Alternatif III
No
1
2
tion for Community Water Supply, planning design construction 4
5
6
7
8
Alternatif I
Prosentase Removal (%)
Proses Pengolahan
Turbidity BOD N
Intake - - -
Prasedimentasi 80% - -
Flash Mix - Slow Mix (Hidrolis) - 23% 99%
Sedimentasi 90% 75% -
Slow sand Filter 90% 87% 52%
Disinfeksi - 35% -
Reservoir - - -
Alternatif II
Prosentase Removal (%)
Proses Pengolahan
Turbidity BOD N
Intake - - -
Prasedimentasi 80% 80%
Aerasi 15% -
Flash Mix - Slow Mix (Mekanis) - 23% 99%
Sedimentasi 90% 75%
Rapid Sand Filter 67% 87% 20%
Disinfeksi - 35%
Reservoir - -
Alternatif III
Prosentase Removal (%)
Proses Pengolahan
Turbidity BOD N
Intake - -
Roughing Filter 80% 40%
Flash Mix - Slow Mix - 23% 99%
Sedimentasi 90% 75%
Rapid Sand Filter 67% 87% 20%
Disinfeksi - 35%
Reservoir - -
Baku Mutu Permenkes No. 492/Menkes/Per/IV/2010
(%) Parameter Baku Mutu Satuan
P Kekeruhan 5 NTU
- BOD 10 mg/L
- Surfaktan 0.05 mg/L
99%
- Karakteristik Air Baku
59% Parameter Eksisting Satuan
- 100 NTU
Kekeruhan
- 145.45 mg/L untuk menghitung lumpur
BOD 80 mg/L
N 4 mg/L
(%) P 2 mg/L
P
- Warna itu kayak bahan organik
Menghilangkan warna pake aerasi dan slow sand
Cari konversi TCU ke
99% Q debit pengolahhasil setelah diolah
Debit 1000 L/dt ini hasil yang diproduksi
20% Alternatif pengolahan dilihat dari % removal yang besar
konversinya dicantumkan datanya
y = 1.0423 x + 41.22
99%
20%
1 Buruk
2 Sedang
3 Baik
>> bisa dikasih bobot juga
Persentase Removal Tiap Alternatif
Alternatif I
Parameter
Removal Tiap Unit
Kekeruhan BOD N
Intake 100 80 4
Prasedimentasi 20 80 4
Koagulasi (Mekanis) 20 61.6 0.04
Flokulasi (Hidrolis) 20 61.6 0.04
Sedimentasi 2 15.4 0.04
Slow Sand Filter 0.20 2.00 0.0192
Disinfeksi 0.20 1.30 0.0192
Reservoir 0.20 1.30 0.0192
Hasil Akhir 0.20 1.30 0.0192
Baku Mutu 5 NTU 10 mg/L 0,05 mg/L
Alternatif II
Parameter
Removal Tiap Unit
Kekeruhan BOD N
Intake 100 80 4
Prasedimentasi 20 16 4
Aerasi 17 16 4
Flash-Slow Mix 17 12.32 0.04
Sedimentasi 1.7 3.08 0.04
Rapid Sand Filter 0.561 0.4004 0.032
Disinfeksi 0.56 0.26026 0.032
Reservoir 0.56 0.26 0.032
Hasil Akhir 0.56 0.26 0.032
Baku Mutu 5 NTU 10 mg/L 0,05 mg/L
Alternatif III
Parameter
Removal Tiap Unit
Kekeruhan Warna Kekeruhan
Intake 100 80 4
Roughing Filter 20 48 4
Koagulasi (Mekanis) 20 37 0.040
Flokulasi (Mekanis) 20 37 0.040
Sedimentasi 2 9 0.040
Rapid Sand Filter 0.66 1 0.032
Disinfeksi 0.66 1 0.032
Reservoir 0.66 1.00 0.032
Hasil Akhir 0.66 1.00 0.032
Baku Mutu 5 NTU 10 mg/L 0,05 mg/L
Pilih jumlah pipa berdasarkan pasang surut sungai,
P Kedalaman sumur pengumpul maksimal 3 m
2 perlu pintu airnya tergantung pake pompa atau nggak
2 kalo pake pompa tidak perlu pintu air, karena setelah dipompa tidak akan ada aliran bal
0.02
0.02
0.02
0.0083
0.0083
Alternatif Baku Mutu Lahan
0.0083
0.0083 Alternatif I 3 2
0,05 mg/L Alternatif II 3 3
Alternatif III 2 3
P
2
2
2
0.02
0.02
0.016
0.016
0.016
0.016
0,05 mg/L
Warna
2
2
0.020
0.020
0.020
0.016
0.016
0.016
0.016
0,05 mg/L
telah dipompa tidak akan ada aliran balik
Operasional &
Investasi Total
Maintenance
3 2 10
2 3 11
2 2 9
I INTAKE
Bell Mouth Strainer
o Kecepatan melalui lubang strainer 0,15 0,3 m/detik
o Diameter lubang strainer 612 mm
o Luas total permukaan strainer = 2 x luas efektif
Cylindrical Strainer
o Kriteria desain sama dengan bell mouth strainer.
o Harus digunakan pada saat head air cukup tinggi di atas strainer.
o Strainer sebaiknya terletak 0,6 1 m dibawah level air terendah (jika tidak mempunyai lubang di bagian atas), sedangkan untuk
Pipa gravitasi air baku
o Kecepatan aliran 0,6 1,5 m/detik untuk mencegah erosi dan sedimentasi.
o Ukuran pipa disesuaikan agar V pada LWL > 0,6 m/detik dan pada HWL < 1,5 m/detik. Dengan mengetahui head dan kecepatan maka diameter p
Suction Well (Intake Well)
o Untuk mempermudah pemeliharaan sebaiknya sumuran ada 2 atau lebih.
o Waktu detensi sekitar 20 menit atau sebaiknya sumuran cukup besar guna menjaga kebersihan air.
o Dasar sumuran 1 m dibawah dasar sungai atau 1,5 m dibawah LWL.
o Sumuran berkonstruksi beton dengan tebal dinding 2030 cm dan bersifat rapat air.
Pipa Suction untuk pemompaan
o V pipa berkisar antara 1 1,5 m/detik
o Perbedaan LWL dengan pompa tidak boleh lebih dari 3,7 m
o Jika permukaan pompa lebih tinggi dari LWL, jarak suction sebaiknya kurang dari 4 m.
Rumus-rumus yang digunakan untuk perhitungan intake antara lain adalah sebagai berikut:
Rumus umum kecepatan (V)
V= Q /A
II b Roughing Filter
Horisontal RF
tinggi =2m
Ratio P:L = 6 : 1
Tebal media = 50-75 cm
Diameter media minimal 30 mm
Kecepatan filtrasi = 0,5-4 m/jam
Diameter media = 4 - 40 mm
Lebar = 2-5 m
v Biasanya terdiri dari 3 kompartemen, dengan ukuran panjang pada masing-masing kompartemen :
Kompartemen awal = 4,5-6 m
Kompartemen tengah = 3-4 m
Kompartemen terakhir = 1,5-2 m
v Ketinggian = 1-1,5 m
Vertikal RF
Tinggi total Vertikal Roughing Filter = 2 m
Tebal media =50-75 cm
Diameter terbawah sekitar 15 - 20 mm, yang di atasnya 10 mm, dan yang terkecil di bagian atas 5 mm
Kecepatan filtrasi = 0,3 m/jam - 1m/jam
IV Slow Mix
Gradien kecepatan (G) = 30 80 det-1
Camps number (G.td) = 104 105
Headloss (Hf) = 0,15 61 cm
V Sedimentasi
1. Jumlah bak minimum = 2
2. Kedalaman air = 3 4,5 m
3. Kecepatan aliran = 0,3 1,7 m/min
4. Waktu detensi = 2 4 jam
5. Surface loading = 1,25 2,5 m/jam
6. Panjang/lebar = minimum
7. Kedalaman air/panjang = minimum 1/15
8. Weir loading rate = 9 13 m3/m.jam
Bak sedimentasi dapat berupa circular, rectangular atau square dengan kedalaman 2 5 m.
Dimana rectangular mempunyai panjang sampai 50 m dan lebar 10 m sedangkan square tank mempunya
Sudut kemiringan ruang lumpur berkisar 45-600 untuk menjaga agar lumpur dapat mengalir secara gravit
Bilangan Reynold yang dihasilkan harus <2000 (agar laminer sehingga flok mengendap) sehingga diperlu
Tangki ideal OFR=kecepatan pengendapan
Kecepatan aliran horizontal 2,45 x 10-3 - 7.62 x 10-3 m/dt
rasio L (panjang) dan W (lebar) >3
Agar laminer, rasio L/W >7
Pengaturan inlet
v air yang melewati lubang berkisar antara 0.2-0.3 m/dt (4x kec horisontal/vertikal)
kecepatan disaluran inlet 0.15-0.61 m/dt (0.5-2 fps)
Ruang lumpur
kedalaman di inlet 2m dan dekat outlet 3m
Pengerukan lumpur
dengan mekanis, maka kecepatanpengerukan maksimum 0.3 m/menit
Slope minimum dari inlet menuju outlet =5-8%
slope dari dinding ke tengah bak = 10%
Kriteria lainnya
1. Kecepatan pengendapan
2. Kemiringan plate
3. Kecepatan pengendapan
4. Jarak antar plate
5. Tebal plate
6. Beban permukaan
7. Bilangan Reynold (NRe)
8. Bilangan Freude (NFr)
VI Filtrasi
No. Parameter Satuan Besaran
A FILTER BED
1 Tinggi air diatas media m 1,5 - 3
2 Kecepatan filtrasi m/jam 5 - 10
3 Ratio panjang : lebar bak filter 1,25 - 1,33
B BACKWASH
1 Kecepatan backwash m/jam 25 - 37
2 Waktu backwash menit 10 - 25
3 Tekanan backwash atm 1-2
4 Debit air backwash m^3/det 1% - 6% Qf
5 Periode pencucian jam 12 - 72
C UNDERDRAIN
1 Luas orifice : luas media ((1,5 - 5).10^-3) : 1
2 luas manifold : luas lateral (1,5 - 3) : 1
3 Diameter orifice cm 0,6 - 1,2
4 Jarak antar orifice cm 7,5 - 30
5 Kec. Max di manifold m/det 0,35 - 0,6
6 Kec. max di lateral m/det 0,2 - 0,5
D GUTTER
1 Lebar gutter ft 2
2 Jarak gutter antar tepi ft 4-6
E HEADLOSS
1 Headloss m 0,3 - 3
F MEDIA FILTER
1 Media pasir
a. Tebal cm 60 - 75
b. Ukuran butir mm 0,5 - 2
c. Spesific gravity 2,55 - 2,63
d. Effective size > 0,45
e. Uniform coefficient < 1,5
2 Media antrasit
a. Tebal cm 25 - 30
b. Ukuran butir mm 0,5 - 1,9
c. Spesific gravity 1,4 - 1,65
d. Effective size > 0,7
e. Uniform coefficient < 1,5
3 Tebal media filter m 1
4 Uniform coefficient < 1,5
5 Media penyangga
a. Tebal cm 30 - 60
b. Ukuran butir cm 0,3 - 6
c. Spesific gravity 2,55 - 2065
6 Slope ke outlet 1 : 200
edangkan untuk strainer yang memiliki lubang sebaiknya 1 m dibawah level air terendah.
V 2
2g
Hm = minor losses (m)
m Sambungan
L.Q 1,85
Hfm
(0,0015 .C .D 2 , 63 )1,85
(weir=pipa pelimpah)
n 2 5 m.
square tank mempunyai panjang 2,5 m. Slope ruang lumpur berkisar antara 2% - 6%, bilangan Reynolds < 2000 agar al
t mengalir secara gravitasi ke sludge Hopper
endap) sehingga diperlukan perforasi setiap sekat inlet untuk meratakan aliran
: 0,25 cm/detik (PLATE SETTLER)
: 20o 60o
: 0,017 0,051 cm/ detik
: 2,5 10 cm
: 3 - 10 mm
: 250 m3/ m2. hari
: < 1000
: > 10-5
- 5).10^-3) : 1
turun secara bertahap, dalam hal ini dibuat beberapa kompartemen sesuai dengan tahap penurunan nilai G (Masduqi, A.,2002).
ar cukup waktu bagi flok untuk berikatan dengan flok yang lain.
a b c d e
A B C D C*D/100
Penduduk
Tahun % Pertumbuhan Jumlah Penduduk % Pelayanan
terlayani
a b c d e
A B C D C*D/100
2017 0.016 71404 90 64264
2018 0.016 71899 92 66147
2019 0.016 72397 94 68053
2020 0.016 72899 96 69983
2021 0.016 73405 98 71937
2022 0.016 73914 100 73914
Debit jam
Debit rata-rata Debit hari max Kapasitas
puncak
(lt/dtk) (L/dtk) Produksi
(L/dtk)
f g h i
Debit jam
Debit rata-rata Debit hari max Kapasitas
puncak
(lt/dtk) (L/dtk) Produksi
(L/dtk)
f g h i
E*150/86400 F*1,2 G*1,6 130%*G
92.97 111.57 178.51 145.04
95.70 114.84 183.74 149.29
98.46 118.15 189.04 153.59
101.25 121.50 194.40 157.95
104.08 124.89 199.82 162.36
106.94 128.32 205.32 166.82
310.47 341.517
Input Data :
1 Debit rencana = 200 L/detik =
Perhitungan dimensi:
I. BANGUNAN INTAKE DAN POMPA
Direncanakan Sumur pengumpul berbentuk rectangular
1 Jumlah = 2 bak
2 Debit rencana (Qave) = 200 L/detik =
3 Waktu detensi (td) = 15 menit =
4 Volume sumur (Vol) = Q x td =
5 Rencana kedalaman (h) = 2m
6 Asurface = Volume sumur/h =
7 Asumsi P:L (rasio) = 4
8 Lebar sumur = (Asurface/rasio P:L)^0,5 =
9 Panjang sumur = L x rasio p:l =
10 Check td = Px L x h/Qpeak =
11 Lahan untuk Intake = P x L x jumlah bak =
Lahan untuk Intake = 591.712 m
II. PRASEDIMENTASI
Jumlah Prased = 4 bak
Debit rencana (Qkapasitas) = 200 l/det =
Debit masing-masing bak = Qpeak/jumlah BP I =
Waktu detensi = 1.5 jam =
Overflow Rates (OFR) = 2500 gal/sqft.d =
Volume tiap bak = Qtiap bak x td =
Asurface = Qtiap bak/OFR =
Dimensi bak :
Jika Prased persegi panjang = =
a. Tinggi Prased = Volume/Asurface =
b. Panjang : lebar = 2: 1
c. Lebar Prased = SQRT(Asurface/2) =
d. Panjang Prased = 2 x lebar Prased =
e. Check td = Volume/Qtiap bak =
Check OFR = Qbak/(panjangxlebar)x86400 =
Luas lahan yang diperlukan = Lebar x panjang x jumlah bak =
Lahan untuk Bak Prasedimentasi = 186.8108
V. SEDIMENTASI
Plate settler system
1 Jumlah BP I = 2 bak
2 Debit rencana = 29507.0688 m3/hari =
3 Debit masing-masing bak = 0.171 m3/det
4 Waktu detensi = 2 jam (1,5 - 2)
5 Overflow Rates (OFR) = 2 m3/m2.jam
= 0.00056 m/detik
6 Volume tiap Bak = 1229.46 m3
7 Asurface = 307.37 m2
8 Dimensi bak:
a. Tinggi BP I = 4.00 m
b. Panjang : Lebar = 2
c. Lebar BP = 12.40 m
d. Panjang BP = 24.79 m
9 Luas lahan utk BP = 737.68 m2
Lahan untuk sedimentasi = 811.4444 m
VII. DESINFEKSI
1 Jumlah bak = 2 bak
2 Debit rencana = 29507 m3/hari =
3 Debit masing-masing bak = 0.171 m3/det
4 Waktu detensi = 300 detik =
5 Volume bak = 51.22755 m3
6 Dimensi bak: =
- Panjang : lebar = 2.0
- Kedalaman : lebar = 0.80
- Panjang = 6.35 m
-lebar = 3.18 m
- Kedalaman = 2.54 m
7 Luas lahan yang diperlukan = 40.33 m2
Lahan untuk Desinfeksi = 44.3651 m
VIII RESERVOIR
1 Debit rencana = 29507 m3/hari =
Jumlah reservoir = 3
Q tiap bak = 9835.690 m3/hari
2 Waktu detensi = 3 jam =
2 Kapasitas reservoir = 1229.46 m3
3 Rencana kedalaman = 5m
4 Panjang : lebar = 2.00
5 Lebar = 11.09 m
6 Panjang = 22.18 m
7 Luas lahan yang diperlukan = 245.89 m2
Lahan untuk Reservoar = 270.4815 m
Input Data :
1 Debit air baku (Qave) = 0 L/detik =
2 Konsentrasi BOD rata-rata = 500 mg/L =
3 Beban BOD rata-rata = Qave x BOD rata-rata =
Perhitungan dimensi:
I. BANGUNAN INTAKE DAN POMPA
Direncanakan Sumur pengumpul berbentuk rectangular
1 Jumlah = 2 bak
2 Debit rencana (Qave) = 0 L/detik =
3 Waktu detensi (td) = 15 menit =
4 Volume sumur (Vol) = Qpeak x td =
5 Rencana kedalaman (h) = 3m
6 Asurface = Volume sumur/h =
7 Asumsi P:L (rasio) = 4
8 Lebar sumur = (Asurface/rasio P:L)^0,5 =
9 Panjang sumur = L xrasio p:l =
10 Check td = Px L x h/Qpeak =
11 Lahan untuk Intake = P x L x jumlah bak =
V. SEDIMENTASI
Plate settler system
1 Jumlah BP I = 2 bak
2 Debit rencana = 0 m3/hari =
3 Debit masing-masing bak = 0.000 m3/det
4 Waktu detensi = 2 jam (1,5 - 2)
5 Overflow Rates (OFR) = 0.011 cm/detik
= 9.504 m3/m2.hari
6 Volume tiap Bak = 0.00 m3
7 Asurface = 0.00 m2
8 Dimensi bak:
a. Tinggi BP I = #DIV/0! m
b. Panjang : Lebar = 6
c. Lebar BP = 0.00 m
d. Panjang BP = 0.00 m
VII. DESINFEKSI
1 Jumlah bak = 2 bak
2 Debit rencana = 0 m3/hari =
3 Debit masing-masing bak = 0.000 m3/det
4 Waktu detensi = 300 detik
5 Volume bak = 0 m3
6 Dimensi bak: =
- Panjang : lebar = 1.0
- Kedalaman : lebar = 0.75
- Panjang = lebar = 0.00 m
- Kedalaman = 0.00 m
7 Luas lahan yang diperlukan = 0.00 m2
VIII RESERVOIR
1 Debit rencana = 0 m3/hari =
2 TD = 4 jam =
2 Kapasitas reservoir = 0.00 m3
3 Rencana kedalaman = 3m
4 Panjang : lebar = 2.00
5 Lebar = 0.00
6 Panjang = 0.00
7 Luas lahan yang diperlukan = 0.00 m2
0.2 m/detik
900 detik
180 m
90.000 m
(4 : 1)
4.74 m 8.2 m
18.97 m 32.8 m
44.83 menit Memenuhi
537.92 m
6.359 m
0.200 m3/det
1 bak, 1 kompartemen. Atau 3 kom
0.200 m3/det
179.0531294
0.342 m3/det
(1,5 - 2) jam
1229.4612
0.001666667
0.342 m3/det
0.0028 m/det
5 menit
0.75
51.22755
2.5402971525
0.342 m3/detik
0.114 m3/detik
0.1250 hari
1229.4612
0.21 Ha
0 m3/hari
0.5 kg/m3
0 kg/hari
0 m/detik
900 detik
0 m
0.000 m
0.00 m 7.5 m
0.00 m 28.5 m
#DIV/0! menit Memenuhi
427.50 m
0.75 jam
0 m/detik
0 m/detik = 0 m/jam
0m 7
0m 20
0.000 m3/det
0.000 m3/det
0.000 m3/det
(1,5 - 2) jam
0.000 m3/det
0.000 m3/det
0.000
0.1667
0.13 Ha
nilai
341.52 l/det 29507.07 m3/hari
199.02 l/det 17195.12 m3/hari
238.82 l/det 20634.14 m3/hari
382.11 l/det 33014.63 m3/hari
1 kompartemen. Atau 3 kompartemen?
1 Jumlah Unit Filter = 2 bak
2 Debit rencana (Qave) = 29507 m3/hari =
3 Debit masing-masing bak = 0.171 m3/det
4 Kecepatan filtrasi = 10 m3/m2.jam
5 Dimensi Filter:
a. Luas permukaan filter = 61.473 m2
b. Panjang : Lebar = 2
c. Lebar filter = 5.5 m
d. Panjang filter = 11.1 m2
d. Kedalaman filter total = 3.50 m
6 Luas lahan total untuk Filte = 154 m2
Lahan untuk Filtrasi = 169.0509 m
6
0.342 m3/det
Jumlah Unit Fi = 2 bak
Debit rencana = 10 m3/hari = 0.000 m3/det
Debit masing = 0.000 m3/det
Kecepatan filt = 10 m3/m2.jam
Dimensi Filter:
a. Luas permu = 0.020 m2
b. Panjang : = 2
c. Lebar filter = 0.1 m
d. Panjang fil = 0.2 m2
d. Kedalaman f = 3.50 m
Luas lahan tot = 0 m2
= 0
= Err:509
= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi BO= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD rat= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
Debit air
L/detik = 0 m3/hari 1 = 0
baku (Qave)
mg/L = Err:509 kg/m3 2 Konsentrasi B= Err:509
Qave x BOD rata-rata = Err:509 kg/hari 3 Beban BOD ra= Qave x BOD rata-rata
L/detik = 0 m3/hari
mg/L = Err:509 kg/m3
Qave x BOD rata-rata = Err:509 kg/hari
Pipa Sadap Air Baku
Q intake = 200 L/s
= 0.2 m/s
V rencana = 1.25 m/s
jumlah intake = 1 buah
jumlah pipa sadap = 2 buah
Q tiap pipa =
= 100 L/s
= 0.1 m/s
A tiap pipa =
=
= 0.08 m
diameter tiap pipa =
= 0.319 m
dpasaran = 355 mm
V cek = 1.01 m/s
Q cek = 0.10 m/s
C pipa galvanis = 110.00
panjang pipa sadap = 4.00 m
hf = 0.0152 m
slope = 0.001 m/m
beda tinggi = 0.004 m
kalo mau pake barscreen trus sumur pengumpul, pake saluran terbuka
urutannya
saluran terbuka, barscreen, sumur pengumpul, pompa
saluran terbuka ditetapkan v nya dan kedalaman, lalu dicek v nya setelah dapet panjang dan lebar
aluran terbuka
pemompaan
jumlah pompa =
Q pompa =
=
Q tiap pompa =
Head Loss pompa ( for 1 pump)
head statis =
Panjang pipa suction (L) =
=
Panjang pipa discharge (L) =
Mayor losses
Hf Suction =
Hf Discharge =
Hf mayor losses =
Minor Losses
Head velocity =
Hfm belokan (1 buah) =
Hfm valve (1 buah) =
Hf minor losses =
Hf total =
Power Pompa
densitas =
Power Pompa =
efisiensi pompa =
=
Tipe Pompa
Q tiap pompa =
Hf Total =
Diplotkan pada grafik Pompa Torishima
350 - K4 - 360
Pipa suction =
Pipa discharge =
Luas Lahan
1 buah A surface = 21.5 m
1.5 m/s Luas lahan = 21.5 m
200.00 L/s
0.2 m/s
0.2 m/s
0.13 m
0.412 m
412 mm
450 mm 45
0.45 m
1.26 m/s OK
1 buah
1.5 m/s
200.00 L/s
0.2 m/s Pipa ke prased langsung dari discharge sumur pengumpul
0.2 m/s
0.13 m
0.412 m
412 mm
450 mm 45
0.45 m
1.26 m/s OK
2 buah
200 L/s
0.2 m/s 12 m3/mnit 720 m3/jam 1.2 buah
0.2 m/s 200 L/s
21 m
4,5 + 10
14.5 m
750 m
0.062499695 m
3.232742855 m
3.295242550 m
0.081 m
0.032 m
0.024 m
0.056 m
24 m
1000 kg/m3
47778 watt
60%
79630 watt
12.00 m/menit
24 m
350 mm
360 mm
Pipa Sadap Air Baku Sumur Pengumpul
Q intake = 1000 L/s sumur berbentuk persegi, panjang = lebar
= 1 m/s jumlah sumur
V rencana = 1 m/s h free board
jumlah intake = 2 buah n kekasaran
jumlah pipa sadap = 4 buah tebal dinding
Q tiap pipa = Q air sumur
Q air tiap sumur
= 250 L/s
= 0.25 m/s td (waktu detensi)
A tiap pipa =
= vol sumur
= 0.25 m HWL
diameter tiap pipa = LWL
h efektif
= 0.564 m
= 606 mm A sumur
V cek = 0.87 m/s panjang (p)
Q cek = 0.25 m/s lebar (l)
C pipa galvanis = 110.00 kedalaman (h)
panjang pipa sadap = 4.00 m kedalaman (h) + freeboard
hf = 0.0061 m panjang (p) + tebal dinding
slope = 0.001 m/m lebar (l) + tebal dinding
beda tinggi = 0.004 m
umpul Pompa
egi, panjang = lebar pipa suction
= 2 buah V air pada pompa =
= 0.5 m Q =
= 0.015 =
= 0.25 m Q tiap pipa =
= 1000 L/s A tiap pipa =
= 500 L/s diameter tiap pipa =
0.500 m/s =
= 5 menit =
= 300 detik diameter pipa dipakai =
= 150 m V cek =
= 2.5 m pipa discharge
= 1m V air pada pompa =
= HWL + 1 m Q =
= 3.5 m =
= 43 m Q tiap pipa =
= 6.5 m A tiap pipa =
= 6.5 m diameter tiap pipa =
= 3.5 m =
= 4m =
= 6.8 m diameter pipa dipakai =
= 6.8 m V cek =
pemompaan
jumlah pompa =
Q pompa =
=
Q tiap pompa =
Head Loss pompa ( for 1 pump)
head statis =
head statis + beda tinggi =
Panjang pipa suction (L) =
=
Panjang pipa discharge (L) =
Mayor losses
Hf Suction =
Hf Discharge =
Hf mayor losses =
Minor Losses
Head velocity =
Hfm belokan (4 buah) =
Hfm valve (1 buah) =
Hf minor losses =
Hf total =
Power Pompa
densitas =
Power Pompa =
efisiensi pompa =
=
Tipe Pompa
Q tiap pompa =
Hf Total =
Diplotkan pada grafik Pompa Torishima
400-M8-500
Pipa suction =
Pipa discharge =
2 buah
1.5 m/s
1000.00 L/s
1 m/s
0.5 m/s
0.33 m
0.652 m
652 mm
655.4 mm
0.6554 m
1.48 m/s
2 buah
1.5 m/s
1000.00 L/s
1 m/s
0.5 m/s
0.33 m
0.652 m
652 mm
655.4 mm
0.6554 m
1.48 m/s OK
2 buah
1000 L/s
1 m/s
0.5 m/s
0.00000019 m
0.00000319 m
0.00000337 m
0.112 m
0.179 m
0.034 m
0.213 m
8m
1000 kg/m3
37832 watt
60%
63053 watt
30.00 m/menit
8m
400 mm
500 mm
Luas Lahan
A surface = 46.2 m
Luas lahan = 92.4 m
n tanah = 4 m
Prasedimentasi
1 Q air = 200
= 0.2
2 Jumlah bak = 4
3 Q tiap bak = 50
= 0.05
4 suhu = 30
5 = 0.0008004
6 = 8.039E-007
7 = 995.68
8g = 9.81
9 Grafik performance good performance (70%)
10 Kedalaman coloum test = 1.5
11 waktu tes (td) = 1
= 3600
12 t/td (dari grafik) = Vo(Q/A)
= 1.5
13 Vo = 0.00042
g ( Sg 1)
= 0.0000193
18 Vsc = 8k ( Sg 1) g .d
0,5
Vh<Vsc supaya tidak terjadi pengggerusan f
= 0.0707
19 Jari-jari hidrolis (R) = (bx H) / (b + 2H)
= 1.84
20 Nre = (VH x R) :
= 4016
21 Nfr = VH2 : (g x R)
= 0.000000171
II Zona Inlet
A Saluran Pembawa
Jumlah saluran pembawa = 4
Q air = 0.2
Q tiap saluran = 0.05
V rencana = 0.6
lebar : kedalaman = 1:1
slope = 0.0001
Panjang = 1.5
Koefisien Gesek = 0.015
Kedalaman (h) = 0.3953322467
= 0.4
Lebar (w) = 1
Free board = 0.3
B saluran pembagi
1 Q air = 200
0.2
2v = 0.60
3 jumlah bak = 4
4 Q saluran pembagi = 0.05
5 panjang saluran (l) = 2.00
6 lebar : kedalaman = 1
7 Luas (A) = Q/v
= 0.083
8 lebar (b) = A/l
= 0.04
9 kedalaman (h) = 0.04
10 Headloss:
v= 2 1
1 b xh 3
hf 2
b 2h L
n
Mayor losses = (((Kecepatan*0,015)/(((Lebar*Kedala
= 0.0485242
slope = Mayor losses/Panjang saluran
V2
Head kecepatan (hv) = (Kecepatan^2)/(2*9,81)
2g
Head total = Mayor losses+Head kecepatan (hv)
C Inlet
1 Q saluran pembagi = 0.05
50
2v = 0.60
3 lebar inlet = lebar zona pengendapan
9.5
4 kedalaman inlet = kedalaman zona pengendapan
= 3.0
5 Luas (A) = Q/v
= 0.083
6 panjang (l) = 0.009
C Perforated Baffle
d lubang = 15
= 0.15
lebar baffle (b) = lebar bak
= 9.5
tinggi baffle (h) = tinggi bak
= 3
kecepatan melalui lubang (v) = 0.5
Perforated Baffle dari inlet = 0.01
Koefisien kontraksi (c) = 0.60
Luas (A) tiap lubang = 1/4 x x D
= 0.018
Luas (A) baffle yang terendam air = bxh
= 28.5
Luas total lubang (A total) =
= 0.17
jumlah lubang (n) =
= 9
susunan lubang
horizontal = 3
vertikal = 3
Jarak horizontal antar lubang (sh) =
= 2.3
Jarak vertikal antar lubang (sv) =
= 0.64
Vh = 0.0018
R = A/P
= 1/4 d lubang
= 0.0375
Nre cek = (VH x R) :
= 82
Nfr cek = VH2 : (g x R)
= 0.00001
Headloss = V/2g
= 0.0000002
N s/m2
m/s
kg/m
m/s
m
jam
detik
jam
m/s
L/s
m/s
buah
L/s
m/s
m
jam
m/s
m
:1
m
m
rasio p: l perbesar
m
detik
jam Memenuhi
m/s Tidak OK
0,5
1) g .d
f
OK
m
m
m
m
m2
m2
m2
m/det
m/det
m/det2
m
m
L/s
m/s
m/s
m/s
m
:1
m
m
an*0,015)/(((Lebar*Kedalaman)/(Lebar+(2*Kedalaman)))^(2/3)))^2)*Panjang saluran
m
ses/Panjang saluran = 0.0242621
n^2)/(2*9,81) = 0.0183486 m
Pintu Air
m/s Lebar Pintu 0.75 m
L/s Q pintu Air=Q tiap bak 0.05 m/s
m/s Tinggi Pintu air 0.112288 m
a pengendapan 0.4 m
m Head Loss Pintu Air 0.0017244141 m
n zona pengendapan
m
m
m
cm
m
m
m/s dicari dari Nre
m
(0,5-0,6)
buah
buah
buah
m
m/s Q/a total lubang
< 2000 OK
>10^-5 OK
v= Q/a total lubang
m
%
% (Fair, Geyer, Okun, Water & Wastewater Engineering, Vol. II)
mg/l
%
% x Konsentrasi SS
%
%
P2
hari sekali pengurasan seminggu sekali
% x Konsentrasi SS
mg/L
% x diskrit dan grit
mg/L
mg/L 30% dari TSS awal
ndapkan x Q
kg/hr
kg/m
kg/m
s solid x 5%] + [berat jenis air x 95%]
kg/m
berat solid
kg/hr
m/hari
e lumpur x banyaknya pengurasan
m
m persegi
m
m
m
m
m
+ 100 +225+100)
m
menit =
m/s
m
m
mm
m
m/s
m/m.hari
m/m s
L/s
m/s
buah
m
m
m
W = n x s + (n - 1) x s + 6t
m
m
m
-1) x 1 + (2x8 - 2) x L
m
m
m
L/s
m/s
:1
m
m
m
m
m/s
L/s
m/s
m
n saluran pengumpul
m
m/s
m
egah aliran singkat
sar -> baffle
P1
L1
L2
P2
Koagulasi mekanis
td = 30
G = 900
G td = 6 x 10^4
N = 60
= 1
jenis impeller = 4 blades
rasio d/w = 6
KL = 49
KT = 2.75
Dimensi Unit Pengaduk persegi
Q = 200
= 0.2
jumlah bak = 4
Q tiap bak = 50
= 0.05
Volume = Q x td
= 1.5
kedalaman = 1.5
1= L
L = 1.0
panjang = 1.0
lebar = 1.0
kedalaman +fb = 2.0
Power yang dibutuhkan
P = G V
= 972
= 0.97
efisiensi motor = 90%
P' = P/ef
= 1081
= 1.1
Ukuran Impeller dan kecepatan rotasi
= 0.628
=
Nre cek = 609549
=
=
Perencanaan inlet = outlet
Q = 50
= 0.05
lebar : kedalaman = 2
panjang saluran = 5
Q = 1,375 x L x h^3/2 =
L = 2h
2h x h^3/2 = 0.04
h^5/2 = 0.018
kedalaman (h) = 0.2
lebar (I) = 0.4
Kecepatan (V) = Q/A
= 0.62
Headloss
Mayor Losses (hf)
V = 1/n R^2/3 S^1/2
n (kekasaran) = 0.015
R (jarijari hidrolis) = lebar x kedalaman
= 0.101
slope = Hf/L
= 0.00183
Hf = slope*L
= 0.00914
Head kecepatan = V/2g
= 0.01940
Headloss total = Hf + hv
= 0.02854
Q = 50
= 0.05
Kebutuhan Koagulan
dosis tawas optimum = 30
densitas tawas = 980
jumlah bak = 4
Q = 0.2
Q tiap bak = 0.05
kadar air dalam larutan = 95%
kadar tawas dalam larutan = 5%
kadar tawas = 60%
Kebutuhan Koagulan = 129.6
Kebutuhan Koagulan kadar 60 % = 216
Volume koagulan = Kebutuhan tawas/densitas
= 0.220
Volume air pelarut = 4.19
Volume larutan total = 4.408
Bak Pelarut Koagulan
periode pelarutan tawas = 4
dimesi panjang : lebar = 1
kedalaman bak = 1
Volume bak = 1.1020
=
0.4 luas = Vol/h
0.3 = 1.10
1.10 = L
L = 1.0
panjang = 1.0
lebar = 1.0
kedalaman +fb = 1.3
Debit koagulan yang diinjeksikan = 0.00005
= 0.05
pipa pembubuh koagulan gravitasi
Kecepatan (v) = 1.5
panjang pipa = 3
c = 130
Q koagulan = 0.00005
= 0.05
Diameter pipa pembubuh
Luas = Q/V
= 0.00003
Diameter pipa = 0.007
= 7
diameter dipakai = 10
V cek = 0.65
Mayor losses
Hf = 0.00000067
Minor Losses
Head velocity = 0.022
Hfm belokan (1 buah) = 0.009
Hfm valve (1 buah) = 0.006
Hf minor losses = 0.015
Hf total = 0.015
detik (10-30 s) suhu
/s (700-1000/s) 30 = 0.8004 x 10^3
= 0.8039 x 10^6
rpm (20-150 rpm) = 995.68 kg/m
rps g = 9.81 m/s
pompa bahan kimia
L/s
m/s
buah
L/s
m/s
m
m
m
m
m
m
Watt
Kw
Watt N m/s
Kw
> 10000 OK
L/s
m/s
:1
m
m
m
m
m 0.2785
130
m/s
mendekati 1 m/s OK
kedalaman
m
m
L/s
m/s
mg/L
kg/m
buah
m/s
m/s
kg/hari
kg/hari
han tawas/densitas
m/hari
m/hari
m/hari
jam/sekali
:1
m
m
m
m
m
m
m/s
L/s
m/s
m
m/s
L/s
m
m
mm
mm
m/s
m
m
m
m
m
N s/m2 = 0.0008004 N s/m2
m/s = 8.039E-007 m/s
Flokulasi Around Baffle Channel
jarak antar sekat = > 45 cm
jarak ujung baffle dan dinding = > 60 cm
kedalaman air = >1m
td = 15-30 menit
Kompartemen 1
G = 50
td = 10
= 600
Kompartemen 2
G = 20
td = 10
= 600
Kompartemen 3
G = 10
td = 10
= 600
jumlah flokulator = 2
Q = 200
0.2
Q tiap bak = 100
= 0.1
kedalaman = 2
f = 0.3
Dimensi bak
td total = td komp 1 + td komp 2 + td kom
= 1800
Volume total bak = Q x td total
= 180
Luas penampang total = Vol total/h
= 90
panjang : lebar = 2
90 = 2L
L = 45
L = 7
panjang = 13
lebar tiap kompartemen = 2
lebar = 7
kedalaman = 2
kedalaman + fb = 2.3
kompartemen 1
jarak antar ujung baffle dan dinding bak (d) = 0.75
jumlah baffle (n) = 100
/s
menit
detik
/s
menit
detik
/s
menit
detik
buah
L/s
m/s
L/s
m/s
m
m
:1
m
m
m
m
m
m
m
m
buah
m
m/s
m
m/s
x h)/(bl + 2h)
m
m
m
m
buah
m/s
m
m/s
x h)/(bl + 2h)
m
m
m
m
buah
m/s
m
m/s
x h)/(bl + 2h)
m
m
m
tlet koagulasi
m
m
m
m 0.10
L/s
m/s
m/s
:1
m/s
m
m
m
m
m
m
0.0008004 N s/m2
8.04E-007 m/s
Analisa Kolom
TSS awal =
Q =
=
jumlah bak =
Q tiap bak =
=
Saluran Inlet =
lebar : kedalaman =
V asumsi =
Luas =
=
0.4166666667 =
h =
lebar =
panjang =
kedalaman =
kedalaman+fb =
slope =
=
Hf =
=
Head kecepatan =
=
Headloss total =
=
Bak sedimentasi
Q =
=
jumlah bak =
Q tiap bak =
=
panjang : lebar =
kedalaman bak (h) =
Nfr >
Nre aliran <
tinggi kolom tes (H) =
jarak antar titik sampling =
waktu percobaan =
=
Vs =
waktu detensi (td) =
=
safety factor Vs =
safety factor td =
Vs =
waktu detensi (td) =
=
Volume bak (V) =
=
Luas (A) =
=
A =
1246.875 =
lebar (W) =
panjang (L) =
V horizontal (Vh) =
=
k =
f =
Ss =
d =
Vsc =
Vh <
Zona Lumpur
SS awal =
ss =
tawas =
periode pengurasan lumpur =
efisiensi removal prasedimentasi =
Konsentrasi SS ke sedimentasi =
SS tiap bak =
=
=
kebutuhan tawas =
kebutuhan tawas per bak =
SS awal bak sedimentasi =
=
efisiensi removal sedimentasi =
produksi lumpur =
=
kadar solid =
kadar air =
berat total lumpur =
=
% berat SS =
=
% berat tawas =
=
lumpur =
=
Volume lumpur =
=
panjang permukaan zona lumpur (P1) =
Lebar permukaan zona lumpur (L1) =
panjang dasar zona lumpur (P2) =
Lebar dasar zona lumpur (L2) =
Luas Permukaan (A1) =
Luas Permukaan (A2) =
Volume sludge selama periode pengurasan =
=
Volume ruang lumpur =
58.8 =
kedalaman ruang lumpur (h) =
pengurasan menggunakan Non-clogging Centrifugal pump
Debit pemompaan =
Waktu pengurasan =
=
pipa penguras lumpur
V pipa =
A =
=
diameter pipa penguras =
=
=
V cek =
Plate Settler
surface settling area
lebar (w) =
V =
diameter partikel terkecil (d) =
=
=
=
panjang (L) =
T =
t =
=
HLR =
=
Vs =
=
As =
=
jarak (d) =
Jumlah plate yang dibutuhkan (n) =
=
=
Jari-jari hidrolis (R) =
=
=
=
Nre =
=
Nfr =
=
Zona Outlet
Weir dan Gutter
WLR =
=
Q tiap bak =
=
jumlah gutter =
panjang total weir (L) =
=
lebar bak (w) =
tebal weir (t) =
lebar gutter (s) =
W = n x s + (n - 1) x s =
20 =
15 s =
s =
panjang bak (b) =
panjang tiap gutter (L) =
b = n x s + (n - 1) x s + (2n-2) x L =
61 =
L =
tinggi air diatas weir (h)
Cd =
Q = (2/3 x Cd x L x 2g)x h^2/3 =
h =
dimensi saluran weir
Q = 1,84 x L x h^3/2 =
0.25 =
h =
Saluran Pengumpul Outlet =
Q =
=
lebar : kedalaman =
panjang saluran =
=
Q = 1,375 x L x h^3/2 =
L =
2h x h^3/2 =
h^5/2 =
kedalaman (h) =
lebar (I) =
Kecepatan (V) =
=
Headloss
Mayor Losses (hf)
V = 1/n R^2/3 S^1/2
n (kekasaran) =
R (jarijari hidrolis) =
=
slope =
=
Hf =
=
Head kecepatan =
=
Headloss total =
=
Saluran Outlet
Q =
=
panjang saluran =
kedalaman saluran =
=
kedalaman saluran + free board =
Kecepatan (V) =
dimensi saluran outlet
Luas (A) =
=
0.5 =
b (jarak tiap gutter) =
slope =
=
Hf =
=
Head kecepatan =
=
Headloss total =
=
100 mg/L
1000 L/s
1 m/s
4
250 L/s
0.25 m/s
saluran outlet flokulasi
2: 1
0.6 m/s
Q/V
0.4166666667 m
2h
0.5 m
1m
3m
0.5 m
0.8 m
Hf/L
0.00026
slope*L
0.00024 m
V/2g
0.01835 m
Hf + hv
0.01859 m
1000 L/s
1 m/s
4 unit
250 L/s
0.25 m/s
3: 1
2m
0.00001
2000
3.2 m
0.6 m
120 menit
2 jam
0.0006 m/s
95 menit
1.6 jam
1.2
1.75
0.00072 m/s
166 menit
2.8 jam
Q x td
2493.75 m
Volume/kedalaman bak
1246.875 m
3W
3W
20 m
61 m
L/td
0.006 m/s
0.04
0.02
2.65
0.000731
0.0615 m/s
Vsc tidak terjadi penggerusan
2.650
1.67 m
0.0008004 N s/m2
8.039E-007 m/s
100 mg/L
2650 kg/m
980 kg/m
1 hari sekali
80%
(100%-eff removal prased) x SS awal
20 mg/L
konsentrasi SS ke sedimentasi x Q tiap bak
5000 mg/s
432 kg/hari
864 kg/hari
216 kg/hari
SS tiap bak + kebutuhan tawas
648 kg/hari
90%
efisiensi removal sed x SS awal
583.2 kg/hari
5%
95%
(SS awal x 100%)/kadar solid
12960 kg/hari
(SS awal / berat total lumpur)x100%
5%
(kebutuhan tawas/berat total lumpur)x 100%
1.7%
( ss x 5%) + tawas (0,1%)
148.8 kg/m
(produksi lumpur/((% berat SS+% berat tawas)x lumpur))
58.8 m/hari
20 m
20 m
15 m
15 m
415.6 m
225 m
Volume lumpur x banyaknya pengurasan
58.8 m
30 m/menit 0.5
V/Q
2 menit
1 m/s
Qlumpur/V
0.500 m
0.798 m
800 mm
0.8 m
1.00 m/s OK
20 m
0.0002 m/s
100 mm
1 cm
0.01 m
60
61 m
30 C
L x sin
52.598 m
Q/(Wxd)
1.226 m/s
HLR x
0.0004 m/s
pxl
1246.875 m
0.3 m
(p sin 60/d)+ 1
176.327
176 buah
W/2
0.15 m
0.0008004 N s/m2
8.039E-007 m/s
150 m/m.hari
0.0017361111 m/m s
250 L/s
0.25 m/s
8 buah
Q/WLR
144 m
20 m
0.1 m
8 s + (8-1) s 18.6
20.4 m 0.6413793103
1.4 m
61 m
0.6 m
0.010 m
2h
0.18 m
0.09 m
0.4 m
0.8 m
Q/A
0.85 m/s
0.015
lebar x kedalaman
0.192 m
Hf/L
0.00148
slope*L
0.03009 m
V/2g
0.03693 m
Hf + hv
0.06701 m
250 L/s
0.25 m/s
2m
kedalaman saluran pengumpul
0.4
0.7 m
0.5 m/s
Q/V
0.5 m
bxh 0.1866666667
0.7 m
Hf/L
0.0001800
slope*L
0.00036 m
V/2g
0.01274 m
Hf + hv
0.01310 m
Perforated Baffle
d lubang = 15 cm
= 0.15 m
panjang baffle = lebar bak
= 20 m
tinggi baffle (h) = tinggi bak
= 2m
kecepatan melalui lubang (= 0.5 m/s
Luas (A) tiap lubang = 1/4 x x D
= 0.018 m
Luas (A) baffle yang terend= Bxh
= 41 m
Luas total lubang (A total) =
= 0.83 m
jumlah lubang (n) =
= 47.2 buah
= 48 buah
susunan lubang =
horizontal = 8 buah
vertikal = 6 buah
Jarak horizontal antar luba =
= 2.1 m
Jarak vertikal antar lubang =
= 0.157 m
Vh = 0.006 m/s
R = A/P
= 1/4 d lubang
= 0.0375 m
Nre cek =
= 274 < 400 OK
Headloss = V/2g
= 0.000002 m
Vs =
dp = 0.00013
Nfr partikel = 0.119 < 10^-5 OK
=
0.0000018
Waktu Kedalam
(menit) 0.6
0 0
10 27
20 45
30 66
40 71
50 76
60 81
70 87
80 90
90 93
100 96
110 98
120 99
Waktu
(menit) %Removal
25 36.25
36 44.69
46 57.5
57 66.56
70 72.5
95 78.76
Waktu So
(menit) (m/menit)
25 0.13
36 0.09
46 0.07
57 0.06
70 0.05
95 0.03
Kedalaman (m)
1.2 1.8 2.4 3.2
0 0 0 0
17 16 11 NA
36 24 19 NA
49 35 31 NA
57 52 40 NA
61 56 48 NA
73 68 62 NA
81 69 67 NA
89 72 70 NA
91 79 71 NA
94 84 75 NA
97 88 79 NA
98 90 81 NA
%Removal
So (m/s) atau %RT
0.002 36.25
0.001 44.69
0.001 57.5
0.001 66.56
0.001 72.5
0.0006 78.76
80
%RT 60
40
20
0
0.02 0.04 0.06 0.08 0.1 0.12 0.14
Surface loading (m/menit)
0
0.02 0.04 0.06 0.08 0.1 0.12 0.14
Surface loading (m/menit)
80
%RT 60
40
20
0
20 30 40 50 60 70 80 90 100
g vs %RT
70 80 90 100
(menit)
FILTER DUAL MEDIA antrasit dan silika media tersusun terstratifikasi
I Kriteria Desain
1 Q instalasi = 1000 L/s
= 1 m/s
2 kecepatan penyaringan = 8 m/jam
= 0.0022 m/s
3 v di manifold (vm) = < 0,35 m/s
4 v di lateral (vl) = < 0,2 m/s
5 headloss = 0,3 -2 m
6 media pasir silika
tebal = 300 - 600 mm
ukuran butir = 0,5 - 2 mm
ukuran media ES = 0,3 - 0,7 mm
ukuran media UC = 1,2 - 1,4
specific grafity (Sg) = 2,5 - 2,65 kg/L
7 media antrasit
tebal = 400 - 500 mm
ukuran butir = 0,5 - 1,1 cm
ukuran media ES = 1,2 - 1,8 mm
ukuran media UC = 1.5
specific grafity (Sg) = 1.35 kg/L
II Dimensi bangunan
1 luas bangunan (Atotal) = Q/v
= 450 m
2 jumlah bak (N) = 2,7 Q^0,5
= 12.8991849087 unit
= 12 unit
3 luas setiap unit (A) = Atotal/jumlah unit
= 37.5 m
4 panjang : lebar = 2 :1
37.5 = 2 b
b = 4.3 m =
l = 9.0 m
5 A cek = 40.5 m
6 Q tiap bak = Q total/jumlah unit
= 83.33 L/s
= 0.0833 m/s
7 v filtrasi = Q/A
= 0.0021 m/s
= 7.41 m/jam OK
III cek apabila 1 bak dicuci
1 jumlah unit = 11 unit
2 Q tiap bak = Q total/jumlah unit
= 90.91 L/s
= 0.091 m/s
3 v filtrasi = Q/A
= 0.0022 m/s
= 8.08 m/jam OK
Media Filter
ES = < 0,45
US = < 1,5
ukuran butir (d) = 0,5 - 2 mm
tebal media pasir (l) = 60 cm
= 0.6 m
specific grafity (Sg) = 2.65
porositas media (f) = 0.4
= 0.75
suhu 30
= 7.98E-04 kg.m/det
= 8.00E-07 m2/det
= 995.7 kg/m
g = 9.81 m/s
hf/L = 5*((/981)*(kecepatan penyaringan)*(((1-porositas media (f))^
= 0.48 m
hf = tebal media pasir (l)*hf/L =
Intermixing
menggunakan diameter yang terkecil
Vs^1,4 = =
Vs pasir = 5.56 cm/s
= 0.06 m/s
menggunakan diameter yang terbesar
Vs^1,4 = =
Vs antrasit = 3.175 cm/s
= 0.032 m/s
Vs antrasit < Vs pasir silika OK
Vs ^1,4 = 279.23 cm/s
Vs penyangga = 55.861 cm/s
= 0.559 m/s
Ekspansi Backwash
1 V up = Vs*f^4,5
= 0.0044 m/s
= 0.4392 cm/s
Sistem Underdrain
I pipa manifold
1 Volume air backwash = 106.74 m
2 waktu backwash = 10 menit
= 600 s
3 Vm = 2.5 m/s
4 jarak ujung manifold dan dinding = 20 cm
= 0.2 m
5 Q backwash = V/t backwash
= 0.18 m/s
6 A pipa manifold = Q/V
= 0.071 m
7 diameter pipa manifold = ((4*A)/3,14)^0,5
= 0.301 m
= 301.1 mm
8 diameter pipa manifold dipakai = 355 mm
9 V cek = 1.80 m/s OK
10 L manifold = L +2m = 11.0
II pipa lateral
1 jarak antar pipa lateral = 25 cm
= 0.25 m
2 jarak antar ujung lateral dengan dinding = 20 cm
= 0.2 m
3 diameter pipa lateral (d) = 20 cm
= 0.2 m
4 jumlah pipa lateral =
= 24 buah
5 Q tiap pipa lateral = Qmanifold/n
= 0.007 m/s
6 Luas pipa lateral = 1/4*3,14*(d pipa lateral)^2
= 0.0314 m
7 kecepatan aliran pipa lateral = Q/A
= 0.237 m/s OK
8 Panjang pipa lateral = 1/2Lebar bak+2m =
9 Luas penampang total pipa lateral (Atotal) = n*A tiap pipa
= 0.8 m2
Luas total pipa lateral = nxA
0.75 m2
m
III Orifice
1 diameter orifice = 1.5 cm
= 0.015 m
2 luas orifice : luas bak filter = 0.005 : 1
3 luas lubang orifice = 0.00017 m
= 1.70 cm
4 luas total orifice = luas bak filter x 0,005
= 0.2025 m
= 2025 cm
5 jumlah total orifice tiap filter = Atotal .orifice
pipa .lateral
= 50 buah
7 jarak tiap orifice = Panjang . pipa.lateral ( dxjumlah.orifice)
Jumlah.orifice 1
= 0.069 m
= 6.9 cm
Untuk memenuhi baku mutu sesuai dengan sheet alternatif pengolahan, maka unit filtrasi di pasang
1
2
L V
7 Hf lubang manifold (Hf) = fx x
3 D 2 xg
= 0.0216600087 m
8 = 0.99
9 Hf ujung manifold (Hfi) = 1
xHf
1
2
= 1.0884 m
10 Hf total = Hf+Hfi
= 1.11010 m
II pipa lateral
1 Jumlah pipa lateral = 24 buah
2 D pipa lateral = 0.2 m
3 L pipa lateral = 4.25 m
4 A pipa lateral = 0.0314 m2
5 Q tiap lateral = Qpipa.manifold
n
= 0.0034883721 m3/dt
6 V lateral saat filtrasi = Q/A
= 0.1110946526 m/dt
1
2
L V
7 Hf lateral = fx x
3 D 2 xg
= 0.0001336738 m
= 6.977777777778E-005 m3/dt
C = 0.6
V orifice saat filtrasi = Q
AxC
= 0.2469135802 m/dt
Hf pada orifice =
V2
2 xg
= 0.0031073556 m
Hf underdrain saat filtrasi = Hf manifold+Hf lateral+Hf orifice
= 1.11334 m
1
2
L V
7 Hf lubang manifold (Hf) = fx x
3 D 2 xg
1
2
L V
fx x
3 D 2 xg
= 0.0257772004 m
8 = 0.99
9 Hf ujung manifold (Hfi) = 1
1 2 xHf
= 1.2953 m
10 Hf total = Hf+Hfi
= 1.32111 m
II pipa lateral
1 Jumlah pipa lateral = 24 buah
2 D pipa lateral = 0.2 m
3 L pipa lateral = 4m
4 A pipa lateral = 0.0314 m2
5 Q tiap lateral = Qpipa.manifold
n
= 0.0038054968 m3/dt
6 V lateral saat backwash = Q/A
= 0.1211941665 m/dt
2
1 L V
7 Hf lateral = fx x
3 D 2 xg
= 0.0001590829 m
= 7.612121212121E-005 m3/dt
C = 0.6
V orifice saat backwash = Q
AxC
= 0.2693602694 m/dt
Hf pada orifice =
V2
2 xg
= 0.0036980099 m
Hf underdrain saat backwash = Hf manifold+Hf lateral+Hf orifice
= 1.32497 m
Bak Pengumpul
1 Jumlah bak = 2 buah
2 Rasio p:l = 2
4 Saluran dari beton (n) = 0.015
5 Tebal dinding = 25 cm
6 Qmasing-masing sumur = 1000 l/dt =
7 td 2 menit =
8 Volume sumur = Q masing-masing sumur*td =
9 H = 2m
10 A = 60 m2
11 Lebar = (Asurface/rasio P:L)^0,5 =
= 4.5 m
12 Panjang = Rasio p:l*L =
= 9m
13 Tebal dinding = 25 cm =
14 Dimensi sumur pengumpul
Panjang total = p+(2*dinding beton) =
Lebar total = l+(2*dinding beton) =
Freeboard = 0.3 m
Kedalaman = h+fb =
15 v dalam bak = V pd outlet Sedimentasi =
16 Headloss:
2 1
v= 1 b x h 3 hf 2
n b 2h L
Mayor losses = (((Kecepatan*0,015)/(((Lebar*Kedalaman)/(Lebar+(2*Kedalama
= 0.00000001 m
slope = Mayor losses/Panjang saluran =
V2
Head kecepatan (hv) = (Kecepatan^2)/(2*9,81) =
2g
Head total = Mayor losses+Head kecepatan (hv) =
n b 2h L
Pintu air
1 lebar pintu air = 0.2 m
2 Debit pada pintu air = 0.0833 m3/det
3 V melalui saluran = Vair pada inlet =
4 A = Q/v =
5 Panjang pintu air = Lebar saluran sumur pengumpul =
6 Tinggi muka air sebelum pintu (y) = A/lebar saluran m =
7 Bukaan pintu air = 0.2172 m
Q = C.L.H ((2gy)^0,5)
C (konstanta pintu air) = 0.6
g = 9.81
y = 0.33
5 Headloss:
2 1
v= 1 bxh 3
hf 2
n b 2h L
Pintu air
1 lebar pintu air = 0.2 m
2 Debit pada pintu air = 0.0074 m3/det
3 V melalui saluran = Vair pada outlet =
4 A = Q/v =
5 Panjang pintu air = Lebar saluran sumur pengumpul =
6 Tinggi muka air sebelum pintu (y) = A/lebar saluran m =
7 Bukaan pintu air = 0.0648 m
Q = C.L.H ((2gy)^0,5)
C (konstanta pintu air) = 0.6
g = 9.81
y = 0.03
5 Headloss:
2 1
v= 1 bxh 3
hf 2
n b 2h L
4.5 m
5 - 15 m/jam
5 - 15 m/jam
0.29 m
0.49
11.05 cm/s
5.04 cm/s
no intermixing
porositas media=
=
tejadi ekspansi bila f < (Vup/Vs)^0,22 atau Vup > Vs f^4
media pasir
Marsono,2000
media antrasit
Marsono,2000
tidak terjadi ekspansi OK
1.85
Q
x L
0.2785 . C . D 2.63
1.85
Q
x L
0.2785 . C . D 2.63
1.85
Q
x L
0.2785 . C . D 2.63
1.85
Q
0.00155 . C . D 2.63 xL
1.85
Q
0.00155 . C . D 2.63 xL
1.57 m
1.6 m
ekspansi total+angka aman (20 cm)
adalah tebal media penyangga+tinggi ekspansi total+an
Tinggi air diatas media=hf total ketika filter beroperasi
tinggi gutter>h air diatas media
jika tinggi gutter<h air di atas media, maka h yang dipilih
1.85
Q
1.85
0.00155 . C . D 2.63 xL Q
Q
2.63
xL 0.2785 . C . D 2.63
0.2785 . C . D
m
Rumus anak dan istri
200
1.85
Q
2.63
xL
0.2785 . C . D
1.85
4.25 m Q
0.00155 . C . D 2.63 xL
1.85
Q
x L
0.2785 . C . D 2.63
unit filtrasi di pasang secara seri 2x sehingga jumlah total unit filtrasi adalah 20 unit
ain (saat filtrasi)
nderdrain(saat backwash)
1 m3/detik
120 detik
120 m3
5.4772255751 m
10.95445115 m
0.25 m
9.5 m
5m
2.3 m
0.0025 m/det
an)/(Lebar+(2*Kedalaman)))^(2/3)))^2)*Panjang saluran
0.000000001
0.0000003 m
0.0000003 m
0.500 m3/det
0.25 m
2.5 m
1.33 m
1.15 m
an)/(Lebar+(2*Kedalaman)))^(2/3)))^2)*Panjang saluran
0.0001
0.0046 m
0.0047 m
1 m/det
0.0833333333 m2
0.3 m
0.33 m
0.0080
0.0510 m
0.0530 m
1 m/det
0.0074122639 m2
0.3 m
0.03 m
an)/(Lebar+(2*Kedalaman)))^(2/3)))^2)*Panjang pintu air
0.0168
0.0510 m
0.0552 m
5 - 15 m/jam 120-360
5
15
m
media pasir silika
Diameter Fraksi Berat
US Sieve Number rata-rata
(mm) Pi (%)
40 30 0.5 9
30 20 0.7 29
20 18 0.92 22
18 16 1.1 20
16 12 1.42 18
12 8 2 2
Marsono,2000
hL
1
2
6
2
hf f Pi
k * *V f * * *
l g f 3
di 2
k = konstanta (k = 5)
= viskositas kinematis (cm2/det)
Vf = kecepatan filtrasi (cm/det)
f = porositas media
g = kecepatan gavitasi (cm/det2)
= shape factor (faktor baentuk)
Pi = fraksi berat
di = diameter geometri media
media antrasit
Diameter
US Sieve Number rata-rata Fraksi Berat
(mm) Pi (%)
40 30 0.5 5
30 20 0.7 25
20 18 0.92 60
18 - 16 1.1 10
0.02
media penyangga
di (cm) Pi (%) Pi/di2
0.34 10 0.8651
0.773 15 0.2510
1.55 20 0.0832
2.69 25 0.0345
4.9 30 0.0125
1.2464
(Vup/Vs)^0,22
0.4036820061
f < (Vup/Vs)^0,22 atau Vup > Vs f^4,5
Kecepatan (Vs)
Diameter fe pi
(cm) cm/s
1.85
63 x L
1.85
63 x L
m
1.85
Q
x L
0.2785 . C . D 2.63
m
m
mm
1.85
2.63 x L
. D
m
No.
1
2
m3/m2.hari 3
m/jam
m/jam
5
Pi/di2
36
59.184
25.992
16.529
8.927
0.5
147.13183789
2
6 Pi
* * L
di 2
an (m atau cm)
au cm)
tis (cm2/det)
(cm/det)
i (cm/det2)
or baentuk)
i media
Pi /di2
20
51.02
70.89
8.26
150.17333978
pi/(1-fe) Nre
0.2102923111 26
0.6113271087 54
0.4319804412 96
0.3767603257 141
0.3214196256 244
0.0335391523 509
1.9853189646
pi/(1-fe) Nre
0.23702201 4
0.9092304097 9
1.856981212 16
0.2834116245 24
3.2866452562
ketika filter beroperasi dg L d asumsi
p=panjang filter @bak
l=lebar @bak
Unit
Karakteristik
Kecepatan Filtrasi
Ukuran Bak
Effective Size (ES) pasir
Uniformity Coef. (UC)
Head loss
Metoda Pencucian
Kebutuhan air pencuci
Konstruksi tertutup
Visible Operation
Biaya Investasi
Biaya Operasi
Penyisihan bakteri
Keterampilan operator
Kriteria Underdrain
Ratio total luas lubang terhadap total luas penampang pipa lateral
Tanpa/dengan blower & atau surface wash Tanpa/dengan blower & atau sur
36 50 36 50
10 15 10 15
18 24 18 24
30 - 50 30 - 50
80 100 80 100
2 -- 5 2 -- 5
80 100 80 100
5 10 5 10
80 100 80 100
10 15 10 15
80 150 80 150
15 30 15 30
Gravitasi
2 5 m /m .hari
3 2
120 360 m3/m2.hari
Luas (2000 m2) Kecil (100 m2)
0,35 mm 0,6 1,2 mm
2 2,5 1,5 1,7
Sampai 1 m Sampai 3 m
Mengeruk lapisan paling atas dan mencucinya atauBackwash dengan air atau air dan udara, dalam beberapa hal mengg
0,2 0,6 % dari filtrat 3 6 % dari filtrat
superficial Dalam
Tidak iya
Tidak optional
Iya iya
Tinggi Tinggi
Rendah Tinggi
99.99% 90 99 %
Tidak begitu Penting Diperlukan
Nilai
20 cm
6 12 mm
7,5 cm untuk diameter lubang 6 mm
20 cm untuk diameter lubang 12 mm
0,25 untuk diameter lubang 6 mm
0.003
60:01:00
30 cm
1,5 sampai 2,0 total luas luas lateral
1,0 1,8 m/detik
Saringan Bertekanan
-
12-33
300 - 700
600 700
300 600
-
1,2 1,4
2,5 2,65
0.4
>95 %
-
-
-
-
-
-
-
-
< 0,5
>4 %
Bertekanan
r atau air dan udara, dalam beberapa hal menggunakan surface scour
Iya
Iya
Tidak
Medium
Tinggi
suhu
30 = 7.98E-04 kg.m/det
= 8.00E-07 m2/det
= 995.7 kg/m
g = 9.81 m/s
Jumlah unit = 4
1 Debit = 1000 L/s
2 Debit per unit = 250 L/s
= 0.25 m3/s
= 21600 m3/hari
3 Sisa klor = 0.3 mg/l ( Sumber : SNI 6774 2008 )
4 kapasitas tabung klorinator = 615 kg
5 BPC = 2 mg/l Analisa lab
6 panjang pipa = 4m
=
I Perhitungan
1 dosis klorin yg di butuhkan = 2.3 mg/l
2 kebutuhan klor dlm 1 hari = 49.68 kg/hari
3 penampungan klor utk 30 hari = 1490.4 kg
4 kebutuhan tabung klor = 2.423414634 tabung
= 3 tabung
5 P.V = n.R.T
n = 20962.02532 mol
R = 0.0821 atm/mol.K
P = 5.132 atm
6 T = 300 K
7 V = 100603.0171 L
= 100.6030171 m3
=
II Injeksi
1 Td = 30 menit
2 Diameter pipa injeksi = 3 cm
3 panjang pipa pembubuh = 4m
4 v asumsi = 2 m/dtk
5 A = 0.125 m2
6 Diameter pipa disinfeksi = 0.399043442 m
= 399.0434422 mm
diameter yg dipakai = 500 mm
7 V cek = 1.27388535 m/s
=
8 Headloss =
mayor losses =
C = 130
Hf = 0.011455172 m
Head Kecepatan (Hv) = 0.082710698 m
Minor Losses = diabaikan karena pipa tidak memilki aksesoris dan tdk b
Headloss Total = 0.094165869 m
umber : SNI 6774 2008 )
Pompa Distribusi
Debit pemompaan =
=
v asumsi =
A =
Diameter pipa distribusi =
=
diameter yg dipakai =
V cek =
Head Loss pompa ( for 1 pump)
head statis =
Panjang pipa suction (L) =
Panjang pipa discharge (L) =
=
Mayor losses
Hf Suction =
=
Hf Discharge =
=
Hf mayor losses =
=
Minor Losses
Head velocity =
0.4 Hfm belokan (4 buah) =
0.3 Hfm valve (1 buah) =
0.95 Hfm basket strainer =
Hf minor losses =
Hf total =
1000 L/s
1 m/s
4
250 L/s
0.25 m/s
30 menit
1800 detik
5m
2: 1
100%
4.167%
536.625 m/jam
0.1490625 m/s 149.0625 L/s
2 m/s
0.07453125 m
0.3081302769 m
308.1302768569 mm
400 mm
1.2 m/s
5.3 m
7.3 m
2000 m
0.0323997 m
8.88 m
8.909 m
0.072 m
0.115 m
0.022 m
0.068 m
0.208 m
14.489 m
Jam % Pengaliran % Konsumsi Selisih Kumulatif Selisih
00.00-01.00 4.17 0.5 3.67 3.67
01.00-02.00 4.17 0.5 3.67 7.34
02.00-03.00 4.17 0.5 3.67 11.01
03.00-04.00 4.17 0.5 3.67 14.68
04.00-05.00 4.17 5 -0.83 13.85
05.00-06.00 4.17 6 -1.83 12.02
06.00-07.00 4.17 8 -3.83 8.19
07.00-08.00 4.17 8 -3.83 4.36
08.00-09.00 4.17 6 -1.83 2.53
09.00-10.00 4.17 6 -1.83 0.7
10.00-11.00 4.17 5 -0.83 -0.13
11.00-12.00 4.17 5 -0.83 -0.96
12.00-13.00 4.17 5 -0.83 -1.79
13.00-14.00 4.17 5 -0.83 -2.62
14.00-15.00 4.17 6 -1.83 -4.45
15.00-16.00 4.17 8 -3.83 -8.28
16.00-17.00 4.17 8 -3.83 -12.11
17.00-18.00 4.17 6 -1.83 -13.94
18.00-19.00 4.17 4 0.17 -13.77
19.00-20.00 4.17 2 2.17 -11.6
20.00-21.00 4.17 2 2.17 -9.43
21.00-22.00 4.17 2 2.17 -7.26
22.00-23.00 4.17 0.5 3.67 -3.59
23.00-24.00 4.17 0.5 3.67 0.08
Jumlah 100 100 0
Kumulatif % Pengaliran Total
4.17 7.84
8.34 15.68
12.51 23.52
16.68 31.36
20.85 34.7
25.02 37.04
29.19 37.38
33.36 37.72
37.53 40.06
41.7 42.4
45.87 45.74
50.04 49.08
54.21 52.42
58.38 55.76
62.55 58.1
66.72 58.44
70.89 58.78
75.06 61.12
79.23 65.46
83.4 71.8
87.57 78.14
91.74 84.48
95.91 92.32
100.08 100.16
Intake 1.000
EMA awal = 100.000
Head pompa = 24.352
EMA akhir = 124.352
Prasedimentasi 4.000
EMA awal = 124.317
Hf saluran pembawa inlet = 0.019
Hf saluran pembagi inlet = 0.067
Hf pintu air = 0.002
Hf saluran pengumpul outlet = 0.037
Hf saluran outlet = 0.005
Hf perforated baffle = 0.000000
EMA BP I = 124.189
Koagulasi
EMA awal = 124.189
Hf saluran inlet = 0.029
Hf saluran outlet = 0.029
EMA akhir = 124.132
Flokulasi
EMA awal = 124.132
Hf Komp I = 0.185
Hf Komp II = 0.0141
Hf Komp III = 0.0021
Hf saluran inlet = 0.078
Hf saluran outlet = 0.019
EMA akhir = 123.834
Sedimentasi
EMA awal = 123.834
Hf perforated baffle = 0.000002
Hf saluran inlet = 0.019
Hf saluran pengumpul outlet = 0.067
Hf saluran outlet = 0.013
EMA akhir = 123.736
Filtrasi
EMA awal = 123.736
Hf gutter = 0.032
h muka air diatas gutter = 1.5993
h gutter dari muka air = 2.069
h muka air diatas media = 0.350
h total media = 1.400
Hf saluran inlet = 0.053
Hf saluran pembagi = 0.005
Hf saluran outlet = 0.053
Hf pintu air = 0.053
EMA akhir = 118.121
unit
m 102
m 2.000
m
m
m
m
m
unit
m 102
m -22.317 naik ke permukaan tanah
m
m
m
m
m
m
m 102
m -22.189 naik ke permukaan tanah
m
m
m 102
m -22.132 naik ke permukaan tanah
m
m
m
m
m
m 102
m -21.834 naik ke permukaan tanah
m
m
m
m
m 102
m -21.736 naik ke permukaan tanah
m
m
m
m
m
m
m
m
m 102
-16.121 di bawah tanah
Sumur pengumpul dibawah perm tanah
Bak Sumur Pengumpul
Volume pekerjaan 68.6
panjang + tebal beton 4.1
lebar + tebal beton 4.1
kedalaman + fb + tebal beton 4.0
Volume beton 22.9
Volume penggalian tanah bangunan 91.5
Volume penggalian tanah antara 43.0665009978
134.6
BP I diatas perm tanah
Bak BP I
Volume pekerjaan 664.5
panjang + tebal beton 19.2
lebar + tebal beton 9.7
kedalaman + fb + tebal beton 3.6
Volume beton 141.2
Volume penggalian tanah bangunan 163.8
perforated baffle
Volume beton 122.7
panjang + tebal beton 9.7
lebar + tebal beton 3.6
kedalaman + fb + tebal beton 3.6
Zona Lumpur
Volume pekerjaan 144.9
panjang permukaan 9.5
lebar + tebal beton 9.7
kedalaman + fb + tebal beton 1.6
Volume beton 54.2
m 5.57 m
m 9.8868329805 m
m 0.8026103358 m
m 0.70 m
m
m 5.14 m
m 2.15 m
m 1.65 m
m 1.45 m
m
Koagulasi
No.
Bak Koagulasi
1
2
3
Bak Pelarut Koagulan
1
2
3
4
5
Saluran inlet
1
2
3
Saluran outlet
1
2
2.471 m
m 7.5 m Flokulasi
m 1.7 m No.
m 1.7 m Bak Flokulator
m 2.75 m 1
m 2
m Kompartemen
1
m 8.63 m 2
m 5.65 m 3
m 1.0526103358 m Saluran inlet
m 1.45 m 1
m 2
3
m 8.63 m Saluran outlet
m 5.65 m 1
m 1.0526103358 m 2
m 1.45 m
m
Sedimentasi
No.
Sedimentasi
1
2
2.372 m Zona Lumpur
1
m 310.1 m 2
m 13.8 m 3
m 7.4 m 4
m 3.05 m Perforated Baffle
m 1
m Plate Settler
1
m saluran inlet
buah 1
m 2
m 3
m saluran pengumpul outlet
1
m 2
buah saluran outlet
m 1
m 2
m
m Filter
buah No.
m Bak Filter
m 1
m 2
3
m 7.43 m 4
m 5.65 m Media Filter
m 1.0526103358 m 1
m 1.25 m 2
m 3
Saluran Penampung Backwash
m 2.02 m 1
m 1.2273502692 m 2
m 1.2273502692 m saluran inlet
m 1.34 m 1
m 2
saluran pembagi
2.183 m 1
2
m 3965.9 m saluran outlet
m 61.8 m 1
m 21.0 m 2
m 3.05 m
m
m
Desinfeksi
m 570.8 m No.
m 20.8 m Unit Desinfeksi
m 20.8 m 1
m 1.31 m 2
m 3
m
m
m Reservoar
m No.
Unit Reservoir
m 1
buah 2
m 3
m 4
m 5
6
m 8.59 m
m 3.65 m
m 1.5628709292 m
m 1.51 m
m Rekapitulasi Biaya
No
m 42.71 m 1
m 21.0368830379 m 2
m 1.4164307515 m 4
m 1.43 m 5
m 6
7
m 5.38 m 8
m 2.65 m 9
m 1.4164307515 m Total Harga
m 1.43 m
m
2.074 m
m 151.6 m
m 9.7 m
m 5.2 m
m 3.05 m
m
m 142.7 m
m 9.5 m
m 5.0 m
m 3.05 m
m
m 1.7 m
m 1.2 m
m 1.2 m
m 1.25 m
m
m 10.4 m
m 2.7 m
m 1.5 m
m 2.50 m
m
m 1.7 m
m 1.2 m
m 1.2 m
m 1.25 m
m
-3.5973 m
m 14404.6 m
m 72.2 m
m 36.3 m
m 5.50 m
m
m
m
m 449.4 m
Sumur Pengumpul dan pompa
Uraian Volume/panjang Jumlah unit Total
Intake
Pipa Galvanis diameter 600 mm 4 2 8
Socket 1 4 4
Gate Valve 1 2 2
Screen
Kisi diameter 15 mm 5 1 5
Volume Beton 22.9 1 22.9
Volume Galian 134.6 1 134.6
Rumah Pompa
Pompa Centrifugal 1 2 2
gate valve 1 2 2
check valve 1 2 2
elbow 90 4 2 8
Total
Prasedimentasi 1
Uraian Volume/panjang Jumlah Total
Prasedimentasi
Volume Beton 141.2 4 564.6
Volume Galian 163.8 4 655.3
Zona Lumpur
Volume Beton 54.2 4 216.9
Pipa lumpur 500 mm 10.0 4 40.0
Pompa penguras lumpur 1.0 4 4.0
Aksesoris pipa 1.0 4 4.0
Perforated Baffle
Volume Beton 122.71 4 490.8
pipa pembawa intake
Pipa Galvanis diameter 600 mm 2.00 2 4.0
saluran pembawa inlet
Volume Galian 0.60 2 1.2
Volume Beton 1.79 2 3.6
saluran pembagi inlet
Volume Galian 0.00 4 0.0
Volume Beton 0.57 4 2.3
saluran pengumpul outlet
Volume Galian 0.77 4 3.1
Volume Beton 4.80 4 19.2
saluran outlet
Volume Galian 2.08 4 8.3
Volume Beton 3.07 4 12.3
Total
Koagulasi
Uraian Volume/panjang Jumlah Total
Bak Koagulasi
Volume Beton 4.0 4 15.9
Volume Urugan 0.3 4 1.4
Paddle 4 blades 1.0 2 2.0
Bak Pelarut Koagulan
Volume Beton 7.8 4 31.2
Volume Galian 0.0 4 0.0
motor pencampur tawas 1.0 4 4.0
pipa pembubuh diameter 18 mm 5.0 4 20.0
pipa penyalur air diameter 18 mm 10.0 4 40.0
Saluran inlet
Volume Beton 5.37 4 21.5
Volume Galian 3.26 4 13.0
Pintu Air 1.00 4 4.0
Saluran outlet
Volume Beton 5.37 4 21.5
Volume Galian 3.26 4 13.0
Total
Flokulasi
Uraian Volume/panjang Jumlah Total
Bak Flokulator
Volume Beton 72.0 4 288.1
Volume Urugan -16.6 4 -66.5
Kompartemen
Volume Beton Komp I 1099.8 4 4399.2
Volume Beton Komp II 597.1 4 2388.3
Volume Beton Komp III 376.1 4 1504.5
Saluran inlet
Volume Beton 4.86 4 19.5
Volume Galian 2.57 4 10.3
Pintu Air 1.00 4 4.0
Saluran outlet
Volume Beton 1.44 4 5.8
Volume Galian 0.57 4 2.3
Total
Sedimentasi
Uraian Volume Jumlah Total
Sedimentasi
Volume Beton 734.2 4 2937.0
Volume Urugan 465.7 4 1863.0
Zona Lumpur
Volume Beton 223.8 4 895.4
Pipa lumpur 800 mm 6.0 4 24.0
Pompa penguras lumpur 1.0 4 4.0
Aksesoris pipa 1.0 4 4.0
Perforated Baffle
Volume Beton 134.19 4 536.8
Plate Settler
Volume beton 568775.18 4 2275100.7
saluran inlet
Volume Galian 3.80 4 15.2
Volume Beton 4.79 4 19.2
Pintu Air 1.00 4 4.0
saluran pengumpul outlet
Volume Galian 19.58 4 78.3
Volume Beton 23.13 4 92.5
saluran outlet
Volume Galian 2.13 4 8.5
Volume Beton 3.25 4 13.0
Total
Desinfeksi
Uraian Volume Jumlah Total
Unit Desinfeksi
Tabung Gas Klor 1.0 4 4.0
Pipa Injeksi 0,3 mm 1.0 4 4.0
Pressure check 1.0 4 4.0
Total
Reservoar
Uraian Volume Jumlah Total
Unit Reservoir
pipa vent 50 mm 10.0 4 40.0
gate valve pompa 1.0 4 4.0
check valve pompa 1.0 4 4.0
pompa distribusi 2.0 4 8.0
Volume Galian 23670.6 4 94682.2
Volume Beton 752.9 4 3011.6
Total
Rekapitulasi Biaya
Unit Pengolahan Harga ( Rp )
Sumur Pengumpul dan pompa 541,124,777
Prasedimentasi 1,508,803,391
Koagulasi 184,814,758
Flokulasi 2,521,146,203
Sedimentasi 667,479,831,364
Filter 987,437,197
Desinfeksi 160,000,000
Reservoir 6,510,448,744
Total Harga 679,893,606,434
Satuan Harga Satuan (Rp) Total Harga (Rp)
m 2,000,000 16,000,000
buah 350,000 1,400,000
buah 1,500,000 3,000,000
m 292,500 165,148,800
m 16,725 10,959,310
m 292,500
m 1,500,000 60,000,000
buah 275,000,000 1,100,000,000
set 3,000,000 12,000,000
m 292,500 143,568,872
m 1,500,000 6,000,000
m 16,725 20,070
m 292,500 1,049,490
m 16,725 232
m 292,500 667,713
m 16,725 51,438
m 292,500 5,611,512
m 16,725 139,027
m 292,500 3,586,928
1,508,803,391
Satuan Harga Satuan (Rp) Total Harga (Rp)
m 292,500 4,646,363
m 31,950 44,075
buah 15,000,000 30,000,000
m 292,500 9,117,956
m 16,725
buah 15,000,000 60,000,000
buah 1,500,000 30,000,000
buah 800,000 32,000,000
m 292,500 6,285,131
m 16,725 218,052
buah 1,500,000 6,000,000
m 292,500 6,285,131
m 16,725 218,052
184,814,758
m 292,500 84,265,831
m 31,950 (2,126,157)
m 292,500 1,286,776,244
m 292,500 698,569,621
m 292,500 440,071,285
m 292,500 5,691,357
m 16,725 171,910
buah 1,500,000 6,000,000
m 292,500 1,687,707
m 16,725 38,406
2,521,146,203
m 292,500 859,070,371
m 31,950 59,521,659
m 292,500 261,900,182
m 800,000 19,200,000
buah 150,000,000 600,000,000
set 3,000,000 12,000,000
m 292,500 157,003,858
m 292,500 665,466,964,236
m 16,725 254,464
m 292,500 5,604,039
buah 1,500,000 6,000,000
m 16,725 1,309,574
m 292,500 27,063,084
m 16,725 142,780
m 292,500 3,797,116
667,479,831,364
m 292,500 161,902,991
m 31,950 50,115,772
m 500,000 22,400,000
m 800,000 72,800,000
m 100,000 61,512,500
m 350,000 150,705,625
m 400,000 73,815,000
m 16,725 26,234,312
m 292,500 125,432,921
m 16,725 162,141
m 292,500 4,054,008
m 1,500,000 140,000,000
buah 1,500,000 77,350,000
m 16,725 162,141
m 1,500,000 20,789,786
987,437,197
m 800,000 32,000,000
buah 1,500,000 6,000,000
buah 2,000,000 8,000,000
buah 500,000,000 4,000,000,000
m 16,725 1,583,560,030
m 292,500 880,888,713
6,510,448,744