Sei sulla pagina 1di 42

SCHEDULE OF QUANTITIES FOR THE CONSTRUCTION OF ADAMITULU MEAT PROCESSING

FOR FRIGORIFICO BORAN FOODS PLC.

SUMMARY OF FINANCIAL FOR TENDER - III

AMOUNT
S. No. TENDER NUMBER
(ETB)

1 TENDER NO. III 14,889,098.512

SUB TOTAL 14,889,098.512

VAT 15% 2,233,364.777

GRAND TOTAL 17,122,463.289

Contract Agreement between Frigorifico Boran Foods PLC and TNT Construction,
October 2014
U MEAT PROCESSING FACILITY

DER - III

REMARK

Contract Agreement between Frigorifico Boran Foods PLC and TNT Construction,
October 2014
: 3 :
SCHEDULE OF QUANTITIES FOR THE CONSTRUCTION OF ADAMITULU MEAT PROCESSING FACILITY FOR
FRIGORIFICO BORAN FOODS PLC.
( TENDER-1 )

S. No. Description of Item Unit Qnty.

I. CIVIL WORK FOR BUILDINGS

A. EARTH WORK

1 Earth work in excavation including dressing of sides and ramming of bottoms, lift upto 1.5 Mts., stacking
the material temporarily near the excavated area and then filling back excavated earth (Any where
within the premises) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cms in
depth and consolidating each deposited layer completed.

Bottom width for excavation shall be measured as given in the foundation drawings and details showing
the width of bedding concrete only and hence side clearance if any will not be measured & paid
separately. The Contractor should cover for this in his rate.

1.01 Clear and remove top soil to an average depth of 200mm. M2 12,696.69
1.02 Bulk / Pit / Trench excavation in ordinary soil to a depth not exceeding 1500mm, stacking the material M3 11,747.84
temporarily near the excavated area, filling back excavated earth and then disposal of surplus
excavated soil including spreading and levelling within the factory premises as per Engineer's
instructions.

1.03 Ditto to Item 1.02 but exceeding 1500mm but not exceeding 3000mm. M3 2,817.00
1.04 Filling selected material (to be brought from outside / quarry) including cost of selected material and M3 1,127.81
filling in trenches, sides of foundations, footings etc. in layers not exceeding 20 cm. in depth,
consolidating each deposited layer with road roller, rammer, plate vibrator etc.

1.05 Filling selected material (to be brought from outside / quarry) including cost of selected material and M3 2,098.12
filling in plinth & under hardcore in layers not exceeding 20 cm. in depth, consolidating each deposited
layer with road roller, rammer, plate vibrator etc.

1.06 Removal, load and carting away surplus excavated material outside the existing premises to an M3 1,536.02
appropriate tip as directed by the Engineer, by mechanical transport.

A. EARTH WORK TOTAL CARRIED OVER TO SUMMARY:

B. CONCRETE WORK:

All R.C.C. and P.C.C. work shall be carried out as per specifications.
Grading of aggregate should be done without any extra cost , as directed by the architect to obtain the
desired strength and workability of the specified grade of concrete .

In all R.C.C. works rate shall be exclusive of reinforcement, which shall be measured and paid for
separately but including cost of material, labor , tools & plant etc.

All R.C.C. works shall be vibrated by mechanical means either with a needle vibrator or screed/ plate/
table/ surface vibrators as directed by the architect.
The rates quoted for beams shall be inclusive of inverted, cantilever and sloping beams.

Nothing extra shall be paid for jointing new work with the existing concrete/brick works of walls roof,
floor, plaster etc., of any mortar or for the use of chemicals as directed by the architect. Dismantling
work if and where required as per Architects instructions shall be paid on contract item rates which
includes stacking of serviceable and disposal of unserviceable material within the compound.

Holes in R.C.C. slabs, column caps, parapets, masonry walls for rain water pipes , electrical works or
spouts shall be left at the time of casting concrete or raising masonry. Nothing extra shall be paid on
this account. These holes will be made good after fixing the pipes and nothing extra shall be paid on
this account.

Grooves, chamfers, drip moulds and mould up-to 40 x 40 mm. shall be made as per drawing and design
or as per instructions of the Architect, in R.C.C. members, without any extra payment. No deduction will
be made in concrete quantities for making such grooves etc.

Nothing extra shall be paid on any account for circular / curved inclined surfaces of rounding off corners
and ends of concrete members where required unless otherwise specifically included in this item for
R.C.C.
: 4 :
If in the opinion of the Architect, any surface other than specified for obtaining patterns in exposed
surfaces in concrete under the specific item, is asked to be left un-rendered and painted, then this item
will not be measured as item concerning exposed surface and no extra for any reason will be allowed.

1.01 Providing and laying cement concrete With mix 1:4:8 (1 cement :4 coarse sand :8 graded stone M3 1,438.67
aggregate 40 mm. nominal size) in foundations, machine foundations, footings and bases of columns
and under floors including the cost of centering and shuttering (formwork).

1.02 Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 stone aggregate 25 mm. M3 50.00
nominal size) in string or lacing courses, copings, bed blocks, anchor blocks, plain window cills,
screeding of any thickness in required slope including centring and shuttering (formwork).

1.03 Providing and laying basaltic stone hardcore well rolled, consolidated and blinded with crushed stone . M3 3,174.17

1.04 Demolishing lean plain cement concrete with soling including disposal of unserviceable material outside M3 10.00
the premises and stacking of serviceable material as per direction of Engineer - in - charge.

B. CONCRETE WORK TOTAL CARRIED OVER TO SUMMARY

C. REINFORCED CEMENT CONCRETE WORK


Reinforcement shall be paid for as per the bar-bending schedule, to be prepared by the contractor at his
own cost and approved by the Architects. The lengths shall be taken as per standard measurements and
weights as per standard for the particular diameters. Rates quoted for reinforcement bars shall include
for cutting and binding reinforcement bars shape and placing in any position as per detailed drawings,
including providing pre-cast cement concrete cover blocks of required thickness for keeping bars in
position. Binding wire for tying of reinforcement shall be provided by the contractor, but will not be paid.
The contractor should cover for all these in his overall rate for the reinforcement bars. The contractor
will keep at all time the reinforcement steel above the ground on brick wall free from rust mud or
cement adhered to it.
Reinforcement Steel bars will be supplied by the Employer at site. The responsibility of safe custody of
materials issued will be that of contractor.
Wastage and variation upto 3% or as specified by the engineer is allowed. The recovery for WASTAGE of
steel beyond permissible limits will be carried out at penal rate to be decided by the Consultants on the
basis of market rates. Binding wire will neither be issued nor be paid separately by the Employer.

1.01 Providing and laying in position design mix reinforced cement concrete quality C-25, 360 kg of M3 992.52
cement/m3 filled in to form work and vibrated around rod reinforcement in footings, foundations, rafts,
plinth beams, pedestal of columns, mass concrete, coving / curved skirting and machine foundations
including leaving necessary pocket for fixing of bolts, but excluding the cost of centring & shuttering
(formwork), finishing and reinforcement - All work up to plinth. (Formwork and reinforcement
measured separately). Reinforcement steel & Cement shall be provided to site by the
employer.

1.02 Providing and laying in position design mix reinforced cement concrete quality C-20, 300 kg of M3 1,816.73
cement/m3 filled in to form work and vibrated around rod reinforcement in footings, foundations, rafts,
plinth beams, pedestal of columns, mass concrete, ground floor slab and machine foundations including
leaving necessary pocket for fixing of bolts, but excluding the cost of centring & shuttering (formwork),
finishing and reinforcement - All work up to plinth. (Formwork and reinforcement measured
separately). Reinforcement steel & Cement shall be provided to site by the employer.

1.03 Extra for fixing of J-bolts in column pedestals for PEB columns as per required development length, line N 336.00
and level including making all fixing arrangement such as template etc. (J-Bolts will be supplied free
of cost by the employer).

1.04 Providing and laying in position design mix reinforced cement concrete quality C-25, 360 kg of M3 66.60
cement/m3 filled in to form work and vibrated around rod reinforcement in columns, walls (any
thickness) including attached pillers, brackets, beams, ground floor slabs, suspended floors, roofs
having slope, overhead RCC tanks, landings, balconies, shelves, canopies, lintels, bands, gutter beams,
horizontal and vertical portion of R.C.C. gutter, staircase etc. for all heights, excluding the cost of
centring & shuttering (formwork), finishing and reinforcement. All floor slabs not receiving flooring tiles
shall be smoothly finished to the satisfaction of Architects / Engineer. (Formwork and reinforcement
measured separately). Reinforcement steel & Cement shall be provided to site by the
employer.
: 5 :

1.05 Provide, cut and fix in position sawn structural wood or steel formwork which ever is appropriate
including strutting, propping etc. and removal of form work for:
(a) Foundations, Machine Foundations, footings, bases of columns, plinth beams and mass concrete, ground M2 2,432.20
floor slabs, etc. - All work upto plinth level.
(b) Walls (any thickness) including attached buttresses, plinth and string courses, columns, pillars, piers, M2
posts and struts etc.
(c) Suspended floors, roofs, overhead RCC tanks, landings, balconies, staircases (except spiral staircase) M2 345.00
and access platform, lintels, beams, girders, cantilevers, horizontal portion of gutter etc.

1.06 Mild steel reinforcement according to structural drawings. Price includes cutting, bending, placing in Kg 93,748.85
position and tying wire and concrete spacers. (Reinforcement bar shall be provided to site by the
employer.)

1.07 Demolishing of C-20 / C -25 or richer mix R.C.C. in beams, slabs, columns, footings, flooring etc. M3 10.00
including cutting of reinforcement, stacking of serviceable material and disposal of unserviceable
material outside the factory premises.

C. REINFORCED CEMENT CONCRETE WORK TOTAL CARRIED OVER TO SUMMARY:

Note:
(1) Steel formwork or waterproof ply formwork is to be used for R.C.C columns, beams, walls, fascias,
suspended floors, roofs, landings, staircases, canopies etc. with the Engineers permission & approval of
quality.

(2) Only steel scaffolding is to be used for all R.C.C. work, brick work, plaster work etc. Wooden planks
will be allowed for scaffolding purpose with the Engineers permission & approval of quality.

(3) Design mix should be done at the beginning of the project and the minimum quantity of cement
should be as per the design mix report without any extra cost.

D. MASONARY / BRICK/BLOCK WORK

The cement and sand shall be as described under cement concrete and the mortar is to be composed as
specified and thoroughly machine mixed. No mortar shall be hand mixed nor that has commenced to set
shall be used in the work.

Every brick shall be thoroughly soaked in water, before use, Broken bricks shall not be used except as
closers. The courses shall be truly horizontal and the work strictly plumb, joints shall be broken
vertically and they shall not exceed 12mm. in thickness. All joints in brick work are to be well filled with
mortar.

Broken blocks shall not be used except as closers. The courses shall be truly horizontal and the work
strictly plumb, joints shall be broken vertically and they shall not exceed 12mm in thickness. All joints in
block work are to be well filled with mortar.

The brick & block works are to be carried out with all necessary set backs projections cuttings and too
things in conformity with the drawings.
All uneven, irregular and bad masonry work, poor in workmanship shall be demolished if deemed
necessary by the Architects and rebuilt by the contractor at his own cost. If necessary, the contractor
will have to provide wooden plug etc. for his work and for which there will be no special payment on
that account.

All masonary work will be executed at all height and lift will not form a criteria for any extra amount.

Any efflorescence observed in brick work should be washed down by clean water and brick surface
treated with such chemicals as are deemed necessary by the Architect without any extra charge and at
contractors own expenses, till efflorescence persist. The brick work shall be demolished if deemed
necessary by the Architect and work rebuilt with new bricks including making good all the work disturb
without any extra charges.

All deductions shall be measured to net size of the openings and recesses. No deduction will be made
for openings up-to one square foot i.e. 0.09 sq.m.

1.01 Hard trachytic roughly dressed stone masonry foundation wall below ground level bedded in cement M3 834.75
mortar (1:4)

1.02 Ditto as Item 3.01 but one side exposed face left for plastering, price includes pointing (Above NGL) M3 556.50

1.03 Brick wall with the designed compressive strength, bedded in cement mortar (1:3) in foundations, M3 10.00
trenches etc. all work upto plinth level. Price includes all accessories the work shall be completed
according to detail drawing
: 6 :

1.04 Brick wall with the designed compressive strength, bedded in cement mortar (1:3) in superstructure, M3 10.00
square or rectangular pillars including pattern such as grooves, nitch at all heights above plinth level.
Price includes all accessories the work shall be completed according to detail drawing

1.05 HCB, Class - C with the designed compressive strength, bedded in cement mortar (1:3) in internal & M3 452.05
external walls including pattern such as grooves, at all heights above plinth level. Price includes all
accessories the work shall be completed according to detail drawing.

1.06 Solid Concrete Block (SCB), Class - C with the designed compressive strength, bedded in cement mortar M3 10.00
(1:3) in internal & external walls including pattern such as grooves, at all heights above plinth level.
Price includes all accessories the work shall be completed according to detail drawing.

1.07 Demolishing stone / brick / block work in cement mortar including attached plaster and stacking of M3 10.00
serviceable material after cleaning the bricks and disposal of unserviceable material outside the factory
premises.

D. MASONARY / BLOCK/ BRICK WORK TOTAL CARRIED OVER TO SUMMARY :

Note: The stones / bricks used shall have the designed compressive strength and the sample shall be
got approved by the Engineer- in- Charge/Architect.

E. CARPENTRY / JOINERY & METAL WORK

All timber shall be of first class quality as described and indicated on drawings and schedules, shall be
uniform in texture free from large, loose head or cluster knots, wanes, injurious open shakes, bore holes,
soft or spongy spots, hallow pockets and all other defects and blemishes. The sizes shown are
described are to be taken as net size when finished.

All framing and other concealed wood members shall be of sound wood or approved specials and shall
be seasoned to a moisture contents of not less than 10% or more than 12%. Wood of high moisture
content shall not be used in any part of the structure.

All joints shall be approved by the Architects and according to the best practice. All joinery work shall be
glued with Fevicol or Equiivalent.

1.01 Providing & fixing 40mm thick hollow core flush wooden door with hard wood frame and both sides M2 10.00
covered with best quality 4mm thick ply wood, wall nut or OAK veneered. Price includes three coats of
varnish paint and all required fittings such as 3 Nos. 125 mm size oxidised iron butt hinges with
necessary screws and aluminium fittings including door stopper, rubber buffer, handles, tower bolts etc.
complete as per drawing.

1.02 Providing and fixing lock with handles of approved make in wooden / steel / Aluminium doors complete. N 47.00

1.03 Providing and fixing glazing of 4.0 mm thick plain float glass fixed to wooden / steel frames (to be paid M2 19.44
separately) including the cost of fixing material as required.

1.04 Providing and fixing plastic laminated sheet of 1.0 mm thickness of approved make, design, quality and M2 10.00
colour on flush door shutters as per Architects' direction complete.

1.05 Supplying and fixing Galvanised rolling shutters of approved make, made of required size M.S. laths
interlocked together through their entire length and jointed together at the end by end locks mounted
on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside
locking with push and pull operation complete including the cost of providing and fixing necessary 27.5
cm long wire springs of approved grade and G.I. top cover of required thickness for rolling shutters.

(a) 80 x 1.25 mm. G.I. laths with 1.25 mm. thick top cover. M2 72.00

1.06 Extra for providing grilled rolling shutters manufactured out of 8 mm dia. M.S bar instead of laths as per M2 10.00
design approved by Engineer (Area of grill to be measured).

1.07 Extra for providing mechanical operating device with all necessary accessories, handles etc. in place of N 10.00
push and pull operation complete.
: 7 :
1.08 Fabricating and fixing structural steel work in staircase/balcony railings and window grills made out of Kg 15,392.23
steel square or round bars and flats and any other section including 40 mm. dia. M.S. tube for hand rail
in required design complete including application of anti rust paint, painting and polishing the same.
(Structural steel will be free issue by Employer).

1.09 Providing and fixing angle iron window frames or edging in trenches/columns/Drains etc. including Kg 100.00
providing and fixing steel lugs of suitable size embedded in cement concrete 1:2:4 (1 cement :2 coarse
sand :4 graded stone aggregate 20 mm. nominal size) complete as per drawing (Rate to Exclude for
cost of structural steel).

1.10 Providing and fixing bright finished brass hydraulic door closers of approved brand for doors with N 10.00
necessary accessories and screws etc. complete.

1.11 Providing and fixing of double action floor spring of approved brand and manufacture for aluminium N 10.00
doors, including the cost of cutting floor and making good after embedding the floor spring with frame
complete.

1.12 Providing and fixing Doors and windows made of Aluminum tubular profile frames of approved quality, M2 74.00
1.6mm thick, door kick plate 1500gm/ml, partly covered with aluminium sheet according to the detail
drawing and window door schedule. Complete work includes all the necessary iron mongery, door
stopper, etc. and all accessories to complete the work. All aluminum windows and doors type shall be in
accordance with the technical specifcation requirement, Architect's preference and approval.

1.13 Providing and fixing fine size galvanized steel wire mesh fixed to Aluminum profile frames. M2 7.40

1.14 Fabricating and fixing SS nosing angle frame on drain, corner tiles as per the drawing including the M1 10.00
grouting and masonry work. The size of the angle shall be upto 40 mm x 40 mm. The steel required
for this item shall be supplied by the owner free of cost.

1.15 Fabricating and fixing MS / GI nosing angle frame on drain, corner tiles as per the drawing including the M1 10.00
grouting and masonry work. The size of the angle shall be upto 40 mm x 40 mm. The steel required
for this item shall be supplied by the owner free of cost.

E. CARPENTRY / JOINERY & METAL WORK TOTAL CARRIED OVER TO SUMMARY :

F. FLOORING
: 8 :
1.01 Providing and fixing 10mm thick imported type approved quality non slippery ceramic tile in flooring, in M2 120.00
skirting, risers of steps and platforms stuck down with approved type adhesive on cement sand screed
floor finish and joints grouted in appropriate color setting coat mortar. Colour and pattern of tile shall be
approved by the Engineers. Rate includes back coat of 50 mm thick cement sceed 1:3 (1 cement :3
coarse sand), grouting material, cement slurry & other necessary accessories to complete the work.

1.02 Providing and fixing 6mm thick imported type approved quality non slippery ceramic tile in walls stuck M2 130.30
down with approved type adhesive on cement sand plaster finish and joints grouted in appropriate
colour setting coat mortar. Colour and pattern of tile shall be approved by the Engineers. Rate includes
back coat of 15 mm thick cement plaster 1:3 (1 cement :3 coarse sand), grouting material, cement
slurry & other necessary accessories to complete the work.

1.03 Providing and laying 20mm thick (minimum) machine cut terrazzo tiles for flooring & landing laid in M2 10.00
pattern over 50 mm thick base of 1:3 (1 cement :3 coarse sand) and jointed with cement slurry mixed
with pigment to match the shade of the slab. Rate including cutting, grinding, polishing, back coat of 50
mm thick cement sceed 1:3 (1 cement :3 coarse sand), grouting material, cement slurry & other
necessary accessories to complete the work as per Architect's instructions.

1.04 Providing and laying 30mm thick (minimum) machine cut terrazzo tiles in treads, risers, skirting etc. laid M2 10.00
in pattern over 50 mm thick base of 1:3 (1 cement :3 coarse sand) and jointed with cement slurry mixed
with pigment to match the shade of the slab. Rate including cutting, grinding, nosing of treads and
polishing, back coat of 50 mm thick cement sceed 1:3 (1 cement :3 coarse sand), grouting material,
cement slurry & other necessary accessories to complete the work as per Architect's instructions.

Providing and fixing 500 x 500 x 10 mm thick imported type approved high quality porcelain tile in M2 10.00
flooring & skirting stuck down with approved type adhesive on cement sand screed floor finish and
joints grouted in appropriate colour setting coat mortar. Colour and pattern of tile shall be approved by
the Engineers. Rate includes back coat of 50 mm thick cement sceed 1:3 (1 cement :3 coarse sand),
grouting material, cement slurry & other necessary accessories to complete the work.

1.05 Labour charges for fixing 600 x 600 x 10 mm thick imported type approved high quality porcelain tile in M2 10.00
flooring & skirting stuck down with approved type adhesive on cement sand screed floor finish and
joints grouted in appropriate colour setting coat mortar. Colour and pattern of tile shall be approved by
the Engineers. Rate includes back coat of 50 mm thick cement sceed 1:3 (1 cement :3 coarse sand),
grouting material, cement slurry & other necessary accessories to complete the work. (Porcelain tiles
will be free issue by employer to site).

1.06 Providing and laying 20 mm thick mirror polished machine cut granite stone for laboratory, kitchen, M2 10.00
platform, working counters and similar locations of required size and approved shade, colour and
texture laid over 20 mm thick base of cement mortar 1:3 (1 cement : 3 coarse sand) with joints treated
with cement mixed with matching pigment, including edge moulding and polishing to give high gloss
finish etc. complete as per design.

1,07 Providing and laying 20 mm thick marble tiles for landing, tread, risers of required size and approved M2 10.00
shade, colour and texture laid over 20 mm thick base of cement mortar 1:3 (1 cement : 3 coarse sand)
with joints treated with cement mixed with matching pigment, including edge moulding and polishing to
give high gloss finish etc. complete as per design.

1.08 Extra for tapping on groud floor slab with the circular pipe to make the corrogations and brooming as M2 12,696.69
per drawing & Engineers instruction.

1.09 Extra for making grooves by cutting machine in floor joints including providing and filling polysulphide
or equivalent sealant.
(a) 5 mm x 20 mm M1 162.90
(b) 12 mm x 50 mm M1 10.00

1.1 Providing and laying 25 mm thick plaster of 1:3 cement mortar over the floor PCC as a smooth levelling M2 10.00
coarse.

F. FLOORING WORK TOTAL CARRIED OVER TO SUMMARY:


: 9 :

G. ROOFING

NOTES: The rates quoted below shall include: all material, tools & plant, labor and working at all height

The water proofed roof shall be tested with 150 mm standing water as directed for 7 days.

Providing required slope as directed by Architects / Engineer.


A guarantee of 10 years against defects shall be given by the Contractor.

1.01 30mm thick smooth finished cement sand screed laid on top of light weight concrete in cement mortar M2 330.00
mix (1:3 and 1:1) with proper slope towards down pipe.
: 10 :

1.02 Average 50mm thick light weight concrete in mix (1:2:5) cement, pumice and sand laid over RC roof M2 330.00
slab with proper slope towards down pipe and corners angled at 450 at parapet and roof slab
connection as shown on the detail drawing.

1.03 Supply & apply 4mm thick bituminous membrane type roof water proofing strictly following the M2 345.00
manufactures instruction. Price shall include reflective aluminum paint.

1.04 Supply & apply 6 mm thick cementitious type (Xypex or Equivalent) water proofing strictly following the M2 10.00
manufactures instruction.

1.05 Providing and fixing uPVC PN6 rain water downpipes of approved quality including all accessories and
joints sealed to be completed as per standard specifications & engineer's instruction.

110 mm dia. M1 504.00


160 mm dia. M1 10.00
200 mm dia. M1 10.00

G. ROOFING WORK TOTAL CARRIED OVER TO SUMMARY:

H. FINISHING & PAINTING

Making all construction and expansion joints and cutting, material, labor, tool & plant.

Making all grooves of any pattern and size as directed by the Architect in plaster and platforms
including rounding off junction with floors. The plaster shall be in plumb. The junction of the two wall &
ceiling shall be right angle.

Work in patches, narrow widths small quantities curved surfaces projected bonds, set backs, off sets
corbels, architraves.
Repairing and finishing the junctions of skirting and plaforms, with relevant mortar.

Finishing the edges of electric fittings and boxes etc.


Use of all scaffolding and cradles, dust sheets and other covering for the protection of fixtures, fittings,
furniture, floors etc.
Cleaning paint splashes, drops or dirt, glass joinery electric fitting wiring etc., including washing the
floors and leaving the premises neat and clean.
Any cracks observed in the work due to bad workmanship shall be repaired without any extra cost by
mortar or filler e.g . snow filla as directed by the architect .

Grooves in plaster at the junction of two different finishes of walls, masonry and R.C.C. etc., shall be
made
Primerwithout any shall
and paints extrabe
charges.
of similar make and applied as per approved manufacturers specifications.

Finishing and painting includes cleaning the surface, sand papering, polishing filling holes with putty,
curing wherever required as per direction of the architect.

1.01 Apply two coats of plastering in cement mortar (1:3) to receive ceramic wall tile / Gypsum plastering. M2 130.30

1.02 Apply Gypsum plastering upto fine finish. Price shall include pre-cleaning and preparation of the M2 10.00
surfaces.

1.03 Providing and applying 20 mm thick plaster on external walls in two coats, first coat shall be 12 mm M2 10.00
thick and the second coat shall be 8 mm thick cement mortar 1:3 (1 cement : 3 sand) including making
grooves as per design and pattern complete.

1.04 Apply three coats of approved quality plastic emulsion paint to all internal plastered surfaces. Price shall M2 797.05
include pre-cleaning and preparation of surfaces.

1.05 Apply three coats of approved quality oil plastic paint to all external plastered surfaces. Price shall M2 2,250.05
include pre-cleaning and preparation of surfaces.

1.06 Apply one coat of primer and quartz paint to all external plastered surfaces. Price shall include pre- M2 10.00
cleaning and preparation of surfaces.

1.07 10 mm thick cement plaster on exposed surfaces of R.C.C. slabs, beams, lintels, staircases, walls and M2 10.00
canopies with drip mould with cement mortar 1:3 (1 cement :3 fine sand) to give an even and smooth
finish.
: 11 :
H. FINISHING & PAINTING WORK TOTAL CARRIED OVER TO SUMMARY

Note : The plain plaster may be required to be given grooves as per design and drawing. Nothing extra
will be paid on account of groove making, if required to be done.

I. MISCELLANEOUS

1.01 Making plinth protection / pavement around the building 50 mm thick of cement concrete 1:3:6 (1 M2 667.20
cement :3 coarse sand :6 graded stone aggregate 20 mm nominal size) over 75 mm bed of crushed
stone well rammed and consolidated and grouted with fine sand including finishing the top smooth.

1.02 Providing and fixing 10 mm Styrofoam expansion joint filler in floor joints /column / beam joints. M2 162.90

I. MISCELLANEOUS WORK TOTAL CARRIED OVER TO SUMMARY:

II. ROAD WORK

2 Earth work in excavation including dressing of sides and ramming of bottoms, lift upto 1.5 Mts., stacking
the material temporarily near the excavated area and then filling back excavated earth (Any where
within the premises) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cms. in
depth and consolidating each deposited layer completed.

Bottom width for excavation shall be measured as given in the road sectional drawings and details
showing the width of bedding concrete only and hence side clearance if any will not be measured & paid
separately. The Contractor should cover for this in his rate.

2.01 Clear and remove top soil to an average depth of 200mm. M2 3,656.00
2.02 Bulk / Pit / Trench excavation in ordinary soil to a depth not exceeding 1500mm, stacking the material M3
2,924.80
temporarily near the excavated area filling back excavated earth and then disposal of surplus excavated
soil including spreading and levelling within the factory premises as per Engineer's instructions.

2.03 Filling selected material (to be brought from outside / quarry) including cost of selected material and M3 1,023.68
filling in plinth, under road pavement & under hardcore in layers not exceeding 20 cm in depth,
consolidating each deposited layer with road roller, rammer, plate vibrator etc.

2.04 Removal, load and carting away surplus excavated material outside the existing premises to an M3 365.60
appropriate tip as directed by the Engineer, by mechanical transport.
2.05 Providing and laying basaltic stone hardcore well rolled, consolidated and blinded with crushed stone . M3 914.00

2.06 Providing and laying P.C.C. 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm. nominal M3 91.40
size) in road including the cost of centring and shuttering as per the drawing.

2.07 Providing and laying in position design mix reinforced cement concrete quality C-25, 360 kg of M3 731.20
cement/m3 filled in to form work and vibrated around rod reinforcement in roads including the cost of
centring & shuttering (formwork), finishing and reinforcement. (Reinforcement measured
separately & Reinforcement steel & Cement shall be provided to site by the employer.

2.08 Mild steel reinforcement according to structural drawings. Price includes cutting, bending, placing in Kg 22,932.00
position and tying wire and concrete spacers. (Reinforcement bar shall be provided to site by the
employer.)

II. ROAD WORK TOTAL CARRIED OVER TO SUMMARY:

III. UNDERGROUND TANK


During the construction of the water tank raft to wall and wall to wall joint should be constructed with
the shear key. The tank should be hydro tested for 48 hrs before backfilling is done.
: 12 :
3.01 Earth work in excavation in foundation trenches or drains in all kinds of soil including dressing of sides M3 450.00
and ramming of bottoms, lift upto 1.5 m, stacking the material temporarily near the excavated area and
then disposal of surplus excavated soil including spreading and levelling within the factory premises as
per Engineer's instructions. Bottom width for excavation shall be measured as given in the foundation
drawings and details showing the width of bedding concrete only and hence side clearance if any will
not be measured & paid separately. The Contractor should cover for this in his rate.

3.02 Filling selected material (to be brought from outside / quarry) including cost of selected material and M3 60.00
filling in trenches, sides of foundations, footings etc. in layers not exceeding 20 cm. in depth,
consolidating each deposited layer with road roller, rammer, plate vibrator etc.

3.03 Providing and laying cement concrete With mix 1:4:8 (1 cement :4 coarse sand :8 graded stone M3 16.00
aggregate 40 mm. nominal size) in foundations, machine foundations, footings and bases of columns
and under floors including the cost of centering and shuttering (formwork).

3.03 Providing and laying in position design mix reinforced cement concrete quality C-25, 360 kg of M3 57.60
cement/m3 filled in to form work and vibrated around rod reinforcement in footings, foundations, rafts,
plinth beams, pedestal of columns, mass concrete, walls and machine foundations but excluding the
cost of centring & shuttering (formwork), finishing and reinforcement - All work up to plinth.
(Formwork and reinforcement measured separately). Reinforcement steel & Cement shall be
provided to site by the employer.

3.04 Provide, cut and fix in position sawn structural wood or steel formwork which ever is appropriate
including strutting, propping etc. and removal of form work for:
(a) Foundations, footings, bases of columns, plinth beams and mass concrete, ground floor slabs, etc. - All M2 10.00
work upto plinth level.
(b) Walls (any thickness) including attached buttresses, plinth and string courses, columns, pillars, piers, M2 336.00
posts and struts etc.
(c) Suspended floors, beams, girders, cantilevers, horizontal portion of gutter etc. M2 160.00

3.05 Mild steel reinforcement according to structural drawings. Price includes cutting, bending, placing in Kg 2,000.00
position and tying wire and concrete spacers. (Reinforcement bar shall be provided to site by the
employer.)

3.06 Apply two coats of cement plaster on internal exposed surfaces of R.C.C. slabs, beams, columns, lintels, M2 168.00
etc. with cement mortar 1:3 (1 cement : 3 fine sand) to give an even and smooth finish.

3.07 Same as above, but with cement mortar 1:3 (1 cement :3 coarse sand) and fine coat of neat cement. M2 10.00

3.08 Supply & apply 6 mm thick cementitious type (Xypex or Equivalent) water proofing strictly following the M2 328.00
manufactures instruction.

III. UNDERGROUN TANK TOTAL CARRIED OVER TO SUMMARY:

IV SANITARY INSTALLATION WORK


All fixtures which differs from that specified below is subject to the owner's approval, based on samples,
catalogues and brochures presented by the contractor....Unit Price shall include all the necessary fixing
brackets or hooks and all assistance civil works such as chiseling of walls, floors, beams etc.

4.01 Providing & fixing turkish type wash down water closets complete with 10 liter capacity high flush N 8.00
cistern of white vitreous china with all the necessary accessories. Type, model & colour shall be
approved by the Engineer.

4.02 Providing & fixing turkish type wash down water closets complete with 10 liter capacity high flush N 1.00
cistern of stainless steel with all the necessary accessories. Type, model & colour shall be approved by
the Engineer.

4.03 Providing & fixing pedestal type wash down water closets complete with 10 liter capacity low flush N 2.00
cistern with press type with half & full option flushing mechanism; of white vitreous china with overflow
drain, plastic seat, cover, galvanised screws and all necessary accessories. Type, model & colour shall
be approved by the Engineer.
: 13 :
4.04 Providing & fixing wall hung type wash down water closets complete with 10 liter capacity low flush N 1.00
cistern with press type with half & full option flushing mechanism; of white vitreous china with overflow
drain, plastic seat, cover, galvanised screws and all necessary accessories. Type, model & colour shall
be approved by the Engineer.

4.05 Supply, fix, test & commission hand wash basins made of White Vitreous China Standard white hand N 2.00
Wash basin with opening of dia. 16mm for faucet access to acceptable standard with a pair of white
painted cast iron screw to wall brackets, 32mm slotted basin waste & overflow, chromium plated basin
chain & rubber plug, complete with fixing devices, Complete with plug, P-smell trap with connection
pipes and all other necessary accessories. Type, model & colour shall be approved by the Engineer.

4.06 Supply fix & test tap for hand wash with opening of dia. 16mm for faucet access to acceptable standard N 22.00
with waste & overflow, Complete with plug, P-smell trap with connection pipes and all other necessary
accessories .

4.07 Providing & fixing white vitreous china flat back half stall urinal of 590x390x375 size with press type
flushing mechanism with fittings, standard size C.P. brass flush pipe, spreaders with unions and clamps
(All in C.P. brass) with waste fittings, C.I. tap with outlet grating and other couplings in C.P. brass,
including painting of fittings and cutting & making good the wall & floor wherever required.

(a) Single half stall urinal with 5 litres P.V.C. automatic flushing cistern. N 2.00
(b) Range of two half stall urinals with 5 litres P.V.C. automatic flushing cistern. N 1.00
(c) Range of three half stall urinals with 10 litres P.V.C. automatic flushing cistern. N 12.00
(d) Range of four half stall urinals with 10 litres P.V.C. automatic flushing cistern. N 1.00

4.08 Providing and fixing white vitreous china large squatting type urinal of size 600x350mm with C.P. brass,
flush pipe, spreaders with brass unions and waste fittings, G.I. clamps complete including painting of
fittings, cutting and making good the walls and floors wherever required).

(a) Single half stall urinal with 5 litres P.V.C. automatic flushing cistern. N 1.00
(b) Range of two half stall urinals with 5 litres P.V.C. automatic flushing cistern. N 1.00
(c) Range of three half stall urinals with 10 litres P.V.C. automatic flushing cistern. N 1.00
(d) Range of four half stall urinals with 10 litres P.V.C. automatic flushing cistern. N 1.00

4.09 Providing and fixing white vitreous china urinal partitions with required fittings to complete the work. N 8.00

4.10 Providing & fixing approved standard stainless steel kitchen sink with opening of dia. 16mm for faucet N 1.00
access with double bowl of type 302 (for chrome & Nickel content) with Gauge 22 (thickness of 0.8mm)
and chromium plated basin chain & rubber plug, complete with fixing devices. Complete with chrome
plated chain, plug, chrome plated faucet, P-smell trap and with all necessary accessories. Size:- 1200 x
600 mm

(a) Providing & fixing approved standard stainless steel kitchen sink with opening of dia. 16mm for faucet N 1.00
access with single bowl of type 302 (for chrome & Nickel content) with Gauge 22 (thickness of 0.8mm)
and chromium plated basin chain & rubber plug, complete with fixing devices. Complete with chrome
plated chain, plug, chrome plated faucet, P-smell trap and with all necessary accessories. Size:- 1000 x
600 mm

4.11 Providing, installing, testing and commissioning of infra red sensor of approved brand, controlled N 1.00
electronic automatic flushing system for urinals comprising of light sensing device and solenoid valve of
approved make including cutting and making good the walls as required.

4.12 Providing & fixing 5mm thick crystal glass mirrors with copper back protection of approved size M2 10.00
including chrome plated brass mirror clips with chrome plated screws.

4.13 Providing & fixing single tubular chrome plated swing pattern towel rails, with chrome plated fastening N 2.00
screws. Complete with all the accessories.

4.14 Providing and fixing 15 mm dia. chrome plated tap with chrome plated walls flange complete. N 2.00

4.15 Providing and fixing 15 mm dia. brass tap with brass walls flange complete. N 1.00
: 14 :

4.16 Providing and fixing 15 mm dia. C.P. brass angle valve with C.P. copper connection pipe with nuts and N 1.00
washers, C.P. brass wall flange complete including cutting and making good the wall wherever required.

4.17 Providing and fixing 15 mm. dia. C.P. brass long body tap with C.P. brass flange complete. N 1.00

4.18 Only fixing knee operated tap & valve in trough only, complete with flexible pipe as required. (Knee N 16.00
operated Tap & Valve to be free issue by owner)

4.19 Providing and fixing 15 mm dia. C.P. brass basin single hole mixer for hot and cold with fittings etc. N 2.00
complete.

4.20 Providing and fixing 15 mm. dia. C.P. brass sink mixer for hot and cold with fittings etc. complete. N 1.00

4.21 Providing and fixing push tap with wall flange (for flow adjustment) & complete accessories. N 1.00

4.22 Providing and fixing easy concealed push type flush valve with exposed water controlling device. N 1.00

4.23 Supply & laying of uPVC Pipes shall be in the 6m lengths, concentric, seamless, free from defects likely
to impair the uninterrupted flow of the carried medium, Pipes shall be uniform in colour, density and
other physical, properties. All domestic waste & vent uPVC pipes to be PN-6 with wall thickness of
5.9mm for dia. 200mm, 4.7mm for dia. 160mm, 3.2mm for dia. 110mm, 2.2mm for dia. 75mm and
1.8mm for dia. 50mm pipes. All fittings like elbow, Y, Tee, Reducers, etc. to be PN-6.

All domestic waste pipe lines shall be provided with a minimum slope of 2% towards the outlet unless
specified. All uPVC pipes and necessary fittings shall be standard quality and be free from damage
during storage, transportation, construction etc. Unit price shall include all the necessary assistance civil
works, such as fixing or hanging to walls, beams or slabs.etc., necessary fittings such as bends, Y, T,
etc.

(a) 75 mm dia. M1 30.00


(b) 100 mm dia. M1 30.00
(c) 150 mm dia. M1 1.00
(d) 200 mm dia. M1 10.00
(d) 300 mm dia. M1 1.00

4.24 Providing, fixing and jointing centrifugally cast (Spun) iron waste and vent and rain water pipes
including fittings i.e. plain door and heel rest bends, junctions, cowls offsets, M.S. clamps/ dash
fasteners for wall/ ceiling etc. including jointing with drip seal joints, including cutting chases/holes in
walls/floors and making good the same complete in all respects.

(a) 75 mm dia. M1 1.00


(b) 100 mm dia. M1 1.00
(c) 150 mm dia. M1 1.00
(d) 200 mmdia. M1 1.00

4.25 Providing and fixing in position the following C.I. spun pipes of approved quality waste water pipes cut
to required length including fittings, drip seal joints, cutting and making good the floors and wall where
required, two coats of painting all complete with excavation of trenches and refilling the same as
required.

(a) 100 mm dia. M1 3.00


(b) 150 mm dia. M1 4.00

4.26 Providing and fixing in position the following diameter G.I. heavy waste pipe with special fittings,
clamps, cutting chase/ holes in walls/floors and making good the same including painting the embedded
pipes with two coats of anti-corrosive bitumastic paint complete in all respects.

(a) 32 mm dia. M1 1.00


(b) 40 mm dia. M1 1.00
(c) 50 mm dia. M1 1.00

4.27 Providing and fixing S.C.I. trap of self-cleaning design complete including cost of cutting and making
good the walls and floors complete but without grating.
(a) 100 mm. dia. inlet and 100 mm. dia. outlet. N 1.00
(b) 100 mm. dia. inlet and 75 mm. outlet. N 1.00
: 15 :

4.28 Providing and fixing uPVC S trap of self-cleaning design complete including cost of cutting and making
good the walls and floors complete but without grating.
(a) 100 mm. dia. inlet and 100 mm. dia. outlet. N 10.00
(b) 100 mm. dia. inlet and 75 mm. outlet. N 1.00

4.29 Providing and fixing 125 mm C.P. grating in all of approved quality provided with mesh cover in toilets, N 16.00
showers, water troughs.

4.30 Providing and laying 75 mm thick cement concrete 1:2:4 (1 cement :2 coarse sand :4 hard stone ballast
20 mm. and down gauge) alround C.I. pipes in floors under building:

(a) 75 mm. dia. M1 30.00


(b) 100 mm. dia. M1 30.00
(c) 150 mm. dia. M1 1.00
(d) 200 mm.dia. M1 10.00

4.31 Providing and fixing inlet fittings with one or more inlets fabricated from 100 mm dia. G.I. pipe and N 1.00
welded G.I. socket and fixed to C.I. trap with drip seal joints and grouted in cement concrete as per
drawing and design complete.

4.32 Providing and fixing of floor drain points formed of 65x50/40 mm elbow of G.I. fitted to pipe with 75 mm N 10.00
dia. stainless steel grating with frame of approved make complete including the cost of cutting and
making good the walls and floors.

4.33 Supply and install approved quality Clean outs of 160 mm dia. uPVC PN6 as where shown on the N 2.00
drawing.

4.34 Cold and hot water pipes shall be PPR pipes SDR 6 PPR 80 PN 20 pipe series 6 acc to Din 80 77/78. wall
thickness 20mm = 3.4 mm. 25mm= 4.2mm. 32mm=5.4mm 40mm= 6.7. mm 50mm= 8.3.mm 63mm=
10.5mm= 75mm=12.5. mm 90mm= 15mm for exposed and open air installations use external black
layer (UV resistant) . Pipe shall be 4m length free from defects. for cold and hot water respectively, and
be fixed to slabs, walls, beams or etcwith metal straps or similar material. Unit price shall include all
assistance civil works and necessary fittings such as T, bends, bridges, elbows, etc. according to where
shown on the drawing. PPR for hot water shall have aluminium foil inside. All water pipes shall be
tested with pressure of 10bar at the expense of the contractor.

a) dia. 20mm Pipe (Dia 15mm Equivant GSP) M1 50.00


b) dia. 25mm Pipe (Dia 20mm Equivant GSP) M1 50.00
c) dia. 32mm Pipe (Dia 25mm Equivant GSP) M1 50.00
d) dia. 50mm Pipe (Dia 32mm Equivant GSP) M1 1.00
e) dia. 63mm Pipe (Dia 40mm Equivant GSP) M1 1.00
f) dia. 75mm Pipe (Dia 50mm Equivant GSP) M1 1.00
g) dia. 90mm Pipe (Dia 65mm Equivant GSP) M1 1.00

4.35 Providing and fixing G.I. pipe of good quality complete with all G.I. fittings and clamps including cutting
chase and making good the walls, floor slabs including bitumastic paint with plastic wrapping polythene
sheet (Internal work).

(a) 15 mm dia.. M1 1.00


(b) 20 mm dia.. M1 1.00
(c) 25 mm dia.. M1 1.00
(d) 32 mm dia.. M1 1.00
(e) 40 mm dia.. M1 1.00
(f) 50 mm dia.. M1 1.00
(g) 65 mm dia.. M1 1.00
(h) 80 mm dia. M1 1.00
(i) 100 mm dia. M1 1.00

4.36 Providing and fixing G.I. pipe of good quality complete with all G.I. fittings for external work including
necessary excavation, painting the pipe with two coats of bitumastic paint and fitting alround with fine
sand etc. complete for

(a) 15 mm dia.. M1 1.00


(b) 20 mm dia.. M1 1.00
(c) 25 mm dia.. M1 1.00
(d) 32 mm dia.. M1 1.00
(e) 40 mm dia.. M1 1.00
(f) 50 mm dia.. M1 1.00
(g) 65 mm dia.. M1 1.00
(h) 80 mm dia. M1 1.00
: 16 :
(i) 100 mm dia. M1 1.00

4.37 Providing and fixing bronze ball valve with screwed female flanged ends with stainless steel valve and
spindle, glass filled tefelon sealing and gland packing quarter turn, lever operated full bore design,
hydraulically tested to 20 Kg./sq.cm. pressures.

(a) 15 mm. dia. N 5.00


(b) 20 mm. dia. N 5.00
(c) 25 mm. dia. N 5.00
(d) 32 mm. dia. N 1.00
(e) 40 mm. dia. N 1.00
(f) 50 mm. dia. N 1.00

4.38 Providing and fixing in position the following bronze vertical/horizontal check valves of approved make
including effecting connection complete.
(a) 40 mm. dia. N 1.00
(b) 50 mm. dia. N 1.00
(c) 65 mm. dia. N 1.00

4.39 Providing and fixing good quality bronze gate valves on pipe lines above ceiling , internal branch water
pipes of the following sizes and as where shown on the drawing.

a) dia. 20mm (Dia 15mm Equivant GSP) N 1.00


b) dia. 25mm (Dia 25mm Equivant GSP) N 1.00
c) dia. 32mm N 1.00

4.40 Providing & fixing Roto or equivalent roof water tank above 1.5m from roof water tank seat on concrete K.Ltr. 1.00
bottom slab. Price shall include all the necessary pipe connection and all other accessories.

50mm dia. Float valve N 1.00


Provide and install automatic level control switch on and off pumps on ground level. N 1.00

Provide dia. 80mm GSP overflow pipe to water tank. M1 1.00


Provide dia. 80mm GSP drain pipe to water tank. M1 1.00
Providing & fixing brass gate valves of approved quality.
i) On pipe inlet point to tank, dia.65mm. N 1.00
ii) On water distribution pipe after tank,dia 65mm N 1.00
iii) On drain pipe of the tank, dia.80mm N 1.00

4.41 Providing and fixing square-mouth S.W. gully trap grade-'A' complete with C.I. grating, brick masonry N 1.00
chamber with bricks of class designation 75 and water-tight C.I. cover with frame of 300x300 mm. size
(inside), the weight of cover to be not less than 4.5 Kgs. and frame to be not less than 2.7 Kgs. as per
standard design: 100 x100 mm. size 'P'-type.

4.42 Only Laying non-pressure NP2 class (Medium duty) R.C.C. pipes with collars jointed with stiff mixture of
cement mortar in the proportion of 1:2 (1 cement :2 fine sand) including testing of joints etc. complete.
(R.C.C. Pipe with coller to be free issue by owner)

(a) 150 mm. dia. M1 1.00


(b) 200 mm. dia. M1 1.00
(c) 250 mm. dia. M1 1.00
(d) 300 mm. dia. M1 400.00
(e) 450 mm. dia. M1 1.00
(f) 600 mm. dia. M1 1.00
(g) 900 mm. dia. M1 1.00

4.43 Constructing stone masonry manhole in cement mortar 1:3 (1 cement :3 coarse sand) R.C.C. top slab
with 1:2:4 mix (1 cement :2 coarse sand : 4 graded stone aggregate 20 mm. nominal size) foundation
concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm. nominal size) inside
plastering 12 mm thick with cement mortar 1:3 (1 cement :3 coarse sand) finished with a floating coat
of neat cement concrete 1:2:4 (1 cement :2 coarse sand :4 graded stone aggregate 20 mm. nominal
size) neatly finished complete as per standard design including necessary excavation for the required
level including refilling and disposal of surplus earth within premises.

a Inside size 45x45 cm. and 60 cm. deep, including precast concrete cover. N 1.00
b Inside size 60x60 cm. and 60 cm. deep, including precast concrete cover. N 20.00
c Inside size 90x80 cm. and 60 cm. deep, including precast concrete cover. N 1.00
: 17 :
d Inside size 120x90 cm. and 90 cm. deep, including precast concrete cover. N 1.00
e Inside size 60x60 cm. and 50 cm. deep, including precast concrete cover. N 1.00

4.44 Extra for depth for manholes on item No. 4.43 above.
(a) 60 x 60 cm. M1 1.00
(b) 90 x 80 cm. M1 1.00
(c) 120x90 cm. M1 1.00

4.45 Providing and fixing in position 150 mm. dia. salt glazed stoneware half round channels jointed in M1 1.00
cement sand mortar 1:1 mixed with waterproofing compound (Acco Proof) including providing of 300
mm. wide and 300 mm. deep bedding concrete 1:2:4 mixed with waterproofing compound and finished
on inside surface with cement mortar 1:3 with waterproofing compound and finishing smooth with a
floating coat of cement.

4.46 Construction of soak-pit of 3.0 m. dia. and 3.5 m. deep. N 1.00

4.47 Providing and making 450X600 mm average storm water drain in stone masonary work in cement M1 80.00
mortar 1:4(1 cement :4 coarse sand) including excavation, laying of 100 mm. thick base P.C.C. (1
cement :5 fine sand :10 brick ballast), laying 50 mm thick cement concrete 1:2:4 (1 cement :2 coarse
sand :4 stone aggregate 20 mm. nominal size )in floor and finishing walls with neat cement plaster 1:4
(1 cement :4 coarse sand ).

4.48 Constructing Septic tank in RCC grade C-25 (1:1.5:3) 1 cement, 1.5 Coarse sand 3 graded stone
aggregate 20mm nominal size including by foundation concrete, stone masonry inlet and outlet
chamber of size 450x450x450mm in liquid depth stone work in 1:4 (1 cement : 4 coarse sand) and
benching in side plastering 12mm thick with floating coat of neat cement and making slope 1:20 RCC
top slab, and baffle walls etc. grade C-20 1:2:4 (i.e. 1 cement :2 coarse sand :4 graded stone aggregate
20mm nominal size) including precast concrete cover, PVC vent pipe of dia 100mm excavation, refilling
in layers complete in all respect as per standard design and drawing of following size.

a For 100 users size-4.0 m x 1.35 m x 1.40 m. N 4.00


b For 200 users size 5.5 m x 1.85 m x 1.5 m. N 1.00
c For 300 users size 6.75 m. x 2.25 m. x 1.5 m. N 1.00
d For 400 users size 7.0 m. x 3.1 m. x 1.4 m. N 1.00
e For 500 users size 8.5 m. x 2.8 m. x 1.6 m. N 1.00
f For 600users size 9m. X 3.0 m. x 1.6 m. N 1.00

4.49 Constructing stone masonry chamber 600x600x500 mm deep for effluent drain chamber with M.S. N 20.00
epoxy painted bucket with perforation as per owner's instructions with stone work in cement mortar 1:4
(1 cement :4 coarse sand), precast concrete cover, R.C.C. top slab with cement concrete 1:2:4 (1
cement :2 coarse sand :4 stone aggregate), foundation concrete 1:5:10 (1 cement :5 coarse sand :10
graded stone aggregate) inside plastering 12 mm. thick with cement mortar 1:3 (1 cement :3 coarse
sand) finished smooth with a floating coat of neat cement on wall and bed concrete etc. as required.

III. SANITARY INSTALLATION WORK TOTAL CARRIED OVER TO SUMMARY:

SCHEDULE OF QUANTITIES FOR THE CONSTRUCTION OF ADAMITULU MEAT PROCESSING FACILITY FOR
FRIGORIFICO BORAN FOODS PLC
( TENDER-I )

SUMMARY

I. CIVIL WORK
A. EARTH WORK ETB
B. CONCRETE WORK ETB
C. REINFORCED CEMENT CONCRETE WORK ETB
D. MASONARY / BLOCK WORK ETB
E. CARPENTRY / JOINERY & METAL WORK ETB
F. FLOORING ETB
G. ROOFING ETB
H. FINISHING & PAINTING ETB
I. MISCELLANEOUS ETB

II. ROAD WORK ETB


: 18 :
III. UNDERGROUND TANK ETB
IV. SANITARY INSTALLATION WORK ETB
TOTAL: ETB
: 19 :

( TENDER-1 )

Rate Amount

8.00 101,573.48
67.00 787,105.45

74.00 208,458.00
170.00 191,728.38

170.00 356,680.15

50.00 76,800.90

1,722,346.35
: 20 :

990.00 1,424,283.30

990.00 49,500.00

815.00 2,586,949.57

600.00 6,000.00

4,066,732.87

1,300.00 1,290,276.00

1,250.00 2,270,906.25

50.00 16,800.00

1,300.00 86,580.00
: 21 :

125.00 304,025.00

125.00 -

150.00 51,750.00

4.75 445,307.03

700.00 7,000.00

4,472,644.28

850.00 709,537.50

-
925.00 514,762.50

-
2,400.00 24,000.00
: 22 :
-
2,600.00 26,000.00

-
1,275.00 576,360.49

-
1,300.00 13,000.00

-
235.00 2,350.00

1,866,010.49

3,450.00 34,500.00

-
450.00 21,150.00

-
250.00 4,860.00

-
290.00 2,900.00

1,600.00 115,200.00
-
600.00 6,000.00

-
1,450.00 14,500.00

-
: 23 :
10.00 153,922.25

-
10.00 1,000.00

-
450.00 4,500.00

-
450.00 4,500.00

-
2,550.00 188,700.00

-
225.00 1,665.00

-
25.00 250.00

-
25.00 250.00

553,897.25
: 24 :
525.00 63,000.00

420.00 54,726.00

305.00 3,050.00

340.00 3,400.00

575.00 5,750.00

150.00 1,500.00

1,600.00 16,000.00

1,350.00 13,500.00

19.00 241,237.02

40.00 6,516.00
60.00 600.00

50.00 500.00

409,779.02
: 25 :

75.00 24,750.00
: 26 :

80.00 26,400.00

350.00 120,750.00

360.00 3,600.00

150.00 75,600.00
200.00 2,000.00
250.00 2,500.00

255,600.00

65.00 8,469.50

40.00 400.00

70.00 700.00

25.00 19,926.19

35.00 78,751.66

115.00 1,150.00

50.00 500.00
: 27 :
109,897.35

150.00 100,080.00

39.00 6,353.10

106,433.10

8.00 29,248.00
67.00 195,961.60

170.00 174,025.60

50.00 18,280.00

815.00 744,910.00

990.00 90,486.00

1,300.00 950,560.00

4.75 108,927.00

2,312,398.20
: 28 :
65.00 29,250.00

170.00 10,200.00

990.00 15,840.00

1,300.00 74,880.00

125.00 1,250.00

125.00 42,000.00

150.00 24,000.00

4.75 9,500.00

60.00 10,080.00

25.00 250.00

350.00 114,800.00

332,050.00

-
: 29 :
-

-
-
-
-

-
-
-
-
-
-

-
: 30 :

-
-
-
-
-

-
-
-
-

-
-

-
-
-

-
-
: 31 :

-
-

-
-
-
-

-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
: 32 :
-

-
-
-
-
-
-

-
-
-

-
-
-

-
-

-
-
-
-
-
-

-
-
-
-
-
-
-

-
-
-
: 33 :
-
-

-
-
-

-
-
-
-
-
-
-
-

1,722,346.35
4,066,732.87
4,472,644.28
1,866,010.49
553,897.25
409,779.02
255,600.00
109,897.35
106433.1

2,312,398.20
: 34 :
332,050.00
-
16,207,788.90
: 35 :
SCHEDULE OF QUANTITIES FOR THE CONSTRUCTION OF ADAMITULU MEAT
PROCESSING FACILITY FOR FRIGORIFICO BORAN FOODS PLC.

( TENDER -III )

S. No. Description of Item Unit Qnty.


I. CIVIL WORK FOR BUILDINGS
A. EARTH WORK
1 Earth work in excavation including dressing of sides and ramming of bottoms, lift
1.01 upto
Clear1.5andMts., stacking
remove thetomaterial
top soil an averagetemporarily
depth ofnear the excavated area and then M2
200mm. 11083.28
filling back excavated earth (Any where within the premises) in trenches, plinth,
1.02 Bulk / Pit / Trench excavation in ordinary soil to a depth not exceeding 1500mm, M3 8082.48
sides of foundations etc. in layers not exceeding 20 cms in depth and
1.03 stacking the material
Ditto to Item 1.02 temporarily near thebutexcavated area, filling back excavated M3
consolidating eachbut exceeding
deposited layer1500mm
completed. not exceeding 3000mm. 1593.00
earth and then disposal of surplus excavated soil including spreading and levelling
1.04 Filling selected material (to be brought from outside / quarry) including cost of M3 3101.18
within the factory premises as per Engineer's instructions.
1.05 selected material
Filling selected and filling
material (to bein brought
trenches, sides
from of foundations,
outside footings cost
/ quarry) including etc. of
in M3 1060.64
layers
selected not exceeding 20 cm. in depth, consolidating each deposited layer with
1.06 Removal,material
load andand fillingaway
carting in plinth & under
surplus hardcore
excavated in layers
material not exceeding
outside 20 M3
the existing 1189.21
road
cm. in roller,
depth,rammer, plate vibrator
consolidating each etc.
deposited layer with road roller, rammer, plate
premises to an appropriate tip as
A. EARTH WORK TOTAL CARRIED OVER TO SUMMARY: directed by the Engineer, by mechanical
vibrator
transport. etc.

B. CONCRETE WORK:
1.01 Providing and laying cement concrete With mix 1:4:8 (1 cement :4 coarse sand :8 M3 1133.75
1.02 graded stone
Providing aggregate
and laying cement40concrete
mm. nominal size) in:4foundations,
1:4:8 (1 cement coarse sand machine
:8 stone M3 50.00
foundations,
aggregate 25footings
mm. and bases
nominal size)ofincolumns
string orand under
lacing floors copings,
courses, including bed
the blocks,
cost of
1.03 Providing and laying basaltic stone hardcore well rolled, consolidated and blinded M3 2651.60
centering
anchor and shuttering
blocks, plain (formwork).
window cills, screeding of any thickness in required slope
1.04 with crushed stone
Demolishing lean .plain cement concrete with soling including disposal of M3 10.00
including centring and shuttering (formwork).
unserviceable
B. CONCRETEmaterial outsideCARRIED
WORK TOTAL the premises
OVER and
TOstacking
SUMMARYof serviceable material
as per direction of Engineer - in - charge.

C. REINFORCED CEMENT CONCRETE WORK


1.01 Providing and laying in position design mix reinforced cement concrete quality C- M3 2156.11
1.02 25, 360 and
Providing kg of cement/m3
laying in position filled in mix
design to form work cement
reinforced and vibrated
concrete around
qualityrod
C- M3 10.00
reinforcement
20, 300 kg ofin cement/m3
footings, foundations,
filled in rafts,
to formplinth
workbeams,
and pedestal of
vibrated columns,
around rod
1.03 Extra for fixing of J-bolts in column pedestals for PEB columns as per required N 1152.00
mass concrete,incoving
reinforcement footings,/ curved skirting and
foundations, rafts,machine foundations
plinth beams, including
pedestal leaving
of columns,
1.04 development
Providing and length,
laying line
in and
position level including
design mix making
reinforced all fixing
cement arrangement
concrete such
quality C- M3 190.02
necessary
mass pocket
concrete, for fixing
ground floor of bolts,
slab but excluding
and machine the cost
foundationsof centring &
includingshuttering
leaving
as template
25, 360 cut etc. (J-Bolts
kgfinishing
of fix
cement/m3 will be supplied
filled in to- Allfree
form of cost
work by
and the employer).
vibrated around rod
1.05 (formwork),
Provide, and in and reinforcement
position sawn structural work
wood upor to plinth.
steel
necessary pocket for fixing of bolts, but excluding the cost of centring & shuttering (Formwork
formwork which and
ever
reinforcement
reinforcement
is appropriate inmeasured
columns,
including walls
strutting, (any thickness)
separately).
propping etc.Reinforcementincluding
and removal of formattached
steel &
work pillers,
Cement
for:
(a) (formwork),
Foundations, finishing
Machine and reinforcement
Foundations, - All
footings, work
bases up to plinth.
of columns, (Formwork
plinth beams and
and M2 1595.36
brackets,
shall beams,
be provided ground
to site floor
by slabs,
theetc.
employer.suspended floors, roofs having slope,
(b) reinforcement
mass concrete,
Walls (anyRCC measured
ground
thickness) floor separately).
slabs,
includingbalconies, - All Reinforcement
work
attached shelves, upto
buttresses, plinth steel
level.
plinth lintels,
and string& Cement
courses, M2 10.00
overhead tanks, landings, canopies, bands, gutter
shall be provided
columns, pillars, piers,to posts
site by and the employer.
struts etc.
(c) beams, horizontal
Suspended floors, and
roofs,vertical
overhead portion
RCC oftanks,
R.C.C.landings,
gutter, staircase
balconies,etc. for all
staircases M2 1081.76
1.06 heights,
(except
Mild steel excluding
spiral
reinforcement the cost
staircase) and of centring
access
according & shuttering
toplatform,
structural lintels, (formwork),
beams,
drawings. girders,
Price finishing and
cantilevers,
includes cutting, Kg 93345.70
reinforcement.
horizontal portion
bending, placing All floor
of gutterslabs
etc.
in/ Cposition not receiving
and tying flooring tiles shall
wire in and be smoothly finished
concrete columns,
spacers.
1.07 Demolishing
to of C-20of
the satisfaction -25 or /richer
Architects mix R.C.C.
Engineer. (Formwork beams,
and slabs,
reinforcement M3 10.00
(Reinforcement
footings, flooring bar
etc. shall be provided
including cutting of to site by the employer.)
reinforcement, stacking of serviceable
C. REINFORCED
measured separately). CEMENT CONCRETE WORK
Reinforcement steel & TOTAL
Cement CARRIED
shall OVER TO
be provided
material
SUMMARY:
to site by and thedisposal
employer. of unserviceable material outside the factory premises.

D. MASONARY / BRICK/BLOCK WORK


1.01 Hard trachytic roughly dressed stone masonry foundation wall below ground level M3 503.12
1.02 bedded
Ditto asinItem
cement3.01mortar
but one(1:4)
side exposed face left for plastering, price includes M3 325.68
1.03 pointing (Above NGL)
Brick wall with the designed compressive strength, bedded in cement mortar (1:3) M3 10.00
1.04 in foundations,
Brick wall with thetrenches
designedetc. all work strength,
compressive upto plinth
beddedlevel. Price includes
in cement all
mortar (1:3) M3 10.00
accessories
in the work
superstructure, shall or
square berectangular
completed according
pillars to detail
including drawing
pattern such as grooves,
1.05 HCB, Class - C with the designed compressive strength, bedded in cement mortar M3 374.36
nitch
(1:3) at internal
all heights above plinth level. Price includessuch
all accessories the work shall
1.06 Solid in
Concrete Block& external
(SCB),walls including
Class - C withpattern
the designed as grooves, at all
compressive heights
strength, M3 10.00
be completed
above plinth according to
level. Price (1:3)detail drawing
includesinternal
all accessories the work shall bepattern
completed
1.07 bedded in cement
Demolishing stone mortar
/ brick / blockinwork & external
in cement walls
mortar including
including such
attached plaster M3 10.00
according
as grooves, toat
detail
all drawing.
heights above plinth level. Price includes all accessories the work
and stacking of serviceable
D. MASONARY / BLOCK/ BRICK material
WORK after cleaning
TOTAL the bricks
CARRIED OVERandTO disposal of
shall be completed
unserviceable according
material outside tothe
detail drawing.
factory premises.
SUMMARY :
E. CARPENTRY / JOINERY & METAL WORK
1.01 Providing & fixing 40mm thick hollow core flush wooden door with hard wood M2 10.00
1.02 frame andand
Providing bothfixing
sides lock
covered
withwith best of
handles quality 4mm thick
approved make plyin wood,
wooden wall nut or/ N
/ steel 44.00
OAK veneered.
Aluminium doors Price includes
complete. three coats of varnish paint and all required fittings
1.03 Providing and fixing glazing of 4.0 mm thick plain float glass fixed to wooden / M2 144.63
such as 3 Nos. 125 mm size oxidised iron butt hinges with necessary screws and
steel frames
Providing (to be plastic
paid separately) including the mm
cost thickness
of fixing ofmaterial as
1.04 aluminiumand fixing laminated sheet of 1.0 approved
bolts etc. M 10.00
2
fittings including door stopper, rubber buffer, handles, tower
required.
make, design, quality and colour on flush door shutters as per Architects' direction
1.05 complete asand
Supplying per fixing
drawing.Galvanised rolling shutters of approved make, made of
complete.
required size M.S. laths interlocked
(a) 80 x 1.25 mm. G.I. laths with 1.25 mm.together
thick top through
cover. their entire length and M2 28.35
jointed together at the end by end locks mounted on specially designed pipe shaft
withAgreement
Contract brackets, side guides
between and arrangements
Frigorifico Boran Foodsfor PLCinside andConstruction,
and TNT outside locking with 2014
October
push and pull operation complete including the cost of providing and fixing
necessary 27.5 cm long wire springs of approved grade and G.I. top cover of
: 36 :
SCHEDULE OF QUANTITIES FOR THE CONSTRUCTION OF ADAMITULU MEAT
PROCESSING FACILITY FOR FRIGORIFICO BORAN FOODS PLC.

( TENDER -III )

S. No. Description of Item Unit Qnty.


1.06 Extra for providing grilled rolling shutters manufactured out of 8 mm dia. M.S bar M2 10.00
1.07 instead
Extra forofproviding
laths asmechanical per designoperating approveddevice by Engineer
with all (Areanecessary of grill to be N
accessories, 5.00
measured).
handles etc. in place of push and pull operation complete.
1.08 Fabricating and fixing structural steel work in staircase/balcony railings and Kg 100.00
1.09 window
Providinggrillsand madefixing out of anglesteel square iron orwindow
round bars and flats
frames or andedging
any other in Kg 100.00
section including 40 mm.etc.
trenches/columns/Drains dia. including
M.S. tubeprovidingfor hand and rail in required
fixing steel design
lugs ofcomplete
suitable
1.10 Providing and fixing bright finished brass hydraulic door closers of approved brand N 10.00
including
size embedded applicationin cement of anti concreterust 1:2:4paint, (1painting
cement and polishing
:2 coarse sand the same.
:4 graded
1.11 for doors
Providing with
and necessary
fixing of accessories
double and screws
action floor etc. spring complete.
of approved brand and N 10.00
(Structural steel will be free issue
stone aggregate 20 mm. nominal size) complete as per drawing (Rate toby Employer).
1.12 manufacture
Providing for
andcost fixingaluminium doors, including the cost of cutting floor and making
ofDoors and windows
steel). made of Aluminum tubular profile frames M 98.01
2
Exclude for structural
good
of after embedding
approved quality, the floor
1.6mm spring
thick, door with
kick frame
plate complete.
1500gm/ml, partly covered with
1.13 Providing and fixing fine size galvanized steel wire mesh fixed to Aluminum profile M2 10.00
aluminium
frames. sheet according to the detail drawing and window door schedule.
1.14 Fabricating and fixing SS nosing angle frame on drain, corner tiles as per the M1 10.00
Complete work includes all the necessary iron mongery, door stopper, etc. and all
drawing
Fabricating including the MS grouting and masonry work.onThe sizecorner
of thetiles
angle as shall be M1
1.15 accessories and fixing
to complete / GIwork.
the nosing Allangle
aluminumframe windows drain, and doors type per the
shall be 10.00
upto
drawing 40 mm x
including 40 mm. The steel required for this item shall be supplied by
in
E. accordance
CARPENTRY withthe the grouting
technical
/ JOINERY &and masonry
specifcation
METAL WORK work. The size
requirement,
TOTAL of the OVER
angle
Architect's
CARRIED shall
TO be
preference
the
upto owner
40 mmfree of cost.
and
SUMMARYapproval. : x 40 mm. The steel required for this item shall be supplied by
the owner free of cost.
F. FLOORING
1.01 Providing and fixing 10mm thick imported type approved quality non slippery M2 87.38
1.02 ceramic
Providingtile andin fixing
flooring, 6mm in skirting,
thick importedrisers of type
steps approved
and platforms stuck
quality non down with M2
slippery 146.68
approved
ceramic type adhesive on cement sand screed floor finish and joints grouted in
1.03 Providingtile and in layingwalls20mm stuckthick down(minimum)
with approved machine typecut adhesive
terrazzoon cement
tiles sand
for flooring M2 10.00
appropriate
plaster finish color
and setting coat
joints grouted mortar.
in Colour
appropriate and pattern
colour of
setting tile shall be
coat:3mortar. approved
Colour
& landing
Providing laid in
and laying pattern 30mm over 50
thick backmm thick
(minimum) base of 1:3 (1 cement coarse sand)
1.04 ofmachine
50 mm cut terrazzo
cementtiles in treads, (1 M 15.90
2
by
andthe Engineers.
pattern of tile Rate
shall includes
be approved by coat
the Engineers. thick
Rate includes sceed
back 1:3 of
coat
and
risers,jointed with
skirting cement
etc. slurry
laid in600 mixed
pattern with
over pigment to match the shade of the slab.
1.05 cement
Labour
15 mm :3 coarse
charges
thick sand),
for fixing
cement plaster grouting
x 600
1:3 1050
(1 material,
xcement mm mm thickthick
cement base
slurryoftype
imported 1:3 (1 cement
&grouting
other necessary
approved high:3 M2 10.00
Rate
coarse including
sand) cutting,
and jointed grinding,
with polishing,
cement back:3
slurry
coarse
coat
mixed 50sand),
ofwith mm thick cement
pigment to
material,
match sceed
the
1.06 accessories
quality
cement
Providing slurryto
porcelain
and & complete
tile20
other
laying the
in
necessary
mm work.
flooring
thick & skirting
accessories
mirror stuck
to complete
polished down
machine the withgranite
work.
cut approved stonetypefor M2 10.00
1:3
shade (1 cement
of the :3
slab. coarse
Ratesand sand),
including grouting
cutting, material,
grinding, cement
nosing slurry
of & other
treads and necessary
polishing,
adhesive
laboratory, onkitchen,
cement platform, screed
working floorcounters
finish and
and joints
similar grouted
locationsin appropriate
of required
1,07 accessories
Providing
back coat ofto50
and complete
laying 20
mmmortar. thecement
mm
thick work
thick as per Architect's
marble tiles(1 instructions.
forcement
landing, :3tread, risers of required M2 10.00
colour
size and setting
approved coat shade, Colour sceed
colour and
1:3
and pattern
texture of
laid tile
overshall coarse
20 bemm sand),
approved
thick
grouting
by the
base of
size
Extraand
material, approved
for cement
tapping slurry
onshade, &
groud colour
other floor and
necessary
slabtexture laid circular
accessories
with the over 20
to sceed mm thick
complete
pipe the basethe
work of
as
1.08 1:3to(1 make :3 M 11083.28
2
Engineers.
cement Rate 1:3
mortar includes(1 back coat of 50 mm thick cement cement
cement
per mortar
Architect's
corrogations and 1:3 (1 cement
instructions.
brooming cement as per
:: 3 coarse
coarse &sand)
3drawing sand)
Engineers
with
with joints
joints treated
treated with
instruction. with cement
cement
1.09 coarse
Extra
mixedfor sand),
with making grouting
matching grooves material,
by cutting
pigment, cement
including machine slurry
edge & other
inmoulding
floor joints necessary
andincluding
polishing accessories
providing
to give and
give high
highto
mixed with matching pigment, including edge moulding and polishing to
complete
filling
gloss
(a) 5 mm the
polysulphide
finish etc.
x 20 work. (Porcelain
or
complete equivalent
as per tiles
sealant.
design. will be free issue by employer to site).
gloss finish etc.mm complete as per design. M1 98.64
(b) 12 mm x 50 mm M1 10.00
1.1 Providing and laying 25 mm thick plaster of 1:3 cement mortar over the floor PCC M2 10.00
as a smooth levelling
F. FLOORING WORK coarse. TOTAL CARRIED OVER TO SUMMARY:

G. ROOFING
1.01 30mm thick smooth finished cement sand screed laid on top of light weight M2 935.00
1.02 concrete in cement
Average 50mm thick mortar mix (1:3
light weight and 1:1)
concrete with(1:2:5)
in mix proper cement,
slope towards
pumicedownand M2 935.00
pipe.
sand laid over RC roof slabbituminous
with proper slope towards down pipe and corners
1.03 Supply & apply 4mm thick membrane type roof water proofing strictly M2 980.00
angled at the
following 450manufactures
at parapet and roof slabPrice
instruction. connection as shown
shall(Xypex
include on the detail
1.04 Supply & apply 6 mm thick cementitious type orreflective aluminum
Equivalent) water M2 10.00
drawing.
paint.
1.05 proofing
Providingstrictly following
and fixing uPVCthe PN6manufactures instruction.
rain water downpipes of approved quality including
(a) all accessories
110 mm dia. and joints sealed to be completed as per standard specifications & M1 348.00
engineer's instruction.
(b) 160 mm dia. M1 10.00
(c) 200 mm dia. M1 10.00
G. ROOFING WORK TOTAL CARRIED OVER TO SUMMARY:

H. FINISHING & PAINTING


1.01 Apply two coats of plastering in cement mortar (1:3) to receive ceramic wall tile / M2 146.68
1.02 Gypsum
Apply plastering.
Gypsum plastering upto fine finish. Price shall include pre-cleaning and M2 10.00
1.03 preparation of the
Providing and applyingsurfaces.
20 mm thick plaster on external walls in two coats, first M2 10.00
1.04 coat shall be 12 mm thick
Apply three coats of approved and the quality
second coat shall
plastic be 8 mmpaint
emulsion thick cement mortar
to all internal M2 3584.70
1:3 (1 cement
plastered : 3 Price
surfaces. sand) including
shall include making grooves
pre-cleaning and as per design
preparation of and pattern
surfaces.
1.05 Apply three coats of approved quality oil plastic paint to all external plastered M2 2471.36
complete.
1.06 surfaces.
Apply onePrice
coatshall include
of primer andpre-cleaning and
quartz paint to preparation
all external of surfaces.
plastered surfaces. Price M2 10.00
1.07 shall
10 mminclude
thick pre-cleaning
cement plaster and onpreparation of surfaces.
exposed surfaces of R.C.C. slabs, beams, lintels, M2 288.00
staircases,
H. FINISHING walls&and canopiesWORK
PAINTING with drip mould
TOTAL with cement
CARRIED OVER mortar 1:3 (1 cement :
TO SUMMARY
3 fine sand) to give an even and smooth finish.

Contract Agreement between Frigorifico Boran Foods PLC and TNT Construction, October 2014
: 37 :
SCHEDULE OF QUANTITIES FOR THE CONSTRUCTION OF ADAMITULU MEAT
PROCESSING FACILITY FOR FRIGORIFICO BORAN FOODS PLC.

( TENDER -III )

S. No. Description of Item Unit Qnty.


I. MISCELLANEOUS
1.01 Making plinth protection / pavement around the building 50 mm thick of cement M2 580.80
1.02 concrete 1:3:6fixing
Providing and (1 cement :3 coarse expansion
10 mm Styrofoam sand :6 graded stone
joint filler aggregate
in floor 20 mm/
joints /column M2 98.64
nominal
beam size)
joints. over 75 mm bed of crushed stone well rammed and consolidated
I. MISCELLANEOUS WORK TOTAL CARRIED OVER TO SUMMARY:
and grouted with fine sand including finishing the top smooth.

II. ROAD WORK


2 Earth work in excavation including dressing of sides and ramming of bottoms, lift
2.01 upto
Clear1.5andMts.,
remove stacking thetomaterial
top soil an average temporarily
depth ofnear the excavated area and then
200mm. M2 3656.00
filling back excavated earth (Any where within the premises) in trenches, plinth,
2.02 Bulk / Pit / Trench excavation in ordinary soil to a depth not exceeding 1500mm, M 3
2924.80
sides of foundations etc. in layers not exceeding 20 cms. in depth and
2.03 stacking
Filling the material
selected materialtemporarily
(to be near the
brought excavated
from outside area fillingincluding
/ quarry) back excavated
cost of M3 1279.60
consolidating each deposited layer completed.
earth
selectedand then
material disposal
and of
fillingsurplus
in excavated
plinth, under soil
roadincluding
pavement spreading
& under and levelling
hardcore in
2.04 Removal, load and carting away surplus excavated material outside the existing M3 365.60
within
layers the
not factory
exceeding premises
20 cm as
in per
depth,Engineer's instructions.
consolidating each deposited layer with road
2.05 premises and
Providing to an appropriate
laying basaltic stone tip ashardcore
directedwell byrolled,
the Engineer,
consolidated by and
mechanical
blinded M3 914.00
roller, rammer, plate vibrator etc.
transport.
2.06 with crushed stone .
Providing and laying P.C.C. 1:4:8 (1 cement :4 coarse sand :8 graded stone M3 365.60
2.07 aggregateand
Providing 40 laying
mm. nominal
in position size)
designin road including cement
mix reinforced the cost of centring
concrete qualityand
C- M3 731.20
shuttering
25, 360 kgas per
of the drawing. filled in to form work and vibrated around rod
cement/m3
2.08 Mild steel reinforcement according to structural drawings. Price includes cutting, Kg 21269.22
reinforcement
bending, in roadsin including the cost of centring & shuttering
concrete(formwork),
II. ROADplacing WORK TOTAL position
CARRIED andOVER tying wire and
TO SUMMARY: spacers.
finishing and reinforcement. (Reinforcement
(Reinforcement bar shall be provided to site by the employer.) measured separately &
Reinforcement steel & Cement shall be provided to site by the employer.
III. UNDERGROUND TANK
3.01 Earth work in excavation in foundation trenches or drains in all kinds of soil M3 450.00
3.02 including dressing
Filling selected of sides
material (toandbe ramming
brought from of bottoms,
outsidelift upto 1.5including
/ quarry) m, stacking costthe
of M 3
60.00
material
selected temporarily
material and near
filling thein excavated
trenches, area
sides and
of then
foundations, disposal of
footings surplus
etc. in
3.03 Providing and laying cement concrete With mix 1:4:8 (1 cement :4 coarse sand :8 M3 16.00
excavated
layers not soil including
exceeding 20spreading
cm. in mm.and levelling
depth, within the
consolidating each factory premises
deposited layer aswith
per
3.03 graded
Providing stone aggregate
and laying in position 40 design nominal size) in foundations, machine
Engineer's
road roller, instructions.
rammer, plateBottom
vibrator width formix reinforced
excavation cement
shall concreteas
be measured quality
given C-
in M3 57.60
foundations,
25, 360 kg footings
of and bases
cement/m3 of etc.
filled columns
in to and under
form work floors
and includingaround
vibrated the costrodof
3.04 the foundation drawings and details showing the width
Provide, cut and fix in position sawn structural wood or steel formwork which ever of bedding concrete only
centering
reinforcementand shuttering
in clearance
footings, (formwork).
foundations, rafts,
(a) and hence side
is appropriate
Foundations, including
footings, bases ifofany
strutting, will not
propping
columns, beplinth
etc.
plinth and beams,
measured and&mass
removal
beams
pedestal
ofpaid
form of columns,
separately.
work
concrete, for: The
ground M2 10.00
mass concrete,
Contractor should walls and
cover formachine
this in foundations
his rate. but excluding the cost of centring
(b) floor
Walls slabs,
(any etc. - All work
thickness) upto plinth
including level. buttresses, plinth and string courses,
attached M2 336.00
& shuttering (formwork), finishing and reinforcement - All work up to plinth.
(c) columns,
(Formwork pillars, piers, posts and struts etc.
Suspended floors, beams, girders, cantilevers, horizontal portion ofReinforcement
and reinforcement measured separately). gutter etc. M2 160.00
3.05 steel & Cement
Mild steel shall be
reinforcement provided
according toto site by the
structural employer.
drawings. Price includes cutting, Kg 2000.00
3.06 bending,
Apply two coats placing in position
of cement plaster and tying exposed
on internal wire and surfacesconcrete
of R.C.C. spacers.
slabs, M2 168.00
(Reinforcement
beams,ascolumns, bar shall
lintels, be provided to site by the employer.)
3.07 Same above, but withetc. cementwith mortar
cement1:3 mortar 1:3 (1 :3
(1 cement cement
coarse: 3sand)
fine sand) to
and fine M2 10.00
give
coat an
of evencement.
neat and smooth finish.
3.08 Supply & apply 6 mm thick cementitious type (Xypex or Equivalent) water M2 328.00
proofing strictly following
III. UNDERGROUN TANK the manufactures
TOTAL CARRIED instruction.
OVER TO SUMMARY:

Contract Agreement between Frigorifico Boran Foods PLC and TNT Construction, October 2014
: 38 :
SCHEDULE OF QUANTITIES FOR THE CONSTRUCTION OF ADAMITULU MEAT
PROCESSING FACILITY FOR FRIGORIFICO BORAN FOODS PLC.

( TENDER -III )

S. No. Description of Item Unit Qnty.

SCHEDULE OF QUANTITIES FOR THE CONSTRUCTION OF ADAMITULU MEAT


PROCESSING FACILITY FOR FRIGORIFICO BORAN
( TENDER -III FOODS
) PLC

SUMMARY

I. CIVIL WORK
A. EARTH WORK ETB
B. CONCRETE WORK ETB
C. REINFORCED CEMENT CONCRETE WORK ETB
D. MASONARY / BLOCK WORK ETB
E. CARPENTRY / JOINERY & METAL WORK ETB
F. FLOORING ETB
G. ROOFING ETB
H. FINISHING ETB
I. MISCELLANEOUS

II. ROAD WORK ETB


III. UNDERGROUND TANK ETB

TOTAL: ETB

Contract Agreement between Frigorifico Boran Foods PLC and TNT Construction, October 2014
: 39 :

( TENDER -III )

Rate Amount

8.00 88,666.24
90.00 727,423.20
74.00 117,882.00
170.00 527,200.60
170.00 180,308.46
50.00 59,460.68
1,700,941.18

990.00 1,122,415.47
990.00 49,500.00
815.00 2,161,049.93
600.00 6,000.00
3,338,965.40

1,300.00 2,802,946.90
1,250.00 12,500.00
50.00 57,600.00
1,300.00 247,020.80

125.00 199,420.00
125.00 1,250.00
150.00 162,264.00
4.75 443,392.07
700.00 7,000.00
3,933,393.77

850.00 427,652.00
925.00 301,254.00
2,400.00 24,000.00
2,600.00 26,000.00
1,275.00 477,303.90
1,300.00 13,000.00
235.00 2,350.00
1,271,559.90

3,450.00 34,500.00
450.00 19,800.00
250.00 36,157.50
290.00 2,900.00

1,600.00 45,360.00

Contract Agreement between Frigorifico Boran Foods PLC and TNT Construction, October 2014
: 40 :

( TENDER -III )

Rate Amount
600.00 6,000.00
1,450.00 7,250.00
10.00 1,000.00
10.00 1,000.00
450.00 4,500.00
450.00 4,500.00
2,550.00 249,930.60
225.00 2,250.00
25.00 250.00
25.00 250.00
415,648.10

525.00 45,874.50
420.00 61,605.60
305.00 3,050.00
340.00 5,406.00
150.00 1,500.00
1,600.00 16,000.00
1,350.00 13,500.00
19.00 210,582.32

40.00 3,945.60
60.00 600.00
50.00 500.00
368,314.02

75.00 70,125.00
80.00 74,800.00
350.00 343,000.00
360.00 3,600.00

150.00 52,200.00
200.00 2,000.00
250.00 2,500.00
548,225.00

65.00 9,534.20
40.00 400.00
70.00 700.00
25.00 89,617.50
35.00 86,497.67
115.00 1,150.00
50.00 14,400.00
202,299.37

Contract Agreement between Frigorifico Boran Foods PLC and TNT Construction, October 2014
: 41 :

( TENDER -III )

Rate Amount

150.00 87,120.00
39.00 3,846.96
90,966.96

8.00 29,248.00
90.00 263,232.00
170.00 217,532.00
50.00 18,280.00
815.00 744,910.00
990.00 361,944.00
1,300.00 950,560.00
4.75 101,028.81

65.00 29,250.00
170.00 10,200.00
990.00 15,840.00
1,300.00 74,880.00

125.00 1,250.00
125.00 42,000.00
150.00 24,000.00
4.75 9,500.00
60.00 10,080.00
25.00 250.00
350.00 114,800.00
332,050.00

Contract Agreement between Frigorifico Boran Foods PLC and TNT Construction, October 2014
: 42 :

( TENDER -III )

Rate Amount

1,700,941.18
3,338,965.40
3,933,393.77
1,271,559.90
415,648.10
368,314.02
548,225.00
202,299.37
90966.96

2,686,734.81
332,050.00

14,889,098.51

Contract Agreement between Frigorifico Boran Foods PLC and TNT Construction, October 2014