANAEL NAINGGOLAN

DELIVERED BY : RECEIVED BY : Mr.BURHAN

CARRIER NAME :

DISTRIBUTION :
WHITE - CUSTOMER, BLUE - ACCOUNTING, YELLOW - ORIGINATOR, PINK - CUSTOMER, GREEN - ACCOUNTING, PINK - LOGISTIC