Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
1
2 Water
Quality
Parameter Maximum Maximum Sample
3.1 Yield of Extractable water
.3 desirable permissible
the Source quantity
level
Pumping duration level
Turbidity
Rate of pumping
pH
3.1 Present Water Use Practices
Electrical Conductivity
.4
Chloride ( as Cl )
3.1 Problems and Upgrading
.5 Total Hardness( as
4.0 CaCO
Health3 ) & Sanitation Aspect
2
7.0 Technical Aspects
7.1 Determination of Water
Requirement
7.1.1 Identification of Project area
7.1.2 Assessment of
population
Populatio No. of
Head works/TP n served connection Length of
Location/Augmented capacity(m3/d) (total s distribution(km)/
projected (total Size Range
) projected)
Topographical Surveys 1400 200 Transmission
Construction of Pump & 90 mm 25km
Generator House
Supply, Delivery, Installation and
Commissioning of Pumps and
generators
Supplying and Laying of
3
Transmission Pipe Line (90mm,
63mm UPVC pipe)
Supply & delivery of 250L UPVC
tank & Fabrication of suitable
stands for low income
people( assumed as 60% of total
population)
Providing connection, including
water meters
Source investigation, Well
construction and Testing
Construction of 60 m3 Ferro
cement Water Tower
Construction of fencing & gate for
intake site
7.4 Total Cost Estimate
Turbidity 5 NTU
Colour Nill
4
9.0 Pump detail
(a) Types of pump Centrifugal pump
(b) 250hp
Power of pump
(c) 5
No of pumps
(d) Pumping rate 100m3/day
ANNEX 1