Sei sulla pagina 1di 4

Value-at-risk is defined as the loss level that will not be exceeded with a certain confidence level

during a certain period of time. For example, if a bank's 10-day 99% VAR is $3 million, there is
considered to be only a 1% chance that losses will exceed $3 million in 10 days. If we are going
to use one measure describing the risk in a particular situation, is VAR the best choice? One
problem with VAR is that, when used in an attempt to limit the risks taken by a trader, it can lead
to undesirable results.

Suppose a bank tells a trader that the one-day 99% VAR of the trader's portfolio must be kept
less than $10 million. There is a danger that the trader will construct a portfolio where there is a
99% chance that the daily loss is less than $10 million and a 1% chance that it is $500 million.
The trader is satisfying the risk limits imposed by the bank, but is clearly taking unacceptable
risks. Most traders would, of course, not behave in this way but some might.

The problem here is summarised in figures 1 and 2. The figures show the probability distribution
for the gain or loss on a portfolio over a specified period of time. Both portfolios have the same
VAR. However, the portfolio in figure 2 is much riskier that the portfolio in figure 1 because
potential losses are much larger.

Expected shortfall

A measure that produces better incentives for traders than VAR is expected shortfall. This is also
sometimes referred to as conditional VAR, or tail loss. Where VAR asks the question 'how bad
can things get?', expected shortfall asks 'if things do get bad, what is our expected loss?'.

Expected shortfall, like VAR, is a function of two parameters: N (the time horizon in days) and X
% (the confidence level). It is the expected loss during an N-day period, conditional that the loss
is greater than the Xth percentile of the loss distribution. For example, with X = 99 and N = 10,
the expected shortfall is the average amount that is lost over a 10-day period, assuming that the
loss is greater than the 99th percentile of the loss distribution. Clearly, the expected shortfall is
much higher in figure 2 than figure 1.

Properties of the risk measures

A risk measure that is used for specifying capital requirements can be thought of as the amount
of cash (or capital) that must be added to a position to make its risk acceptable to regulators.
Artzner et al (1999) have proposed a number of properties that such a risk measure should have.
These are:

Monotonicity: if a portfolio has lower returns than another portfolio for every state of the
world, its risk measure should be greater.

Translation invariance: if we add an amount of cash K to a portfolio, its risk measure should
go down by K.

Homogeneity: changing the size of a portfolio by a factor

while keeping the relative amounts of different items in the portfolio the same should result in
the risk measure being multiplied by

Sub-additivity: the risk measure for two portfolios after they have been merged should be no
greater than the sum of their risk measures before they were merged.

The first three conditions are straightforward given that the risk measure is the amount of cash
needed to be added to the portfolio to make its risk acceptable. The fourth condition states that
diversification helps reduce risks. When we aggregate two risks, the total of the risk measures
corresponding to the risks should either decrease or stay the same.

VAR satisfies the first three conditions, but it does not always satisfy the fourth, as will now be
illustrated.

Consider two $10 million one-year loans, each of which has a 1.25% chance of defaulting. If a
default occurs on one of the loans, the recovery of the loan principal is uncertain, with all
recoveries between 0% and 100% being equally likely. If the loan does not default, a profit of
$200,000 is made. To simplify matters, we suppose that if one loan defaults it is certain that the
other loan will not default1. For a single loan, the one-year 99% VAR is $2 million. This is
because there is a 1.25% chance of a loss occurring, and conditional on a loss there is an 80%
chance that the loss is greater than $2 million. The unconditional probability that the loss is
greater than $2 million is 80% of 1.25%, or 1%.
Consider next the portfolio of two loans. Each loan defaults 1.25% of the time and they never
default together. There is therefore a 2.5% probability that a default will occur. The VAR in this
case turns out to be $5.8 million. This is because there is a 2.5% chance of one of the loans
defaulting, and conditional on this event there is a 40% chance that the loss on the loan that
defaults is greater than $6 million. The unconditional probability that the loss on the defaulting
loan is greater than $6 million is therefore 40% of 2.5%, or 1%. A profit of $200,000 is made on
the other loan, showing that the VAR is $5.8 million.

The total VAR of the loans considered separately is $2 million + $2 million = $4 million. The
total VAR after they have been combined in the portfolio is $1.8 million greater, at $5.8 million.
This is in spite of the fact that there are very attractive diversification benefits from combining
the loans in a single portfolio.

Coherent risk measures

Risk measures satisfying all four conditions given above are referred to as coherent. The example
illustrates that VAR is not always coherent. It does not satisfy the sub-additivity condition. This
is not just a theoretical issue. Risk managers sometimes find that when the London portfolio is
combined with that of New York to form a single portfolio for risk management purposes, the
total VAR goes up rather than down.

In contrast, it can be shown that the expected shortfall measure is coherent. Consider again the
earlier example. The VAR for a single loan is $2 million. The expected shortfall from a single
loan when the time horizon is one year and the confidence level is 99% is therefore the expected
loss on the loan, conditional on a loss greater than $2 million. Given that losses are uniformly
distributed between zero and $10 million, this is halfway between $2 million and $10 million, or
$6 million.

The VAR for a portfolio consisting of the two loans was calculated as $5.8 million. The expected
shortfall from the portfolio is therefore the expected loss on the portfolio, conditional on the loss
being greater than $5.8 million. When a loan defaults, the other (by assumption) does not, and
outcomes are uniformly distributed between a gain of $200,000 and a loss of $9.8 million. The
expected loss, given that we are in the part of the distribution between $5.8 million and $9.8
million, is $7.8 million. This is therefore the expected shortfall on the portfolio. Because $6
million + $6 million (gt) $7.8 million, the expected shortfall does satisfy the sub-additivity
condition for the example.

A risk measure can be characterised by the weights it assigns to quantiles of the loss distribution.
VAR gives a 100% weighting to the Xth quantile and zero to other quantiles. Expected shortfall
gives equal weight to all quantiles greater than the Xth quantile and zero weight to all quantiles
below the Xth quantile. We can define what is known as a spectral risk measure by making other
assumptions about the weights assigned to quantiles. A general result is that a spectral risk
measure is coherent (that is, it satisfies the sub-additivity condition) if the weight assigned to the
qth quantile of the loss distribution is a non-decreasing function of q. Expected shortfall satisfies
this condition. VAR, however, does not because the weights assigned to quantiles greater than X
are less than the weight assigned to the Xth quantile.
Conclusions

Regulators make extensive use of VAR and its importance as a risk measure is therefore unlikely
to diminish. However, expected shortfall has a number of advantages over VAR. This has led
many financial institutions to use it as a risk measure internally.
1
This is to simplify the calculations. If the loans default independently of each other so that two
defaults can occur, the numbers are very slightly different, but the VAR of the portfolio is still
greater than the sum of the VARs of the individual loans.

Potrebbero piacerti anche