Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
CONSTRUCTION SERVICES
1. FULL-TIME SUPERVISION
2. CONSTRUCTION MANAGEMENT
Arch. Mary Catherine A. Diaz
1. Full-
Full-time Supervision
Scope of Services:
A. Quality Control
Interpretation of contract documents
Getting information from the client
On-site observation
Arch. Mary Catherine A. Diaz
B. Evaluation
Design modifications
Review change orders
Arch. Mary Catherine A. Diaz
a) Weather conditions
b) Manpower availability/distribution
c) Construction activities
d) Equipment utilization
e) Correspondences
f) Decisions made
g) Official visitors
h) Observations/recommendations
1. Full-
Full-time Supervision
Legal Responsibility:
Construction supervision group has none
under the civil code.
Compensation:
For a construction supervision group,
salary or flat rate per month
Arch. Mary Catherine A. Diaz
Samplings, tests
2. POST-CONSTRUCTION EVALUATION
UAP DOC 205: POST-
POST-
CONSTRUCTION SERVICES
1. BUILDING AND EQUIPMENT MAINTENANCE
Scope of Services:
In-house architect to see that the building and all parts
thereat are in good working condition
Scope of Services:
Billing of tenants for rentals and utilities
Monitoring of security and janitorial services
Keeping up with local ordinances and building
regulations
UAP DOC 205: POST-
POST-
CONSTRUCTION SERVICES
3. POST-CONSTRUCTION EVALUATION
Scope of Services:
Evaluate actual use of facility
Determine effectiveness of building and material
systems
Evaluate functional effectiveness of the plan
Study application and effectiveness of construction
COMPENSATION:
SALARY basis
Management fee based on percentage: 4%-6% of gross
rentals