Sei sulla pagina 1di 9

REF:

REVISION:
AFIA Jeddah Factory Project DATE: 29/05/2016

Location AFIA Jeddah Factory Project Task/Activity CONCRETE


Completed by: Date:
Completed by: Date:

Severity

Probability

Severity

Page 1 of 9
Health, Safety, and Environmental
2 4 6 8 10
10 20 40 60 80 100 REF:
REVISION:
8 16 32 48 64 80
AFIA Jeddah Factory Project DATE: 29/05/2016
6 12 24 36 48 60
4 8 16 24 32 40
2
2 4 8 12 16 20
First aid

Unlikely

Probability

Page 2 of 9
Health, Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 29/05/2016

Minor injury or damage

Possible

Moderate injury or damage

Likely

Page 3 of 9
Health, Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 29/05/2016

Major injury or damage

Very Likely

10

Fatality or extensive damage

10

Imminent

Page 4 of 9
Health, Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 29/05/2016

RISK ACCEPTABILITY MATRIX

Risk Rating Acceptability level Action required &


priority

Unacceptable risk Shutdown the


installation immediate
R>80
correct action

(40:64) High risk Immediate corrective


action

(20:36) Important & possible Corrective action ASAP


risk

Page 5 of 9
Health, Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 29/05/2016

R<16 Acceptable risk Consider the necessary


of a corrective action

Risk after
Potential P Risk Existing control control Additional Final
hazard S Rat measures measures Control Risk
e P S measures
R required
Concrete 8 6 48 Appropriate Safety 4 4 16 Safety shield can
splashing into Goggles helmet and be worn in critical
eyes from the mask must be worn. working situations
end hose, face
and head.
Concrete burns 6 6 36 Gloves, Rubber shoes Specific MSDS will
to hands and (Safety Wellingtons) 2 2 4 be provided at site
feet helmet and coverall
must be worn.
6 10 60 All equipment should All workers should
Equipment be properly be trained and
Protection maintained and 4 6 24 tested by the
equipped with manager or
manufacturer- superintendent
recommended safety before operating

Page 6 of 9
Health, Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 29/05/2016

devices. Disabling or any equipment


removing safety (from drills to
devices is dangerous backhoes).
and should be Knowledge of the
avoided. All unsafe or hazards associated
inoperable with specific
equipment (cement equipment is the
mixer, cutting and first line of defense
machines etc) should against injury and
be marked as such to proper inspected.
prevent further use of
the equipment.
Mostly Damage
equipments can
cause of sever 2 8 16
electrical shock.
FALLING 8 10 80 Sources of height Should be used fall
HAZARD associated with protection system
concrete construction and Everybody
include but are not should be aware of
limited to scaffolding, specific height of
ladders, bucket- construction site.
trucks, catwalks,
elevated or wall
forms, and elevated
floors.

Page 7 of 9
Health, Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 29/05/2016

Head injury 8 4 32 Move away from end 4 6 24 Safety Helmet


from hose during boom must be worn.
suspended movement. Concrete staff to be
hoses from alert.
boom

Environmental 4 4 32 Implement safety 4 2 8 Suspend / stop all


conditions procedures & operations during
during guidelines on heat extreme
Concrete. stress. temperature &
Inspect the area for humidity and high
possible hazardous wind of more than
atmosphere and any 25 knots.
other condition that
may present a
hazard.
Suspend / stop all
operations during
extreme temperature
& humidity and high
wind of more than 25
knots.

Page 8 of 9
Health, Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 29/05/2016

Page 9 of 9
Health, Safety, and Environmental

Potrebbero piacerti anche