Description of Materials Unit Unit cost
2. ROOFING MATERIALS
3/16" X2"X2" ANGLE BAR (6m) PIECE 520.00
1/4" X2"X2" ANGLE BAR (6m) PIECE 590.00
3/16" X1"X1" ANGLE BAR (6m) PIECE 242.00
2"X 3" ST. C-PURLINS (1mm) PIECE 309.00
2"X 6" ST. C-PURLINS (1mm) PIECE 450.00
2"X4" ST. C-PURLINS (1mm) PIECE 360.00
corrugated G.I sheet PIECE 320.00
RIDGE ROLL METER
FLASHING METER
VALLEY ROLL PIECE
Gutter(Spanish Type) PIECE 120.00
Hardi-Flex building board 1/4 BD.FT. 383.00
Long Span Steel Bricks per meter
Plain GI Ridge Roll and Hip Roll, Ga. 0.4mm PIECE
G.I. Sheet, Ga. 26 PIECE
Vulcaseal Sealant LITER
PVC Pipes downspout, (3" dia. X 10') PIECE 150.00
PVC Elbows , (3" dia. X 10') PIECE 40.00
PVC Solvent Cement LITER 100.00
G.I RIVET KILO 275.00
hack saw blade (ordinary) PIECE
Welding rod KILO
3. PLUMBING PIPES AND FITTINGS
PIECE
uPVC adaptor w/locknut and bushing, 20mm dia.
uPVC range pipe, 25mm dia. X 3.0 m PIECE
pair
uPVC adaptor w/locknut and bushing, 25mm dia.
uPVC utility boxes, 38mmX100mmX54mm PIECE
uPVC junction boxes, 38mmX100mmX54mm PIECE
Solvent Cement LITER
Electric Wire 3.5mm 150m/box
Wire for Range 5.5mm meter
Wire for Range 8.0mm meter
Wire for service Entrance 14mm meter
Wire for service Entrance 22mm meter
plastics Lamp Receptacle PIECE
Porcelain Lamp Receptacle PIECE
Plate Assembly for Single-Gang Switch set
Plate Assembly for two-Gang Switch set
Plate Assembly for three-Gang Switch set
Wall Switch Module, 5A, 250V, AC PIECE
Three-way Switch Module, 5A, 250V, AC PIECE
Duplex Convenience Outlets PIECE
Range outlet with cover plate, 3-prongs set
Friction/plastic tape, Big size roll
ACU outlet PIECE
ELECTRICAL WIRE ROLL
BREAKER 100ampere PIECE
BREAKER 60ampere PIECE
BREAKER 40ampere PIECE
BREAKER 30ampere PIECE
BREAKER 20ampere PIECE
BREAKER 15ampere PIECE
PANEL BOARD 6HOLE PIECE
PANEL BOARD 8HOLE PIECE
PANEL BOARD 10HOLE PIECE
flourescent lamp w/ baluster (1m) set
flourescent lamp w/ baluster (0.5m) set
circular flourescent lamp set
daylight bulb PIECE
7. PAINTING MATERIALS (DUTCH BOY
OR BOYSEN)
TINTED FT2
SMOKE FT2
CLEAR FT2
set
MOBILITY
Unit cost
205.00
170.00
200.00
210.00
7.00
8.00
106.00
175.00
320.00
50
50.00
50.00
50.00
50.00
60.00
37.00
14.00
320.00
290.00
750.00
520.00
580.00
185.00
280.00
450.00
350.00
320.00
80.00
80.00
95.00
95.00
320.00
380.00
150.00
40.00
90.00
190.00
50.00
75.00
650.00
550.00
40.00
40.00
40.00
55.00
50.00
30.00
420.00
350.00
290.00
25.00
30.00
10.00
15.00
15.00
15.00
40.00
40.00
40.00
15.00
15.00
15.00
40.00
40.00
40.00
8.00
100.00
95.00
235.00
65.00
65.00
110.00
120.00
4500.00
900.00
120.00
120.00
500.00
250.00
350.00
75.00
15.00
600.00
8.00
8.00
250.00
240.00
5.00
250.00
70.00
20.00
20.00
2700.00
20.00
12.00
50.00
125.00
20.00
100.00
600.00
400.00
400.00
350.00
200.00
150.00
480.00
550.00
750.00
180.00
210.00
50.00
1600.00
2000.00
2000.00
250.00
260.00
40.00
35.00
35.00
40.00
50.00
50.00
30.00
15.00
10.00
12.00
8.00
2700.00
1100.00
220.00
170.00
Project Title: Proposed 2-Storey Residential with Attic
Project Owner: Rodel T. Grande
Project Location: Brgy. Tolega Sur, Moncada, Tarlac
BILL OF MATERIALS
2. ROOFING MATERIALS
3/16" X2"X2" Angle Bar (6m) 149 PIECE
2"X 3" ST. C-Purlins (1mm) 483 PIECE
2"X 6" ST. C-Purlins (1mm) 14 PIECE
Corrugated G.I sheet 156 PIECE
Ridge Roll 22 METER
Flashing 10 METER
Gutter(Spanish Type) 37 PIECE
Vulcaseal Sealant 5 LITER
G.I Rivet 19 KILO
Hack saw blade (ordinary) 20 PIECE
Welding rod 20 KILO
6. ELECTRICAL MATERIALS
7. PAINTING MATERIALS
(DUTCH BOY OR BOYSEN)
Approved by:__________________________________
Kevin G. Martin
(Owner)
tial with Attic
cada, Tarlac
BILL OF MATERIALS
188.00 156040
130.00 28990
130.00 6760
155.00 22475
7.00 15400
8.00 44168
130.00 116025
188.00 208868
35 10605
35.00 315
35.00 1715
35.00 472.5
35.00 157.5
45.00 405
45.00 405
34.00 35666
12.00 135324
270.00 24300
255.00 17340
825431
390.00 58110
140.00 67620
390.00 5460
280.00 43680
80.00 1760
60.00 600
95.00 3515
360.00 1800
30.00 573
35.00 700
50.00 1000
184818
230.00 5060
170.00 1700
35.00 140
35.00 105
35.00 630
25.00 100
40.00 80
30.00 210
420.00 8400
25.00 125
20.00 400
20.00 40
35.00 140
15.00 150
7.00 70
160.00 160
210.00 210
115.00 575
95.00 95
190.00 950
50.00 350
65.00 260
65.00 260
20210
3100.00 9300
1500.00 4500
100.00 300
80.00 240
650.00 650
150.00 450
550.00 1650
65.00 195
17285
15.00 21375
600.00 4800
122.00 17202
260.00 1560
230.00 230.00
18992.00
20.00 300
20.00 300
50.00 250
50.00 500
20.00 800
45.00 450
130.00 780
50.00
100.00 100
320.00 960
160.00 1120
350.00 350
480.00 480
210.00 5250
50.00 550
11590
1800.00 75600
1600.00 70400
1900.00 83600
88.00 440
88.00 234.432
35.00 1470
980.00 47040
35.00 1015
1300.00 28600
250.00 7250
450.00 9000
8.00 112
13.00 65
19.00 190
30.00 90
35.00 105
35.00 245
15.00 105
15.00 45
10.00 50
12.00 60
8.00 24
325740.432
750.00 148500
500.00 35500
880.00 1760
750.00 3000
450.00 1800
1400.00 4200
194760
Checked by:________________________
Engr. Ritchie Malasan
(Instructor)
Project Title: Proposed 2-Storey Residential with Attic
Project Owner: Rodel T. Grande
Project Location: Brgy. Tolega Sur, Moncada, Tarlac
C. TAX(12%) 188768.57184
Approved by:
Kevin G. Martin
(owner)
dential with Attic
Moncada, Tarlac
825431.000
184818.000
11740.000
18992.000
11590.000
325740.432
194760.000
1573071.432
629228.5728
78653.5716
188768.57184
2469722.148
SLAB
LEVEL THICKNESS AREA
1st floor 0.13 127.39
67.66
2nd floor 0.10
89.66
VT = 28.369 m
CONCRETE SLAB
For Residential Bldg. For Septic Tank & Catch Basin
VT = 127.39 x 0.13 VT = 0.34
= 16.17853 m = 0.51
15 x 20 x 40 cm CHB
# CHB = 5018.3 * 1.1 = 5521 pcs
10 x 20 x 40 cm CHB
# CHB = 336.0 * 1.1 = 370 pcs
SUMMARY
Cement = 814 bags of 40 kg cement
Sand = 223 m
Gravel = 52 m
# CHB = 5521 pieces of 15x20x30cm CHB
= 370 pieces of 10x20x30cm CHB
METAL REINFORCEMENT
Transverse Bars 6
# TB/6m =
12 mm RSB & 0.3 m spacing 1
LCB = 0.25 + 0.216 # 6m RSB = 36
= 1 m
# TB = 214 pcs Tie Wires
# kg = 749.25
= 14.2
FOR COLUMN
Main reinf.
Column 1 6 -12mm
LC1-1T = 4.60 x 23
= 761.76 m 1283.52
# 6m RSB =
LC1-2T = 3.00 x 15 6
= 324.00 m = 214
Column 2 4 -12mm
LC2-1T = 4.40 x 8 6
# LT1/6m =
= 168.96 m 0.88
LC2-1T = 1.00 x 6 = 6.82
= 28.80 m
Lateral Ties 0.2 spacing 6
# LT2/6m =
Column 1 10 mm RSB 0.88
L1 = 0.68 + 0.2 = 6.82
= 0.88 m
# LT1 = 1482 pcs # 6m RSB = 275
Column 2 10 mm RSB
L2 = 0.68 + 0.2 Tie Wires
= 0.88 m # kg = 9456
# LT2 = 392 pcs = 178.5
FOR BEAMS
Main reinf.
LT = 64.35 + 56.60 x 1.2 145.14
# 6m RSB =
= 145.14 m 6
= 25
Stirrups 10 mm RSB
0.2 spacing 6
# S/6m =
LT = 0.68 + 0.2 0.88
= 0.88 m = 6
# Stir. = 605 pcs # 6m RSB = 101
Tie Wires
# kg = 1089 / 53 m/kg # kg = 20.6
Hor. Bars
LHB = 1 m # 6m RSB = 10
# HB = 60 pcs
# B/6m = 6 pcs
Tie Wires
# kg = 162 / 53 m/kg # kg = 3.1
For Slab
L1 = 3 # Bars = 8
# B/6m = 2 pcs
L2 = 1.5 # Bars = 14
# B/6m = 4 pcs # 6m RSB = 8
Tie Wires
# kg = 19.8 / 53 m/kg # kg = 0.4
For Slab
L1 = 0.6 # Bars = 8
# B/6m = 10 pcs # 6m RSB = 8
Tie Wires
# kg = 44 / 53 m/kg # kg = 1
SUMMARY
RSB = 1111 pcs. 12mm RSB
= 893 pcs. 10mm RSB
Tie wire = 303 kg # 16 GI Wire
SUMMARY
Earth = 145 m of Earth Fill (mix)
TILE WORKS
SUMMARY
Cement = 6 bags of 40 kg cement
Sand = 11 m
Adhesive = 6 m
# Tiles = 1425 pieces of 1/8"x8"x8" Glazed tile
= 141 pieces of 1/8"x8"x8" Glazed tile
CEILING JOIST
AT = 127.39 + 67.66
= 195.05 m
CEILING BOARD
AT = 195.05 m
SUMMARY
bd ft. = 1049 bd ft 2"x2" of good lumber
pcs = 68 pcs of 1/4"x4'x8' marine plywood
kg = 9 kg of 2 1/2" nail
SUMMARY
bd ft. = ### bd ft 2"x2" of Coco lumber
bd ft. = 816 bd ft 2"x3" of Coco lumber
pcs = 90 pcs of 1/4"x4'x8' plywood
kg = 49 kg of 3" nail
ROOFING MATERIALS
CORRUGATED G1 SHEET
A1 = 18.2 x 6.07
= 110.474 m
A2 = 14.015 x 2.9
= 40.6435 m
A3 = 7.14 x 2.34 x 2
= 33.4152 m
A4 = 26.0151 x 3.64
= 94.694964 m
A5 = 12.8 x 3.76
= 48.128 m
AE = 2.1
# pcs = 327.355664 / 2.1
# pcs = 156 pcs of 10 ft Corr. GI Sheet
RIVETS
# kg = 156 x 22 / 180
# kg = 19.10 kg
G.I. WASHERS
# pcs = 225.328 / 126
# pcs = 28 kg
C-PURLINS
2"x3"x6m
# 6.07 + 2.9 + 2.34 + 3.64 + 3.76
=
0.6
= 37 pcs
LP = 78.1701 m
LT = 2892.2937 m
2"x6"x6m
LT = 78.1701
TEKSCREW
AT = 327.355664 m
# kg = 17 kg of tekscrew
SUMMARY
Sheet = 156 pcs of 10 ft Corr. GI Sheet
Rivet = 19 kg
Washer = 28 kg
C-purlins = 483 pcs of 2"x3" C-purlins
C-purlins = 14 pcs of 2"x6" C-purlins
Ridge roll = 22 pcs of 2.2 m Ridge roll
Gutter = 37 pcs of 2.35 gutter
FG = 10 pcs of 2.35 flashing gutter
< Bar = 149 pcs of 2"x3/16"x6m Angle Bar
Tekscrew = 17 kg of tekscrew
PAINTING WORKS
MASONRY
AT = 856.68 m
Concrete neutralizer
#L = 29 16L of concrete neutralizer
Primer
#L = 25 16L of Flat Wall Latex
Masonry Putty
#L = 29 4L of Masonry Putty
Primer
#L = 25 16L of Flat Wall Latex
Finishing
#L = 22 16L of Gloss Latex
#L = 4 1L of Acrylic tinting color
pcs = 5 pcs of 1 1/2" brush
pcs = 9 pcs of roller tray
pcs = 8 pcs of sand paper
pcs = 4 pcs roller brush
WOOD
AT = 571.12 m
Solignum
#L = 20 L of solignum
Primer
#L = 17 L of Flat Wall Enamel
Glazing Putty
# gal = 20 gal of Glazing putty
Primer
#L = 17 L of Flat Wall Enamel
Finishing
#L = 30 L of Gloss Enamel
#L = 5 1L of Oil tinting color (brown)
pcs = 3 pcs of 2" brush
pcs = 1 pcs of roller tray
pcs = 6 pcs of sand paper
pcs = 3 pcs roller brush
ROOF
AT = 327.355664 m
Rust Converter
#L = 11 L of rust converter
Primer
#L = 10 L of Flat Wall Enamel
Finishing
#L = 18 L of Gloss Enamel
#L = 6 1L of Oil tinting color (red & black)
pcs = 7 pcs of 4" brush
pcs = 2 pcs roller brush
SUMMARY
#L = 29 16L of concrete neutralizer
#L = 42 16L of Flat Wall Latex
#L = 29 4L of Masonry Putty
#L = 22 16L of Gloss Latex
#L = 20 L of solignum
#L = 44 L of Flat Wall Enamel
# gal = 20 gal of Glazing putty
#L = 48 L of Gloss Enamel
#L = 3 1L of Acrylic tinting color
#L = 5 1L of Oil tinting color (brown)
#L = 11 L of rust converter
#L = 6 1L of Oil tinting color (red & black)
pcs = 5 pcs of 1 1/2" brush
pcs = 3 pcs of 2" brush
pcs = 7 pcs of 4" brush
pcs = 10 pcs of roller tray
pcs = 14 pcs of sand paper
pcs = 9 pcs roller brush
PLUMBING WORKS
SANITARY PIPES
LT = 64.35 m
LWIRE = 2 m/box
FLEXIBLE HOSE
LFH = 258 m
BEAM
0.3
0.3
0.2
64.35
SLAB
ELEV.
0.4
0
For Septic Tank & Catch Basin
x 1.50
m
For Septic Tank & Catch Basin
x 1.50
m
x 0.026
kg # 16 GI Wire
= 3
/ 53 m/kg
kg # 16 GI Wire
= 6
/ 53 m/kg
kg # 16 GI Wire
pcs. 12mm RSB
pcs. 10mm RSB
/ 53 m/kg
kg # 16 GI Wire
kg # 16 GI Wire
kg # 16 GI Wire
x 0.026
kg # 16 GI Wire
pcs
pcs
pcs. 10mm RSB
kg # 16 GI Wire
pcs
pcs. 10mm RSB
pcs
pcs. 10mm RSB
kg # 16 GI Wire
TILE WORKS
ROOFING MATERIALS
+ 5
PAINTING WORKS
PLUMBING WORKS
ELECTRICAL WORK
Manual Clearing
Manhour Capability = 0.03 hr/m2
Total Area = 340 m2
Layout & Staking =
Manhour Capability = 0.20 hr/m2
Total Floor Area = 217.05 m2
No. of Persons = 4
No. of Days = 1.68 day(s) say 2 day(s)
No. of Persons = 15
No. of Days = 0.5 days say 1 day(s)
No. of Persons = 8
No. of Days = 8.6 days say 9 day(s)
No. of Persons = 15
No. of Days = 0.6 days say 1 day(s)
Manhour Capability =
Pipes = 1.00 hr/pc 52 pcs
Clean Outs = 2.00 hr/pc 7 pcs
No. of Persons = 6
No. of Days = 1.38 days say 2 day(s)
Equipment Capability
1 Bagger conc. mixer = 8.00 m3/day x 85% = 6.8
Pouring = 5.00 hr/m 3
No. of Persons = 5
No. of Days = 3.23 days say 4 day(s)
Activity 8: LAYING OF CHB WALL
No. of Persons = 18
No. of Days = 4.76 days say 5 day(s)
No. of Persons = 8
No. of Days = 6.90 days say 7 day(s)
Equipment
1 Bagger conc. mixer = 8.00 m3/day x 85% = 6.8
Pouring = 5.00 hr/m3
Total Volume = 18.69 m3
No. of Persons = 8
No. of Days = 4.21 days say 5 day(s)
Equipment Capability
1 Bagger conc. mixer = 8.00 m3/day x 85% = 6.8
Pouring = 5.00 hr/m 3
Fabrication of Rebars
Manhour Capability = 10 kg/hr
Total No. of KG = 72.15 kg
No. of Persons = 2
No. of Days = 0.90 days say 1 day(s)
Installation of Rebars
Manhour Capability = 10 kg/hr
Total No. of KG = 72.15 kg
No. of Persons = 2
No. of Days = 0.90 days say 1 day(s)
Concreting
Equipment Capability
1 Bagger conc. mixer = 8.00 m3/day x 85% = 6.8
Pouring = 5.00 hr/m3
Total Volume = 7.20 m3
No. of Persons = 4
No. of Days = 2.18 days say 3 day(s)
Laying (4" CHB) = 1.25 m2/hr
Total Area = 26.88 m2
No. of Persons = 4
No. of Days = 1.34 days say 2 day(s)
No. of Persons = 2
No. of Days = 0.69 days say 1 day(s)
Fabrication of Rebars
Manhour Capability = 3.06 hr/m2
Total No. of pcs = 149.00 m2 2" x 2" 3/16" Angle Bar
No. of Persons = 17
No. of Days = 3.35 days say 4 day(s)
Installation of Rebars
Manhour Capability = 3.06 hr/m2
Total No. of pcs = 156.50 m2 2" x 2" 3/16" Angle Bar
No. of Persons = 17
No. of Days = 3.52 days say 4 day(s)
No. of Persons = 15
No. of Days = 8.35 days say 9 day(s)
No. of Persons = 6
No. of Days = 3.53 days say 4 day(s)
Installing
Manhour Capability = 3.06 hr/m2
No. of Persons = 14
No. of Days = 12.10 days say 13 day(s)
Activity 26: PLASTERING OF CHB WALLS
No. of Persons = 20
No. of Days = 4.47 days say 5 day(s)
Gutter
Manhour Capability = 0.81 hr/m
Total Perimeter = 106.36 m
Down Spout
Manhour Capability = 0.31 hr/m
Total Length = 64.00 m
No. of Persons = 5
No. of Days = 2.65 days say 3 day(s)
No. of Persons = 4
No. of Days = 3.05 days say 4 day(s)
No. of Persons = 6
No. of Days = 2.00 days say 2 day(s)
Manhour Capability
Lighting Fixtures = 1.25 hr/set 36 sets
CO = 1.25 hr/set 6 sets
THHN #10/7 = 0.267 hr/m 47 m
THHN #12/7 = 0.267 nr/m 50 m
Panel Board = 1.15 hr/set 1 sets
Utility Box = 0.19 hr/set 15 sets
Switches = 1.25 hr/set 16 sets
No. of Persons = 6
No. of Days = 2.13 days say 3 day(s)
Activity 31: INSTALLATION OF CEILING BOARD
No. of Persons = 8
No. of Days = 1.99 days say 2 day(s)
Manhour Capability
Lavatory = 8 hr/set 2 sets
Water closet = 8 hr/set 2 sets
Bath tub = 8 hr/set 1 sets
Kitchen sink = 14 hr/set 1 sets
Kitchen faucet = 2 hr/set 1 sets
Gate Valve = 8 hr/set 1 sets
Faucet = 2 hr/set 5 sets
Floor Drain = 2 hr/set 2 sets
No. of Persons = 8
No. of Days = 1.22 days say 2 day(s)
Manhour Capability
Doors = 2 sets/day 9 sets
Windows = 1 set/hr 19 sets
No. of Persons = 4
No. of Days = 1.72 days say 2 day(s)
No. of Persons = 10
No. of Days = 2.35 days say 3 day(s)
No. of Persons = 15
No. of Days = 6.29 days say 7 day(s)
Activity 36: CLEARING OF SITE FOR FINAL INSPECTION & TRANSFER TO THE OWNER
No. of Persons = 7
No. of Days = 1.82 days say 2 day(s)
ABOR
ours)
m3/day
6
SCHEDULIN
Activity
Activity No.
Path
A 1 - 2
B 2 - 3
C 3 - 4
D 4 - 5
E 5 - 6
F 6 - 7
G 7 - 8
H 8 - 9
I 9 - 10
J 10 - 11
K 11 - 12
L 12 - 13
M 13 - 14
N 14 - 15
O 13 - 16
P 16 - 17
Q 17 - 18
R 18 - 19
S 19 - 20
T 17 - 21
U 21 - 22
V 22 - 23
W 20 - 24
X 24 - 25
Y 25 - 26
Z 25 - 27
A' 26 - 28
B' 28 - 29
C' 29 - 30
D' 29 - 31
E' 30 - 32
F' 32 - 33
G' 33 - 34
H' 34 - 35
I' 35 - 36
J' 36 - 37
K' 34 - 38
L' 38 - 39
M' 39 - 40
N' 39 - 41
O' 40 - 42
P' 42 - 43
Q' 43 - 44
R' 44 - 45
S' 40 - 46
T' 46 - 47
U' 45 - 48
V' 48 - 49
W' 49 - 50
X' 50 - 51
Y' 50 - 52
Z' 52 - 53
A'' 50 - 54
B'' 53 - 55
C'' 55 - 56
D'' 56 - 57
E'' 57 - 58
SCHEDULING
Estimated Time
Duration (Days)
Mobilization
Temporary Facility
Layout
Excavation
Compaction
Fabrication and installation of steel reinforcement bars in column footings
Pouring of concrete on column footing
Fabrication and installation of steel reinforcement bars in columns
Fabrication and installation of forms, scaffoldings and conduit pipes in columns.
Pouring of concrete on columns
Fabrication and installation of steel reinforcement bars for tie beams
Pouring of concrete on tie beams
Fabrication and installation of steel reinforcement bars for CHB wall
Laying of CHB at the interior and exterior walls
Backfilling and earthfilling
Compaction
Fabrication and installation of steel reinforcement bars for on-fill slab
Fabrication and installation of plumbing pipes
Pouring of concrete on on-fill slab
Fabrication and installation of steel reinforcement bars for stairs (until landing)
Fabrication and installation of forms and scaffoldings for stairs
Pouring of concrete and vibrating on stairs
Fabrication and installation of steel reinforcement bars for floor beams
Fabrication and installation of forms and scaffoldings for floor beams, 2nd floor slab and stairs
Fabrication and installation of steel reinforcement bars for 2nd floor slab and stairs
Fabrication and installation of conduit pipes and plumbing pipes on 2nd floor slab and floor beams
Pouring of concrete and vibrating on floor beams, 2nd floor slab and stairs
Fabrication and installation of steel reinforcement bars for 2nd floor columns
Fabrication and installation of forms and scaffoldings for 2nd floor columns
Fabrication and installation of conduit pipes on 2nd floor columns
Pouring of concrete on 2nd floor columns
Fabrication and installation of steel reinforcement bars for CHB wall
Laying of CHB at the interior and exterior walls
Fabrication and installation of steel reinforcement bars for stairs (until landing)
Fabrication and installation of forms and scaffoldings for stairs
Pouring of concrete and vibrating on stairs
Fabrication and installation of steel reinforcement bars for roof deck beams
Fabrication and installation of forms and scaffoldings for roof deck beams, roof deck slab and stairs
Fabrication and installation of steel reinforcement bars for roof deck slab and stairs
Fabrication and installation of conduit pipes on roof deck slab and beams
Pouring of concrete and vibrating on roof deck beams, roof deck slab and stairs
Fabrication and installation of steel reinforcement bars in roof deck columns
Fabrication and installation of forms and scaffoldings in roof deck columns.
Pouring of concretes and vibrating on roof deck columns
Laying of CHB, door jambs and window frames at the exterior walls
Laying of CHB, door jamb and window frames at the interior walls
Fabrication and installation of steel reinforcement bars for parapet wall
Laying of CHB at the parapet wall
Plastering of the CHB at the exterior and interior walls
Installation of doors and window glasses
Installation of plumbing fixtures
Fabrication and installation of tiles (glazed and unglazed)
Installation of electrical fixtures
Painting of exterior and interior walls
Provision of 30m main entrance wire
Demobilization
Clearing
DATA SHEET
CRITICAL
ACTIVITY
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
GANTT C
ACTIVITY 0 2 4 6 8 10 12 14 16 18 20
5 G 6
0
H K
E 0 0 0
1 3 C 4 F 9
A 0 0
B
0 2 0 0 J
D 0 L
7 I 8
0
NETWORK DIAGRAM
12
N O
0 0
11 16 21
S Z
0 T 0 0
15 R 17 U 19 X 22 A' 23 B'
0 0 0 0 0
0 Q 0 0
V 0
10 14 18 Y
M P 0 W
0 0
13
20
25 E' 27
0
C' G'
0 F' 0 0
24 D' 26 H' 28
0 0
I' 0
29
J' 0
30