Baharampur in West Bengal and Bheramara in Bangladesh, grid inter-connection from 500 MW
to 1,000 MW and to operationalise the supply of 100 MW from southern Tripura's Palatana
power plant to Bangladesh.
"While erecting new power transmission lines from (western Tripura's) Surjyamaninagar power
grid to Comilla (in eastern Bangladesh) power grid to supply the power, human habitations,
forests and other vital installations would be avoided," Dey added.
The PGCB took over about 1144 circuit km of 230 kV lines, 5255 circuit km of 132 kV lines, 6
nos of 230/132 kV substation and 63 nos of 132/33 kV substations from BPDB and DESA in
different phases. Transmission lines of the company up to June, 2016 are stood at 220.70 ckt km
of 400 kV lines, 3185.166 circuit km of 230 kV lines, 6401.628 circuit km of 132 kV lines and 1
nos of 400 kV Station , substations, 1 nos of 400/230kV subtation, 19nos of 230/132 kV
substation and 90 nos of 132/33 kV substations.
The length of the OPGW installed in the transmission line of PGCB till June 2012 is
approximately 4300 km and covering the major part of the country. After PGCB's own
communication need, the spare optical fibers are being leased out to local telecom operators to
develop national communication infrastructure for their commercial use.
Shunt Compensation at Grid Substation by Capacitor Banks (Phase-I) Project
i) To improve the voltage level and to reduce system loss through power factor
improvement.
ii) To ensure the supply of improved quality of electrical energy from the proposed
substations where the Capacitor Banks will be installed.
Objective(s)
iii) To save motors and other electric appliances of industries from the low voltage
effect.
iv) To transmit more quantity of power.
v) To increase the efficiency of transmission network.
450 MVAR Capacitor Bank in 8 Substations at 132 KV side
Scope of Work
10 nos. of 132 KV Bay Extension
Construction of Haripur 360 MW Combined Cycle Power Plant & Associated Substation (PGCB part
in EGCB project)
(a) To meet the electricity demand of the country especially Dhaka region by local
generation & to enhancement of generation system capability.
(b) To accelerate the economic development of the country by adequate and reliable
power generation in order to attain the planned target of power demand.
(c) To increase the power generation through optimum utilization of countrys natural
gas resources.
Objective(s)
(d) To overcome the present generation shortage by increasing generation and to
minimize load-shedding.
(e) To enhance the stability and reliability of the national grid system and reduce the
Transmission loss by localized generation.
(f) To improve the economic development activities by reducing system loss.
(g) To develop human resources through transfer of technology.
Scope of Work Upgradation and Control room building Extension of Haripur 132/33 kV Substation
Grid Interconnection between Tripura (India) and Comilla (South substation) (Bangladesh)
i. To import 100MW power from Palatana power station(Tripura) to Comilla (south)
substation in Bangladesh.
Objective(s)
ii. To meet up the growing demand of electricity of Bangladesh by importing electricity
from Palatana power station(Tripura).
1) 27 km 400 kV Double Circuit Transmission Line from Comilla (North) to Tripura
Border and 16 km 132 kv Double Circuit Transmission Line from Comilla (South) to
Scope of Work
Comilla (North)
2) 132 kv Bay extension at Comilla (South) Substation 2 nos.
Mission:
Efficient and effective management of national power grid for reliable and quality transmission
Vision:
Economic upliftment of the country by reaching electricity to all through reliable transmission.
PGCB was established on the 21st November, 1996 as a fully BPDB owned company with an
authorized capital of Tk.10 billion under the Power Sector Reform Program of the Government.
400 KV SUBSTATIONS
Total
Name of Grid Transformer Capacity
Sl. No Capacity GMD Grid Circle
Substation (MVA)
(MVA)
1 Bibiyana 1 X 520 520 Srimangal Comilla
Bheramara HVDC Back
2 1 x 500 500 HVDC HVDC
to Back Station