Sei sulla pagina 1di 13

Specialist Contractor: Project Name: Client.

HQSM
Enginering
LPG STORAGE & TERMINAL Doc: Technical
FACILITIES AT HAMBANTOTA Proposal
Ref No. Rev. Date:
LWI-16-074 0 4.01.17

Project Title:
CATHODIC PROTECTION OF
STORAGE TANK BOTTOM PLATE & BURIED PIPELINES

Document Title:
TECHNICAL PROPOSAL
Rev.0

0 4/01/2017 Technical Proposal SM OK

Rev Date Description Prepared By Check By Approved By


Prepared by:
LERWICK CORROSION TECHNOLOGIES PTE LTD

Private & Confidential 1


Specialist Contractor: Project Name: Client. HQSM
Enginering
LPG STORAGE & TERMINAL Doc: Technical
FACILITIES AT HAMBANTOTA Proposal
Ref No. Rev. Date:
LWI-16-074 0 4.01.17

1. Introduction

Lerwick Corrosion Technologies Pte Ltd is pleased to submit this Technical Proposal
providing Cathodic Protection system for a new Storage Tank and Buried Pipelines.
The tank bottom plate of the Storage Tank shall be protected by Impressed Current CP
system (ICCP) while the Buried Pipeline shall be protected by Sacrificial Anode CP
system.

This document details the design of the CP System that shall be employed and
engineering calculation to support the design proposed.

2. Scope of Supply

The scope of supply provided by Lerwick Corrosion Technologies as follows;


- Conduct pre-design investigation
- Provide Engineering Calculation and design for the proposed CP System
- Provide Engineering Drawings for Installation
- Provide Method Statement for Installation
- Endorsement of Proposals and Drawings by NACE CP Technologist
- Provide Site Supervision where necessary
- Testing and Commissioning of the CP System
- Prepare & submit Final Commissioning Report endorsed by NACE CP Technologist

3. Design Parameters
1.Maximum Design
Temperature to be Type of CP system : Impressed Current CP (ICCP) should be
specified. Tank Diameter : 28 m (T-4201) considered as 30
: 28 m (T-4202) years
current requirement Pipeline details : 8 x 185m
test to be : 16 x 185m
performed. Anode type : MMO Linear Anode Tanks
Otherwise : Magnesium Ribbon Anode - Pipelines
minimum18mA/m2 Design life : 30 years Tanks
to be used. : 10 years - Pipelines
Coating breakdown : 100%
NACE Criteria : -850 mill volt to CuCuS04 ref
CP design current density : 10 mA/m2
Sand Resistivity : 100 .m
Anode Groundbed : Concentric Linear Anode Tanks
: Distributed Ribbon Anode - Pipelines
Backfill materials : Coke Breeze Tanks
: Gypsum Bentonite Pipelines

Private & Confidential 2


Specialist Contractor: Project Name: Client. HQSM
Enginering
LPG STORAGE & TERMINAL Doc: Technical
FACILITIES AT HAMBANTOTA Proposal
Ref No. Rev. Date:
LWI-16-074 0 4.01.17

4. Reference Standards & Specifications

The Cathodic Protection system outlined herein will be designed, supplied, installed and
commissioned in compliance with internationally accepted standards and specifications as
listed below.

NACE STANDARD SP-0169-13 :


Standard practice control of external corrosion on underground or submerged marine
structures.

BS 7361 : Part 1: 1991 :


Cathodic Protection code of practice for land and marine application

API RP:651 :
Cathodic Protection of Above Ground Petroleum Storage Tanks

4.1 Cathodic Protection Criteria

The National Association of Corrosion Engineers (NACE) Standard Practice No. SP169-13
addresses Cathodic Protection criteria are as follows:

- A negative polarized potential of at least -850 mV vs a saturated copper/copper


sulphate reference electrode (CuCuS04)

- A minimum of 100mV of cathodic protection polarization between the structure surface


and a stable reference electrode contacting the electrolyte.

Private & Confidential 3


Specialist Contractor: Project Name: Client. HQSM
Enginering
LPG STORAGE & TERMINAL Doc: Technical
FACILITIES AT HAMBANTOTA Proposal
Ref No. Rev. Date:
LWI-16-074 0 4.01.17

5. Cathodic Protection Design Calculations Current density


should be revisited.
5.1 Surface Area & Current Requirement Calculations

This section illustrates the design calculation for the proposed CP System.

Surface Area, SA = * r
Current Requirement, Ireq = SA * Coating Breakdown * Current Density
*please refer to section 3 for design values

Structure Diameter Height Surface Current Req


(m) (m) Area (amps)
(m)
STORAGE TANKS

T-4201 28 20 615.7 6.2

T-4202 28 20 615.7 6.2

Total Current Required 12.4 amps

Surface Area, SA = * d * l
Current Requirement, Ireq = SA * Coating Breakdown * Current Density
*please refer to section 3 for design values

Structure Diameter Length Surface Current Req


(m) (m) Area (amps)
(m)
PIPELINES

8 0.203 185 118 1.18

16 0.406 185 236 2.36

Total Current Required 3.54 amps

Private & Confidential 4


Specialist Contractor: Project Name: Client. HQSM
Enginering
LPG STORAGE & TERMINAL Doc: Technical
FACILITIES AT HAMBANTOTA Proposal
Ref No. Rev. Date:
LWI-16-074 0 4.01.17

5.2 Quantity of Anodes for Tank Bottom Plate

Impressed Current CP System is proposed for protection of Tank Bottom Plate. The
system consists of MMO Linear Anodes with Transformer Rectifier Unit and other
accessories. The ICCP System shall provide protection against corrosion to the tank
bottom plate.

The quantity of anodes used is determined by current distribution and the size of the
tank protected, desired service life. Design is selected to ensure good current
distribution while providing an economic design life.

Based on the calculation above, minimum current required by each tank bottom plate is
6.2 amps. In view of possible current leakage to the tanks earthing system and
pipelines, our proposal shall base on adequate current distribution.

In reference to MMO Wire anode datasheet, each meter will provide at least 1 amp.
The tank bottom design also influences in the quantity of anodes. Hence, we propose;

Proposed Nos of Rings: 4 sets.


Ring 1 @ 4 mtr = 11 mtr Wire Anode + 45 mtr Cable tail
Ring 2 @ 11 mtr = 33 mtr Wire Anode + 38 mtr Cable tail
Ring 3 @ 18 mtr = 55 mtr Wire Anode + 31 mtr Cable tail
Ring 4 @ 25 mtr = 77 mtr Wire Anode + 24 mtr Cable tail

Each of the Wire anodes will have cable tail for termination at the Ex-rated Junction
Box located outside the tank bund wall. The Wire anodes shall be laid in concentric
design (circular).

Lerwick proposes 50 Volts / 15 amps DC Output Transformer Rectifier Unit, after taking
into consideration of possible resistance shift in the future.

The Air-cooled TR Unit will require input power source of 415 volts/3 phase/50 Hz.
Location of the the TR Unit shall be indoor or outdoor. Enclosure shall be at least IP55
painted to RAL7032.

Private & Confidential 5


Specialist Contractor: Project Name: Client. HQSM
Enginering
LPG STORAGE & TERMINAL Doc: Technical
FACILITIES AT HAMBANTOTA Proposal
Ref No. Rev. Date:
LWI-16-074 0 4.01.17

5.3 Quantity of Anodes for Buried Pipelines

Sacrificial Anode CP system is proposed for Buried Pipelines. The system consists of
Sacrificial Magnesium Ribbon to provide protection against corrosion to the external
surface of the pipeline.

With reference to Magnesium Ribbon anode datasheet, each meter weighs 0.34 kg.
Hence, Magnesium anode for each of the pipelines required as follows;
should be 30 years.
Minimum anode weight, 8 Pipeline:
Current Req x 8760 x 10 yrs
should be adjusted 1230 x 50%
with the adjusted
current density
= 1.18 x 8760 x 10 / 1230 x 0.5
= 168.1 kg

Minimum Magnesium Ribbon length for 8 Pipeline:


Min Anode Weight / Anode Weight per mtr
= 168.1 / 0.34
= 494.4 meter

Therefore, the 8 Pipeline shall have 3 lengths of Magnesium Ribbon buried next to the
Pipeline. Total length of Magnesium Ribbon shall be 185m x 3 = 555 meter (Total)

Minimum anode weight, 16 Pipeline:


Current Req x 8760 x 10 yrs
1230 x 50%

= 2.36 x 8760 x 10 / 1230 x 0.5


= 336.2 kg

Minimum Magnesium Ribbon length for 16 Pipeline:


Min Anode Weight / Anode Weight per Mtr
= 336.2 / 0.34
= 988.8 meter

Therefore, the 16 Pipeline shall have 3 lengths of Magnesium Ribbon buried next to
the Pipeline. Total length of Magnesium Ribbon shall be 185m x 6 = 1110 meter
(Total)

Private & Confidential 6


Specialist Contractor: Project Name: Client. HQSM
Enginering
LPG STORAGE & TERMINAL Doc: Technical
FACILITIES AT HAMBANTOTA Proposal
Ref No. Rev. Date:
LWI-16-074 0 4.01.17

6. Brief Description of Proposed CP System for Tank Bottom Plate

6.1 Concentric Linear Anode Groundbed


The Linear Anode wires shall be place below the tank bottom plate at approximately
500mm away. There should be other materials between the anodes and bottom plate.
Linear anodes shall be place in Concentric Circle to provide even current distribution.

Cable tail from anodes shall be terminate at the Anode Junction Box which shall be
mounted onto the Tank Wall.

6.2 Air Cooled Transformer Rectifier Unit

The Air-Cooled Transformer Rectifier unit shall be powered by 415Vac, 3 Phase, 50Hz.
The AC power source shall be provided from the nearest Distribution Box. Since the
Transformer Rectifier units are rated IP55, they are proposed to be located outside the
Hazardous Zone Classifications.

Brief description of proposed TR Unit as follows;


Input Voltage: 230v 1Ph 50Hz
DC Output: 50v / 15 amps Single Circuit
Enclosure: IP55 Outdoor
Cooling: Air cooled
Controls: Constant Current Control
Brand/Origin: Lerwick/Singapore

6.3 MMO Wire Linear Anodes

Anode material will be of mixed metal oxide anode which will be of Titanium substrate
coated with mixed metal oxide. The MMO Wire Anodes specifications shall be as
follows:

Composition : Titanium Grade 1 or 2


Coating : Electrocatalytic mixed metal oxide
Diameter : 3 mm
Design Life : 30 years
Brand/Origin : Specialist Casting/United Kingdom

The MMO coating demonstrates a very high chemical stability, even in very low PH
values environments. It is also not affected by the generation of chlorine.

MMO Wire shall be coupled with HMWPE Cables transforming the Wire into Linear
Anodes. The Linear anodes provide continuous close-proximity which enables the
anodes to be placed near to cathode or steel structures.

Private & Confidential 7


Specialist Contractor: Project Name: Client. HQSM
Enginering
LPG STORAGE & TERMINAL Doc: Technical
FACILITIES AT HAMBANTOTA Proposal
Ref No. Rev. Date:
LWI-16-074 0 4.01.17

6.4 Stationary Reference Electrodes

Permanent reference electrodes shall of Zinc electrode shall have a design life of not
less than 20 years. It shall be shipped in a cotton sack with low resistivity backfill. The
reference electrode shall be equipped with 6mm cable tail of appropriate length.

Stationary Reference Electrode originates from Singapore.

6.5 Ex-Rated Stainless Steel Junction Box

Ex-Rated Stainless steel junction box approved for Hazardous Area shall be provided.
All wiring from MMO anodes, Reference Cells and Structure shall terminate in the
junction box.

The Junction Box shall have Insulated Terminal Board with individual Screws and Bolts
for Structure, Anodes and Reference cells.

The Junction Box shall be mounted onto the tank walls for easy access and
maintenance. Ex-Rated Junction Box originates from USA/Europe

6.6 Cables
All ICCP cables shall be of single core conductor copper cable type with XLPE/PVC or
HMWPE Insulation. Details of the cables as follows;

Description Size (mm) Colour Code Insulation


MMO Linear Anode to Anode 16mm White HMWPE
Junction Box
Positive Cable, TR Unit to MMO 35mm White SWA/XLPE/PVC
Anodes (In Anode JB) (2 core)
Negative Return Cable, TR Unit to 35mm Blue SWA/XLPE/PVC
Tank Structure (In Anode JB) (2 core)
Stationary Zinc Reference electrode 6mm Green XLPE/PVC

6.7 Grounding Wire Isolation


Earth Rod for the Tanks shall be isolated eliminate unnecessary current drain from the
CP system. Isolation can be achieved by using Polarization Cells.

One unit of Kirk Cells 5kA is proposed for each Earth Rods. The Kirk Cells shall be
housed in Stainless Steel enclosure with vent.

Polarization Cells isolates CP Current while at the same time allows Alternating Current
to pass thru towards the Earth Rod. This unit prevents CP Current from being drained.

Private & Confidential 8


Specialist Contractor: Project Name: Client. HQSM
Enginering
LPG STORAGE & TERMINAL Doc: Technical
FACILITIES AT HAMBANTOTA Proposal
Ref No. Rev. Date:
LWI-16-074 0 4.01.17

7. Brief Description of Proposed CP System for Buried Pipelines

7.1 Magnesium Ribbon Anode Groundbed

The Magnesium Ribbons shall be laid next to the pipeline under protection. Approx.
300 to 500mm distance from pipeline. The Ribbons anodes shall be buried together
with Gypsum Bentonite powder to provide low resistance path in the ground towards
the pipelines.

Cable shall be connected to the end of the Ribbon anodes, the cable shall terminate in
the Test Station nearby. Another cable shall be connected to the pipeline and terminate
in the Test Station. Bonding of these two cables shall be carried out in the Test
Stations. Once the cables are inter-bonded, Sacrificial Anode CP system will
commence.

The Magnesium Ribbon Anodes specifications shall be as follows:

Open Voltage Potential: -1.70 to -1.75v


Capacity: min 1100Ah/kg
Efficiency: 50% min
Consumption rate: 7.90 kg/A-yr
Weight per meter: 0.34 kg
Size: 9.5 x 19 mm

7.2 Cables

Cables for SACP system shall be of single core conductor copper cable type with
XLPE/PVC Insulation. Details of the cables as follows;

Description Size (mm) Colour Code Insulation


Magnesium Ribbon Anode 10mm White XLPE/PVC
Negative Return Structure 10mm Blue XLPE/PVC
Stationary Zinc Reference electrode 6mm Green XLPE/PVC

7.3 Ex-Rated Stainless Steel Test Station

Ex-Rated Stainless Steel Test Stations approved for Hazardous Area shall be provided.
All wiring from the anodes and pipeline shall terminate in the test station.

The test station shall have Insulated Terminal Board with individual Screws and Bolts
for Pipeline, Anodes and Reference cells.

Ex-Rated Junction Box originates from USA/Europe.

Private & Confidential 9


Specialist Contractor: Project Name: Client. HQSM
Enginering
LPG STORAGE & TERMINAL Doc: Technical
FACILITIES AT HAMBANTOTA Proposal
Ref No. Rev. Date:
LWI-16-074 0 4.01.17

8. BILL OF MATERIALS
depends on the
adjusted
Stated below are the materials for the proposed ICCP & SACP System.
parameters.
S/n Description Quantity
a. Storage Tank Bottom Plate - ICCP
a Air Cooled Transformer Rectifier Unit 2 sets
- AC Input, 230v 50hz Single Phase
- DC Output, 50V 15 Amps
- Constant Current Output Control
b MMO Anodes Linear Wires 2 sets
- with Kynar/HMWPE 16mm Cable
- Anode and cable length to refer to Section 5.2
c Anode Junction Box 2 sets
- Ex-Rated SS Enclosure for Tank Wall mounting
d Loresco SC3 Backfill 200 bags
- 22.7 kg per bag
e Armoured XLPE/PVC Cable, Anode JB to TRU 300 meter
- 35mm, 2 Core
f Stationary Zinc Reference Electrode 4 sets
c/w 6mm XLPE/PVC cable
g Kirk Cells, 5kA 6 sets
c/w SS Enclosure with standing pole

S/n Description Quantity


b. Buried Pipelines - SACP
a Magnesium Ribbon Anode 6 rolls
305 meter / roll
b Gypsum Bentonite Backfill 0.5 Metric
Tonnes
c Test Point 3 sets
- Ex-Rated SS Enclosure with standing pole
d XLPE/PVC Cable, Anode to Test Point 50 meter
- 10mm
e XLPE/PVC Cable, Structure to Test Point 50 meter
- 10mm
f Stationary Zinc Reference Electrode 3 sets
c/w 6mm XLPE/PVC cable

Private & Confidential 10


Specialist Contractor: Project Name: Client. HQSM
Enginering
LPG STORAGE & TERMINAL Doc: Technical
FACILITIES AT HAMBANTOTA Proposal
Ref No. Rev. Date:
LWI-16-074 0 4.01.17

S/n Description Quantity


a. Spares for Commissioning and 2 Yrs Operation
a Portable CuCuS04 reference cell 2 sets

b High Impedance Multi Meter FLUKE 1 set

c XLPE/PVC Cable 50 meter


- 10mm

d Fast Fuses for Transformer Rectifier Unit 1 set

Private & Confidential 11


Specialist Contractor: Project Name: Client. HQSM
Enginering
LPG STORAGE & TERMINAL Doc: Technical
FACILITIES AT HAMBANTOTA Proposal
Ref No. Rev. Date:
LWI-16-074 0 4.01.17

APPENDIX A : SOIL RESISTIVITY MEASUREMENT

Private & Confidential 12


Specialist Contractor: Project Name: Client. HQSM
Enginering
LPG STORAGE & TERMINAL Doc: Technical
FACILITIES AT HAMBANTOTA Proposal
Ref No. Rev. Date:
LWI-16-074 0 4.01.17

APPENDIX B : SITE VISIT REPORT

should be
witnessed.

*END OF PROPOSAL*