Sei sulla pagina 1di 15

Feature Deployment and Testing Guide

NCP CCP Management


Feature ID: ZWF21-20-001

Version: V3.11.10

ZTE CORPORATION
NO. 55, Hi-tech Road South, ShenZhen, P.R.China
Postcode: 518057
Tel: +86-755-26771900
Fax: +86-755-26770801
URL: http://ensupport.zte.com.cn
E-mail: support@zte.com.cn
LEGAL INFORMATION
Copyright 2012 ZTE CORPORATION.
The contents of this document are protected by copyright laws and international treaties. Any reproduction or
distribution of this document or any portion of this document, in any form by any means, without the prior written
consent of ZTE CORPORATION is prohibited. Additionally, the contents of this document are protected by
contractual confidentiality obligations.
All company, brand and product names are trade or service marks, or registered trade or service marks, of ZTE
CORPORATION or of their respective owners.
This document is provided as is, and all express, implied, or statutory warranties, representations or conditions
are disclaimed, including without limitation any implied warranty of merchantability, fitness for a particular purpose,
title or non-infringement. ZTE CORPORATION and its licensors shall not be liable for damages resulting from the
use of or reliance on the information contained herein.
ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applications
covering the subject matter of this document. Except as expressly provided in any written license between ZTE
CORPORATION and its licensee, the user of this document shall not acquire any license to the subject matter
herein.
ZTE CORPORATION reserves the right to upgrade or make technical change to this product without further notice.
Users may visit ZTE technical support website http://ensupport.zte.com.cn to inquire related information.
The ultimate right to interpret this product resides in ZTE CORPORATION.

Revision History

Revision No. Revision Date Revision Reason

R1.0 2012-08-09 First edition

Serial Number: SJ-20120802112720-074

Publishing Date: 2012-08-09 (R1.0)

SJ-20120802112720-074|2012-08-09 (R1.0) ZTE Proprietary and Confidential


Contents
Chapter 1 Functional Description ............................................................. 1-1
Chapter 2 Preparations .............................................................................. 2-1
Chapter 3 Data configuration .................................................................... 3-1
Chapter 4 Testing ....................................................................................... 4-1
4.1 Test Purpose...................................................................................................... 4-1
4.2 Steps for Test..................................................................................................... 4-1
4.3 Expected Results ............................................................................................... 4-3

Chapter 5 Counter List............................................................................... 5-1

SJ-20120802112720-074|2012-08-09 (R1.0) ZTE Proprietary and Confidential


II

SJ-20120802112720-074|2012-08-09 (R1.0) ZTE Proprietary and Confidential


Chapter 1
Functional Description
The NCP/CCP management refers to the maintenance of NBAP signaling channel status
between RNC and Node B. Each Node B has a Node B Control Port (NCP) and several
Communication Control Ports (CCPs). The NCP is used to transmit and receive the NBAP
messages and implement logical O&M of Node B which is independent of specific UEs and
contains public process and global process, for example, AUDIT, cell setup and radio link
setup. As the communication context channels controlled by Node B, CCPs are used to
carry NBAP dedicated signaling and control Node B communication context.
The RNC initiates the NCP and CCP setup procedure which can also be initiated by Node
B when the system is started or a Node B is added in the OMCR. After the NCP and CCPs
are available, the RNC can exchange NBAP messages with Node B. After that, both RNC
and Node B will monitor the status of NCP and CCPs, and decides whether to continue
service provision or re-establish links based on the status of NCP and CCPs.
When a Node B is deleted in the OMCR, the RNC will delete the links related to the Node
B, and terminate the NCP and CCP services of the Node B.

1-1

SJ-20120802112720-074|2012-08-09 (R1.0) ZTE Proprietary and Confidential


Feature Deployment and Testing Guide Feature ID: ZWF21-20-001

This page intentionally left blank.

1-2

SJ-20120802112720-074|2012-08-09 (R1.0) ZTE Proprietary and Confidential


Chapter 2
Preparations
License
N/A

Hardware Requirement
Hardware requirement is shown in Table 2-1.

Table 2-1 Hardware Requirement

NE Requirement

RNC None

NodeB None

Software Requirement
Software requirement is shown in Table 2-2.

Table 2-2 Software Requirement

NE Involved Version Requirement

UE YES UMTS FDD Number: 2


Category: Any
Release : R99 or above

NodeB YES V4.11.10.14

RNC YES V3.11.10.11

MSCS YES ZTE equipment

MGW YES ZTE equipment

SGSN YES ZTE equipment

GGSN NO

HLR NO

Topology
Topology is shown in Figure 2-1.

2-1

SJ-20120802112720-074|2012-08-09 (R1.0) ZTE Proprietary and Confidential


Feature Deployment and Testing Guide Feature ID: ZWF21-20-001

Figure 2-1 Topology

2-2

SJ-20120802112720-074|2012-08-09 (R1.0) ZTE Proprietary and Confidential


Chapter 3
Data configuration
SGSN/GGSN - ZTE
N/A

MSC/MGW - ZTE
N/A

HLR ZTE
N/A

RNC
N/A

NodeB
N/A

3-1

SJ-20120802112720-074|2012-08-09 (R1.0) ZTE Proprietary and Confidential


Feature Deployment and Testing Guide Feature ID: ZWF21-20-001

This page intentionally left blank.

3-2

SJ-20120802112720-074|2012-08-09 (R1.0) ZTE Proprietary and Confidential


Chapter 4
Testing
Table of Contents
Test Purpose ..............................................................................................................4-1
Steps for Test .............................................................................................................4-1
Expected Results .......................................................................................................4-3

4.1 Test Purpose


The purpose of this test case is to verifymaintenance and operation of NCP and CCP is
normal.
Related documents:
l ZTE UMTS Node B Management Feature Guide.doc

4.2 Steps for Test


1. Reset the NodeB1 and observe the cell setup messages on Iub interface.

2. Disconnect the Iub physical connection.


3. Observe the NCP/CCP status from the OMCR.

NCP

4-1

SJ-20120802112720-074|2012-08-09 (R1.0) ZTE Proprietary and Confidential


Feature Deployment and Testing Guide Feature ID: ZWF21-20-001

CCP

4. Connect the Iub physical connection.


5. UE1 makes a voice call to UE2.

6. Release the voice call.

4-2

SJ-20120802112720-074|2012-08-09 (R1.0) ZTE Proprietary and Confidential


Chapter 4 Testing

4.3 Expected Results


NBAP messages can be sent and received normally on the Node B Control Port in step 1
and 5.
The NCP/CCP Administrative is Block and the Operational is Disabled in step 3.

4-3

SJ-20120802112720-074|2012-08-09 (R1.0) ZTE Proprietary and Confidential


Feature Deployment and Testing Guide Feature ID: ZWF21-20-001

This page intentionally left blank.

4-4

SJ-20120802112720-074|2012-08-09 (R1.0) ZTE Proprietary and Confidential


Chapter 5
Counter List
Number of attempted RRC connection establishment, Originating
C310080001 Conversational Call

Number of attempted RRC connection establishment, Terminating


C310080008 Conversational Call

C310080170 Number of successful RRC connection access, MO Conversational Call

C310080177 Number of successful RRC connection access, MT Conversational Call

5-1

SJ-20120802112720-074|2012-08-09 (R1.0) ZTE Proprietary and Confidential

Potrebbero piacerti anche