Quotation for Supply and Installation of Aluminum partitions and doors to the building fo

Ministry of Fisheries and Aquatic Resources

Item Description Unit Quantity Rate


1 Supply material, fabrication and installation of Sq. ft. 300 510.00
partition framed with GI channel and powder
coated (60-80 micron) aluminum extrusion. Top
and bottom portion will be 3 mm thick plywood
sheet on either sides covered with blue color fabric,
matching to existing ones. mid portion will be 5
mm thick clear glass.Rate included all necessary
acceries and door will be measured seperately.

2 Supply material, fabrication and installation of Sq. ft. 100 1,550.00


white powder coated (60-80 micron) aluminum door
with 5 mm thick clear glass (top portion) and all
necessary fittings and accessories. Panneling will be
5 mm thick plywood both sides covered with blue
color fabric, matching to existing ones or 3 mm
thick aluminum composite pannel.

Total
s to the building for

Amount
153,000.00 748.34

155,000.00 842.84

308,000.00
224,501.55 -71,501.55

84,284.12 70,715.88

-785.67

0%
18.03 GI 160.00 16 2,560.00
68.27 0155 2,423.48 4 9,693.91
17.20 0156 2,442.61 1 2,442.61
36.85 0157 1,744.35 3 5,233.04
23.76 M beading 674.78 5 3,373.91
0.00 0063 1,302.61 0.00
0.00 Box 76 X 38 3,066.09 0.00
38.73 Glass Sq.ft 100.00 55 5,500.00
3.52 Accessorie 500.00
28.17 Boards NoS 800.00 5 4,000.00
77.32 Fabric Sq.ft 61.00 180 10,980.00
7.61 Foam Sq.ft 6.00 180 1,080.00
23.46 U rubber 68.00 49 3,332.00
4.73 Flat rubber 22.00 30.5 671.00
120.00 lbourer 120.00 142 17,040.00
0.00
0.00
467.65 Basic cost 66,406.48
23.38 Profit 5% 3,320.32
0.00
491.03 Total cost 69,726.80

Rate confirmed 480.00


160.00
2,787.00 15%
2,809.00
2,006.00
776.00
1,498.00
3,526.00

6.25

467.651255 23.3825628 491.03 87


71.075558272

790,564.45 39,528.22 830,092.67


1,035

155,250.00

42
6,520,500.00

1524

1.644736842

16.44736842

59.28

60.9375

#DIV/0!